Subject: Notes XO Integration Meeting 13.08.2025 
General Announcement:
- A. Galler informs on the LIMP-25 plans for next week: 
1. TS tasks: last week with water, dehumidification activities; 
2. Karabo PLC updates in tunnels ending next week; 
3. Ramp up activities apart of FXE will be ending.
- Issue with SA1 PP-laser air conditioning on Tuesday 12.08: T. Clever says an incident in preparation works at D.14 SPB hutch result in valves not been properly closing so that water leaked. 
Emergency solution was to shut down the 8C cooling water. Increased temperature in hutches of about 1-2C was measure. After fixing the system the temperatures were back to normal operation.
- A. Galler reminds that this XO integration meeting is the main platform to exchange and receive information between groups. 
Please use this platform to share and have discussions between support groups and scientific instruments.
- M. Prollius says a team from NDR may visit tunnels next week for footage. A timetable will be communicated in coming days (likely on Wednesday afternoon). XO will discuss with Communications group.

CTRL:
- Nothing major to report.

DA:
- Nothing to report.

EEE:
- Working with VAC in tunnel deployments.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Not present.

XRO:
- Not present.

LAS:
- Not present.

UNSYS:
- Nothing to report; no news on the work of Desy alignment group - seems that today they may start working in SASE1 with drilling activities.

SPB:
- Nothing to report.

FXE:
- Not present.

MID:
- Not present.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Nothing to report.