Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
 |
|
Message ID: 634
Entry time: 04 Aug 2025, 09:43
|
Author: |
Frederik Wolff-Fabris |
Location: |
General |
Severity: |
Information |
Subject: |
Notes XO Integration Meeting 04.08.2025 |
|
|
General Announcement:
- A. Galler informs on the LIMP-25: 1. TS task #7 takes place this week with firm upgrade of the building management system will affect infrastructure system for about a minute or so.
- Kristina Lorenzen reminds that
1. External companies shall not use visitor cards;
2. Please let room managers know if external companies are accessing or working these rooms;
3. Please keep paths and storage places free.
- Patrick Gessler amends that external companies were letting doors open which should remain closed.
A. Galler says it is a responsibility of the inviting person to let room managers and other affected groups to know an external company is having work here.
CTRL:
- Fast ADC issue was fixed at all places.
DA:
- Everything quiet.
EEE:
- Work in SPB AGIPD 4M ongoing from today;
- Also work at SCS parts to be done this week.
VAC:
- Everything fine.
XPD:
- Everything fine.
DET:
- Everything fine apart of the affected detector and X-ray power due to the power cut on 25.07.
ITDM:
- Issues at IT with Desy was fixed on Friday (cooling pipe leaked affecting building). The affected computer center is primarily not used by XFEL.
XRO:
- Nothing to report.
LAS:
- Nothing to report.
UNSYS:
- Nothing to be reported.
- No news on MEA2 availability; A. Galler says the MEA2 was busy at Flash and could not start work at XFEL. To be enquired at RC meeting today.
SPB:
- Nothing apart of the cabling for AGIPD 4M.
FXE:
- Nothing to report.
MID:
- All PLCs are running.
HED:
- All PLCs are running.
SCS:
- DPVA3 tests ongoing.
- PLC loop 1 crashed by was fixed by Nerea J. / EEE. It runs normally over the weekend.
SQS:
- Nothing to report.
SXP:
- Not present. |