Subject: Notes XO Integration Meeting 23.07.2025 
General Announcement:
- Martin Doering informs on the LIMP-25: 
1. Today it happen crane activities in the XHEXP1 and please take the appropriated safety measurements when craning takes place. 
Also the elevator close to the main entrance is being maintained today so please use alternative ways to get into the XHEXP1; 
2. For next week: Karabo and PLCs will be ramped up; 
3. Activities taking place at some instruments like MID, SCS and SPB starting next week; 
4. Electricity interruption at XHQ level 2 taking place next week, as communicated in e-mail; 
5. IT rooms in XHQ level 1, reception and E1.173 meeting room are affected on July 28th due to electrical works; 
6. On Friday 01.Aug the XTD6 access at XHEXP1 will be interrupted for 2-6hs due to the relocation of the dosimetry cabinet for HXS project (exiting from XTD6 is still possible).
- Air conditioning at XHPEXP1: conditions seems to work well even with limited hardware controlling temperature and humidity.
- Temperature and humidity in tunnels are being monitored and look stable. In XTD9 temperature is 3 C lower than other tunnels. It is not critical for components as of today. Normal operation will resume 
by August 22nd.
- Pouhneh S. says the main work in laser interlock at SA3 is finished and it can be operated again. 

CTRL:
- To ramp up Karabo: they shall be back by the 25.07.

DA:
- Nothing to report.

EEE:
- PLC systems will be bring back starting today.
- uTCA: started yesterday to bring back lab crates. Communication issues with digitizer was encountered. In contact with company to find solution. 
If digitizer are needed in coming days, please get in touch with Bruno Fernandes.

VAC:
- Everything fine.

XPD:
- All fine.

DET:
- Question on cooling water supply for lab areas: systems that are fed by XHPSC has currently no redundancy and in case of failure it could warm for few minutes. 
In general, the cooling water systems is running again. 

ITDM: 
- Starting up racks in tunnels and balcony rooms; DAQ servers to be restarted today.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Not present.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Nothing to update.

SQS:
- Not present.

SXP:
- Not present.