Group Selection Page
HELP
DOC
Controls Group
Data Analysis Group
ITDM
WP76
DET
Vacuum
XRO
EEE
WP78
WP74
FXE
SCS
SPB
MID
HED
SQS
SXP
Sample Environment
Photon Commissioning Team
Operation
PSPO
XO
TS
|
Technical integration and coordination
SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
|
|
Message ID: 125
Entry time: 28 May 2020, 13:58
|
Author: |
Frederik Wolff-Fabris |
Location: |
General |
Severity: |
Information |
Subject: |
Notes XO Integration Meeting 27.05.2020 |
|
|
General Announcement:
- It seems EuXFEL was not affected due to the power glitch at the Desy site last Tuesday (no device was found in off state or damaged).
- TS informed no indications of power failure at EuXFEL. Groups are encouraged to inform XO if they find components that have been affected.
CTRL:
- CTRL has deployed a new cross-hair in images for all instruments; XPD is fully using it. This cross-hair will be also used in the Doocs panels
allowing BKR to use it as tuning tool. CTRL reminds that if operator does not disable it then it ends in the DAQ.
- CTRL is in contact with instruments to arrange New Karabo2.9 installation.
DA:
- Working with contact persons for the Detector Advisor committee.
EEE:
- EEE raises a question on the Shutdown planning procedure for the task scheduling.
XO plans to use a summer shutdown process that coordinates with individual groups the tunnel scheduling.
Starting in the next few days XO will contact the groups for individual scheduling.
Tunnel activities will be initially scheduled and try to schedule without resources conflicts.
- EEE plans planned to make a SA3 loop update tomorrow.
- A MPS board in SA2 is not properly working and has to be replaced. Contact with DESY was done
and this shall not affect operation or risk triggering the emergency power off.
- Today the remaining cable work at FXE will be concluded.
VAC:
- Not present due to tunnel activities.
XPD:
- There was an incomplete update of SA1 Vacuum loop. EEE informs there are issues with some gauges and by tomorrow EEE
must have it fixed and will conclude the final update.
- Yesterday re-cabling SA3 (SS3 brunch) was done; exit slits are being reconnected. The main Karabo shows the two exit slits not connected.
For the IMG it is needed support from CTRL and XO.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- Installing the cooling in XTD9 (M3) during next days and then VAC will take over by next week.
- Actions in XTD6 are needed in order to receive beam for possible operation during June 6th-7th (for the self-seeding activities). XRO will send a summary to XO.
LAS:
- SA1 laser is back: SPB and FXE shall measure energy to confirm all is fine. It is still unclear the cause of water leak in the SA1 laser last week.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- Nothing to add.
HED:
- Nothing to report.
SCS:
- Not present.
SQS:
- Everything is going as planned.
- Regarding the active fiber laser, SQS is waiting for the company reply. |