Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 574     Entry time: 29 Oct 2018, 13:25
Author: Adriano Violante 
Location: General 
Severity: Information 
Subject: Status report after dispatch meeting 09.30 

SPB

  • A smaract stage sensor had issues. The behavior changes whether the chamber is pumped down or not. The Issue is being addressed by AE.

FXE

  • Users are acquiring data with the Jungfrau detector. It is a success so far.
  • Successful users shifts.

SQS

  • Configuration of some motors is incorrect. BB looking into that.
  • It is required to change the sampling rate of the digitizers. CAS is on it.
  • MPOT issue: control is lost as a power supply channel trips. CAS: a fix exists, needs to be deployed.
  • Note from NC(AE): one has to check that the parameters and information written in the CRDs are consistent with what is being used in reality. This would make the time of the OCDs more efficiently used.

SCS

  • Interlocks tripping too easily: CAS will show SCS how to change the thresholds.
  • KB coordinated motion: bug has been reproduced by cas. Fix ongoing.
  • Full control of the scroll pumps still not possible. AE is working on it.
  • Loop 13 will be fixed (miswiring problems)

MID

HED

XPD

VAC

AE

ITDM

  • Issue with the office netword socket in D.09. Fixing ongoing. In general all the operation critical devices have to go to the control network sockets to avoid such issues.
  • Request from HS to add the generic XFEL unix user to the special group of doocs to change the bunch pattern. This has to be first discussed internally to CAS. AS will come back to KW and the others involved players as soon as this has been clarified in CAS.

 

CAS

  • CAS need  a time window to deploy and test the fix for the Lima Basler cameras in XTD6. No feedback since last friday. A.Koch tries to find out a possible time window and come back to ASIlenzi.

AoB

Groups are reminded to send GW (PSPO) the activities planned for the winter shutdown.