Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther, Page 24 of 29  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry   Notes XO Integration meeting 27.04.2020, posted by Frederik Wolff-Fabris on 28 Apr 2020, 16:19 
General Announcement:
- The CTRL group has received 3 Control Network tasks that can be carried out this week;
- Requests from the groups to Tunnel activities from May 4th are being treated and an answer will come in the next couple of days. 
Entry   Notes XO Integration Meeting 24.04.2020, posted by Frederik Wolff-Fabris on 24 Apr 2020, 13:48 
Relaxation control network: 
- CTRL and XO remind the groups to submit the planned activities on e.g. scenes, projects, until Fridays. 
- For next week case: please limit any hardware change. Reason is the current limitation on the physical presence of staff. 
Entry   Notes XO Integration Meeting 22.04.2020, posted by Frederik Wolff-Fabris on 23 Apr 2020, 10:04 
General Announcement:
- An e-mail was sent yesterday about the relaxation of restrictions on the control network.
- From now on, the XO integration meeting series will happen on Monday and Wednesday at 09:30 and Friday at 11:30.
Entry   Notes Dispatch Meeting 20.04.2020, posted by Frederik Wolff-Fabris on 20 Apr 2020, 10:59 
General:
- Desy informed a power glitch occurred on Thursday 16th at 04:55AM. TS has not seen any traces of it in the EuXFEL internal GLT.
- From next week the Dispatch meeting will start at 09:30AM.
Entry   Technical Integration Meeting 15.04.2020, posted by Andreas Galler on 15 Apr 2020, 09:03 


CTRL:


notificagion service device going to be tested this week

ITDM: SMS part is operational but needs to be implemented




EEE:
Entry   Technical Integration Meeting 08.04.2020, posted by Andreas Galler on 08 Apr 2020, 08:45 


CTRL:


no bigger issues
announcement: inital simulation environment ready which can simulate BECKHOFF devices

shall
Entry   notes Dipatch Meeting April 6th, 2020, posted by Frederik Wolff-Fabris on 06 Apr 2020, 09:50 
CTRL:
- It was remotely observed that some cameras were consuming too much memory. By remotely re-starting these devices the issue was solved.  
- No calls to the OCD during the weekend.
Entry   Technical Integration Meeting 01.04.2020, posted by Andreas Galler on 01 Apr 2020, 09:19 


CTRL:


productive meeting with HED

CTRL will ask the other instruments if a similar concept could be agreed upon


discussion
Entry   , posted by Andreas Galler on 30 Mar 2020, 08:57 
CTRL:


Broker Pile Up in 4 topics over the weekend

LAS affected in all topics, LA2 even twice
SPB affected once


mitigation
startegy worked


EEE:
Entry   Technical Integration Meeting 25.03.2020, posted by Andreas Galler on 25 Mar 2020, 09:32 
Currently EuXFEL enforces a hand-off policy for instrument/tunnel hardware. That includes remote control of motors, pumps,
etc.. as well as changing config files. If and when this policy is lifted will be communicated during Dispatch and Technical Integration Meetings. Please
also don't hesitate and contact XO in case of any questions.
Entry   notes Dispatch meeting Mar 23 2020, posted by Andreas Galler on 23 Mar 2020, 08:57 
Currently EuXFEL enforces a hand-off policy for instrument/tunnel hardware. That includes remote control of motors, pumps,
etc.. as well as changing config Files. If and when this policy is lifted will be communicated during Dispatch and Technical Integration Meetings. Please
also don't hesitate and contact XO in case of any questions.
Entry   Technical Integration Meeting 18.03.2020, posted by Andreas Galler on 18 Mar 2020, 09:26 


SPB:


interument parked
power cut --> someon needs to come in
NJ: what'S that status of the VAC
KC
Entry   Notes Dipatch Meeting March 16th, 2020 , posted by Frederik Wolff-Fabris on 16 Mar 2020, 09:36 
FXE:
- Beamline is in safe state;
- Minor Jungfrau calibration issues over last week. In touch with DET and EEE;
Entry   notes Dipatch Meeting March 9th, 2020, posted by Frederik Wolff-Fabris on 10 Mar 2020, 12:44 
* Users are scheduled to be here this week (4 beamlines in user runs). SPB, HED, MID report several users have cancelled the travel. Beamlines are making
mitigation plans 
to run experiments.
Entry   notes Dispatch meeting Mar 2 2020, posted by Andreas Galler on 04 Mar 2020, 08:49 
SPB:


AGIPD improvement campaign great success
EEE --> 2nd C&C worked just fine


FXE:


BTM tests successful
Johann MDL motors should be in closed loop
JF CTRL device crashed


MID:
Entry   notes Dispatch meeting Feb 24 2020, posted by Andreas Galler on 26 Feb 2020, 09:06 
SPB:


nothing to report


FXE:


not present due to group retreat


MID:
Entry   notes Dipatch Meeting Feb. 17th, 2020, posted by Frederik Wolff-Fabris on 17 Feb 2020, 12:02 
FXE:
Nothing to report: no issues;
Entry   Notes Dispatch meeting Feb 10th, 2020, posted by Frederik Wolff-Fabris on 10 Feb 2020, 10:12 
SPB: Nothing to report;

FXE:  Everything ongoing; nothing special to be reported;
Entry   notes Dispatch meeting Jan 20 2020, posted by Andreas Galler on 22 Jan 2020, 09:16 


SPB:


nothing to report


FXE:
Entry   notes Dispatch meeting Jan 13 2020, posted by Andreas Galler on 15 Jan 2020, 09:09 


SPB:


Testing coordinated movement of Mirror motors with the MC2 lib on lemo drives
optics hutch vented accidentally vented but
ELOG V3.1.4-7c3fd00