Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 169     Entry time: 14 Oct 2020, 09:22
Author: Andreas Galler 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 14.10.2020 

General Announcement:

  • .

CTRL:

  • problems in SA3
    • VAC loop unstable, devices cannot be brought into a stable state --> what used to be a restart every  two weeks, cannot be recovered these days
    • issues with motors developing a short time out
      • somewhere there is a beavy load on Beckhoff loops
      • TM comments: at times the movements happen very late after issuing the command
    • influxDB sees high load
      • any modification of or running a new macro?
      • Please let CTRL know
    • the issue started with VAC --> devugging shoud start there

DA:

  • extrafoam OCD call

EEE:

  • working together with CTRL on SA3 issue
  • OCD call from SCS but call was not correctly frowarded

VAC:

  • not present

XPD:

  • no issues

DET:

  • OCD call from SCS --> was fixed

ITDM:

  • nothing to report

XRO:

  • nothing to report

LAS:

  • no issues

UNSYS: 

  • nthing to report

SPB/SFX:

  • all fine

FXE:

  • people on shift could not initiate a hutch search
  • GABS access right missing (Gebietsabsuche)
    • introduced without informing FXE

MID:

  • waiting for invitation AGIPD trainID solution

HED:

  • JUNGFRAU issue presists
  • HexaPOD is working again
    • work around

SCS:

  •  

SQS:

  • DAQ issue
    • no data was recorded without
  • vac is an issue but not endangering
  • motor issue is vital to the instrument

ELOG V3.1.4-7c3fd00