Status report after dispatch meeting 09.30, posted by Adriano Violante on 10 Sep 2018, 10:33
|
SPB
DAQ was updated and no big issues were found.
Some issues are being discussed with CAS and ITDM. Among them also the request
to add more channels to the DAQ.
Interlock definitions are being updated. Discussions with AE ongoing.
FXE |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 12 Sep 2018, 14:52
|
SPB
Testing of the 4 images preview mode for AGIPD will be done today.
Interlock definitions are being updated. Loop update
will be done after the users experiments.
FXE |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 17 Sep 2018, 10:19
|
SPB
Bug in the AGIPD cooling macro (setpoint resets itself to -59 C) - Jola knows about the problem. AS: Macro will be
fixed. |
Re: Status report after dispatch meeting 09.30, posted by Dennis Goeries on 17 Sep 2018, 14:30
|
The GUI crashes reported by FXE will be fixed with the hotfix release coming ~tomorrow.
It is related to very high or low values in plotting widgets scratching the maximum floating point number (1e308 ~ infinity).
-- Wajid & Dennis |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 19 Sep 2018, 09:58
|
SPB
Last monday shift was cancelled since there were prooblems with the cooling of the AGIPD. Not possible to reliably cool it
down. Maintenance of the cooling units plus investigation of the controllers ongoing. |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 26 Sep 2018, 10:42
|
SPB
Maintenance of the AGIPD ongoing.
FXE |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 01 Oct 2018, 10:49
|
SPB
Maintenance of the AGIPD ongoing.
FXE |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 08 Oct 2018, 10:37
|
SPB
Ready for users.
DAQ tests to be done on the SPB side. |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 10 Oct 2018, 10:40
|
SPB
Problems with the GUI not being accessible after update solved with the CAS OCDs
Loop 5 and Master loop will be updated today. New MPS conditions included. |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 15 Oct 2018, 13:39
|
SPB
Issue with the detector cooling pipes during the week end required intervention. Now fixed.
Commissioning ongoing. |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 17 Oct 2018, 10:10
|
SPB
KB motors issue: the motors do not go to the proper position. This has been communicated to AE. Analysis of the problem and fixing
ongoing. |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 22 Oct 2018, 13:46
|
SPB
Issues with the detectors pipeline occured (also for FXE). In the future a test button to check the status of the pipeline wil
be implemented. |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 24 Oct 2018, 11:25
|
SPB
FXE
During the last users run there was a loss of optical laser. This was due to a mistake in CAS. Has been clarified already. It is pointed |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 29 Oct 2018, 13:25
|
SPB
A smaract stage sensor had issues. The behavior changes whether the chamber is pumped down or not. The Issue is being addressed by AE.
FXE
Users are acquiring data with the Jungfrau detector. It is a success so far.
Successful users shifts.
SQS |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 05 Nov 2018, 12:25
|
SPB
FXE
SQS |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 07 Nov 2018, 10:44
|
SPB
Karabo was updated yesterday. Test is ongoing. So far no issues.
The macros for cooling down and warming up the detector do
not work properly. If the button is pushed twice the setpoint changes continuing e.g. cooling down too much. Marcin will bring the issue up with CAS (HS).
|
Status report after dispatch meeting 09.30, posted by Adriano Violante on 12 Nov 2018, 09:55
|
SPB
More interlock updated will take place this morning.
FXE
Supporting the diagnostic and optics group for the testing of the beam feedback mechanism.
A.Galler was informed by |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 14 Nov 2018, 10:23
|
SPB
Lopp 5 update - will be agreed between SPB and AE
Smaract limit switches issues - AE will have a look. In the meanwhile also
the company of the controlles has been asked by SPB
KB motor steps have different size with respect to encoders. This issue is known and |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 19 Nov 2018, 10:39
|
SPB
Gotthard needs to be tested.
Pulse picker will be used and commissioning still has to be done.
Sample chamber encoder
drift issue. Has to be investigated further.
FXE |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 21 Nov 2018, 10:13
|
SPB
KB system and AGIPD commissioning ongoing
FXE
SQS |