Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 626     Entry time: 07 Jul 2025, 09:44
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 07.07.2025 
General Announcement:
- Martin Doering announces: 
1. Karabo will be stopped this week accordingly to a distributed e-mail; 
2. HXS hutch craning will take place today; 
3. Photon tunnels starts by opening rack doors in preparation for cooling water activities - they must stay open; 
4. Companies working at XHEXP1 starts this week; 
5. Toilettes and kitchen are closed in the XHEXP1 for this week (no waste water to be produced); 
6. Elevator maintenance takes place on the 10.07 affecting XHEXP1.
- A. Galler reminds that info distributed at this meeting is disseminated by the present people to colleagues inside their respective groups.

CTRL:
- Plan of Karabo shutdown was sent to xo-info mailing address; topics will be brought up again starting from July 22nd.

DA:
- Nothing to report.

EEE:
- Remind the ramping down was done and will be ramped up after Karabo is back.

VAC:
- Nothing to report.

XPD:
- Regular maintenance ongoing as planned.

DET:
- No news from DET.

ITDM: 
- Supporting opening racks in tunnels.
- Migration of data/proposals: please move them this week as they will be discarded from next week.

XRO:
- Everything fine and progressing with M1 at XTD2 and with the optical delay line.

LAS:
- All are going accordingly to the plan.

UNSYS:
- Everything going well: SA1 undulator cell#17 moved to cell#1; relocation of SA2 cabinets ongoing; area of SCU is free.

SPB:
- Nothing to report.

FXE:
- Not present.

MID:
- All fine.

HED:
- Nothing to report; switching OFF last devices today and tomorrow.

SCS:
- Nothing to report.

SQS:
- Starting to rip-out cables; all fine.

SXP:
- Not present.