Group Selection Page
HELP
Controls Group
Data Analysis Group
ITDM
WP76
DET
Vacuum
EEE
WP78
FXE
SPB
HED
SQS
SXP
Sample Environment
Operation
PSPO
XO
TS
Migrated2Zulip
|
Technical integration and coordination
SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
 |
|
Message ID: 628
Entry time: 14 Jul 2025, 09:59
|
Author: |
Frederik Wolff-Fabris |
Location: |
General |
Severity: |
Information |
Subject: |
Notes XO Integration Meeting 14.07.2025 |
|
|
General Announcement:
- On Crane activities:
1. Next craning activity from truck bay to HXS area will take place on Wednesday 16.07 from early morning. During the time helmets will be provided in case you need to cross the area to access XTD6 or
XTD7 or work around this area;
2. Craning for FXE hutch construction will also take place and please watch out if crane activities take place around e.g. XTD8 entrance.
- Martin Doering informs on the LIMP-25:
1. Air conditioning this week is switched OFF at XHEXP1 but as temperatures outside are expected to be mild during the week we thus expect working conditions to be good at the Hall;
2. Cooling water activities start tomorrow from 7AM but will be already switched OFF today;
3. Elevator maintenance takes place at XHEXP1 on 17.07;
4. AV power will be switched to a different transformer on Friday 18.07 (potential risk of glitch).
- Torsten Schoen says work at lab floor E0 is done (electricity); connection to orange outlets shall be moved to white ones already by Tuesday afternoon. One can use the orange sockets again by the end of
this week.
- Alessandro Silenzi says DOC phone (98089) is still available and coverage will be provided.
CTRL:
- Nothing special to report and tasks going accordingly to the plan (stopping Karabo).
DA:
- Nothing to report; all calm at DA.
EEE:
- Switched off everything apart of tunnels.
- After discussing with instruments: OCD PLC will be discontinued and returned in November.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM:
- Remind couple of proposals to be closed: reminder to be sent by e-mail.
XRO:
- Nothing to report.
LAS:
- Nothing to report.
UNSYS:
- Nothing to report. All fine.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- Nothing to report.
HED:
- Nothing to report.
SCS:
- Nothing to report.
SQS:
- Nothing to report.
SXP:
- Not present. |