SASE1 Status and SASE3 Readiness
|
Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther |
Not logged in |
|
|
Message ID: 580
Entry time: 21 Nov 2018, 10:13
|
Author: |
Adriano Violante |
Location: |
General |
Severity: |
Information |
Subject: |
Status report after dispatch meeting 09.30 |
|
|
SPB
- KB system and AGIPD commissioning ongoing
FXE
SQS
SCS
MID
- TueV Test ongoing.
- Mono commissioning to be done this week.
- Loop 7 is needed for the middle of next week. As of now no fw export and cables for this loop appear to be there. AE/EET will have to check whether this makes sense.
- AGIPD commissioning:
- It seems that some cables needed for the loop 11 were not connected and some other are not yet installed. ILobato and K. Sukharnikov are now dealing with the issue. This delays the foreseen plan. The mitigation strategy for the missing cables issue is to have a list with these specific cables and ask Fa. Schulz to put these hight priority. It already worked with other cables/connectors. Discussion MID/EET/AE needed.
- uTCA crate is now operational.
- It is pointed out by CAS (C.Y.) that component having priority concerning cables and loops operation are AGIPD, DES, PDS, Mirror. It has to be checked whether these are aligned with the actual priority list for loops and cables discussed with MID.
HED
XRO
- in XTD10 horizontal slits were moved to better scan the beam.
XPD
VAC
- in XTD9 the B4C aperture in front of the monochromator grating was changed to a larger one.
- in XTD10 the current amplifiers for the XGM were successfully changed.
AE
- OCD: intervention request during the WE to fix a train id issue. Should be ok now but the problem still needs to be reproduced and undertstood.
ITDM
CAS
- Release tests with ITDM ongoing.
AoB |