SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
 |
|
Message ID: 626
Entry time: 07 Jul 2025, 09:44
|
Author: |
Frederik Wolff-Fabris |
Location: |
General |
Severity: |
Information |
Subject: |
Notes XO Integration Meeting 07.07.2025 |
|
|
General Announcement:
- Martin Doering announces:
1. Karabo will be stopped this week accordingly to a distributed e-mail;
2. HXS hutch craning will take place today;
3. Photon tunnels starts by opening rack doors in preparation for cooling water activities - they must stay open;
4. Companies working at XHEXP1 starts this week;
5. Toilettes and kitchen are closed in the XHEXP1 for this week (no waste water to be produced);
6. Elevator maintenance takes place on the 10.07 affecting XHEXP1.
- A. Galler reminds that info distributed at this meeting is disseminated by the present people to colleagues inside their respective groups.
CTRL:
- Plan of Karabo shutdown was sent to xo-info mailing address; topics will be brought up again starting from July 22nd.
DA:
- Nothing to report.
EEE:
- Remind the ramping down was done and will be ramped up after Karabo is back.
VAC:
- Nothing to report.
XPD:
- Regular maintenance ongoing as planned.
DET:
- No news from DET.
ITDM:
- Supporting opening racks in tunnels.
- Migration of data/proposals: please move them this week as they will be discarded from next week.
XRO:
- Everything fine and progressing with M1 at XTD2 and with the optical delay line.
LAS:
- All are going accordingly to the plan.
UNSYS:
- Everything going well: SA1 undulator cell#17 moved to cell#1; relocation of SA2 cabinets ongoing; area of SCU is free.
SPB:
- Nothing to report.
FXE:
- Not present.
MID:
- All fine.
HED:
- Nothing to report; switching OFF last devices today and tomorrow.
SCS:
- Nothing to report.
SQS:
- Starting to rip-out cables; all fine.
SXP:
- Not present. |