Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther, Page 1 of 31  Not logged in ELOG logo
Entry   Notes XO Integration Meeting 30.06.2025, posted by Frederik Wolff-Fabris on 30 Jun 2025, 09:58 
General Announcement:
- M. Doering announces one schedule change on the test of mobile electrical equipment during the LIMP-25: 
Company doing it finished Desy premises earlier and from this week they start at EuXFEL in offices and then on the labs. If you have equipment to be tested on the offices please place them in the office 
desks.

CTRL:
- On Friday an incident happened with an unexpected reboot of a Broker machine that made SA3 and SA3-LAS Karabo loops to restart.

DA:
- Not present.

EEE:
- Nothing to report.

VAC:
- Everything fine.

XPD:
- Everything going as planned.

DET:
- Busy with SPB AGIPD-1M exchange modules; it went OK and cable fixation is also done. A test of one module shows unstable connection and needs further work. 
Further tests will be done after infrastructure tasks are finished and back.

ITDM: 
- On Friday one Broker lost the power cable - reason for reboot.

XRO:
- Going as planned.

LAS:
- Everything going well so far.

UNSYS:
- Relocation of undulators and control system are ongoing; planned to be finished this week.

SPB:
- Nothing to add apart of AGIPD-1M.

FXE:
- Not present.

MID:
- Nothing to report.

HED:
- Preparing for the LIMP-25. Being powered OFF until Wednesday.

SCS:
- Starting with maintenance.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 25.06.2025, posted by Frederik Wolff-Fabris on 25 Jun 2025, 10:27 
General Announcement:
- Martin Doering informs on the LIMP-25: 
1. Friday the summer party takes place; please deliveries with big trucks shall be re-scheduled; 
2. Cooling water 8C ramp down on July 2nd for the SA2 area; 
3. New connection to 8C cooling water for XHS on July 3-4 in SA2.
- Gerd W. comments that HXS construction ramping up next days on 30th with Inospec works on Steel and crane activities; please be careful when passing nearby; FXE construction starts next 
week for the new control room.
- Inaki De Diego says the XTD6 access turnstiles are not working; shall be back working by 15:00 with the cable being reconnected again.
- M. Prollius says XTD6 area will be fenced and entrance to XTD7 will be restricted; barriers are working again to access the site.
- XO received many reports of the unannounced effects from the HXS activities on cabling cuts on 24.06. Follow-up will be done.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Remark to instruments: FXE and MID mono will be warm-up.

XPD:
- Nothing to report.

DET:
- Intervention at SPB/SFX AGIPD with two modules replaced.

ITDM: 
- Cooling problems.

XRO:
- Not problems.

LAS:
- All accordingly to plan.

UNSYS:
- Relocation of undulators are ongoing in SA1 and SA1: control cabinets disconnected.

SPB:
- Nothing to report.

FXE:
- Started dismantling control room: it is done. 
- Ramp down starting today.

MID:
- Preparing for shutdown.

HED:
- All fine at HED.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 23.06.2025, posted by Frederik Wolff-Fabris on 23 Jun 2025, 10:19 
General Announcement:
- Martin Doering informs on the LIMP-2025: 
1. Tunnels were opened from 7AM today; 
2. Smoke extraction tests have started and be aware of noise or difficulties to open.
- Klaus Loeptien informs on the two constructions sites at XHEXP1: 
1. FXE control room construction - Steel works at FXE will start on 14.07 so access to XTD8 will be different; 
2. Big works begins on 30th June with Inospec starting with steel works for HXS construction; End of this week area will be fenced and please people who does not work on the construction should avoid 
walking this area. Be aware of crane works. 
- Inaki de Diego informs the beam shutter keys of the instruments will be removed today and returned next year.

CTRL:
- Nothing to report.

DA:
- Last week of OCD ended; no OCD from today. All fine.

EEE:
- Nothing to report, from this week starts with ramp-down activites.

VAC:
- Remark: no VAC-OCD during the next half year. Please contact VAC via e-mail.
- Check access rights for tunnel access and talk with Martin Dommach for questions.

XPD:
- Tunnel works starting today.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- Not present.

SPB:
- Nothing to report.

FXE:
- Not present.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 18.06.2025, posted by Frederik Wolff-Fabris on 18 Jun 2025, 09:47 
General Announcement:
-  LIMP-25 information: Martin Doering informs: 
1. Monday 7AM the tunnels are open but smoke extraction system tests is planned from 8AM to 10AM so that tunnels will be noisy and doors difficult to open; 
2. Men's toilettes at the XHEXP1 will be closed for maintenance and the woman's will be for dual use; 
3. HXS construction activities start next week but respecting the grace period for the first two week (no infra-structure works); 
4. New screens are installed at the tunnels entrances with info of major activities taking place at each tunnels sections; 
5. Last LIMP planning meeting on Friday 20.06 with group's representatives and news will be shared during the XO Integration Meeting. 

CTRL:
- Due to issues with Broker the plan is to upgrade MID and HED topics in coming weeks. Timeline will be shared.

DA:
- All fine at DA.

EEE:
- Performing timing tests documented in XFEL e-log; XO informs the system was rolled back to the trigger with 50Hz mains yesterday by 17:00 due to tuning activities.

VAC:
- Nothing to report.

XPD:
- FD studies ongoing this week.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- A. Trapp mentions XRO completed run of temperature tests at M2 XTD10 as planned.
- No info on watchdog tests.

LAS:
- Bringing up Laser back after 50Hz tests

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- D3 tests are ongoing and seems to be well working.

MID:
- No issues to report.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- D3 tests ongoing this week.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 16.06.2025, posted by Frederik Wolff-Fabris on 16 Jun 2025, 09:41 
General Announcement:
- A. Galler says a second Cryo issue happened on Saturday but it was possible to recovered by 18:00.
- LIMP-25 is about to start in one week. In case of questions please do not hesitate in contacting Martin Doering and XO.

CTRL:
- New broker version is ready to be installed to cure issues saw in SA2 recently.

DA:
- Nothing major to report from DA.

EEE:
- Issues on Saturday morning (during beam downtime) with PLCs in SCS to be restarted, affecting local vacuum interlocks. 
- Camera issue also appeared at SCS but CTRL was working on it.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Everything is fine.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Quiet week but SA3 PP-laser had not enough triggers. Tests with EEE were done and will be discussed with Desy.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report; beam stability seems to be fine by now.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Vacuum loop problem seems to be resolved.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 11.06.2025, posted by Frederik Wolff-Fabris on 11 Jun 2025, 09:48 
General Announcement:
-	 

CTRL:
- Update concerning broker issues at MID: CTRL would like to update it with the new SPB version for tests in the coming two weeks.

DA:
- Nothing to report.

EEE:
- Nothing directly from EEE;
- P. Gessler update on the 50Hz tests on 17.06: starts at 8AM and the master timing will stop sync with 50Hz. 
This produces a short jump of trains but shall automatically return back. When switching sync back again it will also jump once more. 
Idea is to test the noise reduction from the 50Kz Mains line and test if one can run without this sync with the 50Hz in future. If things run fine during the test one would run for two days without this 
Synchronization. 
Directed affected groups are already participating in meetings.
- A. Galler informs there is no plans for FEL beam delivery or tuning/energy change possibility during the 50Hz tests on 17.06. 

VAC:
- Everything is going well.
- VAC-OCD got a call from SCS this morning for a change of GATT gas. Please let VAC group knows 1-2 weeks in advance for such changes.

XPD:
- Nothing to report.

DET:
- Incident of DSSC at SCS was investigated and communicated to related people.

ITDM: 
- Not present.

XRO:
- Not present.

LAS:
- Not present.

UNSYS:
- Nothing to be reported.

SPB:
- Nothing to report.

FXE:
- Nothing to report.
- D3 tests taking place at FXE from Tuesday late shift.

MID:
- Nothing to report;
- Started with LIMP preparations.

HED:
- Everything fine and using beam for the last IHR.

SCS:
- Last beamtime occurring this week.

SQS:
- Preparing for next week D3 tests with 100W tests (100 pulses at 10mJ)

SXP:
- Not present.
Entry   Notes XO Integration Meeting 04.06.2025, posted by Frederik Wolff-Fabris on 04 Jun 2025, 09:44 
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to be reported;
- Yesterday Patrick G. received invitation for the meeting on the 50Hz tests on 17.06 taking place at Desy. Patrick G. will forward it to xo-info.

VAC:
- Not present.

XPD:
- Nothing to report.

DET:
- Nothing to report;
- DSSC issue faced last week: problem was solved; S. Hauf said the follow up was taking place Friday afternoon together with SCS by debugging the detector.

ITDM: 
- Nothing to report.
- A. Galler saw issues while logging in Fast-X and will discuss with J. Szuba on it.

XRO:
- No issues to report.

LAS:
- Not present.
- LIMP activities: instruments that requested use of PP-laser during LIMP shall be secured. Otherwise please contact XO.

UNSYS:
- Positioning HXRSS crystal showed a lost communication in DOOCS server: solved;
- PS in SA2 cell10 was stuck yesterday and is also solved.

SPB:
- Nothing to report.

FXE:
- Not present.

MID:
- Nothing to report.

HED:
- Everything seems to be fine at HED.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 02.06.2025, posted by Frederik Wolff-Fabris on 02 Jun 2025, 09:51 
General Announcement:
- The ongoing delivery sees a HXRSS at 12GeV with 1mJ total intensity (~350uJ background). 

CTRL:
- Nothing major to report.

DA:
- Nothing to be reported.

EEE:
- Nothing to report.

VAC:
- Not present.

XPD:
- No issues to report.
- Big brother stopped SA1 because of HIREX power limit: J. Gruenert reports that all pulses of the train are now being seen by Big Brother and things worked as expected.

DET:
- Nothing major to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Ticket was discussed for SPB (timing issues): under investigation and a bug on the code has been found and is under work.

UNSYS:
- Issue with PS in cell#8 in SA1 was already fixed remotely.

SPB:
- Two issues: 1. HIREX watchdog needs a change of filter then works fine; 2. Issue with sample delivery leads that SPB will not use beam tonight (FXE can take if wanted).
- uTCA tested a monitor for received timing info together with ITDM and this test was performed parasitically at SPB.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- HXRSS performance this week is excellent.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 28.05.2025, posted by Frederik Wolff-Fabris on 28 May 2025, 09:42 
General Announcement:
-	 

CTRL:
- Investigate issue reported last Monday with MID is scheduled for next Monday.

DA:
- Not present.

EEE:
- One topic: motor in CRL in XTD2 found by FXE when doing larger steps caused issues (ZZ seems to be needed); however, with smaller steps it works fine and can be used. 
A ticket is here: https://redmine.xfel.eu/issues/221334#change-751944

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Adding data space for the last two weeks of operation: a server integration shows an issue and ITDM works on it for the next days.

XRO:
- Not present.

LAS:
- Not present.

UNSYS:
- Nothing to report.

SPB:
- This week still fine; 
- Issues for the Data measured in March with timing drifts and compensation for PP-laser did not work for three weeks. Contact with LAS to be made later today.

FXE:
- Not present.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Not present.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 26.05.2025, posted by Frederik Wolff-Fabris on 26 May 2025, 09:56 
General Announcement:
- A. Galler mentions the V0 was operated by another group after being interlock on Saturday by a vacuum issue in XTD6 while VAC-OCD was investigating the issue. 
Operation by anyone else has to be prevented in future and only VAC staff shall operate it.

CTRL:
- Issue at MID GUI server being investigated.

DA:
- Nothing major to report.

EEE:
- Nothing to report.

VAC:
- Issue with SA2 Saturday handled by VAC-OCD and PRC. 
- Several mails came from Karabo issue with vacuum pumps in SA1 - to be forwarded to CTRL and discussed.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Not present.

XRO:
- Nothing major to be reported.

LAS:
- Not present.

UNSYS:
- Nothing to report.

SPB:
- Continue with measurements; some difficulties with sample synchronization; nothing else to report.

FXE:
- Nothing to report.

MID:
- Nothing to report apart of the mentioned vacuum issue.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 21.05.2025, posted by Frederik Wolff-Fabris on 21 May 2025, 09:36 
General Announcement:
-	 

CTRL:
- Nothing major to report.

DA:
- Quiet at DA.

EEE:
- Nothing to report.

VAC:
- Not present.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Not present.

UNSYS:
- Nothing to report.

SPB:
- Problem at Laser hutch was fixed yesterday by exchanging a door magnet. 

FXE:
- Not present.

MID:
- All fine at MID.

HED:
- Everything is fine.

SCS:
- All fine at SCS.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 19.05.2025, posted by Frederik Wolff-Fabris on 19 May 2025, 09:42 
General Announcement:
- Harald Sinn inform on the first lasing for XFELO on Sunday morning shift; 100 bunches in the pulse train was giving synchrotron already on Saturday showing the cavity was aligned. 
On Sunday was difficult to find FEL intensity but successful by ~14:30 while scanning cavity. After getting the signal, it was surprisingly stable and running well. 

CTRL:
- Nothing major to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- No issues from XPD;
- Success with FD activities.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Not present.

UNSYS:
- Yesterday a ZZ was done in XTD4 to fix SASE3 cell26 Phase shifter.

SPB:
- Issue with Laser interlock in laser hutch; it will be discussed with Pouneh S. soon.

FXE:
- Not present.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- All good.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 14.05.2025, posted by Frederik Wolff-Fabris on 14 May 2025, 09:39 
General Announcement:
- As PRC, Jan Gruenert reports a problem with fire detection system in XTD4 needed the entire day yesterday to fix and by 18:00 was concluded. The North branch was 
not having beam during this time. 
SA1 started from the evening and SA3 started with beam today morning.

CTRL:
- Remind that today it's planned an intervention to upgrade the SMS service. Ongoing until about 12:00. Notifications are not being sent in this period.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Yesterday an intervention with open tunnel for the FXE mono to refill system with gas.

XPD:
- All fine with XPD.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- Nothing to report.

SPB:
- Involved on night shifts from tomorrow with PAM/BAM/LAM. 

FXE:
- Not present.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 12.05.2025, posted by Frederik Wolff-Fabris on 12 May 2025, 09:36 
General Announcement:
- Successful delivery last days with exceptional machine performance. From tomorrow we have a FD week followed by a 12GeV week.

CTRL:
- Nothing to report.

DA:
- Quiet at DA.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Wednesday CTRL helped with SPB/FXE but fixed.

UNSYS:
- Nothing to report.

SPB:
- Challenges with PP-laser not being able to use WED and THU (switch between masters FXE/SPB); also SAT alignment issues all fixed with help from OCD. LAS and SPB will further discuss.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 07.05.2025, posted by Frederik Wolff-Fabris on 07 May 2025, 09:50 
General Announcement:
-	 

CTRL:
- Yesterday update/intervention with DOOCS server was done and went fine; Systems are up and running.

DA:
- Nothing major for DA.

EEE:
- Nothing to report.

VAC:
- Everything fine.

XPD:
- 3 ZZs done yesterday: camera alignment in SA1; scroll pump belonging to PES XTD2 fixed; and XTD6 shimadzu camera intervention fine;

DET:
- Nothing to report.

ITDM: 
- Not present.

XRO:
- Attenuator fixed in SA1. All fine.

LAS:
- Not present,

UNSYS:
- Everything is fine with Undulators.
- Suren K. reports and entry at TTFinfo for missing communication between undulators and XGM. Seems to be DOOCS related issue. Theo M. will be contacted by A. Koch.

SPB:
- Nothing to report.

FXE:
- Not present.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Not to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 05.05.2025, posted by Frederik Wolff-Fabris on 05 May 2025, 09:55 
General Announcement:
-	 

CTRL:
- Reminder: Desy will perform update tomorrow and DOOCS server will be restarted tomorrow at 13:00.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.
- As DRC, Jola S.-D. says it was a quiet week only a cooling water issue at the balcony rooms happened on May 01.05; a fast reaction prevented major issues. 
High temperature in balcony room 28 (SASE2) was measured and DOC reacted by being called from ITDM-OCD. 
The MKK technicians also acted; doors were opened to control temperature. Issue caused by a valve (Desy side) controlled that had to be exchanged.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.
- Drift of Mono at FXE: investigation in the shows the cryo cooling needs to be serviced for refill during a tunnel access that is requested.

LAS:
- Not present.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Not present.

SQS:
- Not present.

SXP:
- Problem with LabSync timing synchronization from Desy side happened last days but seems to be fixed.  
Entry   Notes XO Integration Meeting 30.04.2025, posted by Frederik Wolff-Fabris on 30 Apr 2025, 10:12 
General Announcement:
- Kimon F. informs that tests for a multi-mode fiber communication in XTD4 have to be scheduled with an external company. XO will organize it.

CTRL:
- Update about the name server update at the Desy side on the DOOCS: not done yesterday and shall happen next Tuesday 06.May. 
CTRL is prepared for corrective actions if needed (restarting DOOCS devices in Karabo).
- Bridges Karako-DOOCS may need to be restarted with the new name server (Flash default). Shall be further investigated if this would be the case. 

DA:
- All fine at DA.

EEE:
- Timing system and DOOCS update: EEE was in contact with Desy and confirmed the XFEL information is going to the new server. 
Middle layer devices were not affected by changing to the new server. 

VAC:
- Everything is fine.

XPD:
- No issues to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Everything fine. Seems the ZZ yesterday was fine.

LAS:
- Nothing to report.

UNSYS:
- SA3 cell#26: under work and trying to fix.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.
- A. Galler says the HXRSS could benefit from a signal looking at the seeded beam with the mono and downstream XGM (from last week HED). 
MID may use a downstream HIREX that may be used. J. Gruenert proposes to use the diamond detector. 

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 28.04.2025, posted by Frederik Wolff-Fabris on 28 Apr 2025, 09:44 
General Announcement:
- From PRC, Maurizio V. and Raul V. have no new things to report, apart of the HXRSS difficult tuning.
- As DRC, Luis Maia says the main points were discussed (see below).

CTRL:
- Friday heard from Desy an update on servers that hold DOOCS and uTCA has to be done, and is planned for tomorrow. In case it is not transparent, the DOOCS servers will need 
to be restarted from our 
side.

DA:
- Nothing to report.

EEE:
- uTCA system to be restarted in case Tuesday's intervention affects it.

VAC:
- Everything is fine.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.
- Related to Tuesday's updates with JDDD: in case of issues one option is to redefine the variables in the servers, as once tested.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- Everything is fine.
- Issues with lost of high level controls in the last blue week: not fully understandable why the fiber optics was lost.

SPB:
- Pulse energy during the nights is low; started with 1mJ and later dropped to ~600uJ.

FXE:
- Digitizer problem during the week was solved:
This occurred when a change of bunch number was requested; the digitizers are reconfigure via mid-layer device whenever number of pulses/frequency is updated. 
It is not clear if this was the cause of the issue. DOC reboot the hardware which resume data acquisition. 
Today (Monday) morning FXE noted that another mid-layer device was not displaying digitizer data properly; since the digitizers are the base class, it could be that 
communication was not reinitiated after the hardware reboot. Re-instantiating the mid-layer fix the issue.
- A temperature drift on the Mono is still to be investigated and XRO is aware of it.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Nothing to report; running instrument.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 23.04.2025, posted by Andreas Galler on 23 Apr 2025, 09:27 

General Announcement:

  •  

CTRL:

  • guiserver at MID
    • backbone services moved to a new machine --> should mitigate the issue

DA:

  • all fine at DA and so far quiet on DOC

EEE:

  • see above

VAC:

  • all fine

XPD:

  • nothing from XPD

DET:

  • DSSC2
    • very successful from Thursday 15:00, big thanks to all groups involved recovering the undualtros to make this posssible.

ITDM: 

  •  

XRO: 

  • nothing to discuss

LAS:

  • slight problem with fastADC cards in SA3 --> EEE is informed

UNSYS: 

  • SA3 undulator last week
    • communication issue through fiber optics
      • mitigation included switching from multimode to singlemode communication, including changing EtherCAT terminal and reconfiguring the PLC
  • cell 12 damaged linear encoder SA3
  •  

SPB/SFX:

  • nothing special

FXE:

  •  

MID:

  • nothing to report

HED:

  • not present

SCS:

  • nothing to report

SQS:

  • nothing to report

SXP:

  • not present

DRC

  •  

PRC

  •  

AOB:

  • problem at FXE wiht an MDL of the Mono 
    • MDL was in unknown state
      • root cause: one the of the devices that the MDL is connected to was switched off (XGM was not instantiated)
  •  

 

Entry   Notes XO Integration Meeting 15.04.2025, posted by Andreas Galler on 16 Apr 2025, 09:33 

General Announcement:

  •  

CTRL:

  • nothing 

DA:

  • nothing

EEE:

  • nothing

VAC:

  • everything fine

XPD:

  • nothing to discuss

DET:

  • DSSC2 commissioning hampered, SA3 undulator only manual controls available.

ITDM: 

  • 2 hours maintenance starting at 10:00 maxwell servers

XRO: 

  • nothing

LAS:

  • nothing

UNSYS: 

  • not present, working on recovering SA3 undulator controls

SPB/SFX:

  • nothing to discuss

FXE:

  • mono drift --> issue with encoder?
  • motor config issue, Leandro helped
  • stuch stage in sample stack 

MID:

  • karabo gui servers crashing both on guiservers 1 and guisever 2
    • Wajid: issue is being investigated --> possibly network issue, but no clear identification as of yet

HED:

  •  all on track

SCS:

  •  

SQS:

  •  

SXP:

  • monday issue with beam

DRC

  •  

PRC

  •  

AOB:

 

Entry   Notes XO Integration Meeting 14.04.2025, posted by Andreas Galler on 14 Apr 2025, 09:26 

General Announcement:

  •  

CTRL:

  • two issues with GUI Server at MID
    • server resatrted no further imapct on operation 

DA:

  • all good, quiet OCD

EEE:

  • nothing to report

VAC:

  • everything fine

XPD:

  • nothing to discuss

DET:

  • nothing major
  • Alessandro :DOC call on Saturday
    • HV of MID AGIPD was turned off between 3:40 - 3:50 on the 12.April

ITDM: 

  • reminder, maintenance this week on Maxwell ...
    • 3:00 contrl node in BR lost connection between DOOCS and SA1 Undulators 11.04. (03:00 am) reported by Suren

XRO: 

  • MID observed beam jitter on mirrors

LAS:

  • nothing to repot

UNSYS: 

  • all fine besides above mentioned issue (ITDM)
  • cell 26 APPLE-X
    • 2 isues, first triggered by loss of control server
    • 2nd, issue with tilt server --> operation of girders are stopped when the tilt sensor runs into thresholds.

SPB/SFX:

  • nothing to discuss

FXE:

  • nothing, mono drift. 

MID:

  • all fine

HED:

  • nothing special

SCS:

  •  

SQS:

  • nothing

SXP:

  • nothing experiment working 

DRC

  •  

PRC

  • no major issues and weekend super quiet
  • cell 26 issue with APPLE-X
    • cell was open and could not be controlled

AOB:

 

Entry   Notes XO Integration Meeting 09.04.2025, posted by Frederik Wolff-Fabris on 09 Apr 2025, 10:07 
General Announcement:
-	 

CTRL:
- Nothing major to report.

DA:
- Nothing to report.

EEE:
- Issue early morning with SPB PLC server which stopped communicating. It has recovered, if it happens again please contact EEE.

VAC:
- Nothing to report.
- Nerea J. comments in SA1 Si attenuator: a ZZ seems to be needed; A. Trapp says XRO is not involved so far; Chan K. says that SPB is fine with the current situation and thus the ZZ can be postponed.

XPD:
- Nothing to report.
- As PRC, J. Gruenert says all is fine and has also no information on the ZZ for SA1 attenuator.

DET:
- Nothing to report.

ITDM: 
- Info for following week: 
1. Maxwell cluster maintenance next Wednesday between 10:00-11:00 (e-mail to be sent); 
2. Additional investigation on the GPFS performance will also be performed next week 15.04 (e-mail also to be sent).

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Problem with SA3 cell 26: bottom shifter driver was stuck. Attempt to recovered via remote failed; a ZZ is mandatory to power cycle (next possible action for a fix).

SPB:
- Everything on PLC and Attenuator already discussed. Own SPB attenuators are in use.

FXE:
- Nothing to report.

MID:
- Continue measurements with FD activity until next Thursday.

HED:
- Nothing to report.

SCS:
- Preparing the DSSC2 tests taking place next week. A special electrical setup is in place at the hutch which needs a special training to allow access into the hutch. Warning signs will be placed.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 07.04.2025, posted by Frederik Wolff-Fabris on 07 Apr 2025, 09:42 
General Announcement:
- Reminder from A. Galler: please use the Operations e-log to report issues or comments instruments may have.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- P. Gessler informs in activity organized by Desy: 10Hz synchronization signal has to be synchronized to the 50Hz of the power work. 
A measurement campaign will happen on 17.June without the sync with the 50Hz. There is the possibility to run this day for tests. 
A meeting on 06.June will take place; please contact Patrick Gessler to be included in the preparation meeting. 
It does not affect normal users and is intended to evaluate possible drifts.

VAC:
- Having a group retreat.

XPD:
- Nothing to report.

DET:
- Nothing to report. Jola S.-D. will discuss with Patrick G. on the 50Hz sync tests.

ITDM: 
- Nothing to report.

XRO:
- Nothing major to report.

LAS:
- Various issues with 1. interlock failing; 2. reset timing; 3. water leakage at sub-sync hutch.

UNSYS:
- Everything is fine.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Lbsync was down over the weekend.
- Bucket jumps on the PP-laser: needs to be readjusted delay time between PP-laser and FEL. Daniel K. says a call to OCD will help to set it up. Probably due to Lbsync issues.

SCS:
- Not available.

SQS:
- Not present.

SXP:
- Preparing the experiment for this week.
Entry   Notes XO Integration Meeting 02.04.2025, posted by Frederik Wolff-Fabris on 02 Apr 2025, 10:31 
General Announcement:
- A. Galler reminds instruments that enquiring and requests on beam parameters shall come prior the respective RC meeting. Otherwise it will be difficult to accommodate last minute 
changes.

CTRL:
- Performed update of dataloggers yesterday.

DA:
- All fine with DA.

EEE:
- Nothing to report.

VAC:
- Issue with broken power supply in SA3 on Monday 2PM. Downtime of 2 hs and it was fixed by exchanging it in a ZZ.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Laser system working;
- Last Thursday evening decisions were done that incurred effects on PP-laser and access. An e-mail to XO will be sent with details.

UNSYS:
- Everything is fine.

SPB:
- Nothing to report.

FXE:
- Reported motor issues are fixed.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Nothing to report; busy preparing DSSC2 setup. 

SQS:
- Nothing to report; ready for beam.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 31.03.2025, posted by Frederik Wolff-Fabris on 31 Mar 2025, 09:36 
General Announcement:
-	 

CTRL:
- Announcement: tomorrow around 10AM an upgrade of dataloggers will take place (to version Karabo 2.20.10) due to issues with data aggregator causing dataloggers to crash. E-mail to xo-info will be sent.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Not present.

UNSYS:
- Nothing to report; all fine.

SPB:
- Nothing to report.

FXE:
- Problem with encoder happened on Saturday evening, it was reported to EEE; It does not look like a showstopper.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 26.03.2024, posted by Frederik Wolff-Fabris on 26 Mar 2025, 09:43 
General Announcement:
- A. Galler reminds on the LIMP-2025 meeting taking place next Friday. If any group misses an invitation, please contact Martin Doering. 
XO expects that the information distributed on Friday will be shared between the group by the present representative.

CTRL:
- Nothing to report.

DA:
- Not present.

EEE:
- Nothing to report.

VAC:
- Nothing to report.
- GATT/SA3 returned to normal operation after last week with gas exchange.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.
- Gateway issue just happened and may need a reboot after investigation.

XRO:
- A ZZ in XTD2 happened to CRL accumulated problems. It found one encoder is finally dead. 
It was communicated to instruments that arm#2 vertical motion is in open loop as does not have an encoder reading. Realignment is needed as position is lost. Operation can continue and replacement of part 
will be organized.

LAS:
- Can not access the gateway; ongoing fix with ITDM.
- SA1 PP-laser is down due to AMPHOS computer down.
- A. Galler enquires on responsibility for the AMPHOS shutter safety; clarification between LAS and SRP has to be done.
- SA3 ADC PP-laser missing values: understood by LAS and EEE; issue with settings of number of pulses. An update will be done to permit pulses higher than 800.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 24.03.2025, posted by Frederik Wolff-Fabris on 24 Mar 2025, 09:42 
General Announcement:
- A. Galler informs that on Friday there is the LIMP meeting organized by Martin Doering. Please contact him in case of questions. Information will be transmitted to people who does not attend it.
- As PRC, A. Galler mentions the SXP laser shutter issue happened on Saturday (see SXP). 
- As DRC, David Lomidze informs it was a quiet week.

CTRL:
- Nothing to report.

DA:
- Not present.

EEE:
- Issue with CRL lenses in XTD2 with a stuck motor. A ZZ is needed tomorrow if possible to fix it.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Problems with GPFS system still in investigation.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Data were collected; CRL got stuck.
- Pulse energy decreased ~20% every day and recovered in the morning; Also when SA2 changed number of pulses.
- uTCA crate crashed and a ticket is sent to EEE, together with DOC being called.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Saturday problem with Laser interlock related to AMPHOS shutter. A quick fix was found by PRC and Pouneh S.
- Responsibility for AMPHOS shutter will be discussed with LAS.
Entry   Notes XO Integration Meeting 19.03.2025, posted by Frederik Wolff-Fabris on 19 Mar 2025, 09:35 
General Announcement:
- As PRC, A. Galler informs delivery has started this week and everything runs accordingly to the plan so far.

CTRL:
- Nothing to report.

DA:
- Not present.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report; XGMs settings at SA1 are fine.

DET:
- Nothing to report.

ITDM: 
- Not present.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- Everything fine.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 17.03.2025, posted by Frederik Wolff-Fabris on 17 Mar 2025, 09:36 
General Announcement:
- As DRC, Jola S.-D. says it was a quiet weekend.	 

CTRL:
- Nothing to report.

DA:
- Not present.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.
DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Not present.

UNSYS:
- Nothing to report; all fine.

SPB:
- Nothing to report; all good downstairs.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- All fine at HED;
- Question: possibility to use beam parasitically tomorrow? A. Galler says one can always open the shutter if stability or tuning is not required. 
Please contact the PRC for details on status or help with communication with BKR.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Preparing for this week's experiment.
Entry   Notes XO Integration Meeting 12.03.2025, posted by Frederik Wolff-Fabris on 12 Mar 2025, 09:36 
General Announcement:
- A. Galler informs the beam delivery start is delayed currently up to 15:00 due to difficulties in setting up the machine after the FD week.
- Couple of meetings regarding the LIMP are scheduled; plans have been distributed and will be shared during the meetings. 
Please attend the meetings and if you want an invitation, contact Martin Doering. Also a DATA meeting on LIMP is happening today and please contact Patrick G., Steffen H. or Martin Doering for invitation.

CTRL:
- Nothing to report.

DA:
- Not present.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report; all fine.

DET:
- Nothing major to report.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report; everything fine.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Preparing for next weeks.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 10.03.2025, posted by Frederik Wolff-Fabris on 10 Mar 2025, 09:53 
General Announcement:
- From the DRC side, there is nothing particular to report.
- From the PRC side, nothing apart of what was reported below.
- XFELO studies: J. Gruenert says a successful time last week to bring all diagnostics in operation; for the first time full system was operational and detected; length of the cavity was measured; 
it was a major step forward by having a signal that can be tuned or amplified.

CTRL:
- Nothing to report.

DA:
- Not present.

EEE:
- Nothing to report.

VAC:
- Friday issue with ion pump controller in XTD1: exchanged by VAC OCD and EEE colleagues in a ZZ.
- Sunday worked in XTD6 on the PBLM - tunnel is open and will be closed after lunch.
- Work ongoing to check piezo at the monochromators.
- No news on the Mono vacuum issue last week at HED (reason).

XPD:
- Blue week studies were successful (e.g. XFELO diagnostics (adjusted grating by ZZ on Friday))

DET:
- No major issue to report.
- SPB pre-intervention with AGIPD took place last week: replaced module and tested - at the moment module is operational; 
however, connection was lost and needs time to evaluate if it will work in stable conditions. Intervention in summer will be later decided.

ITDM: 
- Nothing to report.

XRO:
- During tunnel activity on Sunday also a temperature sensor was exchanged at the PBLM.

LAS:
- Not present.

UNSYS:
- Undulators are all operational.
- Apple-X studies last week: very successful; it reached rotation of microbunching, beam separation and measured contrast (90); 
it was found the orbit before SA3 was not optimal and explain why the expected contrast was not reached; due to ZZ could not use full beamtime allocation; needs further development to improve contrast. 

SPB:
- Pulse arrival time tests were done; an issue needs to be corrected, in touch with experts. 

FXE:
- Issue with vacuum interlock (3 ions pumps): was a PLC issue resolved by EEE.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Commissioning last week went well; GATT could not be set on Friday; R. Villanueva comments the interlock is expected to be set and is a feature to avoid sudden jumps in pressure. 
After stopping and restarting injection, this releases the interlock.
Entry   Notes XO Integration Meeting 05.03.2025, posted by Frederik Wolff-Fabris on 05 Mar 2025, 09:40 
General Announcement:
- On the LIMP-2025 (accordingly to an e-mail sent by M. Doering on 24.02): reminder that groups are requested to give a feedback on the task list for the LIMP until tomorrow, 06.March.
- Next Friday UOM will have presentations from selected FD activities and jitter reports from instruments. 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Everything fine; busy being involved with FDs.

DET:
- Working on SPB replacing module for AGIPD; also busy with installation of AGIPD400K.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- Nothing to report.

SPB:
- Nothing apart of AGIPD intervention.

FXE:
- Nothing to report.

MID:
- Motor position issues while doing FD yesterday but experts are contacted.

HED:
- Nothing to report.

SCS:
- Jan Torben informs they are busy with installation; nothing to report.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 03.03.2025, posted by Frederik Wolff-Fabris on 03 Mar 2025, 09:48 
General Announcement:
- For next Friday 07.03 UOM a jitter report from instruments is expected together with presentations from groups using beam during this FD week.

CTRL:
- Nothing to report.

DA:
- Not present.
 
EEE:
- Nothing to report.

VAC:
- Issue with vacuum at HED Mono on Sunday morning 06:40AM: spike on vacuum happened (needs investigation with HED and EEE to further understand it). Recovered half way by HED colleagues. 
Please do not hesitate in calling VAC-OCD in such situations. The V0 closed and was masked at MPS - now it is back unmasked (Desy-MXL will investigate).

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- Nothing to be reported.

SPB:
- Energy drop on Saturday 02:20AM (bunches not lasing) was seen (fixed); vacuum spike in the chamber being investigated by SPB/SFX.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Apart of the VAC, all fine.

SCS:
- Discussion with BKR will be done.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 26.02.2025, posted by Andreas Galler on 26 Feb 2025, 09:24 

General Announcement:
-     

CTRL:
- nothing major

DA:
- nothing major

EEE:
- PLC large detector mover worked yesterday but not on the weekend (MID)
- CRL1 Lens2Y SA1 encoder not working
   

VAC:
- only minor thing

XPD:
- ZZ yesterday
   - pre vacuum for PES in XTD10, solved quickly and things back to normal. --> a valve was not completely closed putting load on the scroll pump thus in

DET:
- Nothing major

ITDM: 
- nothing to report

XRO:
- access to XTD2
  - exchanging proximity sensor for lens1y in CRL1, XTD2
  - checked SRA on issues

LAS:
- not to report

UNSYS:
- nothing to report

SPB:
- nothing to report

FXE:
- CRL5Y motor issue in hutch, solved with help of Moises, tolerance had to be tweaked.
 

MID:
- all fine and thanks to EEE for helping with the large detector mover.

HED:
- all good

SCS:
- nothing to report

SQS:
- not present

SXP:
- nohting, all set

Entry   Notes XO Integration Meeting 24.02.2025, posted by Andreas Galler on 24 Feb 2025, 09:26 

General Announcement:
-     

CTRL:
- nothing major

DA:
- nothing major

EEE:
- DOC call wrt AGIPD, possibly chiller
   

VAC:
- nothing

XPD:
- PES in XTD10, prevcauum got worse now at 6x10E-1 mbar.

DET:
- MID AGIPD chiller issue being investigated

ITDM: 
- nothing to report

XRO:
- nothing major

LAS:
- not present

UNSYS:
- nothing to report

SPB:
- SPB useres request more computation nodes on Maxwell

FXE:
- issue with PicoMotors over the weekend, already solved
 

MID:
- issues with cryo jet --> vacuum problem triggered warm up of AGIPD
   - during warm up there was ice formation in the Silicon oil, but after resolving the AGIPD could be cooled down again.
- seeeding looks ok
   

HED:
- all good

SCS:
- not present

SQS:
- not present

SXP:
- nohting, all set

SRP
- SQS couldn't open AMPHOS shutter, however resetting the AMPHOS interlock box solved the issue
- Eric informs on CRL1 seps issue to bfixed in tomorrows ZZ.

Entry   Notes XO Integration Meeting 19.02.2025, posted by Andreas Galler on 19 Feb 2025, 09:29 

General Announcement:
-     

CTRL:
- nothing major to report

DA:
- everything in order

EEE:
- issue lens1 y crl1in SA1
   - seps interlock switches are not operational --> lens1 not operational and blocked for operation

VAC:
- nothing to report, regarding the CRL1 lens1 Benoit should be involved and Nerea confirms that he is

XPD:
- no issues to report

DET:
- nothing major, FXE LPD Q2M2 is back in operation

ITDM: 
- nothing to report

XRO:
- nothing

LAS:
- nothing to report

UNSYS:
- mitigation -->BKR now has a reset button available in doocs enabling them to reset any error during wavelength scans on their own

SPB:
- nothing to report

FXE:
- noting to report
 

MID:
- nothing to report
   - MID is kindly asked to share HXRSS perfomance from the MID point of view over the week.

HED:
- nothing to report

SCS:
- instrument setup change with support from XHCrew

SQS:
- nothing to report

SXP:
- not present

Entry   Notes XO Integration Meeting 17.02.2025, posted by Frederik Wolff-Fabris on 17 Feb 2025, 09:39 
General Announcement:
-	 

CTRL:
- Small report: last week issue with bunch pattern configuration (Karabo reporting error). Seems to be obsolete properties removed from DOOCS were still in Karabo. 
Valerii B. is working with DOOCS people and will be ready next days. Device is operational.

DA:
- Couple of calls involving setting data analysis tools.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- All fine with XPD.

DET:
- From DOC: hiccups from one module at LPD. Right now all of them are working. Confirmed by FXE.

ITDM: 
- Info today Maxwell servers will be reconfigured. It shall not disturb anyone.

XRO:
- Nothing to report, also from PRC side (Maurizio V.).

LAS:
- Issues with timing card update was solved by EEE.

UNSYS:
- Received 19 OCD calls due to stuck Apple-X undulators during SA3 scans. To understand software bug, one needs time to work with them.

SPB:
- Nothing to report.

FXE:
- Issues with LPD.
- Stuck motor that was not able to be reset (user motor 19). DOC is informed.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 12.02.2025, posted by Frederik Wolff-Fabris on 12 Feb 2025, 09:53 
General Announcement:
- Delivery to instruments restarted this morning with good FEL performance (above the average). HXRSS in SA2 to be done during the day.
- As PRC, Maurizio Vannoni has nothing to report. So far so good.

CTRL:
- Instrument Control Integration team has a retreat today and tomorrow. So far only a "nothing to report" arrived to XO.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report; all fine.

XPD:
- Nothing to report.

DET:
- Nothing major;
- Jungfrau MID issue: looks to be permanently solved; further analysis on the reason behind is being done.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- It had to replace a uTCA in SA3 which was causing timing drifts; after replacement the restarted is ongoing and EEE helps. Hope to have delivery today by lunch time.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- XTD2 CRL motion issue is solved: Nerea J. informs Leandro Z. did tests with SPB and motor is behaving properly.
- Issue with LPD appeared this morning (no further info on the issue details) but experts are contacted.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Thanks for EEE for recent help.
- Lasermet work is done accordingly to LAS.

SQS:
- Not present.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 10.02.2025, posted by Frederik Wolff-Fabris on 10 Feb 2025, 09:45 
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Anything to be report.

VAC:
- Nothing to report.

XPD:
- No issues.

DET:
- No major issues;
- Small ones to follow up: Jungfrau at MID (connection issues); SQS Gotthard 2 with weird data.

ITDM: 
- Nothing to report.

XRO:
- Note to instruments: devices not used in operations are now locked. Please instruments contact XRO to unlock any instruments that may be needed. 

LAS:
- Nothing to report.

UNSYS:
- Nothing to be reported.

SPB:
- Nothing to report.

FXE:
- Motor X3 of the XTD2 CRL went into the limit switch while moving in the wrong direction. CTRL will further investigate on Tuesday.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 05.02.2025, posted by Frederik Wolff-Fabris on 05 Feb 2025, 09:44 
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- All quiet, good.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Report from SCS with double pulses coming from the laser: still in further investigation (may not be related to LAS, but with experimental setup).

UNSYS:
- Optimization of Circular polarization yesterday: went fine accordingly to expectations; after switching air coils all was in symmetric way; contrast is fine.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine.

HED:
- Not present.

SCS:
- BKR was surprised that SCS gets beam.
- Problem with magnet chiller; internal valve can not be controlled and needs to be sent to the company for repair. 
If another groups has a similar chiller to help SCS, please get in touch with Jan Torben.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 03.02.2025, posted by Frederik Wolff-Fabris on 03 Feb 2025, 09:39 
General Announcement:
- Experiment tuning week is ongoing; Two downtimes happened over the weekend due to 1. an electronic component part of quench circuit of a cold magnet in A20 (11hs) and 2. interlock issues at the injector 
laser (3hs).

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing major to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report;
- Naresh K. work went fine on Saturday (wavefront sensor at HED); program was cut because of short time due to downtime.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- No major problems; hiccups were investigated and there is nothing preventing operation.

LAS:
- Not present.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 29.01.2025, posted by Frederik Wolff-Fabris on 29 Jan 2025, 09:50 
General Announcement:
- Steffen Hauf comments that DOC is active from today and also requests SXP and SCS to get in touch with DRC on needed nodes.
- UOM will restart next Friday at 9AM.

CTRL:
- Successful bring-up days were concluded.

DA:
- One last bring-up day to be done today.

EEE:
- Successful bring-up days.

VAC:
- All fine with VAC.

XPD:
- Concluded last action of XPD preparations. Small issues were addressed.
- ZZ in XTD6 yesterday: Shimadzu camera ZZ everything is fine by restarting PC.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- ZZ in XTD10: stuck pre-mirror in soft-mono due to Elmo controller; physical activity brought back.
- 1mm of limit switch of M5 SA3 is also corrected.
- ZZ in SA2: piezo cables of M1 was swapped and working back.
- Bring up days went fine yesterday.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB/SFX: 
- PBLM was found in front of the beam; took a time to realize that, fixed by now.

FXE: 
- Nothing to report.

MID: 
- Issues with power slits at tunnel; but fix ongoing; not a show stopper.

SCS: 
- Nothing to report.

SQS:
- Not present.

SXP:
- Getting beam today.
Entry   Notes XO Integration Meeting 27.01.2025, posted by Frederik Wolff-Fabris on 27 Jan 2025, 09:59 
General Announcement:
- Maurizio Vannoni reports on behalf of XRO on the ramp-up activities over the weekend: 
SA1 - positions of mirrors were found (post in Zulip) No major problems were found; Attenuators look fine; 
SA2 - positions of mirrors were found and placed at commissioning logbook; one Attenuator had a problem and feedback from instruments will be asked; 
Piezo in M1 was misbehaving and is repaired, but still to be set by XRO; 
SA3 - positions were found and almost the same as before maintenance, small differences are set and shall be used as a guide when beam is taken; 
A limit switch in M5 need a ZZ to be moved by 1mm; Horizontal SCS slit has relative encoders and work with 1um in accuracy. Soft-mono auto collimator is also commissioned (XRO can help if needed). 

CTRL:
- Proceeding with bring-up days. All fine so far.

DA:
- Bring-up days: 5 out 7 days went well so far.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Taking beam this morning in SA3 for MCP detector.
- Last days: Spectrometers in SA1 and SA2 are up and running also calibrated with Mono; HXRSS setup was also commissioning (all motors working); All good from spectrometers (HIREX and PES).
- All fine for Imagers.

DET:
- Nothing to report.

ITDM: 
- Reminder for update/service on Dcache tomorrow.

XRO:
- Couple of things that need access in XTD10 (stuck motor and a switch). Probably to be done on Tuesday morning.
- Motor/temperature issues with SRA SA1: Terminals were replaced and everything is fine.

LAS:
- Nothing to report.

UNSYS:
- Everything is fine;
- On Friday afternoon measurements with K-mono in SA1 and SA3 were done; analysis is ongoing.

SPB:
- Bring up days went fine.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Concluded bring up days. Thanks for the support.

SCS:
- Bring up day today; changed day plan due to a change with Gotthard-II that has to be fixed.

SQS:
- Nothing to report.

SXP:
- Bring up days: all good.
Entry   Notes XO Integration Meeting 22.01.2025, posted by Frederik Wolff-Fabris on 22 Jan 2025, 09:47 
General Announcement:
- Please call DOC number and get in touch with DRC is one needs to save data for any activity or face issues with CTRL and DAQ.
- User and Operation Meeting will start only next week 31.01.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Following up the issue with SRA in SA1: issues with temperature in motors (not sure if terminals or motor itself) still happening. 
Another ZZ is being organized together with PRC for tomorrow for further investigation. Temperatures seem to be beyond 60C while in other tunnels is around 30C.

VAC:
- Everything fine for VAC.
- Will support with the SRA ZZ in tunnel tomorrow.

XPD:
- All fine for XPD.
- W. Freund adds to the SRA that it was moved yesterday to open for K-mono tests but it did not close again.

DET:
- Nothing to report; bring-up days ongoing - so far so good.

ITDM: 
- Tomorrow Update on Zulip accordingly to the shared e-mail.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- Hardware: no problems;
- Small issues with software that are under investigation.
- K-mono measurements were not finished because of the issues with the SRA. Wolfgang F. adds the data was not saved; it is liked because bring-up days happens only today and no ticket for saving data was 
submitted.

SPB:
- Monday the bring-up days happened with EEE and went quite well; On Friday bring-up days with DET and DA.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Not present as busy with Workshop.

SCS:
- Not present.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 20.01.2025, posted by Frederik Wolff-Fabris on 20 Jan 2025, 09:50 
General Announcement:
- E. Boyd reminds on the return of the beam shutter keys: actual plan is to return keys no later than Friday. The SA3 hutches are to be closed on the weekend.
- The User & Operation meeting will start from next week, Friday 31.01.

CTRL:
- Proceeding with bring up days.

DA:
- Busy with bring up days.

EEE:
- OCD was called due to rack 1.1 (SRA motors in SA1). ZZ was done yesterday and today another access at 10:00 to replace fuses.

VAC:
- Everything fine.

XPD:
- For XPD all is fine;
- As PRC Jan Gruenert reports on Friday problems with SRA slits in SA1 with motors in error and could not move. At some point it was moved but with wrong calibration; 
On Sunday a fire alarm in rack 1.1 and extinguisher bottle was empty. No fire was found; Similar issue happened in November but this time the terminals seem to be OK - it seems to be only the fuse. 
The gas bottle has to be exchanged and an access request is placed.

DET:
- Nothing to report; involved in bring-up days.

ITDM: 
- An e-mail will be sent to announce on Thursday this week an upgrade to the Zulip backend of myLog to be done.

XRO:
- SA1 accident with SRA rack; nothing else to report.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Busy at their satellite meeting.

HED:
- Busy with bring-up days;
- Power went down on Wednesday due to emergency OFF triggered by D3. XO is following up: no task that would trigger it was planned; mitigations will be done for the future.

SCS:
- Planned emergency OFF was successful and thanks to everyone who helped.

SQS:
- Not present.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 15.01.2025, posted by Frederik Wolff-Fabris on 15 Jan 2025, 09:40 
General Announcement:
- A. Galler announces that yesterday the cooling water of 20C was leaking. The reason is still to be found, as per e-mail from TS sent to the xo-info.

CTRL:
- Proceeding with updates and nothing to report.

DA:
- Ready for bring-up days.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Information: in XTD6 the PLC loop was repaired.
- XGMs are started (upstream ones).
- As PRC, J. Gruenert says a ZZ is ongoing in XTD10.

DET:
- Nothing to report; prepared for bring-up days.

ITDM: 
- Nothing to report.

XRO:
- The XTD10 H-slit access is finished and cable connection is fixed;
- M. Vannoni sent the draft for the ramp-up plan during next week to the instruments.

LAS:
- Continuing with maintenance tasks.

UNSYS:
- Trying to understand why alignment quadrupoles were inserted in cell#24.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Not present due to interlock tests.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 13.01.2025, posted by Andreas Galler on 13 Jan 2025, 09:29 

General Announcement:

 

CTRL:
- nothing majhor

DA:

EEE:
- ZZ on Friday successful.

VAC:
- nothing to report

XPD:
- several issues with devices in the tunnekl, some of which coul be solved from outside, others needed ZZ acces
- MPOD crate in XTD10 needed to be revived
- XTD6 MCP base detector issue --> root cause found: issue in the PLC due to a failing power supply --> ZZ scheduled for today together with Benoit
- Thursday K-Mono

DET:
- Nothing to report. 

ITDM: 
- Nothing to report.

XRO:
- preparing for next week startup

LAS:
- Not present.

UNSYS:
- Everything is fine.

SPB:
- Nothign to report.

FXE:
- Not present

MID:
- All fine at MID.

HED:
- All fine.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- nothing to report.

Entry   Notes XO Integration Meeting 08.01.2025, posted by Frederik Wolff-Fabris on 08 Jan 2025, 08:36 
General Announcement:
- Interlock tests are ongoing in tunnels and good progress has been made.
- Planning for the LIMP-2025: it has been worked on; currently there is not a detailed plan available as discussion for tasks is ongoing. 
In case of questions or recommendations please do not hesitate in contacting XO. As soon as a timetable is available, it will be shared with everyone.

CTRL:
- Reminder that this week the camera acquisition system will be deployed to switch OFF them on Tuesdays 12:00, accordingly to the shared info in the e-mail. 
Please contact CTRL for details, questions and suggestions.

DA:
- Al fine; nothing to report.

EEE:
- Situation in XTD2 rack 1.0: fast ADC does not work properly. To be followed up after the meeting.

VAC:
- Not present.

XPD:
- Nothing to report.

DET:
- Nothing to report. Restarting things prior bring-up dates.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- Everything is fine.

SPB:
- Not present.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- All fine.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 06.01.2025, posted by Frederik Wolff-Fabris on 06 Jan 2025, 09:42 
General Announcement:
- Interlock tests shall start tomorrow 07.01. In case of questions please do not hesitate in contacting XO.
- Eric Boyd says on Wednesday 10AM two hutches shall be interlocked for the tests (FXE exp. Hutch and MID optical hutch) for ~15 minutes. It shall work for both instruments. 
- A. Silenzi reminds that a tentative schedule for the bring-up days was sent to the instruments and a feedback is expected to be returned by the end of today.

CTRL:
- Present but with technical difficulties; it shall be all fine for CTRL.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- No incoming calls last weeks for the XPD OCD.

DET:
- Nothing to report.

ITDM: 
- Reminder that tomorrow Desy computer center will perform central maintenance; it shall not affect XFEL.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- Nothing to be reported.

SPB:
- All quiet.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- All fine at HED.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 18.12.2024, posted by Frederik Wolff-Fabris on 18 Dec 2024, 09:55 
General Announcement:
- This is the last XO Integration meeting this year.
- Wajid E. reminds attendance to write a ticket to CTRL when needed 

CTRL:
- Done with SA1 and SA2 Karabo update; today proceeds the SA3 update, to be done by mid-late afternoon.

DA:
- Nothing to report.

EEE:
- uTCA updates have been performed in all SASEs; All system up and running.
- One small CPU needs manual intervention in tunnel.
- GATT loop update is up and running now.
- Wolfgang F. says the XFELO crate in SA1 has a crate not working; EEE is looking into it and CTRL is working on the new device. A ticket is created.

VAC:
- Ending most of tunnel activities (XTD2, XTD6 and XTD10) which progressed well. Seems to be all done by end of this week.

XPD:
- PES has been put back in tunnel: was connected and pumped; looks all fine so far and can be brought in operation.
- XFELO worked were done, just missing the ADC (see EEE report);
- Imagers work were done with good progress.

DET:
- Systems are put in Christmas break.
- Tests after Karabo and uTCA updates looked good.

ITDM: 
- E-mail to xo-info was sent about office switches.
- Friday afternoon the XFEL gateway will be updated.

XRO:
- Finishing the last activities.
- Cameras in SA2 had problems (not know if hardware or software issues). In January new tests will be done. Maybe access could be required to check or fix at later 
date.

LAS:
- Not present.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Not present.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 16.12.2024, posted by Frederik Wolff-Fabris on 16 Dec 2024, 09:44 
General Announcement:
- Next Wednesday it is the last XO Integration Meeting.

CTRL:
- Proceeding with Karabo update accordingly to the schedule.

DA:
- Nothing to report.

EEE:
- Issue with PLCs: on Friday the SA3 GATT Loop had issue; not fixed until now and loop will be brought back as soon as possible. Working is ongoing.

VAC:
- Nothing to report.

XPD:
- Proceeding with: 
PES repair (today afternoon goes back to tunnel); 
SA1 XFELO photon diode and grating was installed (electronics ADC card in the uTCA crate was not found in the crate and EEE was contacted – P. Gessler says a normal card will be installed in the coming 
days).

DET:
- Nothing to report; tests to be performed after Karabo updates.

ITDM: 
- SA1 control network switches updates were done (two switches not yet operational but Desy experts are working on it).

XRO:
- Progressing well with maintenance activities.
- Note to CTRL: today Karabo update in SA1, tomorrow in SA2 and Wednesday in SA3; Also EEE makes an update today in SA3.

LAS:
- Not present.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.
- LPD burned cable and plugs: new connectors were ordered and will be replaced.

MID:
- All fine.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 11.12.2024, posted by Frederik Wolff-Fabris on 11 Dec 2024, 09:43 
General Announcement:
- A. Galler comments the maintenance period started; already yesterday tunnels were opened due to the stop in operation from caused by the power glitch at Desy.

CTRL:
- Preparing for the Karabo deployment, to be done next week accordingly to the schedule.
- Dennis Goeries presents on the authentication factor: 
1. tunnel SA1 topic was deployed months ago - the Open Access form is used to generate a 6-digit number that can copied and pasted in the login window. 
2. Thus authentication is then done; One can escalate the access user to have high level access (it is highlighted in Green color at the Karabo); 
3. After 1 hour the session will be closed; When choosing the “remember me” option one needs to make it only once. 

DA:
- Nothing to report.

EEE:
- Schedule for tunnels updates was shared and will be started today. In case of question please get in touch with EEE or Nerea Jardon.

VAC:
- Started with maintenance activities in tunnels.

XPD:
- Working on the maintenance tasks: PES already vented; SA1 XFELO was also vented; Progressing well.

DET:
- Nothing to report.

ITDM: 
- Ongoing with maintenance tasks; some were postponed due to unavailability of software.
- Announcement will be sent for consolidating Maxwell display mode into the cluster mode. Second try to happen tomorrow. Session will be disconnected and users shall connect again later.

XRO:
- Working in tunnels since yesterday.

LAS:
- Start with activities; so far so good.

UNSYS:
- Fixed problem with PS in cell20 SA3.

SPB:
- All fine at SPB.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Nothing to mention.

SCS:
- Start maintenance activities.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 09.12.2024, posted by Frederik Wolff-Fabris on 09 Dec 2024, 09:56 
General Announcement:
- A. Galler informs two downtimes happened last two nights totalizing 10-12hs due to communication issues (between terminals) at the accelerator. 

CTRL:
- Nothing to report.

DA:
- Not present.

EEE:
- Nothing to report in issues.
- Tomorrow from 12:30-13:30 a readout of parameters in tunnels will be made; PLC updates has also a plan.

VAC:
- Everything fine with vacuum.

XPD:
- Reminder the photon ramp-down days take place tomorrow; SA3 hutches must be interlocked.
- SA2 XTD1 XGM stopped working and BKR could resolve by experienced crew.

DET:
- Nothing major to report.

ITDM: 
- Nothing to report.

XRO:
- M1 in SA2: a ZZ on Friday take place to switch OFF and disconnect a controller that was misbehaving and was acting on the piezo without Karabo control.
- U. Boesenberg reports it got better on Saturday and it did not completely fixed the source of problem (beam jitter). Discussion with Johannes M. and Ulrike B. will take place.

LAS:
- Nothing to report.

UNSYS:
- PS cell20 SA3 to be fixed in the WMP.

SPB:
- Nothing to report.
- Request for tuning to improve photon intensities higher than 1mJ today. To be addressed by XO and PRC.

FXE:
- Nothing to report.

MID:
- Apart of beam stability on Friday; a radiation Interlock was triggered by a Lamp. As consequence, could not interlock the hutch. Got solved temporarily and further investigation on the WMP.

HED:
- Not present.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 04.12.2024, posted by Frederik Wolff-Fabris on 04 Dec 2024, 09:41 
General Announcement:
- A. Galler informs X-rays for cw49 are currently been tuned today due to the issues with the cryo plant last week. Schedule for delivering the beam to instruments is to start by 15:00 today.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Everything is fine; switch to 17keV XGM went fine.
- As PRC, J. Gruenert has nothing to report.

DET:
- Nothing to report.
- Burned power plugs on LPD: no updates, however all modules are working.

ITDM: 
- Not present.

XRO:
- Nothing to report.

LAS:
- All quiet with Lasers.

UNSYS:
- Everything fine apart of the PS in cell20/SA3 (to be fixed in the WMP).

SPB:
- Nothing to report.

FXE:
- Regarding the LPD: cable was by-passed.

MID:
- All fine at MID.
- On Monday 09.12 there will be a switch in beam delivery to HED.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Preparing for beamtime this week.
Entry   Notes XO Integration Meeting 02.12.2024, posted by Frederik Wolff-Fabris on 02 Dec 2024, 09:56 
General Announcement:
- A. Galler informs on the changed schedule for Operation due to the difficulties with the cry plant last week: the current beamtimes are extended until Wed 07:00 and then tuning for cw49 will take place. 
It is possible to have special arrangements between instruments - in such case please let XO know. 
Expectation is to have delivery from 15:00 on Wednesday to cw49 delivery, but depends on the promptness of the tuning.
- A. Silenzi announces that DOC has scheduled one extra day of support on Tuesday from 07:00 to 23:00.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Everything fine with Diagnostics.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- OCD call from Desy looking for SA3 instrument to change repletion rate - to be clarified.

UNSYS:
- Cell20 SA3 phase shifter motor has a problem. Repair postponed to the winter maintenance period.

SPB:
- Using the beam until Wednesday morning.

FXE:
- Nothing to report.

MID:
- All fine.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- 2CPP experiment: unexpected changes happened on Saturday when SA2 was tuned. 
- R. Villanueva as PRC comments that a tuning to recover SA1 intensity is under discussion now and being coordinated.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 27.11.2024, posted by Frederik Wolff-Fabris on 27 Nov 2024, 09:44 
General Announcement:
- Issues with machine at the cold compressor happened and the restart is delayed. Expectation for the cryo stable is around 15:00 today. 
Tuning will start from this point and non-standard modes probably be tuned tomorrow. Further info will be distributed during the day.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Yesterday a ZZ access related to the SA1 EPS issues; power supply was exchanged and filters and motors are operational again. Tests on the broken components will be done.
- L. Zanellato adds that cables shall not be the origin of the problem.

VAC:
- Nothing to report.

XPD:
- YAG screen for the SA1 FEL imager was placed in a new spot and is not anymore visible.

DET:
- LPD gain: follow up with CTRL is to be done.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Nothing special since Monday.

FXE:
- Nothing to report.
- Difficulties in using the beam over the weekend for extended hours: no further information.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Nothing to add.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 25.11.2024, posted by Frederik Wolff-Fabris on 25 Nov 2024, 10:02 
General Announcement:
- Martin Doering announces on the upcoming Winter Maintenance period: 
1. Summary Task list was released last Friday 22.11; 
2. A total of 10 working days is predicted for the WMP; 
3. Dates for availability of Karabo, timing, DAQ, online storage were shown (selected period from Dec. 11 to Dec.18th); 
4. Cooling water and technical gases maintenance (Dec.11th-20th); 
5. Electricity: localized task in SA3 SCS exp. Hutch with installation of new emergency OFF button on January 15th: power will go OFF; Interlock tests light in all SASE hutches on January 15th; 
6. In case of questions please contact xo-planning@xfel.eu

- As PRC, Jan G. mentions a full report for the weekend events is available at the Operations e-log: 
1. events on Saturday limited SA1 and SA3 to a max of 30 bunches combined; caused by communication failure by the EPS - partially solved on Saturday but happened again on Sunday afternoon. 
EPS loop was solved by replacing a communication terminal; The MOV loop relates to a terminal seemed to be burned (redundancy was working) – this needs to be worked on Tuesday's ZZ. 
Limitation of 30 bunches came as communication was lost. Recovered after the work on Saturday and Sunday.
2. Broken bridges Karabo-Doocs went down on Friday evening: not caused a beam downtime but photon devices could not be seen at DOOCS. 
A Desy CPU at the injector building failed and Tim Wilksen intervene to restore the bridge and will follow-up.
3. SRA slits and Filter are locked now until the ZZ on Tuesday or the WMP.  

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Issues in XTD2 (Sat and Sun) with PLCs and MOV loops: element had to be replaced to get back EPS on Sunday; Investigation for the cause are still ongoing.
- A new ZZ has to be done on Tuesday still related to the weekend events.

VAC:
- OCD involved on weekend activities to reset some EPS signals and ZZ.

XPD:
- Damaged YAG in SA1 XTD2 FEL imager was found during the weekend, to be worked in WMP.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Apart of the SRA issue reported in SA1, nothing else to report.

LAS:
- Not present.

UNSYS:
- Nothing to report.

SPB:
- Issue with detector motion limit switches; EEE will investigate.
- J. Gruenert says a downtime of 40mins happened due to a broken radiation interlock in SPB/SFX bringing down the machine. SPB/SFX will investigate the cause.

FXE:
- Thanks to OCD colleagues for the help during the weekend to restore full beam permission.
- Issues with gain acquisition with LPD happened and a ticket was created. Expert investigation is needed by EEE and DAQ.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 20.11.2024, posted by Frederik Wolff-Fabris on 20 Nov 2024, 09:47 
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- All fine with DA.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Everything fine for XPD.
- As PRC, J. Gruenert also has nothing to report.

DET:
- LPD burned power connectors: DET is aware of an issue happening last Friday; EEE was working without need of DET. 
- M. Knoll said a connector showed a bad connection (smell could be sensed) and a by-pass for a power supply was done.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- SCS smaract controller for the compressor is under investigation.
- SA1 PP-laser power improve: no news.

UNSYS:
- Nothing new to report.
- Cell#5 SA2: not clear if segment moved; the local control system did not get information from Phase Shifter, which actually moved gap.

SPB:
- Question beam delivery this week: files for 15keV and 17.5keV are prepared and will be delivered at best effort. 

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 18.11.2024, posted by Frederik Wolff-Fabris on 18 Nov 2024, 09:41 
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- HAMP XGM at hard X-rays: emergency was triggered; after rebooting it worked normally.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.
- Low PP-laser pulse energy for FXE: not yet solved; needs investigation with AMPHOS - will talk to both SA1 instruments for use or time that intervention can be done.

UNSYS:
- Problem SA2 cell5: power supply distribution needed to be replaced last Thursday.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Not present.
- Eric Boyd mention that the AIBS box at SQS will be replaced to a spare air box on Tuesday morning.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 13.11.2024, posted by Frederik Wolff-Fabris on 13 Nov 2024, 09:47 
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- Not present.

EEE:
- PLC team: AIBS triggered at SQS; reset alarm (see below).
- Eric Boyd informs the problem with one of the two sensors at the SQS AIBS. One is defective and needs to be reset (2x in last two days) so the entire AIBS has to be exchanged. 
This week we can run in this condition and at the end of beamtime it can be exchanged.

VAC:
- Nothing to report.

XPD:
- A. Koch informs on EPS condition #3 for SA1 Mode-S which was disabled and with that the YAG screen of FEL IMG received up to 30 bunches (limit shall be 2). Enabled by PRC. 
- XO found that it seems to have being disabled on 18.10.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothin to report.

LAS:
- SCS laser: tried to replaced trace compressor; new installation did not work; old one was re-installed. Compression is in the same position.
- LAS investigates issue at FXE laser.

UNSYS:
- Nothing to report.

SPB:
- DAQ update this morning for Shimadzu: Jola S.-D. says it shall be working again.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Busy downstairs.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 11.11.2024, posted by Frederik Wolff-Fabris on 11 Nov 2024, 09:46 
General Announcement:
- Last day of the FD taking place and switching back to 16.3GeV today.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- FD studies went fine during the weekend; Attoseconds went fine; XFELO progressed.
- PES can be used for the remaining delivery weeks for 2CPP but not for polarization.

DET:
- Nothing major to report.

ITDM: 
- Nothing special to report.

XRO:
- XFELO: Alignment problems as expected; first time using 4 undulators from inside the cavity; pointing/trajectory inside had changed and to be re-done on Sunday.
- In general, all studies brought some results even if not majors.

LAS:
- Not present.

UNSYS:
- Nothing to report.
- Polarized attoseconds need more time in FD weeks.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Setting up for two programs this week; all fine so far.

SCS:
- Nothing to report.

SQS:
- Take beam this week for IHR; finishing preparation.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 06.11.2024, posted by Frederik Wolff-Fabris on 06 Nov 2024, 09:38 
General Announcement:
- Invitation for scheduling meeting was distributed to some groups. The Winter maintenance period is relatively short.
- UOM next Friday takes place with presentations from FD studies and jitter reports from the instruments.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report; all fine.

XPD:
- Nothing to report; no news on PES.

DET:
- Nothing to report.
- Successful tests with high Z yesterday.

ITDM: 
- Nothing to report.

XRO:
- Nothing major to report; prepared for the 30keV studies.

LAS:
- Nothing to report.

UNSYS:
- Yesterday problem with PS motor in cell 25/SA1: solved by ZZ;
- Apple-X and PS cell 26/SA3: tomorrow 7AM a ZZ to try to fix problems.

SPB:
- All fine.

FXE:
- Not present.

MID:
- Not present.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 04.11.2024, posted by Frederik Wolff-Fabris on 04 Nov 2024, 09:44 
General Announcement:
- Last Friday was the deadline to submit the Winter Maintenance task list. We thank the groups who have submitted them. If your group did not make it yet, please get in touch with XO.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- EPS interlock for MID Pop-in and graphite filter is disabled and will be reset back tomorrow.

DET:
- Nothing major;
- LPD bugs were fixed during the weekend.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- Problem with power supply / driver quad mover during the weekend in SA2/cell 17: fixed by ZZ.
- SA3 cell25 driver for two motors need access for Apple-X studies.
- Also need investigation for PS in cell26/SA3.

SPB:
- Nothing to report; data being collected.

FXE:
- Preparing for D3 tests; issues with DET solved.

MID:
- Nothing to report; happy with beam/machine performance

HED:
- Taking some beam tomorrow and Wednesday for high Z detector tests.

SCS:
- Nothing to report.

SQS:
- Nothing to report. In-house with attoseconds next week.

SXP:
- Doing experiment; ongoing.
Entry   Notes XO Integration Meeting 30.10.2024, posted by Frederik Wolff-Fabris on 30 Oct 2024, 10:14 
General Announcement:
- Friday Nov. 1st is the deadline to submit the winter maintenance task list to XO.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Yesterday issue with SA3/PES in XTD10: during ZZ a leak developed and was vented by accident. Recovered during the day.

XPD:
- PES problem; thanks to VAC for support yesterday.
- XGM is again operational in SA3.
- A. Galler informs an 8D report will be done on the PES issue.

DET:
- Follow-up on MID AGIPD: it was tested and the issue did not appear again after power restart. It will be monitored in the coming days.
- Issue with AGIPD at HED (train IDs): fixed by workaround taking train IDs from DAQ. Seems to be related only to HED but with all AGIPD modules. 
Needs to be followed up; S. Hauf adds it is likely to be the receiver board.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Today a problem in SA3/cell25 happened with an Apple-X that does not move to Linear Polarization. Under investigation; Linear Vertical polarization will be anyway stablished with 3 segments.
- ZZ for the Phase shifter in SA3 is planned for Nov. 11th.

SPB:
- Nothing to report.

FXE:
- Last week stability issues reported: M. Knoll will follow-up.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Not present.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 28.10.2024, posted by Frederik Wolff-Fabris on 28 Oct 2024, 10:03 
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- Yesterday a data analysis tool had a hiccup which required to SCS more nodes reserved. Resolved.

EEE:
- DOC call to an unknown state for the HDC / pulsed magnet at HED. EEE is investigating.

VAC:
- Nothing to report.

XPD:
- Problem on Sunday with XGM; re-started by Theo and worked again.
- PES / SA3: no news; under work by J. Laksman; spectrum shall be possible but not use for 2CPP. A ZZ is planned in XTD10 for tomorrow morning (Tuesday).

DET:
- Nothing major to report;
- Issue with MID AGIPD noisy modules requiring power cycles: detector is OFF and experts are contacted.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report;
- Reply for a requested ZZ is pending. Perhaps to happen tomorrow (Tuesday).

SPB:
- Experiment wad done; data collected; Sunday night shift was cancelled.

FXE:
- LPD issues with temperature of the front ends, requiring power cycle; Also issues with data acquisitions. 
Steffen H. says one module was causing problems with data aggregators and since Saturday it was fine.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Apart of the damage problem yesterday morning, nothing to report.

SQS:
- Working in the hutch to prepare for next beamtimes.

SXP:
- Preparing for the experiment starting on Wednesday.
Entry   Notes XO Integration Meeting 23.10.2024, posted by Andreas Galler on 23 Oct 2024, 09:19 

General Announcement:

  •  

CTRL:

  • MPOD voltage limiter of PES is being investigated

DA:

  •  

EEE:

  • see SCS report issues with HXRIXS PLC

VAC:

  • everything is fine

XPD:

  • continuing assessing the damage of the PES, possibly supported by ZZ next week.
  • calorimater removed from HED hutch

DET:

  • nothing to report

ITDM: 

  • nothing special

XRO:

  • nothing

LAS:

  • nothing

UNSYS: 

  • presenting Thomas Schmidt
  • all fine with undulators , last phae shifter in SA3 (cell 26) ZZ pending

SPB/SFX:

  • preparing for IHR, nothing special

FXE:

  • nothing to report

MID:

  • very good results

HED:

  •  

SCS:

  • mechanical issues at HRIXS, issues with associated PLC as it was crashing, however EEE (SDilvia and Nerea) brought the PLC back up again

SQS:

  •  

SXP:

  •  

DRC

  • gentle reminder to participate in the DRC journey fixe

PRC

  •  

AOB:

  •  
Entry   Notes XO Integration Meeting 21.10.2024, posted by Andreas Galler on 21 Oct 2024, 09:28 

General Announcement:

  • nothing

CTRL:

  • Nothing major

DA:

  • nothing

EEE:

  • nothing major

VAC:

  • nothing

XPD:

  • PES damage
    • investigation ongoing
    • Thu - Fri increase in retardation voltage destroyed several flight tubes and eTofs
    • Polarimetry and 2 color 

DET:

  • nothing

ITDM: 

  • nothing

XRO:

  • nothing

LAS:

  • nothing

UNSYS: 

  • everything fine 

SPB/SFX:

  • nothing

FXE:

  • nothing

MID:

  • no mjaor issues

HED:

  • not present

SCS:

  • no issues

SQS:

  • not present

SXP:

  • not present

DRC

  • data reduction mode for SPB/SFX

PRC

  •  

AOB:

  •  
Entry   Notes XO Integration Meeting 16.10.2024, posted by Frederik Wolff-Fabris on 16 Oct 2024, 09:57 
General Announcement:
- Reminder that Nov. 1st is the deadline for submitting the Winter Maintenance task list to XO.
- As PRC, Maurizio Vannoni says no issues are currently happening.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- VAC OCD got a call from SQS related to the GATT: interlock is on the limit of reaction at higher operational pressure. Under adjustment.

XPD:
- Yesterday problem with HIREX SA2 Gotthard shutter which did not closed completely: HIREX can still be operated and issue is under investigation.

DET:
- Issue with AGIPD at MID seems to have a hardware problem that will require intervention during the winter maintenance. Still under investigation to make a final plan for repair. 

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Apple-X studies during the blue week: problem with PS in cell26 showing strange behavior with limit switches always activated. A ZZ access is needed.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report in addition to the detector.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Not present.

SXP:
- KB commissioning last days: it had a hardware problem and machine was at times not stable but good process was achieved.
Entry   Notes XO Integration Meeting 14.10.2024, posted by Frederik Wolff-Fabris on 14 Oct 2024, 09:41 
General Announcement:
- Currently machine is now operating at 16.3GeV.
- The Winter maintenance task list was published last week. In case of questions please reach XO and/or Martin Doering. 

CTRL:
- Issue on Thursday causing for the need to restart broker topic at MID and HED: caused by maintenance activity and triggered (unlikely) a chain of circumstances. Now it is fixed and understood. 
The fix still has to be deployed and is unlikely that will happen again during in operation delivery.

DA:
- Nothing to report.

EEE:
- Couple of calls from PLC colleagues, but nothing major to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing major to report; preparing for tests of the detector in cw45 at HED - still to be scheduled.

ITDM: 
- Maintenance on Dcache (only old data) today between 10:00 and 12:00.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Preparing for the night shifts; need higher pulse intensity from PP-laser that last week.

MID:
- Some devices are still down due to the broker issue last week. One has to figure out a bit more in the course of the day. CTRL will help.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 09.10.2024, posted by Frederik Wolff-Fabris on 09 Oct 2024, 09:49 
General Announcement:
- Martin Doering informs on the next Winter Maintenance period: 
1. Release of maintenance task list to the groups up to the end of this week; 
2. Please send back the list to XO until Nov. 1st; 
3. On Nov. 22nd the complete scheduled list will be released; 
4. WMP starts on Dec. 11th; 
5. Interlock tests starts on Jan.6th; 
List of recurring maintenance tasks is available at XO's Alfresco / Maintenance Planning (not yet scheduled); Please use the latest template to submit task list and send to xo-maintenance@xfel.eu;
For question please contact xo-planning@xfel.eu

CTRL:
- Small reminder for the DOOCS mirror device update tomorrow 09:30 (sent e-mail).
- Yesterday the upgrade of GUI server in SA1 requiring authentication was made. A user letter was distributed by e-mail.

DA:
- Not present.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Not present.

DET:
- Nothing to report.

ITDM: 
- Intervention on GPFS was successful and since yesterday afternoon everything works.
- During yesterday maintenance a try to shutdown/update GPFS Maxwell cluster (Dcache update) was attempted but unfortunately data waiting in queue were not finished - so tomorrow morning update on dCache 
will happen.

XRO:
- Activities ongoing on development week and also with debugging problems.

LAS:
- Not present.

UNSYS:
- Not present.

SPB:
- Nothing to report.

FXE:
- Not present.

MID:
- All fine at MID.

HED:
- All fine.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 07.10.2024, posted by Frederik Wolff-Fabris on 07 Oct 2024, 09:54 
General Announcement:
- A. Galler informs a power glitch happened today at around 07:40AM, however machine was unaffected. Please check your systems. 

CTRL:
- Tomorrow an update of DOOCS mirror in tunnels for the Karabo devices accessing DOOCS will happen. E-mail to be sent.
- IT colleagues together with CTRL will access one HOST at tunnels to exchange manually a battery. Only a single HOST is affected with downtime for few cameras.
- Deployment of authentication services to start at 9AM tomorrow: GUI to be restarted. 

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Problems with GPFS migration happening the weekend: workaround could solve it. Hardware replacement has to be done in future, pending confirmation. An e-mail to xo-info will be sent.

XRO:
- Message from SCS to look into drift status of mirror today (not an emergency).

LAS:
- Not present.
- A. Galler reports on behalf of LAS that an spurious signal from SQS is being looked by LAS and EEE; to be further investigation. A watchdog is to be implemented.

UNSYS:
- Last Tuesday an OCD call with problem with Phase shifter: fixed by ZZ. Other calls (e.g. Apple-X controls) were solved remotely.

SPB:
- Nothing to report.

FXE:
- Nothing to report.
- Issue with Laser shutter on Saturday: beamtime was not affected. 
Pouneh S. says an e-mail from Chris M. came for a meeting on Wednesday 11AM to discuss issue and technical solutions with interlock and shutter.

MID:
- Nothing to report.

HED:
- Affected by Maxwell transfer but workaround helped.
- Happy with machine performance.

SCS:
- Successful beamtime.
- Change of setup for the next days.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 02.10.2024, posted by Frederik Wolff-Fabris on 02 Oct 2024, 09:41 
General Announcement:
-	 

CTRL:
- Announcement by Dennis Goeries: next week on Tuesday a test phase is to start with login / authentication in Karabo. An e-mail is to be sent to xo-info. The group accounts will have limited access.

DA:
- Update on investigation of issues with services last weekend: user that was scheduled by chance could access it but not run jobs. Security will be made to avoid people breaking into it in future.

EEE:
- Nothing to report.

VAC:
- Everything is fine.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Not present.

UNSYS:
- Not present.
- ZZ in SA1 took place yesterday to fix a phase shifter.

SPB:
- Nothing to report.

FXE:
- THz has started.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 30.09.2024, posted by Frederik Wolff-Fabris on 30 Sep 2024, 09:46 
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- Problems with calibration pipeline nodes over the weekend: not yet fully understood. Problems with memory in general for all instruments.

EEE:
- Issue on THU nights with slits at SQS (SmarAct); to be further investigated and needs to be removed from beamline; workaround in place with another motors.

VAC:
- GATT/SA3 working in Argon as expected.

XPD:
- Nothing to report.
- As PRC, J. Gruenert mention three points happened since Friday: 
1. Compensation kicker feedback adjusted on Friday morning; 2. Changed bunch pattern sequence between SA1 and SA3 on FRI afternoon; 3. Sunday downtime due to A2 module (1hs).
- On Wednesday, tuning time in SA1/SA3 was needed to recover the performance after the ZZ on XTD10. Full performance was achieved by 17:00. 

DET:
- Chiller in AGIPD SPB/SFX: working with SQS chiller and user experiment could be realized. 

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Not present.

UNSYS:
- One single event for the OCD last week (a SA2 undulator being reset).

SPB:
- A continuous vertical drift of beam since Friday (both XGM); horizontal seem to be fine or being compensated by feedback.

FXE:
- Nothing to report.

MID:
- Yesterday late evening one little issue when trying to change to 150 pulses, making only a max of 30; BKR was contacted and could change to 150. Experts will be contacted today.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 25.09.2024, posted by Frederik Wolff-Fabris on 25 Sep 2024, 09:57 
General Announcement:
- Machine had a rough day yesterday and last night with downtimes due to problems with L-IBFB, dump communication, vacuum in A14. 
Files for beam delivery were prepared and small pointing corrections had to be done this early morning. Beam is currently in delivery mode.
- Martin Doering present the schedule on the preparation for the next Winter Maintenance Period: task list will be sent to groups on 11.10 and shall be returned to XO by end of October.

CTRL:
-  Nothing to report.

DA:
- Not present.

EEE:
- EEE reminds the group will be in a retreat today and tomorrow.

VAC:
- Issue with GATT this morning in SA3: Argon supply line shows interruption and need a ZZ to evaluate the issue.
- As PRC, Jan G. says that it is organized with BKR and SPB/SFX and ZZ can happen as soon as VAC colleagues are ready to enter tunnel.

XPD:
- Changed PES setup to run this week.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- In theory nothing to report.
- Daniel Kane will speak to XO and LAS about THz delivery last week to FXE.

UNSYS:
- Nothing to report.

SPB:
- Water leak in top of control room today: TS is working; humidity is still high.
- Installing the new chiller and AGIPD being cooled down.

FXE:
- Nothing to add.

MID:
- All fine at MID; vacuum issues in hutch but A. Parenti is on it or already solved.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 23.09.2024, posted by Frederik Wolff-Fabris on 23 Sep 2024, 10:01 
General Announcement:
-  As DRC, Krzysztof Wrona and Monica Turcato report all is fine at DOC, no major issues and no DRC calls overnight.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- EEE is on retreat next Wed afternoon and entire Thursday.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.
- Meeting ongoing on chiller issues together with TS, SPB/SFX.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- No news; all fine.

SPB:
- Issue with chiller is a treat to next experiments.

FXE:
- Problem with laser shutter (2-3x trigger interlock). 
- Pouneh S. asks which shutter closes: it's AMPHOS shutter.

MID:
- Nothing to report.

HED:
- Runs good with users.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Preparing for commissioning in cw41.
Entry   Notes XO Integration Meeting 18.09.2024, posted by Frederik Wolff-Fabris on 18 Sep 2024, 09:51 
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- Nothing urgent to report;
- Managed to understand the AGIPD MID issue reported last Monday: it was an one-time event; a manual shutdown of correction devices was done and cause the errors. 
Please do not try to restart manually and use the automated procedure.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- All fine.

LAS:
- Not present due to a workshop.

UNSYS:
- All good.

SPB:
- Starting with beam operation; nothing to report.

FXE:
- All fine.

MID:
- All fine.

HED:
- All fine.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 16.09.2024, posted by Frederik Wolff-Fabris on 16 Sep 2024, 10:03 
General Announcement:
- As PRC, Maurizio V. reports some calls over the weekend mostly for exchange of info on minor issues that were addressed

CTRL: 
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Reported issue with PP-laser: P. Gessler talked to Desy and LAS, and together with Bruno found the delayed train and is under investigation. 
No guarantee it can't happen again, but it may be a one-time event. Under investigation for reason behind.

VAC:
- Nothing to report.

XPD:
- Nothing to report;

DET:
- Nothing to report.
- Marcin S. asks on a problem with MID problem getting correct gain previous; data disappeared then recovered; 
- It is not a detector it self issue; Philip S. looked this morning; DAQ being loaded and could be the cause with this particular aggregator. Ticket has been issued; aggregator was working at 8AM.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 11.09.2024, posted by Frederik Wolff-Fabris on 11 Sep 2024, 09:50 
General Announcement:
-  Todays the machine setup is ongoing and from tomorrow it starts the beam delivery, as planned.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- P. Gessler informs there is no DOC today as there is no beam delivery; DRC is normally reachable.

VAC:
- Yesterday ZZ to exchange preventively a pump controller was carried out successfully.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.
- M. Vannoni says the SA1 drift (by M1) is being monitored and shall not be disruptive as feedback corrects it. XRO will keep an eye and assist in case of need.

LAS:
- SA3-PPL is being delivered.
- SA1-PPL being changed to THz experiment; to be ready today.
- SA2-PPL being changed to 1.1MHz, but no amplification was found; Rolled back to 188kHz to delivery to MID.
- Delay of trigger reported days ago: Desy looked into it and did not find anything specifically; Patrick G. will discuss with LAS.

UNSYS:
- Masking of undulator errors at BKR was addressed with MXL. 

SPB:
- Nothing to report.
- New Radiation constraints were issued and operation has to be with photon energies higher than 8keV.

FXE:
- This week’s nights will have operation higher than 8keV.

MID:
- Nothing to report. No limitations for photon energies on SA2 side.

HED:
- Nothing to report.

SCS:
- Detector calibration last Monday had issue with girder movement; EEE is aware and has to be working next beamtime.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 09.09.2024, posted by Frederik Wolff-Fabris on 09 Sep 2024, 09:38 
General Announcement:
- A. Galler informs a downtime of about 30min happened this morning in the North Branch due to a faulty vacuum controller.
- H. Sinn mentions on the beam drift in SA1: it was seen in both instruments over the weekend and is likely the comes from M1 but can be corrected by feedbacks in M2 and M3; 
drift does not slowdown and together with XRO it will be looked if corrections on M1 can be applied tomorrow.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- A motor in FXE attenuator had an issue on Saturday; it seems issue with encoders and to be further investigated.

VAC:
- Last week was quiet;
- Issue with ion pump controller behaving strangely; to be exchanged tomorrow. System is recovered and can run until tomorrow.

XPD:
- Nothing to report.

DET:
- Nothing major to report; no news on SPB AGIPD chiller.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Issue with cell26/SA1 showing error in gap was fixed.

SPB:
- Nothing to report.

FXE:
- Beam drift was seen at FXE; it is communicated to PRC and XRO.
- Feedbacks for M2 and M3 manage to correct the beam drift.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 04.09.2024, posted by Frederik Wolff-Fabris on 04 Sep 2024, 09:40 
General Announcement:
- Machine tuning last two days was hindered as a power supply for a camera in injector laser had to be exchanged. As consequence, the camera moved and had to be re-aligned costing time. 
So far, they manage to tune satisfactory and beam is delivered to instruments since 7AM.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Not present.

DET:
- Nothing new on the AGIPD issue.

ITDM: 
- Nothing to report.

XRO:
- No deterioration of M1/SA1 since weekend.

LAS:
- PP-L SA1 AMPHOS service finished and in delivery to instruments.

UNSYS:
- Issue of last Monday is fixed.

SPB:
- Aligned beam with FXE together; beam is found at SPB/SFX and FXE.

FXE:
- Nothing to report.

MID:
- All is fine.

HED:
- Setup of beamtime going smooth; HIREX setup ongoing; tuning for HXRSS from 11AM.

SCS:
- Mechanical problem: vacuum chamber had to be vented and is now pumping down.
- Other work in parallel with samples is progressing.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 02.09.2024, posted by Frederik Wolff-Fabris on 02 Sep 2024, 09:53 
General Announcement:
-	 

CTRL:
- Today an IT update on project database at 13:00: 15min service is not available (not able to open them). Reminder will be sent.

DA:
- Note after meeting: Nothing to report.

EEE:
- Nothing to report.

VAC:
- Pressure spike in SA1 vacuum system that tripped interlock but it was quickly recovery on Thursday.

XPD:
- Nothing to report.

DET:
- Issue with Julabo chiller at AGIPD still persists as test last week did not succeed.

ITDM: 
- Nothing apart of the mentioned CTRL report.

XRO:
- Vacuum spike was caused by the one motor at M1/SA1 being loose; Incident with InGa spillage in mirror chamber as a result; 
- M1 Rz motor was reconnected and mirror was put in place again but now should not be moved anymore and it is interlocked. 
- On Saturday beam was found back at SPB/SFX (saved trajectory at one photon energy; for others have to be checked - please do not rely on previously saved positions).
- Beam was not yet found at FXE – M3 reflection at the M3 Pop-in still seen but not further downstream.
- In case of need please do not hesitate in contacting XRO and Antje Trapp for help.

LAS:
- SA1 PP-laser NOPA alignment starting today for delivery tomorrow as AMPHOS service is done.

UNSYS:
- Quad mover stuck in cell7/SA3; needs ZZ.
- Apple-X activities during FD week had re-alignment with beam; found issue with one CAM mover in cell#25. 

SPB:
- Chiller for AGIPD: tests did not get enough temperature.

FXE:
- Nothing to report.

MID:
- All fine at SA2.

HED:
- Getting ready to take beam.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 28.08.2024, posted by Frederik Wolff-Fabris on 28 Aug 2024, 09:52 
General Announcement:
- Communications Group thanks all people involved on the SRI visit. The extension of the beam delivery also worked nicely to instruments.
- As PRC, A. Galler says so far there is nothing to report or discuss for the current week.
- For next Friday the UOM will have presentations from the instruments (on stability) and from the FD activities.

CTRL:
- Nothing to report.

DA:
- All fine with DA.

EEE:
- Not present.

VAC:
- Not present.

XPD:
- No issues; preparing for the FD studies;
- ZZ in XTD2 on Friday to repair camera needed for XFLO.

DET:
- MID AGIPD HV issue on weekend: no power glitch happened that was registered from Desy systems; 
still not understood the reason but likely a local power glitch (small voltage drop (peak) was seen) and will be further tracked. 

ITDM: 
- E-mail sent yesterday for general configuration on displays.

XRO:
- Not present.

LAS:
- SA1-PPL Amphos service ongoing;
- SA3-PPL changing repetition rate for next experiments.

UNSYS:
- Everything is fine.

SPB:
- Nothing to report.
- Issues with trigger distribution systems yesterday happened but was fixed on the fly.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 26.08.2024, posted by Andreas Galler on 26 Aug 2024, 09:28 

General Announcement:
- Today Monday 26.08 the beam delivery will be interrupted from 13:30 to 18:30 due to the SRI visit at EuXFEL. These hours are compensated by extending the beam delivery on Tuesday from 7:00AM up to 12:00.
As DRC, Wajid E. informs the DOC shifts are extended to cover the period of delivery on Tuesday morning.

CTRL:
- nothing major

DA:
- nothing

EEE:
- vacuum

VAC:

XPD:

DET:
- AGIPD Chiller at SPB

ITDM: 
- nothing 

XRO:
- SA1 limited to 30 bunches at times
- M# Piezo was malfunctioning --> Piezo swapped via ZZ

LAS:
- SA1 service still going 
- PP LAS down still being investigated

UNSYS:
- last week successful operation of APPLE-X in circular polarization
- config issue in cell 25 in SA3 had been fixed

SPB:
- AGIPD Chiller --> detector got warmed up on Sat morning. -->  

FXE:
- nothing to report
- M3 Piezo did not impact 

MID:
- nothing to report

HED:
- nothing 

SCS:
- all fine

SQS:
- last week circular polirazation

SXP:
- Laser INterlock issue --> fixed within 30 min

 

DRC:

- vacuum issue because of broken terminal, everythin worked out well with OCD
- DOC mini shift from 8:00 to 12:00

Entry   Notes XO Integration Meeting 21.08.2024, posted by Frederik Wolff-Fabris on 21 Aug 2024, 09:46 
General Announcement:
- Next Monday 26.08 the beam delivery will be interrupted from 13:30 to 18:30 due to the SRI visit at EuXFEL. These hours are compensated by extending the beam delivery on Tuesday from 7:00AM up to 12:00.
As DRC, Wajid E. informs the DOC shifts are extended to cover the period of delivery on Tuesday morning.

CTRL:
- GUI server was updated with success.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- SPB AGIPD: Julabo chiller still not fixed and work together with TS for an asap solution. Right now AGIPD is not operational. The new pump is yet to arrive.

ITDM: 
- Nothing to report.

XRO:
- No news to report.

LAS:
- AMPHOS service started in SA1 for next week or so.
- SA3-PPL work ongoing.
- SA2-PPL in delivery.
- Reasons why the PP-lasers went down last Wednesday under discussion. Right now it seems to be a singular event.

UNSYS:
- Everything fine; ZZ was successful and the Circular polarization is already working for delivery to SQS.

SPB:
- Nothing to add besides the AGIPD.

FXE:
- Nothing o report.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Not present.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 19.08.2024, posted by Frederik Wolff-Fabris on 19 Aug 2024, 09:41 
General Announcement:
- As DRC, Steffen Hauf reminds that if support from DA groups is needed, please request as soon as it is needed; Second: please instruments check if the Zoom is installed and running in the control rooms.

CTRL:
- Announcement: tomorrow around 13:00 a deploy of the new tag of Karabo is to happen in order to fix a bug on missing some devices in the topology. 
Downtime is 10-15 minutes and GUI clients must be restarted. E-mail to xo-info will be sent.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Not present.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Last Wednesday all PP-lasers went down: investigation from Sync group does not show missing trigger; EEE also did not find anything; still on investigation for the root cause.

UNSYS:
- SA3 cell 24 problem: first Apple-X is not reachable. A ZZ is to happen tomorrow Tuesday in the morning to investigate. Apple-X is planned to be used by SQS and SXP this week.

SPB:
- Chiller issue not yet solved.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Not present.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 14.08.2024, posted by Frederik Wolff-Fabris on 14 Aug 2024, 09:44 
General Announcement:
- This morning difficulties to switch to SA2 9keV SASE happen but right now it is working for delivery to HED.
- Eric Boyd informs D3 would like to access an optical hutch to test insert for BTM on next Tuesday. An e-mail will be sent to xo-info mailing list asking for an instrument to open one optics hutch. 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Issue with chiller at SPB/SFX for AGIPD which does not maintain temperature. Investigation shows it is a cooling water flow so T is not stable; 
Issue started after LOOP5 upgrade but seems to be coincidence. Solution still pending, maybe an installation of a new pumping system will happen.

ITDM: 
- Not present.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- Everything is fine; HXRSS 2nd crystal is now retracted in parking position.

SPB:
- Nothing apart of the AGIPD issue.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Not present.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 12.08.2024, posted by Frederik Wolff-Fabris on 12 Aug 2024, 09:44 
General Announcement:
- A power glitch happened on the weekend but had no effects on the machine. So far XO is not made aware of effects at XFEL. Please let XO know if you were affected.

CTRL:
- Nothing to report.

DA:
- Unfortunately the CAL noticed the past week that issues related to the upgrades in the maintenance period, which result in disturbances across most instruments with beam last week. 
A new version of the online correction software meant to be installed then and tested during the bring-up days, but the old version ended up still running at most of them.
When bug fixes found since then were meant to be distributed in the past two weeks as we commonly do, this inadvertently also switched these to the new version, the last time on last Tuesday. 
This was particularly aggravated by the fact the new version has some minor naming and UX changes, which the instruments had to adapt to now during operation.
Most issues reported through the DOC have been hot-fixed already, with more fixes prepared over the weekend. The DOC will contact instruments to apply these as needed.

EEE:
- FXE mono mitigation is in place and working.

VAC:
- Nothing to report.

XPD:
- Remarks on SA1 HIREX interlocks over the weekend has been addressed. Naresh K. is contact with XO, SPB/SFX and FXE.

DET:
- Nothing to be reported.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Working on SPB side and performance improvements were done.

UNSYS:
- Everything is fine.

SPB:
- Calibration issues as mentioned by DA. It is an operational risk for AGIPD until it is clear what happens with the calibration/errors.

FXE:
- Nothing to report apart of the Mono.

MID:
- All fine at MID. Calibration is not a big problem for MID as they do not use AGIPD.

HED:
- In contact with DOC to reset some ADCs.

SCS:
- Not present.

SQS:
- Not present.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 07.08.2024, posted by Frederik Wolff-Fabris on 07 Aug 2024, 09:38 
General Announcement:
- A. Galler informs to SQS that the vertical polarization operation is planned for Thursday starting tuning in the afternoon 15:00. Please SQS inform BKR if tuning can start earlier.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- SA2 and SA3 with normal operating parameters.
- SA1 get extra time to work today from SPB/SFX.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Not present.

MID:
- Nothing to report; HXRSS is planned for this week. 

HED:
- Not present.

SCS:
- Yesterday and Monday problems with Interlocks but were fixed.

SQS:
- Nothing to report.

SXP:
- Nothing to report; it was useful to use the beam on Monday.
Entry   Notes XO Integration Meeting 05.08.2024, posted by Frederik Wolff-Fabris on 05 Aug 2024, 09:41 
General Announcement:
-	

CTRL:
- Nothing to report.

DA:
- Announcement: tomorrow afternoon a maintenance on online and offline calibration will take place causing a 20min downtime.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.
- Suren K. questions SA3 instruments on the vertical polarization setup done last Saturday. 
Laurent M. and Manuel I. say that beam condition with polarized light was fine but they did not yet performed scans. Shifts in beam positions were seen but not understood. 

SPB:
- Nothing to report.

FXE:
- Tuning for SA2 and SA3 influenced FXE data collection, as it was not aware of tuning activities.

MID:
- All fine at MID.

HED:
- All good at HED.

SCS:
- Not using the shift today - done with X-ray commissioning and prioritizing the laser work.
- Changing number of pulses seemed to affect FXE for a second or so. Agreed to inform FXE when wanted to change pulses.
- XGM position was behaving weirdly. Drifts of the beam in the horizontal was seem by order of 1mm.

SQS:
- Nothing to report.

SXP:
- Will use the beam today instead of SCS.
Entry   Notes XO Integration Meeting 31.07.2024, posted by Andreas Galler on 31 Jul 2024, 09:23 

General Announcement:

CTRL:
- nothing major

DA:
- nothing major

EEE:
- nothing new

VAC:
- see XRO

XPD:
- nothing

DET:

ITDM: 
- all system 

XRO:
-  ZZ for XTD2 solid attenuator
 - limit switches of arm5 got llose and were pushed out of the way

LAS:
- all good

UNSYS:
- SA3 cell 11 solved yesterday

SPB:
- all fine

FXE:
- big printer for all instruments, ideally centrally located --> maybe near the XHCrew Operation Center

MID:
- nothing

HED:
- not present

SCS:
- in comm with EEE

SQS:
- not present

SXP:
- not present

Entry   Notes XO Integration Meeting 29.07.2024, posted by Andreas Galler on 29 Jul 2024, 09:27 

General Announcement:

CTRL:
- nothing

DA:
- nothing

EEE:
- nothing

VAC:
- nothing

XPD:
- nothing

DET:
- AGIPD comm. data taken

ITDM: 
- nothing

XRO:
- attenuator arm 5 is stuck XTD2
 - not yet clear if it is a hardware issue.
 - limit sitches are stuck --> EEE can move the attenuator 

LAS:
- SA1: 

UNSYS:
- SA3 cell 11, ZZ needed
 -

SPB:
- attenuator issue

FXE:
- not present

MID:
- damage in the fastADC channel
- calibration pipeline crashed ...

HED:
- all good 

SCS:
- PLC issues
 - parameters lost on PLC level
 - some motors don't work correctly
 - ELMO motors often go into error states 

SQS:
- not present

SXP:
- not present

Entry   Notes XO Integration Meeting 24.07.2024, posted by Andreas Galler on 24 Jul 2024, 09:29 

General Announcement:

CTRL:
- last bring up days

DA:
- minor issues fixed during bring up days

EEE:
- nothing 

VAC:
- nothing

XPD:
- SA1/2 HiREX working
- Diamond detector small isue 

DET:

ITDM: 
- nothing

XRO:
- ramp up mostly completed --> reports send to all Instruments
- SA3 monochromator back in operation

LAS:
- SA1 all good automatic peak integration of dynamic trigger is being implemented
- SA3: 600 uJ short 

UNSYS:
- SA2 cell 10 issue
 - EtherCAT communication with 

SPB:
- JF4M:
 - last week tghe power supply stopped working, with help of DET and EEE the MPOD was made working, hower read out boards would not power trigger 

FXE:
- nothing

MID:
- no big isues with bring up days, vacuum is ok

HED:
- JF issue was solved yesterday with replacing the board

SCS:
- bakeout commecning

SQS:

SXP:

Entry   Notes XO Integration Meeting 22.07.2024, posted by Andreas Galler on 22 Jul 2024, 09:29 

General Announcement:

CTRL:
- nothing major, proceeding with bring up

DA:
- not present 

EEE:
- bring up days SPB today, MID tomorrow, SEPS interlock today

VAC:
- nothing to discuss

XPD:
- nothing to report

DET:
- issue with a JF at HED
 - one of the ASICS misbehaving
 

ITDM: 
- nothing to report

XRO:
- SA3 Mono

LAS:
- not present

UNSYS:

SPB:
- nothing to report

FXE:
- nothing to report

MID:
- damaged roughing pump, needs to be send in
 - atm not an issue

HED:
- issue with Hexapod --> IT config had to be corrected

SCS:
- Friday: mechanical problem in one of the chambers, spare parts to arrive today?

SQS:
- not present

SXP:
- not present

Entry   Notes XO Integration Meeting 17.07.2024, posted by Frederik Wolff-Fabris on 17 Jul 2024, 09:50 
General Announcement:
- Martin Doering informs today an e-mail will be sent to groups asking for tasks that are cancelled or postponed. The feedback will be required until mid of next week.
- A. Galler informs on a report for non-correct bunch arrival monitors at the instruments. It is requested to instruments to get information on this topic and bring back to XO.
- User Operation Meeting starts next Friday 19.07.

CTRL:
- Nothing to report.

DA:
- Not present.

EEE:
- Nothing to report.

VAC:
- Not present.

XPD:
- Gotthard-II in XTD6 Hirex: today the power supply will be checked and by end of the day info to XO/PRC will be done.

DET:
- SPB/SFX an issue with Jungfrau-4M high voltage power supply system happen and is broken needing a fix.
- Hirex/Gotthard-II the tests with beam is prioritized on Monday/Tuesday next week.

ITDM: 
- Nothing to report.

XRO:
- On the weekend it starts the technical ramp-up of SA3 and Monday/Tuesday the SA2 and SA1;
- On Monday the SEPS interlock tests are happening and hutches will be closed.

LAS:
- Nothing to report.
- Bunch pattern server issue last week: fix was provided. No more info on the effects of it on LAS preparations.

UNSYS:
- Issue with SA3/cell18 undulator did not move and hit the limit. Under investigation.

SPB:
- Nothing to add to the Jungfrau issue.

FXE:
- Nothing to report.

MID:
- Issue with vacuum system at MID - failed yesterday twice.

HED:
- Nothing to report.

SCS:
- Yesterday problem with mechanics in tunnel; will need PLC team; Leandro Z. informs is under investigation.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 15.07.2024, posted by Frederik Wolff-Fabris on 15 Jul 2024, 09:39 
General Announcement:
- The User Operation Meetings will restart next Friday 19.07.

CTRL:
- Proceeding with bring up days.

DA:
- Busy with bring up days.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Not present.
- As PRC, Raul Villanueva informs that activities in XTD6 are planned to be finished by tomorrow, Tuesday.

DET:
- HIREX / Gotthard-II inSA2: it is fixed and installation is ongoing.

ITDM: 
- Nothing to report; also involved in bring-up days.

XRO:
- An e-mail will be sent as preliminary tests will be done as preparation for SEPS tests next Monday. It is transparent to the machine.

LAS:
- Not present.

UNSYS:
- All good with undulators.

SPB:
- Nothing to report.

FXE:
- Nothing to add.

MID:
- All fine at MID.

HED:
- All fine at HED.

SCS:
- Today bring up days happening.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 10.07.2024, posted by Frederik Wolff-Fabris on 10 Jul 2024, 09:48 
General Announcement:
- Frank Poppe asks for an available time for a tour in experimental Hall and tunnels. It will be discussed offline with XO.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- XTD6 was searched yesterday evening for extra interlock tests. This was finished and tunnel will be opened again today for XPD work.

XPD:
- Work on HIREX is progressing and estimate to install back in tunnel is Thursday or Friday.

DET:
- Marco R. is working on the Gotthard-II of Hirex; also DET is preparing for next Run.

ITDM: 
- Migration of XFEL gateway will be done on late Thursday. Karabo database will also be done. Announcement will be sent.

XRO:
- Not present.

LAS:
- Not present.

UNSYS:
- Everything is fine.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Nothing to report; transport with Hall crew is planned for today.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 08.07.2024, posted by Frederik Wolff-Fabris on 08 Jul 2024, 08:46 
General Announcement:
- Eric Boyd comments on Interlock tests: today FXE and MID hutches are being searched for ~30 mins. Please contact Eric in case you find lights ON. 
For tomorrow, Tuesday: OFF buttons will be tested and jumped in SA1/SA3 instruments and on Wednesday the SA2 instruments. Access is restricted and e-mail will be sent to communicate when people are 
allowed to resume access/work. 
Also please clean up the hutches for the inspection and tests.

CTRL:
- Nothing to report; Karabo redeployment went well last week.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- XTD6 tunnel access is needed for HIREX.

DET:
- Intervention at SPB AGIPD: modules were swept, severe effect due to radiation (one module not working). One module was swept in the quadrant. It was successful.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Some surprises but under control.

UNSYS:
- All fine.

SPB:
- All fine.

FXE:
- Software and firmware updates with detectors taking place.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 03.07.2024, posted by Frederik Wolff-Fabris on 03 Jul 2024, 09:54 
General Announcement:
- Tunnels have been closed and the Interlock Tests required by the legislators are ongoing.
- Eric Boyd informs that next Monday two hutches have to be searched for the Interlock Tests, one at MID and one at FXE. An e-mail will be sent to the instruments.
- J. Sztuk-Dambietz asks on the DAQ for DET to do not close the proposals yet; Steffen H. informs that a fix is on the way and will be fixed and running. Proposals will not be closed until the deployment.

CTRL:
- Deployment of Karabo last week.
- Announcement: re-deploy Karabo Beckhoff devices to rollback have to be done as new feature was causing problems (related to the unit values). 
Today 2PM for tunnels and Laser topics; for instruments will be later organized. A brief restart is expected.

DA:
- Nothing to report.

EEE:
- Working with CTRL to re-deploy Karabo devices for digitizers. This is ongoing and will be available later today or tomorrow.

VAC:
- Not present.

XPD:
- Completed tasks on tunnels.
- Yesterday work in Gotthard-II detector at SA2 (Hirex) was found detector does not work. CTRL and DET helped and detector was moved out of tunnel. There is no HIREX available in SA2. 
Also power supply for HIREX in SA1 has to be worked.

DET:
- Working on the Gotthard-II with XPD.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- All good so far.

UNSYS:
- Everything is fine.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Not present.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 01.07.2024, posted by Frederik Wolff-Fabris on 01 Jul 2024, 09:40 
General Announcement:
-	 

CTRL:
- Done with updates in tunnels, BKR and instruments. Today continue with lab areas accordingly to schedule;
- Update of Beckhoff version with introducing units for datalog inputs. Working on a fix for some middle layer devices. A rollback can be done in few minutes if desired.

DA:
- Need to do fine tuning deployment for some packages in Maxwell, but not critical.

EEE:
- Nothing to report.

VAC:
- Well in time going with schedule. Tasks in XTD9 to be finished today.

XPD:
- Finishing last tasks;
- Bring Gotthard detector in XTD6 to work with Hirex. If needed access in XTD6 may be requested after Interlock tests.

DET:
- Inspection of AGIPD-1M at SPB/SFX happening with Desy colleagues.

ITDM: 
- Nothing to report.

XRO:
- Everything fine.
- Couple of tasks ongoing in XTD6 (needed manual restart).

LAS:
- Not present.

UNSYS:
- Everything is fine.

SPB:
- Bug in the PLC for the chiller controllers.
- Problem with digitizers - in contact with Bruno F.
FXE:
- Broken Ion pump controller to be fixed with help from VAC.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 26.06.2024, posted by Frederik Wolff-Fabris on 26 Jun 2024, 09:52 
General Announcement:
- Water leak in one of the racks (3.13 / XTD10) in the tunnels that needs attendance. The power for this rack will be cut to investigate and exchange the heat exchanger. Possibly happening at 11:00AM 
today. 
Groups affected are VAC, IT and EEE. Repair is necessary as quickly as possible. Please check for components to that rack and switch them down before the power cut at 11:00.
- Andreas G. informs on the Monday's emergency power off task proposed to take place today at SA3: This work is postponed to the winter maintenance period. 
Only two new search buttons will be installed at SCS this week however it does not need emergency power OFF, meaning no effects on electricity and/or interlocks.

CTRL:
- Proceeding with Karabo update.

DA:
- Nothing to report.

EEE:
- Progressing with maintenance tasks.

VAC:
- Not present due to tunnel activities.

XPD:
- Tasks ongoing as planned.
- Message for CTRL and DA: Gotthard-II was installed in SA2 and water connections made. It is ready to be deployed as soon as SA2 Karabo is back. Please CTRL inform XPD/Naresh K. when Karabo is back.

DET:
- Nothing to report.

ITDM: 
- Ongoing with maintenance.
- No news for Maxwell yet; needs a follow up.
- Needs to restore components when power is back in rack 313.

XRO:
- Not present.

LAS:
- Tasks ongoing as planned.
- Lasermet installations are done.

UNSYS:
- Try to understand the level of hardware that needs to be replaced in the long maintenance. The power cycling of the cabinets brings problems for the terminals. 
One needs to replace all linear encoders in the undulators or at least the ones that does not work.
- Currently all ready for starting next Run 2024_02.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Incident with Jungfrau detector: together with DET checking of repair can be done in modules.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 24.06.2024, posted by Frederik Wolff-Fabris on 24 Jun 2024, 10:11 
General Announcement:
- Eric Boyd and Torsten Schoen: work by MPS / Wille company in SA3 radiation protection hutches will trigger emergency OFF button on Wednesday. Rack rooms connected to these hutches are also affected.
Decision if task takes place to be done after internal discussions between parts. XO will coordinate together with Eric Boyd.

CTRL:
- Start with summer maintenance: today with SA1 area.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Not present.

XPD:
- Not present.

DET:
- Nothing to be reported.

ITDM: 
- Continuing with maintenance activities: today Maxwell cluster is updated; all activities are going accordingly to the plan.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- Not present.

SPB:
- Nothing to report.

FXE:
- Not present.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 19.06.2024, posted by Frederik Wolff-Fabris on 19 Jun 2024, 09:48 
General Announcement:
-	 

CTRL:
- Perform tests on watchdogs with XPD after this meeting.

DA:
- Nothing to report.

EEE:
- Today start with cable installations at SQS - be careful with cables when walking.
- Many tasks are ongoing.

VAC:
- Nothing to report.

XPD:
- Ramp down day yesterday by XRO and XPD; issues were identified and solved. Time was useful and successful.
- Tests with Imagers without X-ray beam are being done today.

DET:
- Start with maintenance tasks.

ITDM: 
- First day with activities on servers and clusters at balcony room.
- Maxwell update on 24.06 will be advertised by e-mail today.

XRO:
- Not present.

LAS:
- Start with shutting down lasers today.
- Safety interlock work in SA3 laser areas takes up to end of next week that requires Electrical expert present (see e-mail from Torsten S.). 
Emergency OFF button is only valid for the laser rooms/hutches in SA3.

UNSYS:
- Replace SA1 cell22 PS motor from today.

SPB:
- Not present.

FXE:
- Nothing to report.

MID:
- All fine at MID; going accordingly to the schedule.

HED:
- Nothing to report.

SCS:
- Moving experimental chamber today through the Hall.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 17.06.2024, posted by Frederik Wolff-Fabris on 17 Jun 2024, 09:38 
General Announcement:
- Summer maintenance is about to start on Wednesday; tomorrow the XRO and XPD ramp down activities are planned. 
- The XO Integration meeting continues to happen during the summer maintenance period.

CTRL:
- Nothing to report; preparing for the summer maintenance.

DA:
- Nothing to report and quiet on the OCD side.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing major to report.

ITDM: 
- Nothing to report.
- Maxwell maintenance: Likely to be done Monday/Tuesday of last week of June is the deployment. E-Mail will be sent.

XRO:
- Nothing to report.

LAS:
- Nothing to report.
- SA1 issue of last weeks with drifting: sync system maintenance was not announced and found to be the reason for it. Right now it is fixed. Also master time was reset by EEE.

UNSYS:
- Everything fine apart of the SA1/cell22 PS motor to be replaced when tunnels are open.

SPB:
- Not present due to the ongoing retreat.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Start with maintenance tasks.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 12.06.2024, posted by Frederik Wolff-Fabris on 12 Jun 2024, 10:01 
General Announcement:
- This is the last operation week with beam delivery for users for this Run.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Yesterday afternoon an issue with V0 closing was solved.

XPD:
- A. Galler informs that on SPB/SFX branch the XGM was switched OFF by Theo M. as part of preparation for the summer maintenance that triggered the V0 valve.

DET:
- Nothing to report.

ITDM: 
- Announcement: upgrades of some systems will happen in last week of June after agreement with Desy-IT.
- Dcache system will also be updated in the same days, for about 2 days.
- General announcements will be sent around in due time.

XRO:
- Nothing major to report.

LAS:
- Unexplained issue in SA1 by oscillator shifted against the triggers. Under investigation.

UNSYS:
- Nothing to report.

SPB:
- Issue with AGIPD with intervention on chiller + modules exchanges and will not take beam this Run.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Not present due to Fusion workshop.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 10.06.2024, posted by Frederik Wolff-Fabris on 10 Jun 2024, 10:03 
General Announcement:
- Martin Doering presents the summer maintenance plan: 
1. Complete task lists was released last Friday; 
2. ITDM and CTRL dates: a. Karabo down from 24.06 to 02.07 depending on the topic; b. DAQ unavailable from Jun 18th to Jul. 2nd; c. replacement of exflgateway on Jun 28; d. upgrade of operations elog on 
Ju. 2nd. 
3. No major intervention cooling water apart of fluctuations on flow and temperature; 
4. No interruptions of electricity; 
5. Safety tests: a. interlock tests in experimental hutches on July 9-10.; b. SEPS and AIBS tests on July 22.  
- As PRC, Martin Dommach says everything went quiet last week.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Yesterday at SPB/SFX operation was interrupted due to Julabo chiller in AGIPD 1-M. Managed to put system back online after few hours.

ITDM: 
- Nothing to report.

XRO:
- Everything fine.

LAS:
- Not present.

UNSYS:
- Issue with phase shifter SA1/ cell22: needs a ZZ to replace parts today due to availability of people. To be discussed later.

SPB:
- Chiller issue; in discussion with DET.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 05.06.2024, posted by Frederik Wolff-Fabris on 05 Jun 2024, 09:55 
General Announcement:
- On Monday 10.06 a few slides on the Summer maintenance will be presented by Martin Doering in this meeting series. The task list will be released next Friday 07.June.

CTRL:
- Working on the all watchdog: hotfix was released last Monday and follow up is being done. Will get in touch with instruments for deployments if needed.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Everything is running fine.

XPD:
- In a retreat.

DET:
- Nothing to report; as info: DAC meeting is taking place this week at XFEL.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Sync issues seen at SCS last weekend were fixed and did not happen again.

UNSYS:
- On SA1 cell#21, two ZZs were needed on Monday: first power distribution was replaced; 
after switching on cabinet the linear encoders were not communicated and after placing controller to the rotary encoders the motor of the PS was found broken and was replaced.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Problem with on a spectrometer camera: ticket was sent to CTRL and needs further help. 
Wajid E. says DOC was also contacted and seems to be an issue with the hardware/camera as controls side it seems fine. A test with a spare camera is needed.

SCS:
- 400nm laser issue: follow up on the info regarding this failure is appreciated to be shared to other instruments that perform pump-probe experiments.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 03.06.2024, posted by Frederik Wolff-Fabris on 03 Jun 2024, 09:54 
General Announcement:
- As PRC, Maurizio V. informs on: 1. Fire alarm in tunnels / SA2 cost beamtime on Saturday as beam permission was removed; 2. PP-laser synchronization seems solved; 3. HED setting point was slightly 
changed but assumed to be fine. 


CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- It was observed at SA2 XGM too large a background synchrotron radiation signal. It was removed when Graphite filter was inserted in SA2 and it may relate to the attempt to delivery 9keV at 11.5GeV.

DET:
- Nothing to report.

ITDM: 
- Network update: move of the rack in room 27 is finished and network is running again. Please users check the system and report back to IT-support ticket system in case something is found to be wrong.

XRO:
- Nothing to report.

LAS:
- Sync issue in SCS: PP-laser went out of LOCK and Desy Sync group adjusted the internal clock and is currently optic synchronized.

UNSYS:
- Limit switch of cell3 in SA2 was activated while attempting to reach minimum gaps; fixed by UNSYS-OCD.
- Fire alarm was related to a fire extinguisher system in an undulator rack as the fan was broken.
- Wrong phase shifter gaps related to middle layer server; people working on it.

SPB:
- Preparing for Tuesday starting with beam.

FXE:
- Not present.

MID:
- Broken nano-second laser system at MID: chiller pump of the laser broke two days before user beamtime and a new order is ordered but arrives this week. 

HED:
- Nothing to report.

SCS:
- The 400nm laser use was cancelled due to damage optics.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 29.05.2024, posted by Frederik Wolff-Fabris on 29 May 2024, 09:45 
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.
- Silicon oil leak in DET lab: team was investigating and seems to be fixed by now. It is particular to this lab installation and is not similar to the ones in the instruments.

ITDM: 
- Rack move in E.0: rack has been moved to final position. Related components also moved; at the moment coordinating with room managers to make inside installations. All going smoothly and accordingly to 
the plan.

XRO:
- Not present.

LAS:
- Issue with timing jumps by SQS: debug has been done with EEE and Sync groups. Front end was changed yesterday but did not solved. 
The uTCA slave card (in the PP-laser rack) was drifting and this card was also changed last evening. There is less jitter and issue seems to be solved now.

UNSYS:
- Nothing to report.

SPB:
- Preparing beamline for next user.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Issues from the weekend: 1. interlock hutch door contact broken; 2. Misunderstanding on tuning for SA1 without notifying SQS members. 
- A. Galler comments that the tuning was discussed with instruments and likely another shift crew in the instruments were knowing the tuning operation and this information was not passed to all member of 
SQS.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 27.05.2024, posted by Frederik Wolff-Fabris on 27 May 2024, 09:41 
General Announcement:
- Thanks to all groups who have submitted the Summer/24 maintenance task list. In case you haven't done yet, please inform at xo-planning@xo.eu when you are planning to do so.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Issue with AGIPD-1M yesterday evening. DOC was called because of a misbehavior: hardware problem since several exits show high current and causes channels to trip for M1 module. 
Detector is back online but with 4 channels OFF (30% of this module). More investigation will follow.

ITDM: 
- Nothing to report: progressing with IT rack change and hopefully will meet deadline by Tuesday next week.

XRO:
- Nothing to report.

LAS:
- Just got a message from SPB/SFX with problem in wavelength in SPB/SFX laser. Will be looked at after the meeting.

UNSYS:
- Everything fine.

SPB:
- AGIPD and PP-LAS issues already reported.

FXE:
- Nothing to report.

MID:
- All fine.

HED:
- Fine at HED.

SCS:
- Not present.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 22.05.2024, posted by Frederik Wolff-Fabris on 22 May 2024, 09:53 
General Announcement:
- Next Friday 24.05 is the deadline to submit maintenance task lists. Please contact XO in case you are not prepared to submit by the deadline.

CTRL:
- Nothing to report.

DA:
- Not present.

EEE:
- Issue with Hexapod in HED: under investigation by EEE and Bernard B. Not having the Hexapod will affect the experiment this week. A back plan exists but no guarantee it works if a fix can't be done. 

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Julabo chiller at SPB/SFX does not maintain the low temperature - under work.
- Two weeks ago (user experiment) some AGIPD modules at SPB/SFX were exchanged and damage has been found at the new modules. 
A report by SPB/SFX will be written for that it does not happen again as if damages are frequently happening one will run out of spare modules.

ITDM: 
- Works started in the network at lab areas and are ongoing.

XRO:
- Nothing to report.

LAS:
- Flatness of SPB PP-laser under investigation;
- SA3 PP-laser stain issue did not go away: manufacture of front-end amplifier is contacted; further tests to be done today.

UNSYS:
- Not present.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Hexapod issue already mentioned.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 15.05.2024, posted by Frederik Wolff-Fabris on 15 May 2024, 09:44 
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- All fine from DA.

EEE:
- Nothing to report.

VAC:
- Not present.

XPD:
- All fine with diagnostics;
- First shift yesterday for studies with beam steering in SA1 and today the continuation.

DET:
- Nothing to report.

ITDM: 
- Reminder for the announcement on the network works on next Tuesday in the lab areas (see also sent e-mail). No strong objections were presented so far. Please contact urgently ITDM in case of questions.
- Room managers have to grant access to the workers during the Network maintenance.

XRO:
- Everything fine.
- Working today with Euler MDL.

LAS:
- On timing jumps and spectrum shifts for SA1 PP-laser reported last Monday: timing jumps under investigations by EEE (not happened since Monday); changes during the shifts under investigation.

UNSYS:
- All fine.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 13.05.2024, posted by Frederik Wolff-Fabris on 13 May 2024, 09:43 
General Announcement:
- A. Galler reminds that entries from the instruments taking beam at the Operation-2024 e-log is highly appreciated.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Issue Friday night at 02:28AM: the SA2/XTD1 XGM stopped delivering single shot data. There was an interlock of high voltage HAMP (over current happened). 
It was repaired earlier in the morning around 08:30AM but further investigation is ongoing. 
MID did not take beam during that time due to another issue happening in parallel, so no data needed from XGM were lost.

DET:
- Nothing to be reported.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- Everything is fine.

SPB:
- Piezo motors for the PP-laser had issue but now it's solved.

FXE:
- Problem with PP-laser (fundamental spectrum) was fixed by OCD.
- PP-laser timing jump after shift changes from SPB/SFX.
- Problems with dark taking for the Jungfrau which was reported to DOC - as DRC, Phillip Schmidt reports that refreshing the myMDC page permits to make data visible.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Users are taking beam.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 08.05.2024, posted by Frederik Wolff-Fabris on 08 May 2024, 09:39 
General Announcement:
- A. Galler inform that if a hutch radiation alarm is triggered please familiarize yourself with the procedures. It can be helped by Hall Crew and/or D3. Operation is stopped when this alarm is triggered.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Problems with AGIPD-1M at MID: one module does not send proper data. Under work;
- Last week issue with AGIPD at SPB: modules were flickering and major intervention is needed to further investigate. Issues with calibration and data quality: work is ongoing.

ITDM: 
- Everything is fine.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Everything is fine and yesterday the ZZ was not needed.

SPB:
- Issue with AGIPD-1M data quality is been worked on.

FXE:
- Not present.

MID:
- AGIPD module issue already mentioned by DET.
- 2.4mm CVD foil attenuator seems to be damaged; it will be discussed with XRO.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Nothing to report, starting to take the beam.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 06.05.2024, posted by Frederik Wolff-Fabris on 06 May 2024, 09:21 
General Announcement:
- Summer maintenance task list was sent to the groups. Please contact XO in case of questions or if your group did not receive the list.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Discussion ongoing for the summer maintenance tasks.

VAC:
- No OCD calls for VAC and systems seemed to be not affected by this morning's power glitch at 05:47AM.

XPD:
- Everything fine with diagnostics.

DET:
- Nothing major to be reported.
- 500k AGIPD over the weekend was helped by DOC and DATA OCDs solved.

ITDM: 
- Nothing to report.

XRO:
- Event of misalignment of M6 on Friday for SA3/SXP under investigation. It will be discussed with SXP.

LAS:
- Not present.

UNSYS:
- All fine with undulators.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to be reported.

HED:
- Running and thanks to DOC and OCDs for AGIPD help.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 29.04.2024, posted by Frederik Wolff-Fabris on 29 Apr 2024, 11:35 
General Announcement:
- Martin Doering announces the 2024 summer maintenance period: 
1. Release MTL on May 3rd; 
2. deadline to submit back tasks on May 24th to xo-maintenance@xfel.eu ;
3. Maintenance starts on Jun19th. 
4. Interlock tests on July 1st-11th; 
5. There are 119 recurring tasks that happen often during maintenances which are showed in XO Alfresco page under Maintenance Planning (start and ending dates will be determined during scheduling period); 
6. For further questions please contact XO at xo-planning@xfel.eu

- Janusz S. and Kimon F. announce an eminent downtime on network for Lab and T0 areas to perform the exchange of the battery UPS location. It will take place on May 21st. 
Please affected groups to give a feedback. Safety group will also be involved as it affects the wireless network. Network shutdown takes place during two weeks. 
A. Galler asks all groups that have rooms in lab areas to contact Kimon F. and/or Janusz S..

- Next Wednesday due to the public holiday there is no XO Integration Meeting.

CTRL:
- Tomorrow the SA2 broker update takes place in coordination with XO.

DA:
- Nothing to report.

EEE:
- Nothing to be reported.

VAC:
- Trouble with Ion pump controller at HED branch on Thursday evening. Clarified by VAC-OCD and PRC and an access tomorrow morning is needed to exchange the controller.

XPD:
- Nothing to report.

DET:
- Nothing to be reported.

ITDM: 
- Janusz S. informs on tomorrow gateway reboot taking place tomorrow between 10Am and 11AM.

XRO:
- Not present.

LAS:
- Not present.

UNSYS:
- SA3 cell 21 phase shifter needs ZZ in tunnel.

SPB:
- Problems with uTCA for some controllers contacted with DOC.

FXE:
- Issue with data aggregator giving fault when too many were acquired and some data were lost. Steffen H. said is was addressed and shall be stable now - a test by FXE will be done.

MID:
- Small problem scanning photon energy with the seeding crystal.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Change on experimental plan but parameters are kept the same for cw19.
Entry   Notes XO Integration Meeting 24.04.2024, posted by Frederik Wolff-Fabris on 24 Apr 2024, 09:49 
General Announcement:
-	 

CTRL:
- Broker incident on SA2 and LAS topics last Saturday: update to be done in a split mode; 
SA2 topic could not be done yesterday so is planned for Tuesday 30.04 morning and LAS topic to be done still this week as none uses PP-laser.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Everything fine;
- SA2 FEL IMG issue: linked mainly to a bridge connection to DOOCS (left over from broker issue on Saturday). Restart it only yesterday and not during the weekend. 

DET:
- Nothing major;
- Feedback from Jungfrau test at SPB last week: unfortunately, did not fully run as expected as user Bragg magnifier scene was optimized at 10keV and not 21keV. 
Nevertheless, data could be seen and it was useful to have beamtime.

ITDM: 
- On EXFEL Gateway: need to apply a fix and update security; an e-mail will be sent for scheduling on next Tuesday.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- Everything fine.

SPB:
- Nothing o report.

FXE:
- Problem with middle layer server reported to DOC this morning. It seems solved after server restarted.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Issue with detector/data found last week and on the way to be fixed for next week. 
Entry   Notes XO Integration Meeting 22.04.2024, posted by Andreas Galler on 22 Apr 2024, 09:28 

General Announcement:

  •  

CTRL:

  • Broker Issue in SA2 on Saturday evening
    • LA2 and SA2 topic restarted

DA:

  •  

EEE:

  • nothing to be reported

VAC:

  •  

XPD:

  • everything fine

DET:

  • nothing major

ITDM: 

  • nothing major

XRO:

  •  

LAS:

  •  

UNSYS: 

  • Everything fine

SPB/SFX:

  • everything worked fine

FXE:

  • nothing to report

MID:

  • all fine

HED:

  •  

SCS:

  • nothing

SQS:

  • nothing

SXP:

  • nothing

DRC

  •  

PRC

  • HED was not taking beam during the SA2 broker issue, as a hardware change was being done
    • by 2 am Sunday the systems were recovered and working

AOB:

  •  
Entry   Notes XO Integration Meeting 17.04.2024, posted by Frederik Wolff-Fabris on 17 Apr 2024, 09:47 
General Announcement:
- A. Galler inform on the transponder/access issues at XHEXP1 last two days: when turnstiles are not working, people shall not get though and enter experimental Hall. 
This is a safety break that will be taken by SRP. Please do not enter Hall if turnstiles are not working. 
- As DRC, A. Silenzi informs there is nothing to report so far.

CTRL:
- Together with XPD and XRO a new version of DAQ in tunnels was installed and tested. All went fine.

DA:
- Nothing to report.

EEE:
- Nothing to be reported.

VAC:
- Nothing to report. Repair on Monday went successful.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- DAQ Switch in SA3 was exchanged and work fine.
- GPFS update is postponed to a later date (tbd).

XRO:
- SA2 ATT #5 (1.2mm CVD) is replaced and working.
- SA1 mirror is calibrated to work with Euler motions.
- SPB/SFX is aligned with 22keV beam.

LAS:
- Nothing to report.

UNSYS:
- PS motor in SA1/cell23 was replaced yesterday by a ZZ.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 15.04.2024, posted by Andreas Galler on 15 Apr 2024, 09:31 

General Announcement:

  •  

CTRL:

  • SA1 DAQ upgrade

DA:

  • nothing to report

EEE:

  • nothing major

VAC:

  • involved in XTD1 solid attenuator repair
    • inform control once its done for MDL

XPD:

  • nothing major

DET:

  • nothing major

ITDM: 

  • FES switch for SA3 DAQ update will be replaced today --> DAQ won't be available
    tomorrow gpfs pclayer update

XRO:

  •  SA1 Solid Attenuator repair & SA1 21-22 keV beam transport alignment had been done

LAS:

  • not present

UNSYS: 

  • nothign major

SPB/SFX:

  • beam is prealigned for 21- 22 keV this week, lots user prepartion

FXE:

  • mothing major

MID:

  • allfine

HED:

  • not present

SCS:

  • nothing

SQS:

  • not present

SXP:

  • not present

DRC

  •  

PRC

 

AOB:

  •  

 

 

Entry   Notes XO Integration Meeting 10.04.2024, posted by Andreas Galler on 10 Apr 2024, 09:26 

General Announcement:

  •  

CTRL:

  • nothing to report

DA:

  • nothing to report

EEE:

  • nothing major

VAC:

  • nothing major

XPD:

  • nothing major

DET:

  • nothing major

ITDM: 

  • FES switch reboot in SA2 successful

XRO:

  •  nothing major

LAS:

  • not present

UNSYS: 

  •  

SPB/SFX:

  • nothing major

FXE:

  • mothing major

MID:

  • allfine

HED:

  • not present

SCS:

  • nothing

SQS:

  • nothing

SXP:

  • not present

DRC

  •  

PRC

 

AOB:

  •  
Entry   Notes XO Integration Meeting 08.04.2024, posted by Andreas Galler on 08 Apr 2024, 09:27 

General Announcement:

  •  

CTRL:

  • Nothing major

DA:

  • nothing major

EEE:

  • nothing major

VAC:

  •  

XPD:

  • everything fine, maybe ZZ tomorrow

DET:

  • nothing major

ITDM: 

  • short interuption of DAQ Switch for SA1 tomorrow
    • in coordination with CTRL 
  • GPFS clients on all PClayer servers planned for tomorrow

XRO:

  •  XTD1 ATT repair planned for next Monday

LAS:

  • not present

UNSYS: 

  • everything fine

SPB/SFX:

  • Nothing major

FXE:

  • train issue with JUNGFRAU

MID:

  • nothing major

HED:

  • nothing major

SCS:

  • nothing major

SQS:

  • not present

SXP:

  • not present

DRC

  • Broker issue on Friday
    • SA2 topic restarted

PRC

 

AOB:

  • XPD is planning for a ZZ in SA2 tomorrow, UNSYS wishes for ZZ in SA3 --> both topics to be discussed in the following RC meeting
Entry   Notes XO Integration Meeting 03.04.2024, posted by Andreas Galler on 03 Apr 2024, 09:28 

General Announcement:

  •  

CTRL:

  • nothing major

DA:

  • nothing major

EEE:

  • nothing major

VAC:

  • Leak in SA2 Attenuator
    • Arm5, had been removed and a blind flange
    • Wajid asks if arm 5 was disabled from the middle layer device --> Mikako set the interlock for this arm and Wajid and MIkako will check together

XPD:

  • no damage to XTD9 XGM

DET:

  • nothing major

ITDM: 

  • nothing major

XRO:

  • see VAC ...
    • arm5  = CVD 1.2 mm
    • spare CVD available, 

LAS:

  • nothing to report
    •  

UNSYS: 

  • cell 11 and cell 34 in SA2 not repsonfing

SPB/SFX:

  • nothing to report, AGIPD operational

FXE:

  • nothing to report

MID:

  •  

HED:

  • AGIPD didn't send traiIDs for some modules -> fixeed on Monday by DOC

SCS:

  • nothing major

SQS:

  • easter experiment was good

SXP:

  •  

DRC

  • HED trainID issue
    • related to legacy data aggregators and not understood, but related to the legacy DAQ version from which HED will depart soon
      • issue will not be investigated
    • HED scheduled for rollout of new DAQ in cw 15

PRC

  •  
Entry   Notes XO Integration Meeting 27.03.2024, posted by Frederik Wolff-Fabris on 27 Mar 2024, 10:01 
General Announcement:
-	 

CTRL:
- Nothing to report.
- No DAQ updates today.

DA:
- Things are fine; nothing to report.

EEE:
- Nothing to report.

VAC:
- Pressure issue in XTD2/SA1 during the night stopped beam permission to North Branch. One controller for ion pump needs to be replaced in a ZZ.

XPD:
- Ticket was sent to CTRL about missing data in DAQ at slow 10Hz data.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing from XRO.

LAS:
- Nothing from LAS.

UNSYS:
- Nothing to report.
- If ZZ in SA3 can be done, a replacement of a Pandora box may take place. Suren K. will contact Mikako M. (PRC).

SPB:
- Nothing to report.

FXE:
- Not present.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 25.03.2024, posted by Frederik Wolff-Fabris on 25 Mar 2024, 10:24 
General Announcement:
- A power glitch happened last night around 02:50AM.

CTRL:
- Nothing to report.
- DAQ update: MID had operation during the weekend and seems to run fine; one issue after several hours needed a recycling but further investigation is ongoing to provide a fix in the coming days.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing major to be report.
- AGIPD in SPB/SFX is running with 16modules; issue with connection caused one module to do not work (due to positions). There is a golden position and for next quadrant move has to be observed. 
For a fix one needs a heavy intervention (disassemble half the detector - for the big shutdown).

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- Everything is fine.

SPB:
- Nothing to report.

FXE:
- Not present.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Experiment goes well so far.
- Hall crew will support SCS this week.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 20.03.2024, posted by Frederik Wolff-Fabris on 20 Mar 2024, 10:12 
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- All fine at DA.

EEE:
- PLC team received SCS calls regarding interlocks; under investigation.

VAC:
- Last weeks a shutdown on seven ion pumps happened on Friday but was restarted remotely.

XPD:
- All running good from XPD.

DET:
- AGIPD follow-up: nothing obvious was found, but module started working again after quadrant was moved; it may relate to vacuum issues and results from operation or electrical connection.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Everything is fine;
- On Monday successful operation from BKR operators regarding Apple-X. 
A. Galler clarifies the Apple-X is not yet available for instruments and coordination with Unsys, machine and photon RCs are still needed.

SPB:
- Nothing to report.

FXE:
- Taking the beam and everything is fine so far.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Since yesterday, Tuesday, an issue with a O2 sensor happens but TS and TN were informed.
- Interlock issues that EEE is also informed.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 18.03.2024, posted by Frederik Wolff-Fabris on 18 Mar 2024, 09:58 
General Announcement:
- Machine is currently down due to the file system issues / controls. People are working with priority to recovery systems.

CTRL:
- Nothing to report;
- DAQ Uodate: Steffen Hauf informs the new DAQ version at SPB/SFX running last week had issue with data aggregator on Saturday. Debugger output is being performed in the nights at SPB; 
Deployment at MID will be discussed; Data reduction inconsistencies need to be further checked with SPB/SFX.

DA:
- Nothing to report; quiet week with DA/DOC.

EEE:
- Nothing to be reported.

VAC:
- Not present.

XPD:
- Everything working good with XPD.

DET:
- AGIPD at SPB/SFX: 1 module was lost last week and excluded of the operation (top module); correlated to when quadrants were moved; 
Changing of config and inspection will be done from tomorrow; there is a chance we run with only 15 modules until end of the run. There is no spare module to be replaced.
- Chiller at SPB/SFX was exchanged and running now.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- Everything is fine.

SPB:
- Already reported: Back to old DAQ; AGIPD module missing (top corner) - would be important for PCS beamtime.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report; user experiment ongoing fine; happy users.

SCS:
- Two dewars of liquid nitrogen are requested for liquid jet experiments - Hall Crew will prepare dewars.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 13.03.2024, posted by Frederik Wolff-Fabris on 13 Mar 2024, 11:30 
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- Not present.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Everything is fine. ZZ on Monday was successful.

SPB:
- Nothing to report;
- Problem with AGIPD chiller: seems solved for the moment - see how it goes next days.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Starting with the beam.

- SCS:
- Prepared equipment; maybe electronics will be contacted later.

SQS:
- All good.

SXP:
- All not present.
Entry   Notes XO Integration Meeting 11.03.2024, posted by Frederik Wolff-Fabris on 11 Mar 2024, 10:04 
General Announcement:
- A cryo failure happened today at 09:15AM. Machine is down and shifts for today are cancelled. Experts are investigating the issue to define when to expect ramp-up for the delivery week. Naresh K., as 
PRC, adds that the expected downtime is 12 hs.
- As PRC, Naresh K. informs the blue week activities were successful so far. On Sunday the AC for SPB/SFX was making strange noises - TS is aware and will look into details.

CTRL:
- Nothing to report.
- Dennis Goeries informs on DAQ report: Last week run configurations were replaced; this week the new DAQ will run completely ON at SPB/SFX – if everything runs fine then MID will be updated next week 
and others in cw15.

DA:
- Nothing to report.

EEE:
- Agreed to update tomorrow the SPB EPS.

VAC:
- Nothing to report.

XPD:
- Many studies were conducted; minor issues with calibration on XGM, but fixed;
- Diamond detector beamtime was successful.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- All fine.

LAS:
- Nothing to report.

UNSYS:
- SA1 cell 25 need replace terminal on undulator control rack - needs ZZ.
- Communication between undulator server to DOOCS is problematic for last cells (from 31) in SA1.

SPB:
- Issue with AGIPD 1-M Julabo chiller which does not work; needs TS.

FXE:
- A ticket for the Data groups for DAQ is sent.

MID:
- All fine.

HED:
- Preparing for next experiment. New DAQ with half upgrades are installed and will be running the whole week.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present. 
Entry   Notes XO Integration Meeting 06.03.2024, posted by Frederik Wolff-Fabris on 06 Mar 2024, 10:12 
General Announcement:
- This is a facility development week and on Friday's UOM we will get reports on recent weeks' jitter observations from the instruments. 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Clean tent is moved from XTD10 to XTD2 for XFELO activities on the summer maintenance period.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- E-mail was sent to xo-info on the intervention of migration THU morning for about an hour.

XRO:
- SA1 ATT watchdog presenting typos and acting with the wrong bunch number: Mikako M. reports the same (copied) watchdogs in other SASEs do not show this error and the SA1 is now fixed. 
Origin for the error in SA1 is not understood and difficult to find.
- All Attenuators in SA1 were moved 1mm up to help reaching an area without damage.

LAS:
- AMPHOS shutter issue over the weekend: the ad-hoc procedure is no longer in place and the issue is fixed.

UNSYS:
- Motor and electronics in PS SA3/cell12 were exchanged yesterday. 

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Not present.

HED:
- Nothing to report.

SCS:
- Girder system showed an electronic problem that requires hardware change; discussed with Sylvia and E-planners.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 04.03.2024, posted by Frederik Wolff-Fabris on 04 Mar 2024, 09:50 
General Announcement:
- A cold compressor failure happened on Friday and since Sunday early hours machine is running in good performance again.
- Pouneh S. reports that Sunday morning Amphos shutter closed and ad-hoc procedure was put in place to allow beam delivery. Investigation is ongoing.

CTRL:
- Information: minor incident with SA1 macro server which was shutdown by mistake on Friday. Macros that were know to be running were restarted afterwards.

DA:
- Nothing major to report: OCD was quiet before and after downtime.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Damage on one of the XTD2 solid attenuator is found. A similar action as done in XTD1 to move the plate position is under discussion with instruments.

LAS:
- Not present.

UNSYS:
- Everything is fine and tomorrow SA3 cell 12 PS motor will be replaced.

SPB:
- Issue with changing number of bunches that originated from XTD2 attenuator watchdog, limiting to 24 bunches.

FXE:
- Decoupling phase shifters during scans caused non-stable beam.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 28.02.2024, posted by Frederik Wolff-Fabris on 28 Feb 2024, 09:41 
General Announcement:
- As PRC, Maurizio Vannoni informs that messages on the SA1 solid attenuator were sent to SPB and FXE - further info and discussions will happen offline; 
also operation of XGMs in SA1 and SA2 were clarified and everything is running fine from machine side. 

CTRL:
- No issues from CTRL.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- All fine with Diagnostics

DET:
- Nothing to report.

ITDM: 
- Nothing to report.
- Issue with data migration: understood and fine.

XRO:
- Nothing to report from Optics.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report; thanks to everyone for enabling delivery this week.

FXE:
- Nothing to report.

MID:
- All fine.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 26.02.2024, posted by Frederik Wolff-Fabris on 26 Feb 2024, 09:42 
General Announcement:
-  As PRC since Sunday, Maurizio Vannoni reports the weekend had no major issues.

CTRL:
- Nothing to report.
- Steffen H. updates that Saturday night issues at SPB/SFX DAQ happened. Seems to be related to a late data from Hirex. Decided to switch to legacy version and is running smoothly. New tests are schedule 
for this week.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Issue with data migration: strange pattern; under work.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Waiting for the ZZ on March 5th to fix PS in SA3.

SPB:
- Nothing apart of the DAQ issues.
- User collects data.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Running in general with very happy performance of HXRSS.
- Sample water stop update; a redmine ticket to EEE is sent and is under discussions.
- User wanted background measurements with HIREX. To be done on last hour of beamtime. 

SCS:
- Nothing to report.
- Getting data at one color mode.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 21.02.2024, posted by Frederik Wolff-Fabris on 21 Feb 2024, 10:05 
General Announcement:
- The HED/HIBEF pulser will be fired today for the first time. If other groups see spurious effects on electronics please report back to XO.

CTRL:
- Nothing to report.

DA:
- Nothing to report.
- Issue with FXE dark run calibrations: follow up problems with not correct Jungfrau DAQ; with installing new DAQ this can be solved; a work around exists for the old version.

EEE:
- Nothing major to report.

VAC:
- Nothing to report.

XPD:
- Not present.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report; no updates on last week's SA1 jitter fluctuations.

LAS:
- Nothing to report.

UNSYS:
- SA3 cell 12 Phase shifter needs the ZZ to be done on March 5th.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All great at MID.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 19.02.2024, posted by Frederik Wolff-Fabris on 19 Feb 2024, 09:55 
General Announcement:
- As PRC Maurizio V. mentions there is nothing particularly important to report.


CTRL:
- Nothing to report.
- Steffen H. informs on DAQ: SPB run the new version and not too many issues were left - just trains were not reduced entirely and scheme updates were not available. Overall it run stable last nights.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Issue with Jungfrau/FXE: gain parameters were not saved in files sometimes; Fixed by refreshing the DAQ. DET is working on it. 
Fabio D.'A. confirms the strategy and there is no impediment to the instruments anymore.

ITDM: 
- Reminder for commissioning proposals from last year: there are one from SPB/SFX and one from SCS that still have to be closed. From Thursday data will be lost if not moved/copied.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- Waiting for ZZ for repairing the phase shifter in cell#12 SA3.

SPB:
- Nothing to report.

FXE:
- Jungfrau problem: FXE called DOC every time (See DA above). Steffen H. proposes to test new DAQ this week as it has no users and shall help to fix the DAQ point reported.
- Beam energy loss during the weekend.
- Pointing issues were reported on Friday.

MID:
- Issue with AGIPD when moving.
- Users are happy and taking data. 

HED:
- Preparing for beam this week with two programs.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 14.02.2024, posted by Frederik Wolff-Fabris on 14 Feb 2024, 12:21 
General Announcement:
-  As PRC, Maurizio Vannoni says so far everything is going well this week.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Not present.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- Problem with SA3 cell 12: seems that electronic is damaged (worked yesterday after power cycling but after few hours of operation it stopped again). 
Needs to replace electronics and motor in a next ZZ. Also error message is not given but motor simply does not work.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Damage of ATT 1.2mm diamond: will investigate new position with beam today.

HED:
- Successful user experiment until yesterday morning; machine performance with HXRSS was very good!

SCS:
- Good experiment last week and preparing for the next beamtime.

SQS:
- Preparing to use beam over the weekend.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 12.02.2024, posted by Frederik Wolff-Fabris on 12 Feb 2024, 09:40 
General Announcement:
- As PRC, Andreas G. informs the week went smooth so far.

CTRL:
- Announcement: CTRL will shut down one control host in SA1 and SA3 to let maintenance by ITDM. It affects one server at each part. To be done tomorrow at 10:00AM by half an hour. 
The GUIs that are open and connected will not work during this time.
- DAQ upgrade: not good news - few issues with DAQ at SPB/SFX. Under detailed investigation and working from that lessons. SPB rolled back to old DAQ and worked as it had been before.

DA:
- Nothing to report. Quiet week from DA.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- SA3 / cell12 status: waiting for the power cycling but seems not to be necessary. All fine.

SPB:
- Issues with DAQ (as reported by CTRL).
- Happy users so far; the change on Saturday went smooth.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- It went overall well for the experiment. HXRSS was done well with a bit larger background.
- N. Kujala asks for the HIREX must stay inserted on Tuesday allowing further studies.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 07.02.2024, posted by Frederik Wolff-Fabris on 07 Feb 2024, 10:29 
General Announcement:
-	 

CTRL:
- Influx data show timing inconsistencies. Under investigation but data can still be seen in Graphana.
- Steffen H. updates the DAQ: SPB/SFX is using the updated version and seems to work nicely. Still following up things that were observed during the tests.

DA:
- Not present.

EEE:
- Motor issue during the weekend was solved.
- As DRC, Patrick Gessler says DOC is not occupied on Tuesdays now that this is the access day.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Yesterday the migration to new storage system went successful.

XRO:
- ZZ was done yesterday for the XTD6 attenuator. Needs a feedback from MID when they get the beam.
- No other issues to report.

LAS:
- PP-laser is delivering also in SA3. SCS has 1.3mJ power delivered at 112kHz. One gets 1.7-1.8mJ in front of upstream, what is not too far from the nominal value (2mJ).
- From next week a two stage NOPAS is requested in SA3.

UNSYS:
- Everything is fine.

SPB:
- DAQ feedback: so far but it is happy with it.

FXE:
- Issue with MONO heater is solved.

MID:
- All motor issues have been solved.

HED:
- It had a minor issue with automatic Dark Procedure; a ticket will be written.
- From lunch time today the HXRSS will be tuned.

SCS:
- It had Vacuum issues at DPS which triggered the XGM. It is in contact with Theo M. which will restart the XGM.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 05.02.2024, posted by Frederik Wolff-Fabris on 05 Feb 2024, 09:57 
General Announcement:
-	 

CTRL:
- Issue with CTRL high CPU use in a Control machine due to Karabo side; servers have to be restarted and investigation of error source is ongoing.
- Steffen H. updates on DAQ update: today performing tests at SXP. For AGIPD on Friday the system was very stable and today continue with Jungfrau.

DA:
- Nothing to add apart of Steffen H. comment.

EEE:
- OCD call for PLC team from MID which is under investigation. Problem with motors.

VAC:
- Nothing to report.

XPD:
- Issue with XTD9 imager solved by ZZ.

DET:
- One OCD call due to misconfiguration at MID AGIPD.

ITDM: 
- Reminder for the SA1 online storage will be migrated to the new storage tomorrow. It will not be available during the time.

XRO:
- Nothing to report.

LAS:
- SA3 PP-laser has issue and AMPHOS technician is called.

UNSYS:
- SA3 cell#12 has an issue and needs to be exchanged in the next ZZ.

SPB:
- Nothing to report.

FXE:
- Not able to enough heat up FXE mono. Needs ZZ to increase heating power.
- Intensity bunch trains not stable and bunch pattern device was not stable (fixed by DOC; cause still unclear).
- Wajid E. says source is restarted and further investigation is ongoing.
- Martin Dommach received an e-mail and will discuss with Peter Z. on the Mono.

MID:
- Couple of problems with Smaracts motors and encoders;
- Slowness of processing AGIPD darks was observed.
- XTD1 Attenuator (diamond 1.2mm) was inserted and beam was cut as well as a shadow in upper side. Needs XRO to discuss. 

HED:
- No major issues from last week and HXRSS is needed for the coming week.

SCS:
- Nothing to report.

SQS:
- Running in interleaved gave background from SA1; switch to non-interleaved worked nicely for the program.
- Pulse intensity slope was observed for long trains.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 31.01.2024, posted by Frederik Wolff-Fabris on 31 Jan 2024, 09:57 
General Announcement:
- Steffen Hauf informs on DAQ: the crashes on slow aggregators were reproduced in the lab. A work is being prepared to be tested at MID tomorrow or Friday.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- MID LDM and PLC issues being worked and to be finished as soon as possible.

VAC:
- Not present.

XPD:
- Issue with Pop-in in XTD9 after M3 preventing SPB using the beam: being checked right now.

DET:
- Nothing to report.

ITDM: 
- Information about storage for SA1 instruments: hardware and software are ready and storage can be used. A test yesterday went fine. 
Proposals that were delayed in creation for this Run were created yesterday. Raw data for these new proposals is already stored there.
- Remind that old proposals that were prolonged must be closed.
- New storage is a temporary solution as instruments take beam this week. A half-day is needed to migrate to the final location. 
Proposition is to make this final synchronization next Tuesday (non-availability of storage data for SA1 for a couple of hours). E-mail to xo-info@xfel.eu will be sent.

XRO:
- Nothing to report.

LAS:
- SA1 and SA2 all good; thanks for EEE with last minutes help;
- SA3: bringing up NOPAS and looks good to be ready for the end of the week.

UNSYS:
- Nothing to report.

SPB:
- Issue with M3 Pop-in.

FXE:
- Nothing to report.

MID:
- All fine; LDM problems were solved by EEE - thanks.

HED:
- Taking the beam and looks fine so far.

SCS:
- Taking the beam.

SQS:
- Taking the beam from the afternoon.

SXP:
- Tomorrow it takes the beam.
Entry   Notes XO Integration Meeting 29.01.2024, posted by Frederik Wolff-Fabris on 29 Jan 2024, 09:57 
General Announcement:
- Experiment tuning week starts on Wed 7AM until Tue 7AM next week. It is the first week with Tuesday as tuning day by machine.

CTRL:
- Nothing to report.
- Steffen H. inform on DAQ update: SPB run with AGIPD (data aggregator) worked nicely; With runs over the weekend making progress.

DA:
- Nothing to report.

EEE:
- One PLC update requested by HED was done.

VAC:
- Nothing to report.

XPD:
- Fine from XPD side;
- As PRC, Jan G. informs that overall all program points for last week were completed even if small issues happened; On Sunday machine had a downtime during the day.

DET:
- Contacts with bring up days: detectors were put into operation and all good.

ITDM: 
- Info regarding new online storage for SA1: still on preparation and in good way to have ready for this week. A switch will be done and organized with SPB/SFX and FXE.

XRO:
- Ramp-up time last week: SA1 and SA2 mirror motors are recalibrated and/or readjusted. Please see 2024 e-log for details. Instruments can use these values as starting point.
- Beam commissioning still limited due to bunch limitations by interlocks from MDL instrument side.

LAS:
- Not present.

UNSYS:
- Small problem with cell12/SA3 undulator. A ZZ is planned for today.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Everything looks good so far.

SCS:
- Everything is fine.

SQS:
- Everything OK.

SXP:
- Problem with safety keys: not returned before Friday. A. Galler mentions that for the future it will be incorporated as a maintenance activity.
Entry   Notes XO Integration Meeting 22.01.2024, posted by Frederik Wolff-Fabris on 22 Jan 2024, 09:47 
General Announcement:
- Reminder that machine tuning day is on Tuesdays and Friday's User op meeting does not contain Coordinator reports this year which are to be done on Mondays RC meeting.
- The User & Operation Meeting will restart next Friday 26.Feb.
- Martin Doering presents the status of the winter maintenance tasks. An e-mail will be sent to the groups today for a feedback on pending or cancelled tasks. A reply up to Friday is needed.
- A confirmation if XO Int. meeting takes place on next Wednesday (due to the User's meeting) will be sent.

CTRL:
- Friday XPD reported bug in XGM. Fix to be done today.
- Progressing well with bring up days - today with SQS.

DA:
- Nothing to report.

EEE:
- Busy with bring up days at SQS.

VAC:
- XTD10 broken ion pump controller needing a ZZ access.

XPD:
- Fast XGM data issue mentioned by CTRL.
- On weekend machine tuned for SASE and SRA slit apparently need readjustment for the center position. Unclear is position is lost due to recalibration.
- Gotthard-II commissioning with beam later this week.

DET:
- Busy with bring up days.

ITDM: 
- Nothing to report.

XRO:
- From tomorrow starts the recommissioning/alignment of mirrors in preparation for next week's operation.
- SA3 instruments are needed to interlock the hutches and open the shutter for the weekend to allow XRO work on alignment.

LAS:
- Not present.

UNSYS:
- All fine with Undulators.

SPB:
- Not present.

FXE:
- D3 setup installation taking place today.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- All fine with SCS.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 17.01.2024, posted by Frederik Wolff-Fabris on 17 Jan 2024, 09:44 
General Announcement:
- Functional interlock tests at instruments are ongoing by D3 and SRP. Information was sent by e-mail.
- A. Galler reminds that from this year the machine maintenance and tuning day takes place on Tuesdays. 
- The UOM on Fridays will slightly change its program and the report from RC, PRC and DRC will not take place on it but rather on Monday's RC meeting at 10AM. 
From January 26th every instrument that receives beam regardless of having users or not will present their status and activities. 
For blue weeks the Schenefeld groups using beam will make a brief report together with the Jitter report from instruments. An e-mail with these changes will be sent.

CTRL:
- Progressing with bring up days. SQS was postponed due to sickness and will be done next Monday.

DA:
- Busy with bring up days.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Busy with bring up days and going smoothly.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- Problem with SA1/cell28 undulator: replace of power distribution did not solve the issue. The downstream linear encoder does not work and a switch to rotary encoder is done to allow operation. 
Encoder to be fixed in a future maintenance period.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Busy with bring up days.

SCS:
- Bring up days went fine - thanks to the groups.

SQS:
- Not present.

SXP:
- Bring up days went well on Monday.
Entry   Notes XO Integration Meeting 15.01.2024, posted by Frederik Wolff-Fabris on 15 Jan 2024, 10:52 
General Announcement:
- Interlock tests light: functional tests will happen this Wednesday starting at 09:00 at the instruments. Emergency OFF will not be pressed.

CTRL:
- Updates are working and going well;
- Experiencing issue with DOOCS devices since Friday. Reported to DOOCS team and needs to roll it up.
- Weekend: issue with SA2 topic: MPP broker had one post that lost connectivity to Karabo (LAS2). Middle layer devices successfully connected and easiest solution was to restart these two topics. 
Done between DRC and PRC. Macros or calibration services were not started yet.

DA:
- Nothing to report.

EEE:
- Friday evening OCD call with VAC.
- Bring up day at FXE went fine.

VAC:
- Problems: false alarm that were cleared out on Sunday and is normal now.
- Continuing some maintenance tasks.

XPD:
- Starting Diagnostic devices this week. From weekend SASE tuning is planned.

DET:
- Nothing to report.

ITDM: 
- Investigating broker in SA2.

XRO:
- Not present.

LAS:
- Not present.

UNSYS:
- Small problem in SA1 / cell28: power distribution terminal must be replaced by ZZ.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Bring up days starting today at SCS.

SQS:
- Not present.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 10.01.2024, posted by Frederik Wolff-Fabris on 10 Jan 2024, 10:37 
General Announcement:
- Interlock tests are finished and XTD6 and XTD9 will be closed again today during the day. They shall close on January 19th.

CTRL:
- Nothing to report.

DA:
- Not present.

EEE:
- Update of 2 tunnels PLCs: 1. SA3 MOV2 loop today in 30mins; 2. tomorrow afternoon FXE tunnel PLC to integrate interlocks.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to be reported.

ITDM: 
- One info: still a problem with switch in a SA2 power supply: still operational but fix being discussed with vendor.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Issues with PUMA with EEE working on it.

HED:
- Nothing to report; Zuzana K. asks on plans for HXRSS. This was discussed after the meeting ended and machine allocated Jan. 25-26th for HXRSS studies.

SCS:
- Not present.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 08.01.2024, posted by Frederik Wolff-Fabris on 08 Jan 2024, 09:41 
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report; continuing with maintenance tasks.

VAC:
- Done with maintenance tasks.
- Ask HED, MID, FXE to check cameras in monochromators to check them again.
- Tunnels close today after lunch; XTD6 and XTD9 will re-open on Wednesday afternoon.

XPD:
- Progressed well with tunnel works;
- Would like to work in XTD6 and XTD9 after reopening them for completing some tasks.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- Everything fine; maintenance tasks for this period is finished and went accordingly to the plans.

SPB:
- Nothing to report.

FXE:
- Not present.

MID:
- Nothing to report.

HED:
- Nothing to report; will go to XTD6 to verify the Mono.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 20.12.2023, posted by Frederik Wolff-Fabris on 20 Dec 2023, 09:43 
General Announcement:
-  This is the last XO Integration meeting for this year. 

CTRL:
- Issue with upgrade of dataloggers was fixed and is now done. This time it runs smoothly.
- Issue with PP-lasers was solved by Desy colleagues.

DA:
- Nothing to report.

EEE:
- Finishing PLC tasks for the tunnels.
- HED will have an update today.

VAC:
- Not present.

XPD:
- Main ongoing task is the implementation of Gotthard-II in SA1 Hirex. Progress is being made.

DET:
- Nothing to report.

ITDM: 
- E-mail was sent to xo-info on the office switches maintenance taking place next week 27.12. Control network is not affected.

XRO:
- Not present.

LAS:
- Pattern device is working, as reported by CTRL.

UNSYS:
- Not present.

SPB:
- Not present.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Flooding on the HED experimental hutch due to maintenance on AC. 
Tobias Clever informs that during the maintenance some pumps were unplugged and was forgotten to be connected back due to the human error.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 18.12.2023, posted by Frederik Wolff-Fabris on 18 Dec 2023, 10:13 
General Announcement:
-	 

CTRL:
- Fix for the datalogger issue that was experienced after the deployment is created. To be applied tomorrow at 11:30. Very limited impact; only few mins downtime. An e-mail will be sent.
- Current issue with the laser pattern device: DOOCS colleagues are involved to investigate.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- DOOCS was not reachable and VAC loops had to be restarted (last week). All fine now.

DET:
- Nothing to report.

ITDM: 
- Info to instruments: close proposals for cleaning. Please look at a sent e-mail; SA1 instruments will have a new device installed so they have a longer deadline.
- Incident in balcony room with water leak: fixed on Friday.
- Delays for fast switch in SA2: finally done on Friday and shall be operational. Final checks to be done until Christmas.
- Incident with rack room (604): sensors were broken and temperature was raising. By 4-5AM on-site intervention. System is down but cooling started to work again.

XRO:
- Finished commissioning of exit slit in XTD10 (SQS/SXP) and operation tests to be done in January.

LAS:
- Issue with laser pattern (mentioned above in CTRL).
- Issue that brought down laser on Wed/Thu: to be followed up. 

UNSYS:
- PKGs were removed from tunnels.
- Apple-X: all 4 devices are installed and wired. Commissioning of electronic parts ongoing; checking limit switches.
- Tomorrow morning alignment to be done and after the vacuum system will be closed and prepared for operation.

SPB:
- Not present.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 13.12.2023, posted by Frederik Wolff-Fabris on 13 Dec 2023, 10:04 
General Announcement:
-	 

CTRL:
- Few hiccups happened last days: 
1. SA3 Karabo topics required full restart of the topic due to hardware failure of the new broker; 
2. Network failure affecting communication between SA3 topic and broker. After a restart of topic, it runs well; 
3. Issue with communication between Karabo and PLC loops in SA2. It is solved but not fully understood yet.

DA:
- Nothing to report.

EEE:
- Fast electronics team finished the uTCA updates; from PLC side the mentioned problem by CTRL is solved and PLC system is stable; regular updates are continued.

VAC:
- Nothing to report.

XPD:
- Works are ongoing: SA1 PES detectors were tested and seem fine; work in HIREX is ongoing.

DET:
- Nothing to report.

ITDM: 
- Fast switch for SA2 was delivered yesterday and today ITDM will mount and configured it to be installed.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- Installation of Apple-X: all 4 devices are in place and cabling is ongoing. The first segment shall be controllable this afternoon.
- Update on problems with SA2/cell37: yesterday it was figured out that an encoder is damaged, which sits near from the new absorber. 
Encoder needs to be replaced but one does not have time and human power to do it during the WMP. Exchange will be done during the next Summer maintenance. Also Desy-VAC does not have Pb material to shield 
the absorber in the next 6 months. 
An alternative for this undulator is to control it with the rotary encoders in the meantime.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Working with planned activities.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 11.12.2023, posted by Frederik Wolff-Fabris on 11 Dec 2023, 09:51 
General Announcement:
-	 

CTRL:
- Last week updates on Karabo were done. Please check systems for functionality.
- Another update of data loggers will be done in coming days.

DA:
- Following the Karabo updates DA is checking their devices.

EEE:
- Suffering from illnesses in the group: colleagues that are not sick try to get all work done but some delay in some activities is expected in some areas;
- Also Wille company is suffering with sickness and they try to find substituted colleagues.
- Vacuum updates were fixed; plan to update of SA2 VAC was postponed from Friday to today.

VAC:
- Nothing to report.

XPD:
- Request to EEE when updates for XGM are to start, please inform Florian Dietrich and Jan Gruenert for that they prepare beforehand. After update is done one needs to restart vacuum and XGM.

DET:
- AGIPD at SPB/SFX intervention: replaced all modules; three attempts were needed and the situation is that detector is fully operational and all modules are working. 
Also tests after Karabo deployment worked nicely. Next is a test with DAQ and everything looks very promising.
- At MID AGIPD: Bias issue is also fixed; tested at real conditions went successful. Cause was a wire.

ITDM: 
- Most of the activities are done.
- Problem with exchange of switch in SA2 for DAQ collection: power supply had a problem but not only it, so new chassis will be delivered and needs to be replaced. DAQ connections for SA2 is not working.

XRO:
- Planned works are continuing and everything is going fine.

LAS:
- Nothing to report.

UNSYS:
- More two last Apple-X are being installed; from today Beckhoff technicians will connect the cabling.
- Issues with encoders are solved (radiation damage). Replacement was done and calibration was successful.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 06.12.2023, posted by Frederik Wolff-Fabris on 06 Dec 2023, 09:49 
General Announcement:
- Jan Gruenert announces a seminar done by UK guests from Daresbury on UK plans for FEL. The seminar happens on THU 13:30 at XHQ E2.042. Please contact Jan G. for zoom link.

CTRL:
- Few hiccups when performing Monday's update was done: restarted system again and fixed now.
- HED had also an issue with router but was understood and fixed.
- Performed SA1 update and today continuing with SA2 and tomorrow SA3 topics.

DA:
- Nothing to report.

EEE:
- Doing updates in SA1 tunnel PLC updates today.
- Affected by personal missing due to sickness.

VAC:
- Maintenance activities are ongoing.

XPD:
- Tasks progressing as scheduled.

DET:
- Nothing to report.

ITDM: 
- Routers update were done on Monday and Tuesday. They are operational and connected - looks successful.
- HED problem with a faulty connection/switch but for the time been it shall be fine.

XRO:
- Nothing to report.

LAS:
- Issue after Karabo update: can not instantiate and restart system; CTRL received a ticket and is looking into it.

UNSYS:
- Fixed problem with broken encoders in tunnels; calibration of cam movers was successful and is ready to install Apple-X; broken connector was found but reason for this happen still under investigation.
- First 2 Apple-X will be installed Thursday.
- Next 2 Apple-X to be moved to shaft building on Friday and installed on Monday.

SPB:
- Issue after power maintenance last week: downstream control room and experimental hutch does not have power in some white/orange sockets; A ticket to TS was written.

FXE:
- Nothing to report.
- Electronics rack room were switched ON now.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 04.12.2023, posted by Frederik Wolff-Fabris on 04 Dec 2023, 09:52 
General Announcement:
-	 

CTRL:
- E-mail sent this morning to xo-info for Karabo and CTRLs maintenance starting today.

DA:
- Nothing to report.

EEE:
- Personnel is affected by Covid-19 sickness; task schedules may be affected as well.

VAC:
- Not present.

XPD:
- Tasks ongoing.

DET:
- AGIPD 1-M at SPB/SFX: 16 modules were replaced but 1 is not working and new intervention has to be made to exchange it;
- AGIPD at MID with 2 modules problems: inspected by Desy colleagues and found the problem with wire, that was fitted and now is fixed and working again.

ITDM: 
- Starting today with maintenance: CTRL network replacement starting today
- Please expect until 6PM today that connection breaks may happen

XRO:
- Replacing Mono component at SA2 tunnel; needs Karabo to conclude when service is back.

LAS:
- Nothing in terms of unexpected issues.
- Last Thursday it was difficult to find when power went back (lost 4hs)
- SA3 shutdown due to fire alarm: needs feedback from SRP.

UNSYS:
- Two Apple-X undulators are in shaft building and preparing for installation; Today alignment of PS vacuum chambers; 
- Affected by sick leave as well as from sickness in Desy transport group.
- Two encoders are damaged in the cam movers below one Apple-X. In contact with Bekhoff; maybe delay can be expected.

SPB:
- Nothing to report.

FXE:
- Not present.

MID:
- Not present.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 29.11.2023, posted by Frederik Wolff-Fabris on 29 Nov 2023, 09:43 
General Announcement:
-  Please remember and remind group members that the machine day is on Tuesdays and not Mondays anymore. Delivery will then start on Wednesday.
- Regarding the 2025 shutdown at the 2nd half of the year: XO is collecting initial tasks. Please groups are asked to provide a draft to XO of the planned tasks by next Friday 01.12.
- The UOM does not take place next Friday.

CTRL:
- From next week the deployment of Karabo will start. E-mail with reminders will be sent.

DA:
- Nothing to report.
EEE:
- Power OFF in SA1 instruments; PLC colleagues will read all parameters beforehand to be in safe side. PLC will be down on Thursday.
- Learn that cooling in SA1 rack rooms will be OFF tomorrow. Does it affect balcony room? Tobias C. will verify with Oleg E. to check with company performing the job.

VAC:
- V0 valves are closed; also to the instruments. 
- Photon tunnels XTD6 and XTD9 will be opened in 30mins and XTD10 will be accessible after lunch.

XPD:
- Tests with IMGs are ongoing for the next 1-2 hours and need motors running. Please do not shutoff Karabo, racks until it is done.

DET:
- Yesterday started the AGIPD maintenance at SPB/SFX. Modules were exchanged together with Desy group. Today test of vacuum and temperature to be done;
- AGIPD at MID: Desy team will inspect it from today.

ITDM: 
- Planned tasks starting from next week.
- Tomorrow's electricity maintenance in SA1 - not clear who is responsible to open the racks door (ITDM, room manager or rack manager). To be clarified by TS and T. Clever.

XRO:
- Ramp down went fine last two days and thanks for the collaboration among the people.

LAS:
- Nothing to report.

UNSYS:
- Two problems in SA3 and SA2 will be fixed in the maintenance.
- Other tasks are ongoing accordingly to the plan.

SPB:
- Small issue with PLC but it was solved.

FXE:
- Nothing to report; preparing for the electricity task tomorrow.

MID:
- Nothing to report apart of the AGIPD.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 27.11.2023, posted by Frederik Wolff-Fabris on 27 Nov 2023, 09:39 
General Announcement:
- User operation finished this morning 7AM for the year.
- Reminder that WMP starts on Thursday. Possible photon tunnels open on Wednesday but this still to be confirmed and e-mail will be sent.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.
DET:
- AGIPD at MID: issue on weekend with the bias motion. The power system for high voltage was changed but it did not cure the system. 
Further investigation with the modules will happen during the WMP. MID managed to finish the beamtime.

ITDM: 
- GPFS issue reported by DRC on Friday: happened only one time and did not repeat.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- Remind SA3 and SA2 problems (needs ZZ): BKR will continue working and during the WMP it will be fixed.

SPB:
- Pointing/jitter issue reported by Adam R. on E-log: Romain Letrun reports that is was a drift but not much different from usual behavior and not a real problem.

FXE:
- Nothing to report.

MID:
- Could run 2 AGIPD modules during the weekend.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 22.11.2023, posted by Frederik Wolff-Fabris on 22 Nov 2023, 10:39 
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- Issue reported on darks processing failure for data processing (Maxwell processes); ITDM and Desy is following.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report;
- Afternoon DOC member will look into ITDM reported issue.

XRO:
- Nothing to report; As PRC Maurizio says all fine.

LAS:
- Michael P. says a meeting with company is taking place and news will be brought to LAS.

UNSYS:
- SA3 cell 2 power terminal distribution has to be exchanged in ZZ;
- SA2 cell 37 problem with quadrupole mover in error state and top girder driver.

SPB:
- Thanks to SCS for helping with the chiller.

FXE:
- Nothing to report.

MID:
- Not present.

HED:
- Chamber contamination issue reported on Monday is closed. No contamination happened.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 20.11.2023, posted by Frederik Wolff-Fabris on 20 Nov 2023, 10:01 
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- AGIPD SPB still offline with issues on Julabo chiller.
- Adam R. adds the AGIPD is not mandatory for the coming week of operation. Jola S.-D. adds they are in touch with SPB and the issue will be further investigated after run is ended. 
In addition, AGIPD is let out of beam for this week's operation.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS: 
- Fire alarm on Friday brought down all Lasermet systems (SA3 PP-laser and E.0 systems). Needs further investigation. PP-L is not needed for the current week.
- Fire alarm was due to smoke detectors triggering it accidentally

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.
- Adam R. adds AGIPD detector may not be needed this week but it is good for checking.

FXE:
- Affected by fire alarm (timing sync down).

MID:
- Nothing to report.

HED:
- Experiment with PP-laser on Sat night faced a drop in pp-laser energy (not clear from LAS why);
- Users using hazards samples let contamination at chamber. Needs to be addressed with SRP.
- Covid-19 impacted personnel.

SCS:
- Nothing to report.

SQS:
- Since laser went down, the R&D was impacted.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 15.11.2023, posted by Frederik Wolff-Fabris on 15 Nov 2023, 09:48 
General Announcement:
- As PRC, A. Galler informs the machine runs without major issues but kicker adaptation has difficulties with 4.5MHz. For the next 20 mins machine colleagues will introduce stronger kickers and during 
this time beam will be jittery at SA1/SA3. SA2 shall be unaffected. 
During the meeting PRC received a call from BKR informing the intervention was done at 09:45 and stable beam is currently available.
- Martin Doering announces on the Winter Maintenance period: 
1. The release of Maintenance Task List will happen tomorrow 16.11 and maintenance starts on 30.11; 
2. Major topics: 
Karabo (4-7.12 and 13.12), 
DAQ and CTRL network interruptions (4-8.12), 
Cooling water has no big interruptions planned apart of the regular maintenance with fluctuations in flow and temperature, 
Electrical maintenance in XHQ (4-22.12) with rooms affected in different days, 
electrical maintenance at XHEXP1 in 27.11-22.12, 
Timing missing, smoke detector tests, laser interlock upgrades, 
interlock test "light" (17.01); 
3. Please check for precise dates on above at the Maintenance Task List.

CTRL:
- No announcements for CTRL.

DA:
- Nothing to report.

EEE:
- Nothing to mention.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing for DET and for DRC (Monica T.).

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report apart of the Kicker issues.

FXE:
- Issues with Kicker as mentioned by the PRC.

MID:
- Nothing to report.

HED:
- Nothing to report. Tomorrow the switch to 24keV will take place and time has to be allocated for tuning.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 13.11.2023, posted by Frederik Wolff-Fabris on 13 Nov 2023, 10:16 
General Announcement:
- This and next week of operation are the last 2 delivery weeks, which are done with 4.5MHz base rep rate. 

CTRL:
- Announcement: today IT will make an intervention in one of the hosts (204) for the DOOCS topic; downtime is expected and colleagues using cloning devices in this host (DOOCS requester to clone DOOCS) 
have to be refreshed and restarted.

DA:
- Nothing to report.

EEE:
- Incident that SCS motor not correctly moving during the weekend. PLC-OCD could not be reach due to phone issues; issue with motor was solved

VAC:
- ZZ on Thursday in XTD2 to exchange turbo pump was successful.

XPD:
- SA1 studies with 1nC was done in SA3 and not in SA1;
- 30keV went well on Wednesday but with Nepal-X no lasing was found on Friday.

DET:
- Nothing to report.

ITDM: 
- Nothing to add apart of CTRL report. An e-mail will be sent when it is done.

XRO:
- A. Trapp says the issue with SA2 motors moving slowly was fixed now after a patch was deployed.

LAS:
- Nothing to report.

UNSYS:
- ZZ last week for SA1 cell20 PS motor being replaced (damaged encoder). Many spare encoders are in house.

SPB:
- Nothing to report.

FXE:
- Preparing for in-house experiment.

MID:
- All fine at MID.

HED:
- 2 experiments this week at 18 and 24keV.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Preparing experiments at 4.5MHz.
Entry   Notes XO Integration Meeting 08.11.2023, posted by Frederik Wolff-Fabris on 08 Nov 2023, 09:55 
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- As PRC, Raul V. informs on a small issue at Hirex-Gotthard with number of pulses yesterday. Promptly solved in few minutes.

XPD:
- No issues and supporting the ongoing blue week with 30keV in SA2.
- Access happened on Monday in XTD2 to fix the solid attenuator.

DET:
- Nothing to report.

ITDM: 
- Monday intervention (announced in e-mail to xo-info) went OK and systems are recovered.

XRO:
- Solid Attenuator in SA1 temporarily solved: middle layer device calculating transmission shall be working; the automatic interlock is not yet working and a new interlock logic will be deployed. 
Please instruments in SA1 do that manually. Arm 5 and Arm 4 are currently disabled. 

LAS:
- Issue with 4.5MHz operation in SA3 but it was fixed.

UNSYS:
- SA1/cell20 phase shifter shows a problem and a ZZ will happen tomorrow morning.

SPB:
- Laser interlock issue happening yesterday evening was solved (signal of a power glitch happened yesterday evening).

FXE:
- Nothing to report.

MID:
- Seems that short pulses studies at MID were successful.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 06.11.2023, posted by Frederik Wolff-Fabris on 06 Nov 2023, 09:53 
General Announcement:
- As PRC, Jan G. reports that on Saturday morning no beam permission at the North branch happened. An issue with XTD2 solid attenuator vacuum happened and together with VAC-OCD the threshold was changed 
to allow continuation of beam delivery. A ZZ will be needed today to fix the vacuum leak; 
On Sunday around 09:20 an issue with accelerator quadrupole magnet in A21 caused downtime initially until noon (SA2) and around 16:00 (North branch); also D3 had to come onsite to reset burn through 
monitors in the aftermath.

CTRL:
- Nothing to report.
DA:
- Nothing to report.
EEE:
- MID had couple of uTCA cards offline that needs to be rebooted. This will be discussed with MID offline.

VAC:
- Preparing for the needed ZZs in XTD2.

XPD:
- Nothing to report.

DET:
- Couple of tasks for the DSSC (SQS) to reconfigure the detector;
- DAQ of DSSC was affected by failure of GPFS servers.

ITDM: 
- GPFS issue happened last Friday and was fine over the weekend.
- An update of the clients will happen today in all SASEs. This was agreed with instruments.

XRO:
- Nothing to add to what was reported by the PRC.

LAS:
- SA2 issue with pulse on demand will be discussed with MID.

UNSYS:
- Nothing to report.

SPB:
- User beamtime went OK even with downtimes during weekend.

FXE:
- Nothing to report; last night shift (Sunday night) cancelled as program was finished on Saturday. 

MID:
- Supporting today the short pulses activities; from tomorrow interventions at MID can be scheduled.
- Regarding laser issue: when changing sequence for using Laser showed trains with pulses and trains with missing pulses. Running macro was changed for working to 1 pulse per second.
- Users were happy and the program was accomplished in full.

HED:
- Not present.

SCS:
- Detector tests to be done by end of the week.

SQS:
- Affected by beam losses but overall a lot of useful data was acquired.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 01.11.2023, posted by Frederik Wolff-Fabris on 01 Nov 2023, 10:04 
General Announcement:
- Jan G. as PRC comments: 1. reminds SQS and FXE instruments to place entries at the Operations e-log; 
2. machine is running well and ZZ accesses happened on Monday (hindered by issues with tunnel entrance) but all done; 
3. the XTD2 issue with upstream differential pump close to the XGM: one pump is defective and VAC will exchange if a ZZ is allowed next week.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- FSSS motor in MID: OCD received a call yesterday and device was restarted and came back to operation.

VAC:
- Not present.

XPD:
- Nothing to report from XPD.

DET:
- Nothing to be reported.

ITDM: 
- Nothing to report.

XRO:
- On the XTD10 ZZ last Monday: V-slit was checked and a faulty cable for the encoder was found. For the time being this was fixed by tapping it and will continue monitoring.

LAS:
- Nothing to report.

UNSYS:
- All fine with Undulator.

SPB:
- Nothing to report.

FXE:
- Beam was not stable the last night / down for few times. To be investigated internally at FXE and reported to XO.

MID:
- Roll motor for M2 mirror at tunnel was moving very slowly; to be seen with XRO.

HED:
- Nothing to report.

SCS:
- Nothing to report; working in hutch preparations.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 30.10.2023, posted by Frederik Wolff-Fabris on 30 Oct 2023, 09:47 
General Announcement:
-	 

CTRL:
- No announcements for today.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Issue with turbo pump in XTD2 (happened 22:30 yesterday). Getting in touch the PLC team. Maybe a ZZ is needed today.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Open points from last week: vertical slit SA3 bottom (error); SRA in SA1 is currently in error. To be followed up if fixed or not.

LAS:
- Nothing to report.

UNSYS:
- Yesterday night problems in SA1 (XTD2): cell 2 motor drive problems; cell 11 power distribution terminal in cabinet; cell 14 bridge terminal problem; errors from cell#31 to downstream segments.
- Yesterday night possible to bring system operational at night; ZZ is ongoing to address above points. Extension of time for ZZ is unclear.
- Problems with central control node also observed. 

SPB:
- Nothing to report.

FXE:
- Not present.

MID:
- Nothing to report.

HED:
- Beamtime good.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Saturday lost synchronization with both lasers: promptly solved by PRC and LAS-OCD.
Entry   Notes XO Integration Meeting 25.10.2023, posted by Andreas Galler on 25 Oct 2023, 09:26 

General Announcement:

  •  

CTRL:

  • nothing major --> a couple of people on vacation, i.e. issue repsonse time may be a bit longer this week

DA:

  •  

EEE:

  • nothing

VAC:

  • nothing

XPD:

  • nothing to report

DET:

  • nothing

ITDM: 

  • not present

XRO:

  • nothing

LAS:

  • nothing 
  •  

UNSYS: 

  • nothing to report

SPB/SFX:

  • SA3 background affecting focussing of x-rays

FXE:

  • smooth, beam instability yesterday
    • horizontal jitter entagled with PopIn measurements --> around lunch time
    • beam was clipping and LPD was seeing poweder scattering from the collimator pipe

MID:

  • nothing to report

HED:

  • Yesterday evening unexpected venting in the CRL3 (HED-Optics Hutch) --> X-ray Operation cancelled at least for Wed night
    •  

SCS:

  • beam instability in pointing over night
    • this cuased non optimal beam transport --> pulse energy decreased on sample

SQS:

  • nothing to report

SXP:

  • everything is looking 

DRC

  •  

PRC

  • SA1 pulse energy will be lower than possible, because of XGM settings that need to cater 7.8 keV and 12.5 keV
Entry   Notes XO Integration Meeting 23.10.2023, posted by Andreas Galler on 23 Oct 2023, 09:26 

General Announcement:

  •  

CTRL:

  • nothing major

DA:

  • nohting major

EEE:

  • nothing 

VAC:

  • nothing

XPD:

  • nothing major

DET:

  • nothing major

ITDM: 

  • nothing major

XRO:

  • nothing major

LAS:

  • SA3 PPLaser up and running
  • SA1 PPLaser went down from time to time
    • Windows PC crashed
    • instabilities in NOPA

UNSYS: 

  • Everything is fine

SPB/SFX:

  • SA1 PPLASER ISSUES

FXE:

  • Smooth

MID:

  • all fine

HED:

  • all fine

SCS:

  •  

SQS:

  • all good

SXP:

  • nothing 

DRC

  •  

PRC

  • 2 long down times over the weekend
    • from 7 to 12:30 fast valve in BC
    • Sun 10:30 - 19:00  broken network switch
Entry   Notes XO Integration Meeting 18.10.2023, posted by Frederik Wolff-Fabris on 18 Oct 2023, 10:01 
General Announcement:
- Next Friday 20th Oct. is the deadline for submitting the Winter maintenance task list back to XO.

CTRL:
- Nothing to report.

DA:
- Nothing major to report.

EEE:
- Nothing to report.

VAC:
- Nothing from VAC.
- As PRC, Martin D. informs on the issue with the Self-seeding monochromator: X-axis is not operational. A ZZ is needed today by UNSYS. To be seen the HXRSS program.

XPD:
- Not present.

DET:
- Nothing to be reported.
- Jungfrau calibration and DAQ: there is nothing more from DET to be done; P. Schmidt adds that operation modes have to be adapted and there is work on progress in long term.

ITDM: 
- Nothing to add.

XRO:
- Nothing to report.

LAS:
- Technician from AMPHOS arrived yesterday and work in ongoing with SA3 PP-laser; no final conclusion yet.

UNSYS:
- All day working with the SA2 monochromator yesterday (X-axis and roll axis). It looks the X-axis is stuck or broken and in a ZZ an attempt to recover with a manipulator will be done. 
Chances are not high for a fix and if the worst-case scenario, the HXRSS for the remaining of the year may be cancelled.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Busy at beamline and worried with the HXRSS program.

HED:
- All fine at HED.

SCS:
- No outcome form PP-laser; getting a temporary laser from SXP (1030nm) and working to make it for the beamtime (no THz pump probe experiment will be possible).

SQS:
- Issue with digitizers (Smaract and PES); Being followed by EEE as was informed by DOC. For the PES it was discussed with XPD and needs further follow-up with SQS and XPD. 
In general, please contact DOC in case of operational issue or write EEE ticket if not an operational issue.
- High voltage power supply not responding at Karabo; being investigated by CTRL and will be coordinated with SQS for a fix.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 16.10.2023, posted by Frederik Wolff-Fabris on 16 Oct 2023, 09:46 
General Announcement:
- Last X-ray delivery week went normal. 
- Friendly reminder for the submission of the maintenance task list on 20.10, next Friday. In case of questions please do not hesitate in contacting XO.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- ZZ on XTD2 today at 13:00 to exchange XGMD amplifiers.

DET:
- Investigating the settings of detector with FXE.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- SA3 AMPHOS engineer is at XFEL today. Intense work will be made to have PP-laser back by the end of the week - to be seen in coming hours/days.
- In SA1 PP-laser was recovered on Friday.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.
- Naresh K. will interact with MID to align Hirex for the HXRSS operation this week.

HED:
- Nothing to report.

SCS:
- Needs PP-laser for the beamtime starting on THU.

SQS:
- SQS broke interlock at 6AM and took away beam permission.

SXP:
- Takes beam tomorrow and Wednesday; it will use another laser if SA3 PP-laser is not available.
Entry   Notes XO Integration Meeting 11.10.2023, posted by Frederik Wolff-Fabris on 11 Oct 2023, 10:15 
General Announcement:
- Reminder that next week, on 20.10, is the deadline to submit the Winter maintenance task lists to XO. In case of help, please contact Martin Doering at xo-planning@xfel.eu.

CTRL:
- Nothing to report.

DA:
- Nothing to report; all quiet at the DOC also.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- A Silicon oil leak at DET cleaning room happened: leak comes from Jungfrau cooling loop (built by external company); status is area was cleaned and leak point is being searched;
- AGIPD setup at SPB got a failure of Julabo chiller; it does not work properly and it does not cool as expected. Detector is interlocked and there was no problems for itself; to be further investigated.

ITDM: 
- Gitlab was down for about 30 mins and now is available again.

XRO:
- Nothing to report.

LAS:
- Status of SA3 PP-laser: still investigating and in contact with AMPHOS. Still to be seen.
- Smaract in SA2 is fixed.

UNSYS:
- All good.

SPB:
- Issue with AGIPD chiller. Installed yesterday mid-day and was cooling slowly but not reaching base temperature.

FXE:
- Handover laser to SQS.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- In contact with EEE (Bernard) regarding the commissioning of our additional local box for the THz experiment.

SQS:
- Not present.

SXP:
- Nothing to report; backlash of M6 seems to be fine.
Entry   Notes XO Integration Meeting 09.10.2023, posted by Andreas Galler on 09 Oct 2023, 09:23 

General Announcement:

  •  

CTRL:

  • nothing major 

DA:

  • nothing major 

EEE:

  • nothing major

VAC:

  • nothing major

XPD:

  • nothing
    •  

DET:

  • nothing

ITDM: 

  •  

XRO:

  • miror setup tuned for grazing incidence with high photon energy.
  • higher backlash at M6, XRO is monitoring this.

LAS:

  • SA2 treacy compressor  smaract stage not operational --> EEE informed
  • SA3 AMPHOS still suffering from low puse energy

UNSYS: 

  • gap scan
  •  

SPB/SFX:

  • nothing major

FXE:

  • nothing major

MID:

  • nothing to report

HED:

  • nothing to report

SCS:

  • no issues

SQS:

  • uTCA in rack room --> EEE will be informed
    • crate power cycled

SXP:

  • M6 backlash

DRC

  •  

PRC

  •  
Entry   Notes XO Integration Meeting 04.10.2023, posted by Frederik Wolff-Fabris on 04 Oct 2023, 09:52 
General Announcement:
- A. Galler reminds this is a facility development week and for the next UOM on Friday a report of stability/jitter shall be done by the instruments.
- Martin Doering announces the Winter maintenance period 23/24: 
1. The new maintenance task list was sent to the groups last week; 
2. Deadline to submitting back the filled list is Oct.20th; release takes place on Nov. 16th and maintenance period starts on Nov.30th. 
3. Locations can be chosen with dropdown menu in a 3-step process; 
4. Services needed and blocked are condensed in two dropdown fields; 
5. Submit task list to xo-maintenance@xfel.eu; for questions please address xo-planning@xfel.eu. 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- PLC team working in SQS Elmo motor drive.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to be reported.

ITDM: 
- Nothing to report.

XRO:
- Nothing major to report.

LAS:
- Nothing to report; PP-lasers survived the power glitches.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Question to EEE on the timing crate: it seems to be fine now.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Issue with 1-bunch digitizer (uTCA in rack room): SQS will contact EEE.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 02.10.2023, posted by Frederik Wolff-Fabris on 02 Oct 2023, 09:59 
General Announcement:
-	 

CTRL:
- Deploy dataloggers fix today; it takes around 5 minutes.

DA:
- Couple of OCD calls over the week that could be all addressed.

EEE:
- PLC team checking motors in SQS to test issue.
- uTCA team: 1. replace a CPU at MID (possible); 2. digitizers at HED will be replaced by uTCA team to improves setup;
- Also install power supply at SQS.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Last week started bumpy but operation stabilized later on.

ITDM: 
- Nothing to report.

XRO:
- XTD1 attenuator: one arm is blocked; after speaking with SA1 instruments the decision is to wait to fix during the winter maintenance. In case of urgencies to use it please contact Maurizio V.

LAS:
- Issue with FXE laser: will need CTRL to help debug;
- AMPHOS issues at PP-lasers are solved.

UNSYS:
- Nothing to report; all fine.

SPB:
- Test with machine tomorrow / taking beam.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 27.09.2023, posted by Frederik Wolff-Fabris on 27 Sep 2023, 10:30 
General Announcement:
- The Winter Maintenance Task list will be sent to all groups in the course of today. Next Wednesday 04.10 Martin Doering will make a quick presentation on the list itself and take questions. 
Two minor upgrades are done on it: 1. Location places are not divided in up to 3 sub-sections/levels; 2. Services needed and blocked are now condensed in two columns with color code related to the chosen 
service.  
The deadline for submission is October 20th.

CTRL:
- Nothing to report.

DA:
- No relevant updates.

EEE:
- Continued with work recovering systems after power cut.
- Patrick G. points that a clear information on the infrastructure of e.g. power, water, has to be made available to groups. 

VAC:
- Not present.

XPD:
- Nothing to report.
- As last PRC, J. Gruenert adds that to protect CRLs in SA1 a watchdog is being tested. F. Wolff-Fabris adds that XO will discuss it with instruments.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Mikako M. says that the test of the SA1 CRL watchdog was done yesterday night; some bugs were found and a fix needed to be done. Watchdog is in principle ready but should be still tested. However, it is 
not yet a fail proof device.
- Steffen H. points that safety relevant devices that are not fail proof shall not be deployed. In addition, for longer use: one may be worthwhile to implement a dedicated device.
- XO states that the tested watchdog is not going to be placed in operation now.

LAS:
- Not present.

UNSYS:
- All fine.

SPB:
- Issue with PP-laser affected preparations.

FXE:
- Issues with AMPHOS shutter were fixed yesterday and now it runs properly.
- Progress was done with night work.

MID:
- AGIPD detector issue is in DET hands.

HED:
- Nothing to report.

SCS:
- Pointing had issues (drift) being root cause for instabilities last night. Right now beam performance looks better than the last night, after BKR intervention.

SQS:
- All good.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 25.09.2023, posted by Frederik Wolff-Fabris on 25 Sep 2023, 12:31 
General Announcement:
- Two severe power glitches happened on the weekend (SAT and SUN around 7AM). We thank all colleagues that were in shift, OCD or volunteered to help assessing the situation and restoring their operation 
ability. 
- The presentation of the Winter Maintenance planning period is postponed due to time issues.
- Janusz S. reminds on cyber security: tomorrow the next step to secure Zimbra mail client takes place. A detailed e-mail will be sent.
- XO will create a report on the power issues.

CTRL:
- Issues with power glitch: restoring parameters, Karabo, SEPS, SA2 started from scratch.

DA:
- Nothing to report; end of chain regarding the power issues.

EEE:
- Same issues with power.
- Will follow up the SCS train ID.

VAC:
- No effect on VAC; no access to SA2 then it was blind / no Karabo, but at the end was fine.
- Issue with HED and MID Monochromator - to be investigated. Access is needed today.
XPD:
- As PRC Jan thanks all people who helped to restore SA and SUN (two power glitches around 7AM); Also Desy/MKK confirmed that machines were briefly affected. EuXFEL accelerator recovered quickly.
- Consequences on SAT: 1. Power went away of whole SA3 area; 2. Tunnels mostly not affected but water cooling pumps were switched OFF (affecting also balcony rooms). 
One auxiliary pump did not turned ON and several hours later (10-11AM this was too hot) and brought down services. SA2 tunnel cooling water temperature raised but on SUN it was faster to act/recover (MKK; 
30mins).
- XGM at XTD6 went down.
- MKK does not see the temperature but only humidity. To be implemented in the coming days.
- SA2 Karabo totally down.
- Interlocks went down (EEE, D3, SRP) and had to unblock radiation alarms. A Desy mTCA crate went down and had to be manually power cycled (due to cooling water lack at balcony room).
- PP-laser in SA3 went down. SA3 experiment at SCS was cancelled at the point.

DET:
- No specific feedback for DET; shall be OK.
- Broker pile up was not fully understood. SA2 was restarted and back to normal; MID restarted yesterday and will get in touch with them.

ITDM: 
- Cooling issue: discovered by alarm (Kimon who informed MKK); it needs a better procedure to inform MKK.
- After 30 mins called from MKK saying T was going down, but due to open doors.
- Steffen H. says a report has to be done with goal oriented to avoid this in future.

XRO:
- Looking into systems: in tunnels, if power is OFF then mean cooling shall be OFF. Cameras do not work remotely (connection to servers; only one is accessible).

LAS:
- SA3 is down: problems with main amplifier;
- Checking for damage after second power glitch.

UNSYS:
- All fine.

SPB:
- Nothing to report. User got data.

FXE:
- SA1 was also affected by power glitch (interlock crashed): had to be reset by D3; AIBS went to error and be reset by DOC.m
- Prevented continued with user (lost 6+4 hours of beamtime). User went well and collected data.
- On Saturday the AMPHOS laser broke down in FXE. SRP and Management took measure to bypass. Not sure if caused by electricity. To be followed up this week.

MID:
- Nothing to report. Request: in such severe power glitches an e-mail to MID has also to be sent.

HED:
- Could recover after SA2 Karabo broke down. Recovery faster than expected.
- Continued with user program. Data was successful.

SCS:
- Stopped running experiment. 
- Interlock problem with laser helped by Pouneh (thanks!).

SQS:
- Nothing to report.

SXP:
- Challenging communication. Manuel gave phone number to PRC and will give to XO.
- Power glitch: Desy colleagues do not have access to SXP hutches.
Entry   Notes XO Integration Meeting 20.09.2023, posted by Frederik Wolff-Fabris on 20 Sep 2023, 10:04 
General Announcement:
- The access and maintenance day is taking place today. Current ZZs at the accelerator are scheduled until 10AM and then it follows the tuning for cw38 beam delivery that starts from tomorrow at 7AM. 
- Martin Doering announces that next Monday 25.09 a short presentation on the 2023 Winter Maintenance will be made in this meeting series. 
Please a representative from every group is welcome to be present. The Maintenance task list is going to be send to instrument and support groups next week.
- As PRC, Jan reports so far the week looks good. Downtime from Mond-Tue of 1:15 which is being looked today at tunnel (LINAC);
- J. Gruenert (as PRC) reminds instruments to post at least once a day a report at the Operations e-log; In addition, for SA1, it is introduced a power limit of 5W to protect CRL1 lens when operating low 
photon energies (this will be discussed with SPB/SFX).

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report;
- Reminder that forbidden XGM ranges (SPB/SFX): in SA1 the two XGMs do not have the same gas. Upstream has Kr to be able to run 5.5keV; SPB/SFX can run with 7keV at this XGM and their own on with Xe 
instead;

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- Quad issue in SA2/cell28: ZZ is done and successfully fixed.

SPB:
- Nothing to report.

FXE:
- Drop SASE Intensity when changing photon energy from FXE side: current understanding is that in some way the phase shifters are not set properly if the wavelength change is triggered from the Karabo. 
- Wavelength changes/scans work properly when done by BKR.
- Test this afternoon from both sides (BKR and FXE) to understand and solve the issue. Possible workaround is to ask BKR to operate the undulators.

MID:
- Not present.

HED:
- Calibration for Jungfrau had problems with MyMDC starting only Thursday. Needs to discuss with DATA department on this scheduling issue.
- Status of sample stages with EEE: being further investigated.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 18.09.2023, posted by Frederik Wolff-Fabris on 18 Sep 2023, 10:01 
General Announcement:
- Differently from standard Mondays, today is a beam delivery day. The machine tuning day for cw38 takes place on Wednesday.

CTRL:
- Nothing to report.

DA:
- Quiet OCD weekend with two calls.

EEE:
- Nothing to report.

VAC:
- Friday afternoon SPB found pressure increase at SA1 solid attenuator which triggered vacuum signal. Investigation showed a bellow of one attenuator arm (arm 5; 1.2mm diamond) leaking and organized tunnel 
access;
- VAC will discuss with XRO how to monitor possible damage and possibly modify middle-layer device.  

XPD:
- Involved on Friday with XGM triggering alarm due to vacuum issue in XTD2.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to add to the solid attenuator issue.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Not present.

FXE:
- Preparing for beamtime.

MID:
- Nothing to report.

HED:
- Troubles with sample stages being addressed with EEE.

SCS:
- Not present.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 13.09.2023, posted by Frederik Wolff-Fabris on 13 Sep 2023, 09:49 
General Announcement:
- The current week is the long delivery beam week for instruments. Operation continues up to next Wednesday 20.09 at 7AM. The DRC, PRC and RC will change as usual on Monday 18.09.

CTRL:
- Nothing to report.

DA:
- Not present.

EEE:
- Different problems with digitizers being addressed: 1. At XPD/ PES (card not working, it is then disabled); 2. FXE with jitter scene; 3. SQS is solved (undulator panel).

VAC:
- Everything good.

XPD:
- Apart of issues with PES nothing to report.

DET:
- Nothing to report.

ITDM: 
- At a retreat.

XRO:
- Nothing major to report.

LAS:
- Not present.

UNSYS:
- Not present.

SPB:
- Everything fine.

FXE:
- Not present.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 11.09.2023, posted by Frederik Wolff-Fabris on 11 Sep 2023, 09:47 
General Announcement:
- A Cryo issue taking place in the night Fri-SAT lead to beam not being delivered since them. The failure was at a magnetic bearing with a misreading of motor position. 
In parallel motors 3 and 4 were exchanged as preventive measure during this downtime. Cryo OK came back on Sunday afternoon and efforts are focusing in bringing machine up for cw37.

CTRL:
- Pulse on demand for FXE (main scene) will be updated today.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Not present.

DET:
- Nothing to report.

ITDM: 
- Not present.

XRO:
- Change middle layer for the bunch patter at SA1 for fixing today.

LAS:
- Not present.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Between Synchronization issue and cryo failure only a total of 6-7hs of data were collected.

SCS:
- Beamtime affected by cryo failure.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 06.09.2023, posted by Frederik Wolff-Fabris on 06 Sep 2023, 10:03 
General Announcement:
-	 

CTRL:
- Issues with cameras are being addressed.

DA:
- Nothing to report.

EEE:
- Yesterday issue with SEPS/HED being investigated/addressed.

VAC:
- Not present.

XPD:
- Nothing to report.
- As PRC, Naresh K. reports 1: new SEPS interlock at HED not properly working; 2. FXE reported crosstalk from SA3 pulses being lasing at SA1; also when switching 0 pulses in SA1 the SA3 went to zero also. 

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Mikako M. is aware of HED SEPS issue and is helping EEE.

LAS:
- Nothing to report.

UNSYS:
- SA2/cell25 fixed (terminal replaced) and is functioning.

SPB:
- Nothing to report.

FXE:
- Crosstalk SA1/SA3.

MID:
- Not present.

HED:
- Issues with ADC fixed by EEE (rear module) - seems a recurring feature with a 1 week frequency.

SCS:
- Motors at ending station solved by DOC;
- Issue with bunch/crosstalk. 

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 04.09.2023, posted by Frederik Wolff-Fabris on 04 Sep 2023, 09:46 
General Announcement:
- Last week was a facility development week / blue week. Another cyo issue happened on Friday morning which was recovered quickly.
- As DRC, Steffen H. reminds on the Jour-Fixe today at 13:00 to instruments communicate needed data allocation; also reminds on calling DOC may have a quicker help than sending a ticket.

CTRL:
- DOOCS clone devices disappearing from topics was fixed on Friday and since then works nicely.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Not present.

XPD:
- XPD involved in facility development since Friday. All activities went fine and more studies for Harmonic lasing and Aspect will be continued.
- J. Gruenert mentions for cw38 XPD and XRO colleagues are in Trieste for a conference and only limited staff is available for support. Basic functionality of devices is guaranteed.
- REXX servers were down last week. 

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Message to SA2 instruments: last week the Euler calibration was done for M1 and M2 and instruments can make use. The link is on the main mirror scene and the SA2 scene will be updated.

LAS:
- Nothing to report.

UNSYS:
- Issue with cell 25/SA2 terminal: undulator could not be used for harmonic lasing. Needs access for fixing.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- During the blue week it repaired the long arm for detector angular motion.

HED:
- Issues with IDC on rear module; EEE is working on it.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 30.08.2023, posted by Frederik Wolff-Fabris on 30 Aug 2023, 10:55 
General Announcement:
- Facility development week is ongoing.
- After the cryo incident last weekend the machine colleagues have an impression everything is in good shape and next tuning day can be made on Monday. 
- Next UOM will have an invitation for instruments to briefly report on jitter issues (pointing, temporal, etc) that impact performance from last weeks. 
If you have found any jitter issues please mention it during the UOM for discussion with machine colleagues.

CTRL:
- Today 13:00 new version for the DOOCS devices will be deployed for undulator controls. It takes 2-3 minutes.
- Follow up of PP-ODL devices: Wajid E. will right a ticket to DOOCS colleagues.

DA:
- Nothing to report.

EEE:
- Yesterday a SA2 SEPS interlock was updated and tested with XRO group and it went fine.

VAC:
- V0 closed after the SA2 loop update which was promptly re-opened.

XPD:
- Nothing to report.

DET:
- Not present.

ITDM: 
- Upgrade of GPFS was finished yesterday successfully.

XRO:
- SEPS interlock update in SA2 worked well.
- One issue: communication to DOOCS was unstable in the early afternoon. Late on the day it was better.

LAS:
- Nothing to report. All fine.

UNSYS:
- At 15:30 a ZZ will be done to fix 3-way valve at SA2/cell4.
- Issues with MARWIN robot in SA3 and A. Leuschner will make a ZZ for fixing it.

SPB:
- Small issues on last THU and MON related to middle layer device and macros. DOC is informed and have recognized it. Further investigation in the particular macro that may can cause the issue. 

FXE:
- Preparing for next week.

MID:
- All fine at MID.

HED:
- Nothing special; preparing next experiment.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 23.08.2023, posted by Frederik Wolff-Fabris on 23 Aug 2023, 09:47 
General Announcement:
- Next Monday, 28.08 there is no XO Integration Meeting due to agenda unavailability of XO. 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Not present.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Tri way valve SA2 cell4 causing warm water in vacuum chamber which drifts the gap for few um. To be fixed in a shutdown.
- Cell25/SA2 feedback of temperature sensors is solved.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Waiting for beam. Tuning under way.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 23.08.2023, posted by Andreas Galler on 21 Aug 2023, 09:26 

General Announcement:

  •  

CTRL:

  • nothing major

DA:

  • nothing major

EEE:

  • nothing major

VAC:

  • nothing to report

XPD:

  • nothing

DET:

  • nothing major 

ITDM: 

  • nothing major

XRO:

  • nothing major

LAS:

  • nothing to report

UNSYS: 

  • nothing to major
  •  

SPB/SFX:

  • due techincal issues no beamtime

FXE:

  • not present

MID:

  • nothing to report

HED:

  • not enough intensity to pump samples
    • experiment was a partial succes

SCS:

  • nothing to report

SQS:

  • nothing to report

SXP:

  • not present

DRC

  •  

PRC

  •  
Entry   Notes XO Integration Meeting 16.08.2023, posted by Andreas Galler on 16 Aug 2023, 09:24 

General Announcement:

  •  

CTRL:

  • nothing major

DA:

  • nothing major

EEE:

  • nothing 

VAC:

  • nothing

XPD:

  • nothing 

DET:

  • nothing

ITDM: 

  • nothing

XRO:

  • nothing

LAS:

  • nothing

UNSYS: 

  • nothing

SPB/SFX:

  • Issue with Hexapod of sample changer.

FXE:

  • not present;
  • frequent error with PPODL, locked station --> investigated by CTRL (wajid)

MID:

  • Julabo chiller
    • switching off recurrenlty

HED:

  • nothing to report

SCS:

  • nothing to report

SQS:

  • nothing to report

SXP:

  • not present

DRC

  • nothing

PRC

  • nothing
Entry   Notes XO Integration Meeting 14.08.2023, posted by Andreas Galler on 14 Aug 2023, 09:30 
General Announcement:

CTRL:
- nothing to report

DA:
- Nothing to report.

EEE:
- Motor issue with SPB
PLC is investigating

VAC:
- All running fine.

XPD:
- Everything fine from XPD.

DET:
- Nothing to add.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Everything is fine.

SPB:
- see motor issue EEE

FXE:
- nothing to report

MID:
- Julabo Chiller
    switched off by itself --> curculation stopped
    AGIPD not harmed

HED:
- nothing to report

SCS:
- Nothing to report.

SQS:
- Nothing to report

SXP:
- Nothing to report

 

 

Entry   Notes XO Integration Meeting 09.08.2023, posted by Frederik Wolff-Fabris on 09 Aug 2023, 09:43 
General Announcement:
- Starting this semester, a jitter report will be started at the UOM on the blue weeks. 
Instruments are kindly requested to make a 2-3 mins report on experience with jitter for the previous few weeks, especially in relation to instabilities with beam.

CTRL:
- Issue at HED with Jungfrau detector module2: workaround is put in please and seem to work fine. Also issue looks like to be specific only to this module / detector controller. 
Once experts return from holidays more investigation will be done.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- All running fine.

XPD:
- Everything fine from XPD.

DET:
- Nothing to add.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Problem with SA3/cell9 got stuck (third time). Not clear if it is a mechanical or control system issue. Further investigation during the winter maintenance period. 
Error is currently fixed and undulator is running.

SPB:
- Nothing to report. PCS experiment is running well.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Will get in touch with CTRL to discuss Detector fix.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 07.08.2023, posted by Frederik Wolff-Fabris on 07 Aug 2023, 09:50 
General Announcement:
-  A. Silenzi is the DRC for this week and will send an e-mail to instrument local contacts for the jour-fixe meeting this afternoon.

CTRL:
- Movement issue in SA3 watchdog: after splitting the system it became more stable and will monitor it for next days.
- HED reported a bug with Jungfrau and will deploy the fix today.

DA:
- Nothing to report.

EEE:
- Follow up of a problem in SQS rack room (grounding): it was corrected in Thursday and now everything is fine.

VAC:
- Nothing to report.

XPD:
- Solution from CTRL to watchdog in SA3 is working fine.

DET:
- AGIPD at SPB: the chiller for cooling electronics (not the Julabo) failed. Investigation shows that interlock worked well and further investigation to be done after replacement.
- Jungfrau module2 needs work at HED and will be followed up.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Sunday morning issue with SA1 PP-laser that shutdown the AMPHOS. It was brought up by OCD at the same day. 
- Need to coordinate with EEE on crate work for SA2.

UNSYS:
- All fine with Undulators systems.

SPB:
- Issue with AGIPB: there is a spare to be changed and further investigations to be done.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- All fine with beam last week.
- Ticket is ongoing to solve issue on Jungfrau for next week. Wajid E. says a deployment will be made this week.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 02.08.2023, posted by Frederik Wolff-Fabris on 02 Aug 2023, 10:12 
General Announcement:
- Status of machine: a lot of work was done last days on laser injector and RF jitter; all seems to be OK and improvement were done. 
Concluded that electron beam shape is now Gaussian and right now SASE is being tuned. Aim is to have about 2mJ in SA1 and 1mJ in SA2 at 9keV. Beam to be handled to the instruments on Thursday morning, as 
planned.
- MID HED asked on use of HXRSS this week/next week. To be discussed at the daily Ops meeting today.

CTRL:
- Investigating the MOV loop in SA3 watchdog. 

DA:
- Nothing to report.

EEE:
- Routine checks in rack for instruments (currents for ground lines). One rack presented an issue and today there is a plan to disconnect the wrong wiring line and a second power will be installed. 
No impact shall be seen on motors using 40V at SQS.

VAC:
- Nothing to report.

XPD:
- If HED or MID goes to use seeding then N. Kujala has to setup the Hirex.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Progress in SA1 PP-L going well.

UNSYS:
- Error in gap of SA1 cell 10 undulator. It seems to be fine now.

SPB:
- Preparing for the shifts from tomorrow.

FXE:
- Nothing to report.

MID:
- Will discuss with HED on the using of beam for next 2-3 weeks.

HED:
- Nothing to add.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 31.07.2023, posted by Andreas Galler on 02 Aug 2023, 09:27 

CTRL
    - still investigating the slowness in SA3 --> which wtachdog is repsonsible
DA:
    - not present
EEE:
    - nothing to be reported

VAC
    - nothing major to report
XPD:
    - part of slownwss in SA3 response team with CTRL

DET:
    - nothinbg major, and despite beam qualityu some calibration data could be taken
iTDM:
    - wil investagete BSASLER 2 issues

XRO:
    - nothing major
LAS:
    - SA1 AMPHOS service finsihed
    - NOPAs are being brought up

    SA3:
        - spurious switch off of seeder over the weekend, but could be brought up
        - comment on LASERMET 
UNSYS:
    - last week issue with cel9 SA3, undulator was not moving but isue solved

PRC:
    - beam was not super performing but some instruent tuning tasks could be done
    - SXP wanring light was broken and repaired on Sat
    - pointing difference between SQS and SCS leads to delays in tuning by the machine
        - the beam should be on the crosshair, and if that needed to be changed XPD can do that easily.
    - SA1 FEL imager stalled on Sunday -->

SPB/SFX:
    - beam could be used over the weekend, but only calibration constants could be taken or AGIPD

FXE:
    - nothing to report

MID:
    - beam was used and to a major fraction this was succesful

HED:
    - the planned program could be done

SCS:
    - nothing to report
SQS:
    - 
SXP:
    - PPLASER couldn't be used

Entry   Notes XO Integration meeting 26.07.2023, posted by Andreas Galler on 26 Jul 2023, 09:21 

General Announcement:

  • The injector Laser Window had been exchanged yesterday and currently leak search is ongoing. Tuning is expected to start around lunch time. 

CTRL:

  • nothing major to report

DA:

  • not present

EEE:

  • nothing mjor to report

VAC:

  • same

XPD:

  • nothing

DET:

  • nothing

ITDM: 

  • nothing

XRO:

  • nothing

LAS:

  • PPLAS in SA1 will not be ready this week
    • hopefully finished by the end of this week
      • please conatct Radu for continuous updates

UNSYS: 

  • Everything is fine

SPB/SFX:

  • Nothing to repoert ready for beam

FXE:

  • same

MID:

  • same

HED:

  • some

SCS:

  • nothing

SQS:

  • not present

SXP:

  • nothing

DRC

  • nothing

PRC

  • nothing
Entry   Notes XO Integration Meeting 24.07.2023, posted by Frederik Wolff-Fabris on 24 Jul 2023, 09:49 
General Announcement:
- Machine still works in improving performance. News will be posted at xo-info.
- Mikako M. And Idoia F. presented the summary of photon commissioning activities for SA1, SA2 and SA3:
SA1: https://in.xfel.eu/elog/XRO+Beam+Commissioning/206
SA2: https://in.xfel.eu/elog/XRO+Beam+Commissioning/186
SA3: https://in.xfel.eu/elog/XRO+Beam+Commissioning/201

CTRL:
- Last week prioritized work with bring up days at instrument workplaces.

DA:
- Bring up days last week; everything went smooth.

EEE:
- Bring up days went well.

VAC:
- Nothing to report.

XPD:
- Everything is fine with Diagnostics.

DET:
- Bring up days went fine.

ITDM: 
- Dcache update taking place tomorrow for two days (old data affected). GPFS storage works as usual.

XRO:
- Handover to be explained after the meeting (see above).

LAS:
- Nothing to report.

UNSYS:
- Everything is fine.

SPB:
- Bring up days went well and some minor issues are being worked on.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Quick ZZ today to XTD6 to verify camera motors.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 19.07.2023, posted by Frederik Wolff-Fabris on 19 Jul 2023, 10:25 
General Announcement:
- SEPS interlock tests are done in SA1 and SA2. It continues tomorrow in SA3 during the morning.
- Machine accelerator startup is ongoing. Photons are being produced and operators are working hard to improve conditions.
- When summer maintenance started in mid-June some instruments' staff were entirely gone and none were available to open hutches, which delayed some tasks. 
XO will have a look next maintenance into this issue.

CTRL:
- Proceeding with bring up days.

DA:
- Working on the bring up days.

EEE:
- Work with bring up days and support SEPS tests.

VAC:
- All normal with VAC systems.

XPD:
- Not present.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Starting today with ramp up.
- ZZ for M6 mirror in SA3 tomorrow morning.

LAS:
- Received report from Pouneh S. on the Lasermet events. 

UNSYS:
- All fine.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Busy at beamline.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 17.07.2023, posted by Frederik Wolff-Fabris on 17 Jul 2023, 09:53 
General Announcement:
- SEPS interlock tests are taking place today. An e-mail was sent to xo-info last Friday containing information about the order of the tests.

CTRL:
- Start with bring up days (SCS and SXP today) the whole week.
- Workaround solution for PLC/Karabo was deployed but needs to be redone tomorrow at 8AM tomorrow. An e-mail will be sent to xo-info.

DA:
- Nothing to report.

EEE:
- Bring up days and support of SEPS. 

VAC:
- Nothing to report.
- As PRC, Martin D. says on Saturday morning issues with AIBS blocked beam operation. Solved by DRC and EEE/PLC OCD.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Data analysis of experiments (past ones): to be migrated on next week over three days. E-mail to be sent to xo-info.

XRO:
- Involved in the SEPS interlock today.
- ZZ for HED Mono was successful by power cycling device Not yet clear if camera is broken or a Karabo/PLC issue. 

LAS:
- Nothing to report.

UNSYS:
- All fine.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- PP laser work this week and then setting up beamtime for cw31.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 12.07.2023, posted by Frederik Wolff-Fabris on 12 Jul 2023, 10:18 
General Announcement:
- There were two power glitches last night observed at Desy which switched OFF some cooling water pumps. Please check your systems and let XO know if you were also affected.
- SEPS Interlock tests driven by RPOs with help from Maurizio V. and CTRL colleagues are now scheduled to take place on Monday 17.07 instead of tomorrow. 
This is because the required bunch patterns may not be provided by machine in due time this week. A tentative schedule for each instrument/SASE will be made in the coming day(s).
- Martin Doering mentions an e-mail was sent out to groups asking for the feedback on tasks that were postponed or cancelled. Please inform xo-planning if you have tasks in these situations.

- Steffen H. says starting today responsibility for the Data Acquisition services (Karabo devices and data group configuration) has been transferred from ITDM to CTRL. 
So CTRL will be the support contact together with DOC. A small task force develops the DAQ at CTRL. Please contact CTRL and Steffen H. in case of questions.

CTRL:
- Deploy Karabo beckoff loops due to some bugs at PLC side which affects communication at Karabo. Patch for Karabo was prepared and will be deployed today at 13:00 in SA1-2-3 the moving loops; downtime few 
minutes.
- Hardware intervention done by IT in replacing a mother board at SA3 which runns PLC loops. Takes longer (30 mins) to replace and restart Karabo. 

DA:
- Calibration team will migrate offline calibration to different nodes. No interruption of services. DET is informed.

EEE:
- Bug of PLC and work around by CTRL: bug was there before and now that makes issues (see CTRL). 
- MID: update of master loop as wished from MID.
- Next Monday busy with bring up days.

VAC:
- No impact of power glitch.

XPD:
- ZZ successful at XTD9 yesterday with Bassler cameras..

DET:
- Nothing to report.

ITDM: 
- Message from Luis: update of myMDC takes place.
- Power glitch: around 03:00-03:30 the cooling failed. At 604 around 20 servers switched OFF as cooling water went down (as prevention mechanism to mitigate temperature raises). Tomasz. P. is working to 
bring servers up.
- Tobias C. also confirms TS sees the 8C water was affected (which is used for the 20C water). 

XRO:
- Nothing to report.

LAS:
- SA3 laser was shut down yesterday due to Lasermet work. Pouneh S. says additional Lasermet works for today were then cancelled and no more work will happen in this maintenance.

UNSYS:
- 4 Quadrupoles are not moving and are under investigation.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine.

HED:
- Not present.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration meeting 10.0723, posted by Andreas Galler on 10 Jul 2023, 09:30 
General Announcement:
- 

CTRL:
- Bring Up Days start next Monday

DA:
- DA and DET sessions are alwys the same days following CTRL and EEE

EEE:
- nothing to report

VAC:
- VAC is ready for beam

XPD:
- Nothing to report.

DET:
- Nothing to report

ITDM: 
- Nothing to report.

XRO:
- nothing to report

LAS:
- Nothing to report.

UNSYS:
- nothing to report


SPB:
- Couple of open things with crates --> EEE in discussion

FXE:
- Nothing to report

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Not present

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 05.07.2023, posted by Frederik Wolff-Fabris on 05 Jul 2023, 09:53 
General Announcement:
- Interlock tests are ongoing up to 12.07 (instruments area) and from 13.07 the accelerator restart with upstream devices.

CTRL:
- Nothing to report.

DA:
- Focusing in brink up days. All fine.

EEE:
- Bernard B. comments that rack room at FXE went power OFF. This morning TS / Torsten S. recovered the power in crates. No clear the reason of what happened. To be investigated.
- A. Galler asks Bernard B. on the 13.07 SEPS tests as additional device is present at SA2. Plan is prepared by Zunaira A. and he will check planning and get back to XO.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- No major news to report.

ITDM: 
- Nothing to report.

XRO:
- Activities are completed.
- At SCS exit slit there was a change of electronics: for the user point of view the motors are now moving in opposite directions and please remember situation is different from other exit slit.
- SA2 pitch motors in all 3 mirrors are now being driven by micrometers and not in millimeters. Scene is in preparation and during ramp up this will be checked and documented.

LAS:
- Nothing to report.
- Friday loss of power in SA3 is being reconstructed by Pouneh S. and will be communicate.

UNSYS:
- Undulator systems are operational.
- SA3: cell 15 and cell 17 have lost the linear encoder in the planar undulator. They are now operated by the rotary encoders. Probably it was finished to be damaged by power cycled and radiation damage 
together. 

SPB:
- Not present.

FXE:
- Intervention this morning on the cabinets. Reason for emergency power OFF not known.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 03.07.2023, posted by Frederik Wolff-Fabris on 03 Jul 2023, 09:58 
General Announcement:
- Power glitch happened on Friday morning: emergency power off was triggered in SA2 so power went down and TS installed a new UPS for SA2 area. Power was switched back few hours later; EEE was busy 
bringing up systems.
- In SA3 Lasermet work triggered a down in electricity for SA3 on Thursday end of afternoon: by mistake a wire was grounded and power went OFF for a second. However, Lasermet did not inform on that. 
The PP-laser went down and was discovered only on Friday morning. Only laser hutches were affected. Tobias C. says that Oleg E. and Torsten S. checked all cabinets and experimental hutches were not 
affected as TS had bridged the emergency OFF. 
Jan G. adds that also on Friday morning during the power glitch the network for diagnostic components in SA3 were also lost.
- Tunnels are technically open until tomorrow when interlock will be set. However, interlock tests are ongoing today and access shall not happen. 
Please only in urgent cases access today shall be done, as will interrupt tests. This shall be negotiated with D3 group / Wolfgang Clement.

CTRL:
- Bug was reported while writing parameters at MC2 motors. It was fixed by EEE colleagues. However, work around at Karabo side will be applied as not all motors had parameters updated.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Finished program with maintenance.
- Only Gotthard2 system was not received therefore not done.
- Calorimeter and laser power meter were recovered from SPB hutch and is now at XPD lab. Jan G. will contact SQS colleagues for being used on the instrument.

DET:
- Gotthard: no news but XPD and DET are in contact.

ITDM: 
- SA2 storage was moved; an e-mail will be sent.

XRO:
- Maintenance tasks were completed on Friday. This week remote check will be done.

LAS:
- Nothing to report.

UNSYS:
- Tasks are accomplished. Need to recheck all systems.

SPB:
- Problems on Friday required EEE intervention.
- Nagios notifications on MPS crate is being received.

FXE:
- Nothing to report.

MID:
- Not present.

HED:
- Not present.

SCS:
- Friday afternoon realized some devices were down and another check is to be done today.
- This week there is AC maintenance which requires a move of spectrometer which needs planning. Tobias C. will coordinate with company and Jan Torben D. for precise scheduling.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 28.06.2023, posted by Frederik Wolff-Fabris on 28 Jun 2023, 10:22 
General Announcement:
- PKG maintenance in SA1-2-3 areas (XHEXP1) is to take place today and fluctuations of temperature are to be expected. 
- Please remember that from next Monday 03.07 access is to be done with the new transponder only.

CTRL:
- Karabo deployment done for instruments and SASE topics: couple of issues for LAS (Galvo device could not be started; dependence was then installed manually and is now fixed).

DA:
- Nothing to report.

EEE:
- Runs smoothly with activities; no issues were found so far.

VAC:
- Everything accordingly to the plan.

XPD:
- PES in SASE3 is repaired. No other issues for maintenance plans.

DET:
- Nor present.

ITDM: 
- Status of storage: SA1 is up and running; SA3 storage had a hardware upgrade to new technology (old still available) and an e-mail will be sent to local contacts of proposals/users; 
SA2 storage upgrade is ongoing and decision where to exchange hardware is to be made today.

XRO:
- Not present.

LAS:
- Galvo issue is solved.
- Other issues were also solved and good to go.

UNSYS:
- Ready with tunnel tasks.
- After replacing quad vacuum chamber in SA3 cell 22 and cell23: Desy vacuum group used a Pt-100 sensor installed and is limiting the travel range of the Quadrupole. 
The range was measured and needs to be discussed with MXL if allows operation.

SPB:
- Not present.

FXE:
- Not present.

MID:
- Nothing to report.

HED:
- Everything on the track.

SCS:
- Not present.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 31.05.2023, posted by Frederik Wolff-Fabris on 26 Jun 2023, 09:40 
General Announcement:
- Tobias Clever mentions that the tasks for the UPS repair is cancelled for the summer maintenance period.

CTRL:
- Not present.

DA:
- Nothing to report.

EEE:
- All fine with maintenance activities.

VAC:
- Everything works (more or less) accordingly to the plan

XPD:
- PES in XTD10 will be repaired today.
- Progressing accordingly to the plan.

DET:
- Nothing to report.

ITDM: 
- E-mail was sent to xo-info on maintenance / updates of gateway and Maxwell for next Friday after lunch or around lunch time. In case of questions please contact ITDM.
- Today the new storage system is being moved. Old one still available and e-mail will be sent.
- Regarding online resources: essentially finished and DAQ will be brought back.

XRO:
- Going well but new activities appeared since last week, needing interaction with instruments:
- Solid attenuator in SA2: was decided to disable the arm; the other solid attenuator has the same problem – needs to be discussed with instruments.
- Accumulate issues with motors and findings are being sent to Bernard B. but contact to EEE will be done in order to speed up fixes due to the large amount of findings.

LAS:
- SA1 parameters are lost as well with network connections. ITDM will be contacted.
- Control and libraries are also having issues for Galvo system in SA1.

UNSYS:
- Pending task is the replacement of Almemo batteries in SA3. Other tasks are completed.

SPB:
- Not present.

FXE:
- Last week replacement of chamber was done, thanks to Janni E. from VAC to support.

MID:
- All well for the moment.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Nothing to report.
SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 21.06.2023, posted by Frederik Wolff-Fabris on 21 Jun 2023, 11:42 
General Announcement:
- Tobias Clever informs on the UPS repair for SA2 and SA3 areas in the XHEXP1. A new date has to be tentatively arranged. 
XO will communicate with involved parts. The on the central UPS system does not only affect green sockets but also will affect overall power while the emergency OFF is pressed.
- Please note the PRC scheduled will be restarted on July 14th only.

CTRL:
- Starting updating SA1 today, tomorrow with SA2 and SA3.

DA:
- Nothing to report.

EEE:
- Started with activities; Many instruments contact people are gone - needs a solution for the future.

VAC:
- At tunnel.

XPD:
- Hirex being protected;
- XGM switched OFF yesterday.
- Work at FEL IMG SA3: vented.
- Nothing bad appeared in the ramp down; MCP detector in SA3 found some things - to be followed up.

DET:
- Nothing to report.

ITDM: 
- Started activities in all three SASEs: SASEs storage unavailable for the next 2 days
- Updates with SA1 with CTRL;
- Next week Friday gateway update; followed by FastX 3 update (URL will change as port changes - if using webbrowser to get to FastX has to be downloaded again). Details to be sent later.
- Maxwell updates on next week.
- Updates of packages at control PCs: update all hardware in all instruments, requiring reboot afterwards.

XRO:
- Tunnel doing repairs and activities: Solid Attenuator today; Got contaminated by exposure to air. XRO will disable the 75um tick diamond in SA2 (arm1) and introduce the 2.4mm tick diamnond (agreed with 
instruments).
- Ramp down went well: reminder it is dedicated to ramp down (machine activities interrupted a bit) is a matter of communication to be reinforced.
- Few things were found during the ramp down.

LAS:
- Nothing to report.

UNSYS:
- Work ongoing accordingly to the plan: installed Pb shield in SA2 and SA1 in PS.
- Replaced doocs servers; batteries on Almemo sensors;
- XTD4/SA3 upgrade of absorbers in cell 22 and cell23.
- Replacing MONO in SA3

SPB:
- Not present.

FXE:
- XTD9 task today.

MID:
- Nothing to report - all ongoing.
- Please contact MID if tasks take a day or more inside MID to verify for collisions and vacations time.

HED:
- All in the retreat.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 19.06.2023, posted by Frederik Wolff-Fabris on 19 Jun 2023, 10:08 
General Announcement:
- Today is the last day with photon beam operation for the ramp down activities from XRO and XPD. From tomorrow (Tuesday) morning the photon tunnels (XTDs) will be open for the summer maintenance period. 

CTRL:
- Starting to deploy Karabo for the summer maintenance; an e-mail will be sent to xo-info list.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Together with XRO there is the ramp down day. Check system; support studies from Gianluca/Weilun (XGM and HIREX);
- Start with SA3; then SA1 and SA2.
- Measurements in SA3 (PES / grating spectrometer) take place.

DET:
- Nothing to report.

ITDM: 
- As mentioned last week, the closing proposals is taking place; please move the data.
- SA3 will switch to the new storage system / hardware by end of the week / start next week. 
Files present at the current online storage system need to be copied - copy is not automatic: info will be sent to xo-info mail.

XRO:
- Working in ramp down day: coordinating with BKR and experiments.
- Priority is to get data for the current situation to address potential issues during the maintenance. 
- Reminder to SXP: please close hutch and open shutter; SQS branch ramp down is done; SCS ongoing.

LAS:
- Started with maintenance. Lasers will be OFF in the middle of the week.

UNSYS:
- All fine.

SPB:
- Preparing for maintenance.
- Beamtime last week went fine.

FXE:
- Nothing to add; used beam during the nights last week.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Started on Tuesday: photon energy was bad at 1keV;
- Hutch will be closed today morning.
Entry   Notes XO Integration Meeting 14.06.2023, posted by Frederik Wolff-Fabris on 14 Jun 2023, 09:43 
General Announcement:
- This is the last XO integration meeting during X-ray operations week. In case of questions on the summer maintenance please contact xo-planning@euxfel.eu

CTRL:
- Minor issue with FXE sample scanner: one motor required intervention from CTRL and feedback is expected from FXE; another motor needs an improvement of the code which is being worked out.

DA:
- Not present.

EEE:
- Nothing to report.

VAC:
- Issue with solid attenuator is solved and vacuum recovered well.

XPD:
- Switch to 20.5keV on Thursday night will require XGM expert.

DET:
- SPB Jungfrau has issues with network connection but seems to be OK by now.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- SA2 PP-laser oscillator went out of "Lock" and the coarse did not work. Under work by the Sync group. It does not affect operation at instrument.

UNSYS:
- Problem in SA3 cell16: terminal was replaced;
- Motor driver in SA3/cell23 had an error and was recovered by power cycling. Driver spare parts are in stock but replacement needs around half-day intervention if that happens again. 

SPB:
- Start up yesterday took about 2hs for alignment. An e-mail will be sent to XO for discussion with machine colleagues.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 12.06.2023, posted by Frederik Wolff-Fabris on 12 Jun 2023, 10:03 
General Announcement:
-	 

CTRL:
- FXE sample motor: CTRL will investigate the status of the issue.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Work with vacuum leak of SA2 Solid Attenuator: solved with XRO and VAC tunnel entry by removing the Arm6 from the device. Vacuum is now good and the overall solution will be prepared in future.

XPD:
- Nothing to report.

DET:
- AGIPD 512K at MID had a module with a start/stop error and it is not related to the damaged module.

ITDM: 
- Remind on closing the commissioning proposals: an e-mail was sent to interested staff. Please note the software migration requires all data collected in the last half year to be copied/cleared.
- Saturday overnight: issue with Maxwell cluster that affected calibration/correction jobs; Jobs were pending even with free partition available. 
It was solved on SAT morning with help from Desy colleagues. Reason is also not yet understood and will be followed up this week. 

XRO:
- Nothing to report apart of the solid attenuator in SA2.

LAS:
- SA1 PP-laser works on AMPHOS is ongoing to optimize beam better and improve energy.

UNSYS:
- Quad mover in SA3/cell16 issue.
- X-axis motor at the second monochromator in SA2 has issue and needs a ZZ access this morning (ongoing).

SPB:
- Nothing to report.

FXE:
- Issue with frequent error started in motor: ticket sent. 

MID:
- Difficult week; thanks to XPD, XRO and VAC for the help.
- Experiments somewhat successful.

HED:
- Preparing the last experiment taking place this week.

SCS:
- Finished experiment this morning.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 07.06.2023, posted by Frederik Wolff-Fabris on 07 Jun 2023, 10:35 
General Announcement:
- As PRC, Jan G. says that overall the start on Monday was difficult but no major issues happened so far. SXP got the 2.5keV photon energy at best effort and planned program was carried out.

CTRL:
- Not present.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- All fine with VAC.

XPD:
- No issues for diagnostics.

DET:
- Investigation on AGIPD at HED is ongoing but is determined that the X-rays caused the damage (detector set for several runs died as it was illuminated with high intensity). 
Idea is to keep this module until the end of the run (no possibility to recover it before) and plan for exchanging damaged module for the next run will be organized.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- SCS helped SPB/SFX in giving more bunches to SA1 yesterday night.

FXE:
- Colleagues waiting for beam for 2 hours this morning to get it at the same conditions as yesterday.
***Note after meeting: machine was down for about 1hr due to overheat of a kicker at TLD system caused by high number of unused bunches sent to TLD.

MID:
- Waiting for XHRSS better conditions and machine colleagues are working on it.

HED:
- Precautions for protecting detector will be evaluated.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 05.06.2023, posted by Frederik Wolff-Fabris on 05 Jun 2023, 09:44 
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report. 
- XGM will be prepared for 20.5keV for cw24.

DET:
- Problem reported by the DOC: AGIPD 500K at HED has a potential damage in one module. It will be investigated by DET.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- T. Sato reports that could not change X-ray parameters on Friday. 
- XO had communicated any change of parameters should be requested to BKR (info to SPB/Patrick V. on Friday). 

FXE:
- Problem with a middle layer device and contact will be done with CTRL.

MID:
- Nothing to report.

HED:
- Successful beamtime.

SCS:
- Nothing to report.

SQS:
- Issue with beam pointing mentioned Friday was mitigated for the weekend.
***Note after meeting: SQS still suffered on pointing after Friday during the SA1/SA2 changes. Thanks to the measure put in place (communicating BKR on every request for change) the overlap could be 
recovered minutes after these changes.

SXP:
- It will request with the PRC a photon energy change for tomorrow.
- Commissioning of KB mirror at 2.5keV progressed last week and will continue tomorrow.
Entry   Notes XO Integration Meeting 31.05.2023, posted by Frederik Wolff-Fabris on 31 May 2023, 09:47 
General Announcement:
- The Maintenance tasks list was released yesterday evening. If you did not receive or have any questions please contact xo-planning@xfel.eu
- Please instruments shall make use of the Operation-2023 e-log for at least one summary entry a day.

CTRL:
- Nothing to report.

DA:
- After DOC experience with LPD in train-on-demand some critical errors happened (the LPD with train-on-demand mode created empty sequences) and is under work for a fixing. 

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report; the XGM was adapted for SA2 operation and is working.

DET:
- Not present.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Energy distribution within the train is seen (slope of 50%). BKR has improved to about 30% now but it is preferable to have it flat if possible. A member of SPB/SFX will join the Daily Ops today.
- Discussion on scheduling Ros experiment in cw33 or cw38 need to happen with XO.

FXE:
- Issue with laser and pointing stability last week but users were happy.

MID:
- All fine at MID: obstacle in the beam was solved las week and last experiment was successful.

HED:
- Not present.

SCS:
- SCS eventually used the beam during last weekend.

SQS:
- User beamtime: issue with DSSC detector happened but solved yesterday with support group.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 24.05.2023, posted by Frederik Wolff-Fabris on 24 May 2023, 09:50 
General Announcement:
-	 

CTRL:
- Not present.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Everything working fine.

DET:
- Not present.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- PP-lasers are back and running. All fine.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Issue with clipping the beam was found and relates to a combination of devices.
- Progress is being made for user experiment.

HED:
- Preparation for next week ongoing.
- Needs to get in contact with RCs for next Monday tuning.

SCS:
- Preparing the THz setup for beamtime.

SQS:
- Nothing to report.

SXP:
- Used beam yesterday for commissioning KB. 
Entry   Notes XO Integration Meeting 22.05.2023, posted by Frederik Wolff-Fabris on 22 May 2023, 10:00 
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- OCD Call related to motors in SXP was addressed.

VAC:
- Nothing to report.

XPD:
- No issues on the week.
- Successful progress with measurements on Wavefront sensors.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Commissioning of KB mirror at SXP worked well.

LAS:
- SA1 PP-laser is back but no yet at full power. Hopefully by evening will run at specs.

UNSYS:
- All fine with undulators systems.

SPB:
- Program with XPD went well.

FXE:
- Nothing to report.

MID:
- Issue with a motor; MID in contact with EEE.
- Collimator in tunnel was lifted by 5mm last week. 
M. Vannoni checked on the weekend and confirms the beam can move higher but another device is now blocking beam - still to be found which device.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Commissioning KB mirror successfully.
- Two issues: 1. Motion middle layer device crashed; 2. Gas attenuator issues with changing attenuation (not properly working) @ 1keV photon energy. Contact to VAC will be done.
- Measurements of focus size with KB will be done by tomorrow.
Entry   Notes XO Integration Meeting 17.05.2023, posted by Frederik Wolff-Fabris on 17 May 2023, 09:40 
General Announcement:
- Change in 2024 schedule: for next year the setup days is shifted from Mondays to Tuesdays. Please keep it in mind when setting shift plans for next year. 
In case of questions please get in touch with XO.
- Currently we are in facility development week and so far mostly activities linked to the accelerator were done.
- The UOM of next Friday 19.05 does not take place.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Everything running normally.
- Yesterday intervention at XTD6 to move collimator at MID branch: system was moved accordingly to the plan.

XPD:
- Commissioning activities ongoing.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Bringing up the AMPHOS laser and it shall be OK by the end of the week. In case of questions please address Max L.

UNSYS:
- All good.

SPB:
- Nothing to report.

FXE:
- Two vacuum leaks were found at the experiment and fixed together with VAC members.

MID:
- Preparing for experiment next week. MID is in contact with EEE to address some issues.

HED:
- Not present.

SCS:
- Preparing new timing setup.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 15.05.2023, posted by Frederik Wolff-Fabris on 15 May 2023, 09:51 
General Announcement:
- There are different infrastructures among the instruments regarding liquid nitrogen. An idea is to standardize the systems in future to avoid technical issues will be evaluated and put in place.
- There is no UOM on next Friday 19.05 due to the bridge holiday.

CTRL:
- HED Karabo slowness: CTRL is helping HED to better understand it and will be followed up today.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Issue with GATT in SA3: solved by PRC on the weekend and further investigations ongoing.

XPD:
- Today XPD is working at SPB to exchange parts of the calorimeter.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- SA1 AMPHOS intervention was completed successful.

UNSYS:
- SQS reported that undulator cells got stuck over the weekend for minutes during energy scans. They were reset by the BKR but after restarting servers by Unsys the problem was gone.
	
SPB:
- Difficulties to align mirrors during the weekend.

FXE:
- Preparing next beam time and so far, all under progress.
- FXE requested liquid nitrogen for preparation with user experiment.
- Access to the truck bay during the weekend was not possible for some people; XO informs an e-mail to A. Suleyman shall be send to address this matter.

MID:
- Nothing to report.

HED:
- Run last week was finished successfully.

SCS:
- Nothing to report.

SQS:
- Good commissioning and use of beam last week apart of the GATT issue.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 10.05.2023, posted by Frederik Wolff-Fabris on 10 May 2023, 09:47 
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- Time to commission the LPD detector was made and was useful.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- No issues with diagnostics.

DET:
- Feedback on the MID AGIPD data: problem was around the PC layer from MID which needed a reboot. It seems to run well after that.

ITDM: 
- Problems with crashing DAQ in MID because of slowness of GPFS: memory had to be clean but after that it run fine.

XRO:
- Monday an access in XTD10 to repair the top slit of the SQS exit slit was done and successful: the bottom blade was also checked and is fine. The top one was exchanged; 
1. Yesterday morning exit slit was recommissioned and recalibrated. 
2. A software issue not correlated to the mechanical problem appeared (when setting the motor to a position it goes closer but not exactly to the desired position). 
3. A ticket was written but SQS can use it.

LAS:
- PP-laser in SA2 has issues with stage and an intervention is ongoing;
- At SA1 PP-laser a defect diode caused the leak and it being dried up currently. Laser will not be working at the end of this week. But there is a chance it will work at the start of next week.

UNSYS:
- All fine with Undulators.

SPB:
- Nothing to report.

FXE:
- Problem with LPD pipeline calibration last night is being addressed; DOC will be contacted today.
- Regarding He supply: situation did not change as related to last year and for next two weeks He supply is guaranteed.

MID:
- Mechanical issues with LDM being addressed.
- PP-Laser will not be used this week.

HED:
- Busy with beamtime.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Busy with KB installation.
Entry   Notes XO Integration Meeting 08.05.2023, posted by Frederik Wolff-Fabris on 08 May 2023, 09:53 
General Announcement:
- As PRC Jan G. reports that: 
1. ZZ access to XTD10 was planned and started around 9AM today to work on the exit slit. Plan is to finish by 12:30; 
2. Machine worked nicely during the weekend (only 1 downtime due to cryo OK for around 1 hour); 
3. on FRI afternoon MID close the pre-absorber and background signal was seen in the AGIPD - it was clarified by PRC and XRO that the pre-shutter does not provide a full stop for beam, just protecting 
electronics from intense beam.

CTRL:
- It has split the watchdog devices (imagers) to two servers and performance was seen to be stable.

DA:
- FXE mini-LPD issues during commissioning are being addressed.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- MID during the weekend reported issues with AGIPD data: two modules were missing. A DOC expert was on shift but further investigation is still needed; MID continued to work without the modules.

ITDM: 
- Issue with performance of online data storage at MID: if AGIPD is set in full speed mode during several hours the cache gets full and needs a break. 
This happened yesterday and by 6PM MID decided to stop for 3 hs until cache was emptied (reason for such long time was sample related; cache can be emptied faster). 
To be in safe side is better to stay with cache filled by 50%. A new system from IBM with double performance is ordered and shall be available during the summer.

XRO:
- ZZ is ongoing for the Exit slit.

LAS:
- Issues with the Sync in SA1 and SA2 which are addressed by Desy group LabSync; On THU and FRI instabilities were observed by LAS.
- Called by FXE during the weekend which will be investigated.

UNSYS:
- Nothing to report.

SPB:
- Night shifts at 12.4keV last week went fine.

FXE:
- Not present.

MID:
- Two MID related issues were already addressed (see above).

HED:
- Nothing to report.

SCS:
- Loss of optical sync: Laurent M. says that 12hs were lost last week. SCS is discussing with CTRL to copy the alarm system from SPB/SFX. Wajid E. adds that the logic has to be checked (properties) and 
then implemented.

SQS:
- Beam will start with SQS and not with SXP on Tuesday.

SXP:
- Not taking beam tomorrow as the KB system arrives and needs to be brought to the hutch.
Entry   Notes XO Integration Meeting 03.05.2023, posted by Frederik Wolff-Fabris on 03 May 2023, 09:49 
General Announcement:
- The current week is the first 16.3GeV week of this run in 2023.
- On the summer maintenance period: one list is still missing but is being mitigated. XO thanks for submitting lists on time.
- As PRC, Jan G. informs some accesses were successful; machine was tuning yesterday to higher photon energies and achieved performance was not enough. 
More tuning is ongoing today morning in order to improve pulse energy inclusive touching common nobs that affect all 3 SASEs.

CTRL:
- Nothing to report.

DA:
- Nothing to report; DA is on a retreat today.

EEE:
- Related to DOC: two motors needed intervention from XRO and EEE during the week. A ZZ was done yesterday by Maurizio V. and F. Wolff-Fabris and in principle they shall be working now.

VAC:
- Everything fine.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- All fine at lasers.

UNSYS:
- Issue with Phase shifter control system with a problem with new feature developed by Desy colleagues; it related to the number of periods.
- SA1 cell32 phase shifter motor was exchanged in ZZ last Monday.

SPB:
- Start with beam tonight at 12.4keV.

FXE:
- Preparing the He setup.

MID:
- Changed to 23keV few minutes ago and optimization ongoing.

HED:
- Not present.

SCS:
- Question on ongoing tuning: as long general nobs are touched then the SA3 performance may also be affected in the coming hours.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 26.04.2023, posted by Frederik Wolff-Fabris on 26 Apr 2023, 09:46 
General Announcement:
- Please remember Friday is the deadline to submit the summer maintenance task list.
- Performance conservation action at 7AM: reminder this takes place and BKR will call instruments to inform when they start with it. This action is transparent for the beam delivery.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.
- As PRC, Naresh K. says the week is smooth and there was a request from SQS to shift/change the starting of the beam region 2 to later time/trigger and this was done by BKR. In summary all are fine.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- On the MID clipping of the beam: it was related to a collimator in SA2 of the same kind that was removed in past at FXE. Further discussions for a long term solution is ongoing with MID.

LAS:
- Nothing to report.

UNSYS:
- Phase shifter in SA2 had issues with middle layer devices at Desy side but fixed and running fine.

SPB:
- Nothing to report.

FXE:
- During the nights this week FXE is preparing for next week's beamtime.
- Working on motors.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present due to a meeting.
Entry   Notes XO Integration Meeting 24.04.2022, posted by Frederik Wolff-Fabris on 24 Apr 2023, 09:53 
General Announcement:
- Two cryo events happened last week: one Friday morning 03:30AM and one on Saturday evening. Machine has fully recovered by now. First event was caused by a ceramic bearing of the cold compressor.
- Power glitches were reported at Desy last few days but it seems that no equipment was impacted at XFEL. In case you see differently, please contact XO and TS.
- Next Friday 28.04 it is the deadline for submitting the summer maintenance task list.

CTRL:
- DOC shift was in place until this morning to help from recovery of the cryo events.

DA:
- Quiet week for OCD.

EEE:
- Issues that appeared are being followed by EEE.

VAC:
- All fine with VAC.

XPD:
- No issues with XPD.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- SA2 PP-laser was back running and fine.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Joerg H. will get in touch with XRO / Maurizio V. on a beam clipping issue (originated at the end of MID branch). 
- HXRSS was recovered fast during last week.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
Entry   Notes XO Integration meeting 18.04.2023, posted by Andreas Galler on 19 Apr 2023, 09:27 

General Announcement:

  •  

CTRL:

  • nothing major

DA:

  • nothing major

EEE:

  • nothing major

VAC:

  • nothing major

XPD:

  • nothing major

DET:

  • nothing major

ITDM: 

  • jhub update went though at 9:00

XRO:

  • nothing major

LAS:

  • failure of a piazo in the beam stability in SA2, laser is being recovered

UNSYS: 

  •  

SPB/SFX:

  •  

FXE:

  • nothing mjor

MID:

  • waiting for laser
  • missing data from the JF, and motor 

HED:

  • nothing major

SCS:

  • nothing major

SQS:

  • nothing major

SXP:

  •  

DRC

  • qiet week

PRC

  • quiet week
Entry   Notes XO Integration meeting 17.04.2023, posted by Andreas Galler on 17 Apr 2023, 09:26 

General Announcement:

  •  

CTRL:

  • nothing major

DA:

  • nothing major

EEE:

  • nothing major

VAC:

  • nothing major

XPD:

  • nothing

DET:

  • nothing

ITDM: 

  • nothing

XRO:

  • not present

LAS:

  • all good

UNSYS: 

  • everything fine

SPB/SFX:

  • nothing

FXE:

  • nothing

MID:

  • XRO did alignment in XTD2 --> successful, euler MDL recommissioned

HED:

  • nothing

SCS:

  • issues ar being taken care of

SQS:

  • XRO investigated damage threshold mirrors 

SXP:

  • nothing 

DRC

  •  

PRC

  •  
Entry   Notes XO Integration meeting 12.04.2023, posted by Andreas Galler on 12 Apr 2023, 09:23 

General Announcement:

  •  

CTRL:

  • not much to report

DA:

  • not much more to report

EEE:

  • not much to add

VAC:

  • successful intervention for Turbo Pump intervention of PES in XTD10

XPD:

  • Diamond Detector Study in SA2 on Thu

DET:

  • not much to report

ITDM: 

  • last week was super successful with SPB taking 5 PB of data
    • however please provede better estimations, here a factor of 5 overshoot was seen.

XRO:

  • not present

LAS:

  •  

UNSYS: 

  • one terminal SA3 cell 5 issue over the week --> replaced on Tuesday

SPB/SFX:

  • EPS issue SPB_XTD9_IMGPI out siwtch not working --> limited to two pulses --> taken out of EPS interlock
    • later repaired by XPD

FXE:

  • nothing

MID:

  • all fine

HED:

  • excellent performance of the self-seeded x-ray beam last week, for the user experiment #3326 (Fri-Sat).
    The beam is very stable both in terms of intensity (700-800 uJ constant) and the pointing jitter! Users were very happy with the performance and the experiment was successful. 

SCS:

  • issues with electronics
    • EEE contacted and Bernard going to support today

SQS:

  • not present

SXP:

  • nothing to report

DRC

  • n/a

PRC

  • n/a
Entry   Notes XO Integration Meeting 05.04.2022, posted by Frederik Wolff-Fabris on 05 Apr 2023, 09:47 
General Announcement:
- Last week the template for the summer maintenance was send to the groups. In case of questions please contact M. Doering.
- UOM will not happen this Friday due to the holidays.

CTRL:
- HED setpoint issue is solved.

DA:
- Nothing to report.

EEE:
- Checking a ticket on issues with HED train-IDs; being addressed by the DOC.

VAC:
- XTD10 will be open next Tuesday 11.04 to exchange a PES turbo pump. It is a chance for additional accesses until after lunch.
- VAC did not notice effects of the power glitches.

XPD:
- Nothing to report.

DET:
- E-Pix at MID: the detectors are back online but reason for the issue is not yet understood.

ITDM: 
- GPFS is up and running after the downtime yesterday (problem with one Maxwell node that was not accessing the system).

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- ZZ access yesterday to replace two broken motors in SA3. Unsys still has 4 available spare motors. 
- On April 11th Pb shield will be installed in SA3. All PS behind two color chicane in SA3 were already affected/exchanged and some for more than once.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- For beam time starting on Friday the user will bring their own time-pix detector. User arrives only tomorrow afternoon and a test will be done prior Friday. 
HED would like to get in touch with EEE and CTRL for support. Beamtime will start with AGIPD detector.
- Steffen H. as DRC mentions the DOC is around but may not be able to address some eventual issues over the holidays if experts would be needed; Nerea J. says that Frank Babies and Bruno Fernandes will get 
in touch with Motoaki N.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Commissioning with beam is progressing good.
Entry   Notes XO Integration Meeting 03.04.2023, posted by Frederik Wolff-Fabris on 03 Apr 2023, 09:42 
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Small intervention in lasers uTCA today: please save data; this was organized with LAS. 

VAC:
- Not present.

XPD:
- Hirex spectral integral was fine; nevertheless, a threshold setting was changed.

DET:
- MID called for the Epix detector: strong current for the Mpod was observed and further investigation to be done.
- DSSC showed a minor problem (reported on a phone call) that will be investigated.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Everything fine.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Need to get in touch with XRO as beam was looking like to be blocked by some device.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 29.03.2023, posted by Frederik Wolff-Fabris on 29 Mar 2023, 10:02 
General Announcement:
- M. Doering makes the quick-off presentation for the summer maintenance period:
1. Next Friday the list will be released to the groups and shall be returned on April 28th; 
2. May is dedicated to scheduling and conflict solution and on June 2nd the task list summary will be released; 
3. SMP starts on June 20th; 
4. Interlock tests take place from July 3rd to July 14th; 
5. Machine ramp up from July 15th to July 24th.
- Maintenance task list is unchanged as compared to the latest winter maintenance period. Group's small internal tasks that do not affect other groups or areas do not need to be included. 
Please use the naming convention and send the list to xo-maintenance@xfel.eu
- A maintenance planning workshop will take place on April 13th 10:00-11:30. Invitation to the respective contacts/groups will be distributed. Aim is to discuss, review and improve the maintenance planning 
process.
- Zunaira A. questions on the recent issues and progress with Alfresco: Luis M. says that 3 issues are known with Alfresco Wiki and contact with external company (Highland) which will deploy a fix for 
tables. HTML issue has no solution.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Hirex is working fine, but yesterday showed a spectral integral of 9mJ. Naresh K. will investigate further.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Nagios issue was fixed on Monday.

UNSYS:
- Nothing to report.

SPB:
- Issue with stepper motor (hardware - connector need to be replaced) for a sample environment device which is tried to be solved today.

FXE:
- Problems with pulse IDs and DOC will be contacted.

MID:
- Monday afternoon issue with high/low voltage power supply. EEE and CTRL are helping to investigate and hopefully a clear picture is found today.

HED:
- Nothing to report.

SCS:
- Thanks TS for fixing problem with leak in the chiller system.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 27.03.2023, posted by Frederik Wolff-Fabris on 27 Mar 2023, 09:55 
General Announcement:
- Next Wednesday the kick off presentation for the summer maintenance plan will take place at the XO Integration meeting done by Martin Doering. Please invite colleagues from your groups who may be 
interested.

CTRL:
- OCD call on Saturday due to a network failure (broken switch) that affected SA2. It was solved by DOC and OCDs.

DA:
- The online cluster was disconnected on the weekend and had to be restarted.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- On Saturday BKR and XPD noticed an indicator of SA2/XGM giving a warning. XGM was checked and was operating fine. The gas type information on DOOCS was not being received and a ticket to DOOCS/DESY was 
made. 
- As PRC Naresh K. said a major failure could cause that signals from SA2 were not sent to DOOCS and DOC was informed on this particular issue with XGM.
- Steffen H. says a procedure to reach DOOCS people shall be made together with a list of devices that send signals from Karabo to DOOCS. Karabo was not the cause of the XGM problem and DOC had no means to 
help on this.

DET:
- Nothing to report.

ITDM: 
- Switch for brokers in SA2, located at Balcony room, was broken on Saturday morning causing the network problem. The spare part was exchanged and configured by Desy colleagues. After the exchange CTRL and 
DOC recovered from Karabo side.

XRO:
- Nothing to report.

LAS:
- Affected by switch issue in SA2 on Saturday. The Nagios is still offline and CTRL is informed and working on it.

UNSYS:
- Nothing to report.

SPB:
- Yesterday a small issue with AGIPD data happened and the detector had to be power cycled. Reason for it is not yet understood
- User run with 8keV to 9keV was affecting SQS beam. A decision was reached which included coordinating SQS on every photon energy change.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Beamtime: many devices had to be restarted on Saturday after the network switch failure and about 24hs of operation was lost until all systems were working back again.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 22.03.2023, posted by Frederik Wolff-Fabris on 22 Mar 2023, 11:00 
General Announcement:
- A. Galler reminds on the conservation parameters action from accelerator which takes place every day at 7AM to recover conditions from day before or prevent possible degradation of conditions. 
BKR operators will call instruments at the moment they start.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Contacted by DOC on an issue with recording data by the DAQ. Problem is understood and if this is critical for any instrument this week, please contact EEE.

VAC:
- Nothing to report.

XPD:
- Hercules students worked with also at HED.
- Calorimeter at SPB hutch: XPD needs to get in contact as it seems a power outage affected the control computer (also venting it) (see below).

DET:
- AGIPD also went down at SPB/SFX yesterday due to power outage (see below). 

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to add.

UNSYS:
- Nothing to report.

SPB:
- Local power outage in the hutch: R. de Wijn confirms that yesterday in the afternoon while connecting a device the power went down locally and this explains why the Calorimeter computer went down as well 
as the AGIPD connection had to be restarted / power cycled. 
- Nothing more to add apart of the power cut.

FXE:
- Busy with instrument review.

MID:
- Nothing to report.

HED:
- M2 mirror feedback went OFF many times yesterday. It could be restarted and if it happens again today MID will contact DOC / XRO.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 20.03.2023, posted by Frederik Wolff-Fabris on 20 Mar 2023, 09:43 
General Announcement:
- An e-mail was sent to xo-info list about the pressurized air that is being serviced at XHEXP1. Some vacuum valves may close and please check for components connected to pressurized air. 
This intervention had to be done as the system is being reconnected due to an extension.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to be reported.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Chiller from SCS taken and installed at SPB/SFX for AGIPD cooling, working fine
- MPOD problem at SPB/SFX required installation of a spare card, now working fine.

ITDM: 
- Nothing to report.

XRO:
- Nothing major to report.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Confirm that Julabo chiller was replaced and is operation.
- An MPOD was replaced and works again.

FXE:
- FXE review happening and FXE will not use night beam on Tuesday and Wednesday; SPB/SFX can use the beam.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Nothing to report.
- SCS will contact Nerea J. to discuss a question/issue.
- A. Galler asks Jan Torben D. to verify with SCS colleagues on the reported jitter due to SA2 tuning.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 15.03.2023, posted by Frederik Wolff-Fabris on 15 Mar 2023, 10:49 
General Announcement:
- Tobias Clever informs on electrical works needed to connect XHO to electrical grid:
1. A new transformer will be connected to the new building on 03.April (a small chance of error can produce a minor power glitch as the ones frequently seen by Desy power glitches - usually this events 
have not affected us in the past 2 years. 
2. Second work on 11.04: test of auxiliary conditions that were installed in December; it will be connected for the first time and a chance that a power glitch could happen affecting more XFEL premises 
(only affecting general power supply - all devices connected to secure or redundant power supply will not be affected). 
There is only a small risk and is necessary to run XHO with power. 
This is scheduled in a blue week and last similar event was in 2021 when cryo went down and XFEL systems were not severally affected, so it shall be contained event. An e-mail will be sent to xo-info list. 
P. Gessler raises the concern that this is a blue week.
- Tobias Clever says that for chillers ordered by instruments please make sure a standing maintenance contract has to be done as degradation of coolants happen with time without maintenance. Maintenance 
contracts are usually renewed automatically after the purchase contract is done. XO will forward the comment to DOB (to discuss level of maintenance contracts: individual or facility wide).

CTRL:
- Datalogger problem: fix will be deployed today at 13:00 and shall not take more than 5 mins. Please contact Wajid E. in case of conflicts.

DA:
- Nothing to report.

EEE:
- Call from DOC related to beam shutter from MID (see below): uncertainty in who could help. A ticket was sent via DOOCS; SRP was involved.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Julabo chiller exchange is ongoing (see below).

ITDM: 
- Nothing to report.

XRO:
- Instruments are fine with mirrors cooling OFF.

LAS:
- Nothing to report.

UNSYS:
- All fine.

SPB:
- Julabo chiller: repaired unit return is delayed and not arrive today. An emergency plan is on place: transfer chiller from SCS to SPB/SFX is ongoing today.
- Tonight SPB/SFX will not use beam. Between today and tomorrow the new chiller has to be put operational.

FXE:
- FXE can use the beam tonight if there is the wish.

MID:
- D3 shutter: BS6.2.3 shutter; root cause unclear if replacement of PC and/or IP address. Michael Dressel showed how to open shutter “manually” using the interlock box until it is finally repaired. 
Root cause shall be identified still.
- Operation with HXRSS started roughly but today it is better than yesterday (stability as well).

HED:
- Nothing to report.

SCS:
- Problem with DAQ (images could not be saved from detector); looks like slowness but DOC is investigating.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 13.03.2023, posted by Frederik Wolff-Fabris on 13 Mar 2023, 09:49 
General Announcement:
-	 

CTRL:
- On Friday a minor issue with Karabo dataloggers while connecting to Influx DB happened. Investigation to be concluded today and possibly apply the fix today.

DA:
- Deployment of offline calibration went well and smooth. In case of question please contact DA.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Issue with SA2 XTD6 XGM on Friday and Saturday: finally, it was found the Hard drive was damaged and had to be exchanged by a ZZ on Saturday 13:00. 
Thanks to Theo M., Fini J. for the ZZ and Soeren G. for software re-installation - all under voluntary basis.

DET:
- Problem with Julabo chiller at SPB/SFX: Julabo to be dismounted today and to be sent to Julabo. The repaired one will arrive Wednesday or Thursday and installed at SPB asap.

ITDM: 
- Nothing to report.

XRO:
- For SA1 and SA2 all mirrors cooling are OFF.

LAS:
- Nothing to report.

UNSYS:
- Did studies on radiation of Apple-X. 
- Problem with roll angle motor at 2nd Mono for HXRSS at cell#18. It can not be controlled and it seems it needs to be replaced. 
Understanding together with RCs is that is possible to run HXRSS this week with current roll position.
- Pb-shield for phase shifter motors are received and will be placed during ZZ accesses.

SPB:
- Julabo chiller exchange is planned for this week.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 08.03.2023, posted by Frederik Wolff-Fabris on 08 Mar 2023, 09:48 
General Announcement:
-	

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- All fine with the ADQ deployment on last Monday.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Issue with SCS chiller recently and again a similar issue now at SPB which the chiller stopped work. Has to be sent to repair. 
- It is unclear when two chiller will return. One is needed at SCS for the coming weeks. TS will contact chiller company and DET is following up.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- All fine.

UNSYS:
- Busy with K-measurement cell33/SA2 and radiation studies at Apple-X.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Nothing to report apart of the Chiller issue.

SQS:
- On Basler cameras: Gabriele G. comments that issue was the firmware that needs a new version from company. Caused by an application that is not in use. 
Solution by ITDM is to disable the application (see e-mail from Wajid E. to xo-info on 07.03).

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 06.03.2023, posted by Frederik Wolff-Fabris on 06 Mar 2023, 10:06 
General Announcement:
- Operation this week consists in a Facility Development week. Many FDs are scheduled and if you plan any activity that may interfere in tunnels please contact either XO or the PRC. 
- As DRC Patrick Gessler informs there is no DOC this week and all calls will be handled by him who then coordinate with respective DATA OCDs and groups.

CTRL:
- Nothing to report.

DA:
- Uncovered a situation last week: old data saved by DAQ (HED) is now understood and DA will apply a fix. 

EEE:
- Remind the deployment of ADQ in all setups apart of SQS today before lunch time.

VAC:
- All fine with VAC; a short interruption on Friday in SA1 happened due to some tests with electronics. To be redone possible today.
- As PRC Martin D. reports a 5-6 hours downtime on night to Saturday due to issues with interlocks at the Injectors. It was fixed by Desy colleagues.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- All fine and data were collected for last week's user.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Fight with beam jitter last week; For the weekend a change in focusing configuration helped to get acceptable situation and beamtime seemed to be successful.

SCS:
- Experiment arrived at the point of data collection. Further analysis needed to evaluate if successful or not.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 01.03.2023, posted by Frederik Wolff-Fabris on 01 Mar 2023, 09:41 
General Announcement:
-	 

CTRL:
- Nothing to report.
- Problems with FXE motors were solved at the DOOCS side. It was not a Karabo issue.

DA:
- Nothing to report.
- As DRC P. Schmidt says all is running quietly this week.

EEE:
- Remind on the deploy of ADQ new digitizer to be done next Monday morning. It will be done in all instruments apart of SQS. In case of question please contact Bruno F.

VAC:
- All fine with VAC systems.

XPD:
- All fine with Diagnostics. 
- The PES issue was resolved by exchanging the low voltage module in a ZZ also together with CTRL. Under investigation why the board was damaged.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.
- Issue with FXE motors / undulators will be further investigated.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Setting up experiment.
- Problems with Karabo being slow which affected night progress. CTRL and DA will investigate with DOC.

SCS:
- Several problems with Karabo devices happening during the night. It seems to be solved by now. Jan-Torben D. will get further information.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 27.02.2023, posted by Frederik Wolff-Fabris on 27 Feb 2023, 09:48 
General Announcement:

- Tobias Clever announces work in safety light installations at XHEXP1 taking place today: no disturbances shall happen and therefore no need to be alarmed.

- As PRC M. Vannoni says operation was smooth (no changes of parameters to keep machine stable).



CTRL:

- Nothing to report.



DA:

- No incidents for OCD: all fine.



EEE:

- MID called OCD for 1. Hexapods (to be followed); 2. Configurations on motors that were fixed.



VAC:

- Nothing to report.



XPD:

- Not present.



DET:

- DSSC is back online at SCS - thanks to involved groups to make it happen. Spare chiller is installed and being in use. Old one needs to be repaired.



ITDM: 

- Nothing special to report.



XRO:

- Nothing to report.



LAS:

- Installing device in SQS PP-laser side.



UNSYS:

- Everything is fine.

- Pb shield for motors are expected to be delivered this week.



SPB:

- Nothing to report.



FXE:

- X-ray delivery worked well.

- Sudden shift of photon energy by 9eV and recalibration was required costing 1 hours.

- Friday night error for undulator gaps costing 50% of intensity. <-- PhaseShifter hysteresis

- Motors moving to wrong positions. CTRL will follow.



MID:

- Problems with encoders in motors which were solved by DOC or followed up.



HED:

- Nothing to report.



SCS:

- Nothing to report.



SQS:

- Nothing to report. Last week of delivery was fine.



SXP:

- Not present.
Entry   Notes XO Integration Meeting 22.02.2023, posted by Frederik Wolff-Fabris on 22 Feb 2023, 09:44 
General Announcement:
- Situation of He gas: currently it is a bit more relaxed than last year but it is still hard to make predictions of He availability in a month or so. Please contact XO in case you have plans to use He 
gas.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- PLC team: SA3 PPL was damaged and replaced. Fixed together with LAS.
- ADQ for SPB Laser setup was fixed (fast ADC).

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Setting up DSSC at SCS for the next experiments: main chiller used to cool down the detector did not restart after the maintenance period. A replacement will be installed today. For tomorrow there are 
plans for testing.

ITDM: 
- Nothing to report.

XRO:
- SCS exit slit is fixed and further commissioning still pending.

LAS:
- Issues with Smaract stages in SA3: control crates (replaced) and stage (not functioning). Stages to be exchanged today and tomorrow.

UNSYS:
- Nothing to report; ZZ on Monday was successful.

SPB:
- Nothing to report.

FXE:
- PP-laser is solved;
- Yesterday one had 1mJ at 5.8keV. After fixing some machine parameters the realignment had to be done and took 4 hours of lost time.

MID:
- All fine at MID

HED:
- Nothing to report.

SCS:
- Thanks to TS also for supporting with chiller issue.

SQS:
- Running 2-color PP experiment. When SASE1 changed photon energy the pulse energy of the pump color changed, this is a serious problem for experiment.
- Wiener MPOD power supply does not work properly. We can ramp it up from zero, and ramp it down to zero, but otherwise changing value was not possible. 
Meanwhile the problem solved by itself. Still unclear if it was hardware or control or whatever else.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 20.02.2023, posted by Frederik Wolff-Fabris on 20 Feb 2023, 11:05 
General Announcement:
- Accesses to XTD10 and XTD4 are happening this morning. The South branch sees continuation with beam activities and preparation for this week of operation.

CTRL:
- Two Announcements: 
1. Today at 13:00 a fix for influx proxy will be deployed. A short downtime will happen; 
2. Also 13:00 a fix for the delay timers will be deployed everywhere. A contact person at instruments will restart the device.

DA:
- Nothing to report.

EEE:
- One OCD call related to HED encoder: to be investigated and fixed this week.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- SA3 intervention for SCS exit slit ongoing this morning.

LAS:
- SA3 PP-laser will be ready at the end of today.

UNSYS:
- A ZZ in SA3/XTD4 will take place today.

SPB:
- Pointing always had to be corrected at 7AM after beam back from night shift at FXE.
- Transmission with XPD last week: higher intensity at the calorimeter was seen (also high fluctuation 10-15%).

FXE:
- Pump probe beam shape showed some problems. LAS will investigate today.

MID:
- Nothing to report.

HED:
- Beam jitter in order of 50-100us is not like best performance seen last year.
- Everything else went fine. 

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 15.02.2023, posted by Frederik Wolff-Fabris on 15 Feb 2023, 10:14 
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Working with SPB with laser power meter / calorimeter.

DET:
- Not present.

ITDM: 
- Announcement: on next Monday at around 8AM the E-log will not be available for a short time.

XRO:
- Working on SCS exit slit. Recommissioning with beam will need to be done. Next action in tunnel will happen on next Monday. Until then the slit is currently detached with cables. None shall move or touch 
the device.
- Regarding parts: they are ordered and shall arrive later this week.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Problem with Jungfrau 1M last night. Informed to DET.

MID:
- Motor of rotation for the spectrometer is not yet working to characterize seeding. EEE is investigating and may have to exchange motor.

HED:
- Beam pointing was realigned. It jitters and feedback tries to work. To be see along the day.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 13.02.2023, posted by Frederik Wolff-Fabris on 13 Feb 2023, 10:05 
General Announcement:
- Accelerator downtime on Saturday of 5-6 hours due to a matching capacitor located at the GUN. Work to find the problem and exchange cause this delay and it was the first of this kind since 2016.

CTRL:
- A fix for the device clone is prepared and will deployed today.
- Two issues from weekend being investigated (camera SPB/SFX and PLC) with EEE and CTRL.

DA:
- Data generation for MID: high load during the weekend. Now it was drained. 
- Data delay during the weekend was recovered: migration queues were very long and calibration was delayed. Denial of services happened as many works were in the queue. 
This was changed and shall not happen anymore. All data taken during the time was processed.

EEE:
- Working on the timeout issue.
- OCD calls for AGIPD motor positions: configs were recovered.
- Scanner issue is not yet clear if mechanical or software related.

VAC:
- Nothing to report.

XPD:
- Preparing for calorimeter measurements at SPB.
- Today supporting BKR to record images.

DET:
- Nothing to report.

ITDM: 
- Be aware that last week was not a standard week in Data recording, being a run at the edge of capabilities. Experts are looking to explore other possibilities. 
- ITDM expected MID to take a bit higher data but it was really at the edge. Much less calibrated data was generated – efforts by data reduction helped to keep into the edge. 

XRO:
- Nothing to report.

LAS:
- Unexplained behavior of ADC in SA2 laser being investigated.

UNSYS:
- Nothing to report.

SPB:
- Did not get the RF window at the beginning. It was enough to get some data by end of the week.

FXE:
- Users were happy last week.

MID:
- Good week and very successful week with user group.
- High duty cycle could be achieved - thanks to DA; reduced due to the high load.

HED:
- Nothing to report; finishing to prepare for this week beam.

SCS:
- Nothing to report; waiting for XTD10 tunnel investigation of the motor.

SQS:
- Nothing to report.

SXP: 
- Nothing to report.
Entry   Notes XO Integration Meeting 08.02.2023, posted by Frederik Wolff-Fabris on 08 Feb 2023, 10:25 
General Announcement:
- When questions or issues with operations or beam parameters appears, please contact the PRC. The Karabo main scenes are changed and the PRC phone can be directly found at them.
- As PRC A. Galler says that competing requests by SA1 and SA3 was taking place yesterday. So the decision was to run non-interleaved until Thursday when the plan will be revisited.

CTRL:
- Issue with Bassler cameras in SPB (only): still under investigation.
- PLC timing feedback devices: workaround was implemented and together with EEE further investigations are ongoing. 

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing major to report.
- ZZ in XTD10 for the exit slit was done on Monday.

XPD:
- Calorimeter for XPD is installed and running.
- FEL IMG in SA3 has a new feature installed by XPD and XO: in case of danger for the device the number of bunches will go to zero. 
This takes into account the damage threshold of the total pulse energy of photon beam. Above a limit it will drive beam to 0 bunches. 
Only installed at the FEL IMG and in case of questions please contact Andreas Koch.

DET:
- On Friday there is was a timing shift for pulse resolved detectors for SA2. That also appears with AGIPD. 
Jolanta S.-D. says that at MID the shift is at 9 clocks; at HED is up to 15 clocks (thus around 100-138ns) when comparing to September, and depending on detector positions. 
An enquire with machine has to be done if it relates to BAM or another device.

ITDM: 
- Nothing to report.

XRO:
- SA3 exit slit: work/investigation is ongoing by XRO.
- Calibration of mirrors are almost done.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Issue with CRL1 (first arm): device is interlocked in the OUT state for both X and Y axis. Zunaira A. says that arm1 is not part of SEPS Interlock. 
Investigation with EEE has to take place. Operation can continue with current status.
- Issue with rotary motor for the spectrometer rotation appeared - seems to be damaged. On Monday chamber has to be open. 

HED:
- Not present.

SCS:
- On the exit slit strategy/status: Mikako M. will discuss internally at XRO and go back to SCS. 

SQS:
- Nothing to report; acknowledged the announcement done by the PRC.
Entry   Notes XO Integration Meeting 06.02.2022, posted by Frederik Wolff-Fabris on 06 Feb 2023, 12:48 
General Announcement:
- A. Galler shows at the TTFinfo schedule where to find information for operation calendars. 
- A. Silenzi inform that the Jour-Fixe takes place and instruments shall be present to inform on needed requests to DRC/DOC.
- As PRC, Harald Sinn informs the agreed RF window that was set on Friday was reversed on Saturday. Do not hesitate in contacting the PRC in such situations.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Two OCD calls on weekend: 
1. Issue with PP-laser setup at FXE/Mono in tunnels - to be followed by PLC team; 
2. Issue with SA3/SCS Exit SLIT in the tunnel to be followed up by ZZ. Couple of hours are needed in tunnel to try to fix it without guarantee of success.

VAC:
- Performing ZZ and breaking interlock in XTD10.

XPD:
- Jan G. says chamber for calorimeter and laser power meter are being installed in SPB hutch today.
- Tests of the IMG watchdog can take place only after lunch due to ongoing ZZ access.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Laser timing in SA1 is 3ns off.

UNSYS:
- Tunnel access ongoing in SA2.
- Replacement of the HXRSS crystal to take place today.

SPB:
- Wednesday morning Karabo server was down for 90min; it was fixed by the DOC.
- Chan Kim says that SPB/SFX had a wrong RF window set on Wednesday.
- Camera devices were showing issues (had to break interlock to reset camera) and needs a long term fix. 
Wajid E. says CTRL investigates with high priority and it seems not to be a Karabo issue. Investigation continues at CTRL hands.

FXE:
- Nothing to report.

MID:
- Problem with FSSS that is needed for the user experiment: CTRL and SEC are looking into it.

HED:
- Setup instrument; Karabo connections solved by DOC.
- Due to RF window AGIPD tests were delayed.
- A ZZ for checking a motor can be done still this morning.

SCS:
- Troubles with motors were addressed.
- Exit slit issue still pending.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 01.02.2023, posted by Frederik Wolff-Fabris on 01 Feb 2023, 10:56 
General Announcement:
- A. Galler reminds instruments to use the Operation-2023 e-log for daily reports.

CTRL:
- Issue with Karabo dataloggers connection to newly available Proxies (not connecting). Problem is understood and a fix in under made. Then one shall apply to topics (takes 5-10 minutes downtime).

DA:
- Nothing to report.

EEE:
- Nothing major to report; working on a received ticket.

VAC:
- Last night FXE reported issues with SA1 ion pump. Vacuum was OK but the status of Karabo was wrong. It's under further investigation and Wajid E. comments a ticket was sent and is being addressed.

XPD:
- Nothing to report.

DET:
- Detector installed back to HED (ePix) after successfully intervention.

ITDM: 
- Updates of Maxwell cluster was done yesterday. If something unexpected happens please get back to ITDM.

XRO:
- Instruments taking beam at hutches and no major problems have seen so far. 

LAS:
- SA1 and SA2 PPL's are in operation.
- SA3 PP-laser is under preparation.

UNSYS:
- Issue with cell24/SA1 undulator motion happened and was fixed on Monday.
- Gap of exchanged undulator in SA2 seems not be correct and it is needed a ZZ for the gap calibration, possibly next Monday (tbc).

SPB:
- Camera devices goes to error and needs power cycle.
- After power cut some motor lost positions.

FXE:
- He gas supply: A. Galler informs that currently there is no shortage of He for the next two weeks.

MID:
- Making good progress by setting things up at instrument.
- One sample stage has problems and EEE will work on Friday.

HED:
- Preparing for taking beam on Friday and currently working on Dipole laser.

SCS:
- Problem with new Interlock and BKR had to overwrite it. Beam is now at the instrument.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 30.01.2023, posted by Frederik Wolff-Fabris on 30 Jan 2023, 09:49 
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- DA-OCD service has started from this week.

EEE:
- PLC had an OCD call on Saturday (motor SA3 M2). XRO could continue and further investigation is ongoing.
- SEPS to be done today in SA3.

VAC:
- Nothing to report.

XPD:
- Minor HIREX issue on the weekend but did not affect activities.

DET:
- Jungfrau detector had a small bug in Karabo control device. The device has to be re-instantiated when detector is rebooted. CTRL is aware and preparing fix.

ITDM: 
- Nothing to report.

XRO:
- On SA3 M2: issue related to PLC update in December; apparently resulted with loss of calibration in one motor. All alignment were done with other parameters based on beam reflection. 
- Steffen Hauf comments there was two different issues with different motors: 1. the calibration was solved end of last week; 2. from Saturday it was a problem with encoder which will be fixed this week 
with EEE. 

LAS:
- Stages with problem but running.
- SA1 will be ready for users by the end of today.

UNSYS:
- Small issue with SA1/cell22 air coils were fixed by Suren K.

SPB:
- Thanks to supporting groups for the bring-up days.

FXE:
- Nothing to report.

MID:
- Question on the availability of PP-laser in SA2: Daniel K. informs that is expected by the end of today but this will be confirmed with other LAS colleagues.
- Question about intensity in SA2: A. Galler informs there is no news on the cause of low intensity; Raul V. as PRC mentions currently it was reached about 500uJ at 9keV.

HED:
- Nothing to report.

SCS:
- Bring-up days today and SEPS interlock tests.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 25.01.2022, posted by Frederik Wolff-Fabris on 25 Jan 2023, 11:01 
General Announcement:
-  As PRC, Raul V. thanks to CTRL and EEE for the work with the SEPS yesterday.

CTRL:
- New version for bunch alignment monitor devices (for pulse resolved operation). An e-mail will be sent to xo-info list.
- Regarding the issue reported by LAS: Karabo Beckhoff device went in error and a work around solution has been developed and to be implemented to reset the system.
- Issues with SEPS interlocks: PLCs devices went down at HED during tests. 
Steffen H. says an interface issue with Karabo happened; interlock settings are protected; yesterday CTRL had to implement a new update and as consequence many PLCs went down.

DA:
- Bring up days going smoothly; few issues found were fixed.

EEE:
- Nerea J. informs that fix for the MDL for IMGS is deployed and shall work.
- SEPS modifications were done by lunch time yesterday. SA1 and SA2 were tested by end of the day. The SA3 SEPS tests will be done on Monday.

VAC:
- Nothing to report.

XPD:
- Hard X-ray PES was recommissioned last week. New Metrocal acquisition did not work; DA will investigate and inform XPD.

DET:
- Bring up days are ongoing.

ITDM: 
- E-mail was sent for the dCache maintenance scheduled for next Monday.

XRO:
- Not present.

LAS:
- Issues with stages are under work and to be implemented today.

UNSYS:
- A ZZ in SA2 to replace PS motor in cell 17 took place. The motor was replaced and a few spares are still remaining. 
- This or next week Pb shields will be received and ZZ would be required for their installation.
- Tomorrow the alignment of 4mm aperture in SA2 will take place.

SPB:
- Not present.

FXE:
- Nothing to report.

MID:
- Comment to XRO: alignment in tunnel XTD1 in ongoing.

HED:
- Broken pile-up on Monday happened. Steffen H. says that macros can be restarted now.
- Alignment in tunnels by XRO: HED needs some information on activities.

SCS:
- Busy with bring up days at hutch.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 23.01.2023, posted by Frederik Wolff-Fabris on 23 Jan 2023, 10:01 
General Announcement:
- As PRC Jan G. says machine was tuned at 7keV for SA1 and SA2 and 700eV for SA3 with good performance. SASE tuning proceeded as planned with few issues blocking EPS. 
- Analyzed the effects of the 4mmm aperture at the end of the undulators in SA2: it is not exactly in the center where the FEL is lasing. 
It was found the FEL is well aligned at the IMG cross but is partially blocked by the pipe and is under discussion with RCs the next steps.
- Jan G. mention that one screen at SPB was in unclear state; also a software device was blocking beam in XTD9. A ticket was issued; initially the software blocking could not be identified. 
Solution was to close the XTD9 shutter. Steffen H. suggested to also contacting the DRC for urgent and the technical problem with clone device will be followed up.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Busy with bring up days. No major obstacles were found so far.

VAC:
- Nothing to report.

XPD:
- Restart Diagnostics and photon systems last weekend went relatively fine.

DET:
- Finished with MID for ramp-up and today HED is scheduled. So far so good.

ITDM: 
- Nothing to report.

XRO:
- On the weekend issues with MDLs run by the experiments appeared. A follow-up will be made to avoid problems in the future.

LAS:
- EEE was informed of issues in the balance cross correlators. Nerea J. comment that tests were done but not reproducible. More follow-up to be done today.

UNSYS:
- SA3 cell 18 issue with PS solved remotely last week. All fine with undulator systems.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Bring up days were mainly a success; thanks to involved groups. All good.

HED:
- Bring up days were also successful. Thanks to EEE and CTRL.

SCS:
- Not present.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 18.01.2023, posted by Frederik Wolff-Fabris on 18 Jan 2023, 11:37 
General Announcement:
- The 5Hz tests were successfully completed. Contrary to the original schedule all tests (pure and hybrid) were finished yesterday already. 
From now on the rep rate is set back to 10Hz. If you were affected during the tests please contact XO. 
- Machine starts up with 11.5GeV from January 30th.

CTRL:
- The requirement to add the associated karabo device name to the Master Equipment List before requesting the network registration of the device is not needed anymore. 
Please suggest the karabo name directly in the network registration form. 
In case of doubts please contact Wajid E.; J. Szuba adds the network registration form in XIM is changed (Karabo name is now optional). It shall be used when an ALIAS is needed.
- Karabo framework is being worked today. 

DA:
- Preparing for bring up days next week.

EEE:
- Nothing to report.

VAC:
- Closing XTD6 and XTD9 today after lunch.

XPD:
- Finishing tunnel activities.

DET:
- Nothing to report.

ITDM: 
- UBuntu22 DOOCS JDDD is being updated today.

XRO:
- Nothing to report.

LAS:
- All good and no interruptions from the 5Hz tests.

UNSYS:
- Currently performing middle plane scans in SA1 and SA2.

SPB:
- Nothing to report.

FXE:
- Aligned XTD9 cameras and Mono. One power supply did not work and Beckhoff devices of all FXE tunnel components did not work; Wajid E. informs this was because of wrong Alias.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Agilent turbo pump shows a Karabo problem. EEE will be contacted.
Entry   Notes XO Integration Meeting 16.01.2023, posted by Frederik Wolff-Fabris on 16 Jan 2023, 09:54 
General Announcement:
- Tomorrow and Wednesday the 5Hz test take place; Wednesday as the pure 5Hz operation and on Wednesday there is the hybrid test. Every second pulse will not see any train.

CTRL:
- New version of Beckhoff Karabo device will be deployed today at 14:00; it shall take 5-10 mins.

DA:
- Nothing to report.

EEE:
- Continuing with remaining maintenance tasks and preparing the bring-up days with instruments.

VAC:
- Nothing to report. Tunnels XTD6 and XTD9 remain open until Wednesday.

XPD:
- Preparing for tunnel closure, stat-up and 5Hz tests.

DET:
- Gotthard1 detectors: need a firmware upgrade and will be coordinated with instruments.

ITDM: 
- Announcement: on Friday exchange of SA1 devices.

XRO:
- All fine from XRO.

LAS:
- Working on the Lasers back-up; Lasers will be shut down for the 5Hz tests.
- Issue with Smaract stages being worked.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 11.01.2023, posted by Frederik Wolff-Fabris on 11 Jan 2023, 11:16 
General Announcement:
- If you have a forwarded invitation for the XO Int. meeting in your calendar, it will not be automatically deleted. The new invitation was sent at the end of December. 
Please contact XO if you have not received. Another option is to subscribe to the xo-info mailing list.
- The Operations-2023 e-log is made available. Thanks to ITDM for the support on it.
- The 5Hz tests will take place on the 17-18.01. A timeline schedule is to made available today from Desy and will be shared via the xo-info list. 
The 5Hz operation will be done on the 17th and a hybrid mode test is on the 18th.
- Tunnels XTD6 and XTD9 will remain open for a max of 1 week. 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Power OFF in SA3: electronics in SQS, SCS and PP-lasers were affected. Systems had to be restarted. 
- Discussion is going on to avoid such mishaps not happening again in future.

VAC:
- XTD6 and XTD9 are open; Please FXE and HED shall check cameras and Monochromators before the tunnels are permanently closed.

XPD:
- XGM in SCS hutch was affected by the power failure. It was recovered and is back into the normal state. Other systems are also being brought back during this week.

DET:
- Nothing to report.

ITDM: 
- Upgrade of Ubuntu 18.04 LTS control PCs is going to take place until April. An e-mail was sent to xo-info list. Instruments shall contact ITDM accordingly by using the ticket systems.

XRO:
- Not present.

LAS:
- Switch OFF in SA3: no harm seems to remain. 

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- FXE is interested in XTD9 access for the next days. 

MID:
- Nothing to report.

HED:
- HED is interested in XTD6 access for the next days.

SCS:
- Suffered from the power OFF: bringing back vacuum for XGM and other systems. All shall be fine.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 09.01.2023, posted by Frederik Wolff-Fabris on 09 Jan 2023, 10:10 
General Announcement:
- Interlock tests light taking place today and tomorrow, starting at Desy premises and tunnels.
- On 23.01 there is the Interlock tests at XHEXP1. 
- Zunaira A. asks for one experimental hutch in all SASEs (optics hutch can also be) to be closed for tomorrow to check some signals for tunnels. Hutches need to be closed at around 09:30-10:00. 
SQS accepts to interlock the hutch. MID also says it is possible but a precise time needs to be communicated.
- On 17-18.January the 5Hz operation will happen. Needed groups are already informed and tests shall be transparent for the instruments. Tim Wilksen will prepare a schedule to be distributed as soon as 
available.

CTRL:
- Influx DB: two nodes are available. A 6-month policy notice is the one to be used by Karabo. An e-mail will be sent.

DA:
- Nothing to report.
EEE:
- SA2 lost power on the 31.01. The CPUs in the instruments were not affected; the CPU in SA2 laser was affected and parameters had to be reset. Impression is that UPS did not act. EEE needs more 
information.
- A. Galler says that it relates to the broken UPS in SA2 area. A possible automatic check run/done by MPS triggered the emergency OFF. A new battery for the UPS is ordered and it is to be delivered in 
future.

VAC:
- All relevant tasks for WMP are closed.

XPD:
- XPD would like to continue in XTD9 and XTD6 after the interlock tests to conclude minor activities.

DET:
- Nothing to report.

ITDM: 
- Reminder to all instruments and support groups: finish accessing and closing the proposals (deadline has already passed) before they will be discarded.

XRO:
- Will need access to tunnels XTD6 at late January. The access is not related to test components.

LAS:
- Bringing lasers back up. In SA2 there was a rough start due to the power OFF but seems all in good track.

UNSYS:
- SA3 undulators: rotary encoders could be used to control the undulator gaps.
- Suren K. informs that partially recovered encoders for the 3 upstream segments. Spare parts for the next two devices will arrive in some months. Root cause for the SA3 power issue is not understood. 
Undulators can be operated.
- Power distribution terminals in SA2 (2 units) and 1 unit in SA1 needed replacements.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Request to support groups: if external companies need access to hutch, please remind these companies to do not use dirty shoes when accessing any hutch.

HED:
- Nothing to report.

SCS:
- Issue with XGM gas supply last week (valve was closed by someone unknown). Check functionality is ongoing but all seems to be fine. 
- Transport taking place may affect access in areas around SCS, including XTD10.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 19.12.2022, posted by Frederik Wolff-Fabris on 19 Dec 2022, 10:01 
General Announcement:
- This is the last XO Integration meeting of this meeting.
- An electrical issue in SA2 experimental area happen: issue with UPSs - rack rooms could be affected. TS is investigating. PP-lasers were unaffected.

CTRL:
- Concluded Karabo updates basically in all topics.
- Further updates ongoing this week.

DA:
- Nothing to report.

EEE:
- Nothing to report.
- Train-IDs for SA2 instruments were missing during the weekend (likely related to the UPS failure) but are back since about an hour ago and then maybe only PLCs were affected.

VAC:
- All fine with VAC.

XPD:
- Work ongoing as planned.

DET:
- Nothing to report.

ITDM: 
- Maxwell maintenance taking place this week. 
- Servers for SA2 apparently were not affected due to the issue with UPS. To be further checked.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- Five undulators in SA3 have faulty encoders and are not moving after a power cut on 06.12 (seen in history of local PLCs - happened from cell14 to cells23). Reason for power down is not known. The power 
was ON from cell1-13. 
- Replacement of linear encoders are not possible with vacuum chamber between girders as needs alignment.
- First UNSYS will try to operate with rotatory encoders, if does not succeed, segments will be taken out.
- There are 4 spare encoders to repair 3 segments. Delivery time for new spares is 3-4 Months.
- Needs investigation to discover reason for the power outage in cells#14-23.
- Cell 33 in SA2 is fully operational.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Power failure of UPS happened on Saturday on the SA2 experimental Hall area – will further investigate for affected systems.

HED:
- Will investigate any effect of the UPS failure.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 14.12.2022, posted by Frederik Wolff-Fabris on 14 Dec 2022, 09:55 
General Announcement:
- There will not be Xo Int. meeting next Wednesday 21.12. The last meeting for this series will be next Monday 19.12.
- Martin Doering announces that the DACHS system maintenance previously scheduled for next Monday 07:30AM was already done and there will be no access disturbance next Monday; 
Currently around 48% of the winter maintenance tasks are timely done. For Desy groups around 36% are closed.
- Please inform xo-planning for tasks that are not going to happen or are cancelled/delayed. An e-mail will be sent to inform the groups in the coming days and the file to be updated will appear at the 
Sync&Share system.
- XO has been asked regarding gases and cryogenics. The process in place is the Hall Crew only supporting TS and if any group is needing technical gases and cryogenics, please continue to submit a ticket 
to TS. 
- K. Wrona asks for additional info on the 5Hz operation. A. Galler says that if there is a showstopper this has to be communicated and the startup period in January is meant to test this operation mode.
All timing systems will run at 5Hz and some solutions will be put in place e.g. at the lasers. Reason behind is to save electricity. 

CTRL:
- Done with Karabo upgrade in SA1 and SA3 topics. Today goes on with SA3.
- On Thursday ITDM will upgrade the SA1 topic for data loggers' machines. This takes about 1 hour.

DA:
- Nothing to report.

EEE:
- Ongoing with the current schedule for tunnel updates: SA1 motion done yesterday. Please check these systems in the coming days.

VAC:
- Everything is going accordingly to the schedule.

XPD:
- In a group retreat.

DET:
- Testing detectors after the Karabo update.
- Following request from DA to test Detectors calibration pipeline (LPD, AGIPD-1M).
- Operation at 5Hz will be discussed internally.

ITDM: 
- Continuing the calibration work.
- Finalize servers update today (there is one hardware issue to solve).
- Data loggers for SA1 will be changed to the new hardware. An e-mail will be sent.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- Small absorber at the end of SA2 was installed in preparation for the SCUs.
- SA3 will have a Marwin installed to measure radiation during operation.
- Beckhoff sent back repaired motors for PSs. A total of 8 spares are now available.
- SA3 undulators had a power cut and is under investigation.

SPB:
- Nothing to report.

FXE:
- Maintenance of the electrical rack today.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Work happening at the experimental hutch today; Filter change for the air conditioning has to be postponed.
Entry   Notes XO Integration Meeting 12.12.2022, posted by Frederik Wolff-Fabris on 12 Dec 2022, 10:01 
General Announcement:
- So far there is no reports of big bad effects from the power outage on 03.12 caused by MPS activity.
- Experimental Hall cranes will be maintained tomorrow by an external company and therefore can not be used in the time.

CTRL:
- Starting today with Karabo update.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- All planned tasks for maintenance are ongoing; in XTD2 started mounting the clean tent; 
- On Tuesday and Wednesday XPD has a group retreat.

DET:
- Nothing to report.

ITDM: 
- Delivery of online cluster server is delayed in SA1 and it will be concluded this week. Please contact ITDM if service is needed.
- Tomorrow 6AM distribution layer switches will be updated to be back with redundant mode of operation.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- New SA2 undulator is aligned and vacuum chamber clearance is to be checked today.
- Fuses for the balcony room are ordered.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Working inside the hutch as planned.
Entry   Notes XO Integration Meeting 07.12.2022, posted by Frederik Wolff-Fabris on 07 Dec 2022, 12:06 
General Announcement:
- Tobias Clever informs to contact TS (Oleg E.) in case of broken fuses (see UNSYS).
- Regarding liquified gases: the XHCrew does not provide safety trainings nor is the main contact for supplying gases or cryogenics. 
Please contact TS will enquires regarding technical gases or cryogenic liquids. TS is the main point of contact for this matters.
- Regarding network problems yesterday: Desy exchanged a switch for a new one and it was when problem happens. Office telephones are currently not working. A new ticket to NOC was issued. 

CTRL:
- Started the topics back after the power maintenance. Not all devices are up as there is some updates to be done in the next days/week. The ramp-up went fine for the topics that were restarted.

DA:
- Nothing to report.

EEE:
- Results of the check after the power cut show no damage.
- PLCs were also recovered.
- uTCA went up and the planned update of fast-ADC will take place next week after the Karabo update. Please do not use fast ADC until then and contact Bruno F. in case of questions.

VAC:
- Continue with scheduled works for the WMP.
- From Saturday task: everything was recovered without main issues.

XPD:
- Nothing to report.

DET:
- Not present.

ITDM: 
- Not present.

XRO:
- Electrical shutdown went well in tunnels.
- From yesterday once Karabo is back: XRO is checking again systems.
- An update of tasks for the WMP will be send to XO as some tasks were cancelled.

LAS:
- No issues from the power shutdown. All are fine.

UNSYS:
- SA3 balcony room had a problem after the power shutdown - fuse was broken; Now it is working.

SPB:
- All going fine, tests with Jets today.

FXE:
- Examining CRL lenses.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Switching ON components and so far no damaged devices were found.
- Normal maintenance program is ongoing.

SQS:
- Restarting devices and no damaged components were found already.
Entry   Notes XO Integration Meeting 05.12.2022, posted by Frederik Wolff-Fabris on 05 Dec 2022, 09:59 
General Announcement:
- Dec.3rd power an drinking water maintenance: many thanks to TS and MKK groups for their efforts - tasks accomplished without any harm by lunch time (4 hs earlier than originally planned). 
- Unfortunately an action by another Desy group triggered radiation protection in instrument areas. This action was not announced to XO. 
Please inform XO if you encounter any damaged device. An 8D report will be prepared on this incident.
- PLCs and Karabo will be ramped up; Office network was available all time; Drinking water is already available.
- Zunaira A. says that an e-mail is usually sent to a list of persons. A. Galler says that this time we do not know if someone was informed.
- J. Szuba says only in SA1 rack rooms were out of power.
- Tobias Clever inform that every device can be switched on again.

CTRL:
- Start bringing up Karabo topics as soon as control machines are available.

DA:
- Nothing to report.

EEE:
- Tunnel loops are already properly working.
- Switching ON instruments loops as agreed with them from today on.
- uTCAs are in process to be brought back.

VAC:
- Lost some controllers and power suppliers as expected but no major issues on Saturday.

XPD:
- Survived electrical shutdown quiet well: PES and XGMs are fine.
- Second outage due to Desy group was detected first at SCS XGM which was the first device to be brought back.
- Re-starting more devices after Karabo is back.

DET:
- Nothing to report.

ITDM: 
- Started to bring up the control servers and other systems.
- Comment to update done on office network switches Friday afternoon: one distribution layer is not working. Currently one runs office network in a single layer - to be investigated by NOC.
XRO:
- All systems are reconnected and will be checked when Karabo is available.
- One computer did not come back (failure of power supply).

LAS:
- Nothing to report. Seeders were unaffected to the best of LAS knowledge.

UNSYS:
- Replacement of undulator: new one in SA2/cell33 is in place and connected to control system; Needs alignment by MEA.
- Control cabinets in balcony room to be brought back.

SPB:
- Ion pump system is back online Saturday evening. Continue today with other devices.

FXE:
- To be checked today for effects from the weekend.

MID:
- All fine at MID. Most devices were OFF.
- Work on power line at the balcony room today. Wait for TS finish the work before start major switches. ITDM will wait before re-starting machines there.
- High temperature in control room and hutches is seen this morning.

HED:
- High temperature in the control room and hutches as of now.

SCS:
- Components were OFF and today switches ON again and search for damage.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 30.11.2022, posted by Frederik Wolff-Fabris on 30 Nov 2022, 09:55 
General Announcement:
- Reminder on the Power cut activity on Dec. 3rd: please contact XO for questions.
- The heating at HXQ will be switched OFF on Friday 8AM.
- There will be no available drinking water from Friday 15:00.

CTRL:
- Related to 03.12: Karabo and other topics will be shut down on Friday starting at 11:00AM.

DA:
- No updates for today.

EEE:
- In process of preparing for the power cut; groups were contacted for timeframe work.

VAC:
- Not present.

XPD:
- Preparing for power cuts.
- Ramp down day on Monday found only minor issues; very useful data were taken; XGMs were placed OFF; beam transport was brought to safe state.

DET:
- Nothing to report; no news on Jungfrau burst mode.

ITDM: 
- Working accordingly to the plan.

XRO:
- Not present.

LAS:
- Lasers will be switched down from tomorrow.

UNSYS:
- Maintenance work is ongoing.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID; 95% of devices are already OFF.
- Reminder: on Monday TS has work in MID rack rooms; MID start back on Tuesday with maintenance work.

HED:
- Question related to cooling water for the PLC CPUs (which are not being switched OFF): Nerea J. and A. Galler confirm that water cooling is available. 

SCS:
- Nothing to report.

SQS:
- Not present: on a retreat.
Entry   Notes XO Integration Meeting 28.11.2022, posted by Frederik Wolff-Fabris on 28 Nov 2022, 09:58 
General Announcement:
- The XO Integration Meetings will continue until the end of the year; For next year SXP will be included in the round of discussions.
- A. Galler reminds on the electrical and water supply maintenance on Saturday 3rd. Please read the latest e-mail from TS and contact xo-planning@xfel.eu in case of questions.
- SXP hutch is currently interlocked for the ramp down day. A. Scherz will ask G. Mercurio for closing also SCS experimental hutch.

CTRL:
- Nothing to report.

DA:
- All fine at DA.

EEE:
- Dates for switching OFF the PLCs for the Dec.3rd activity are available at the EuXFEL infrastructure calendar.

VAC:
- Nothing to report.

XPD:
- Working on the ramp-down activities today. Ongoing activities can be seen at Remote1 Zoom session from BKR.

DET:
- DSSC was tested in commissioned. 
- SPB/SFX AGIPD modules were exchanged and detector is running again.
- No news from Jungfrau / Burst mode.

ITDM: 
- Start tomorrow with online resources at balcony room updates (out of service during intervention).
- Over the weekend ITDM takes the chance to migrate InfluxDB: system not available.
- On Friday the network gateway will be updated.

XRO:
- Busy with ramp-down day.

LAS:
- Nothing to report.

UNSYS:
- Cell29/SA1 Phase shifter presents a problem and is to be fixed from tomorrow by exchanging motors.

SPB:
- Working with Agipd and ramping down for the weekend.

FXE:
- XRO is using FXE hutch for the ramp-down.
- Preparing for the power work on Saturday.

MID:
- All fine at MID; started with ramp down procedure.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 23.11.2022, posted by Frederik Wolff-Fabris on 23 Nov 2022, 10:03 
General Announcement:
- Remind the 03.12 activity on Electrical and drinking water is nearing: please contact XO if you have any questions on their effects or where electricity is affected.


CTRL:
- Monday SA2 VAC tests went fine.

DA:
- Nothing to report.

EEE:
- TCP/IP VAC SA2 tests went fine on Monday.

VAC:
- Nothing to report.

XPD:
- No incident to report; Preparing for the studies e.g. 30keV.

DET:
- Jungfrau 1M module at FXE: work ongoing in the detector to understand why burst mode was not working. Work with firmware is done.
- MID detector update is ongoing (opened detector; needed support from Desy). Now it is back online.
- SPB AGIPD firmware update was done and tomorrow exchange front end modules.

ITDM: 
- Nothing to report.

XRO:
- Reported by SQS strange behavior of M1 in SA3 (related to beam moving event of last weekend): after investigation it was found one electronics was dying near the Dump, probably related to radiation 
damage. 
It will be disconnected as it is not needed at the moment. During the WMP more activities will be done. 
- Monday there is the Ramp-down activity scheduled to access conditions of mirrors: SA3 hutches must be interlocked at lest for the morning. An agreement for time schedule will be done.

LAS:
- Nothing to report.
UNSYS:
- All fine with Undulators. There are 5 spare encoders for PS.

SPB:
- AGIPD intervention planned for tomorrow.

FXE:
- EEE is looking into homing procedure with encoders today.
- PP-laser issues from last week were resolved.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Nothing to report.
- Giuseppe M. will ask internally if hutch can be closed on Monday.

SQS:
- Suffering from artefact on DAQ 412 digitizer recently: if another instrument also see such problems, please contact Alberto de Fanis.
- SQS can close the hutch on Monday.
Entry   Notes XO Integration Meeting 21.11.2022, posted by Frederik Wolff-Fabris on 21 Nov 2022, 10:09 
General Announcement:
- The procedure for requesting gases and cryogenic liquids consists in submitting a ticket to TS at least one week prior your plans for usage/needs. 
Please avoid requests by phone or e-mail or at last minute which may not be possible to grant.
- An e-mail on the effects of the Electrical and Drinking water activities of 03.Dec was sent to xo-info@xfel.eu mailing list. In case of questions please contact xo-planning@xfel.eu.

CTRL:
- Busy together with EEE preparing for the deployment and test SA2 VAC update.

DA:
- All fine.

EEE:
- VAC SA2 update activity starting at 12:00 today.

VAC:
- Nothing to report.
- As PRC, Martin Dommach says the weekend was quiet with no major issues.

XPD:
- Nothing to report. All fine.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report. Issue with pump diode at PP-laser SA1 last Wednesday was solved by replacing it.

UNSYS:
- Nothing to report.

SPB:
- Last shifts on weekend were cancelled.

FXE:
- Lost 2 days with PP-laser operation.
- Weekend problem with digitizer: stopping every two hours but lately more often. Had to start acquisition manually. Called DOC and solved by re-instantiating the Karabo. 
It should investigate if a permanent solution can happen.
- Issues with undulator scans energy: beam instability while scanning - BKR switched OFF feedback which somewhat helped. Pulse energy fluctuates during the scans.

MID:
- All fine - start preparing for the power outage of Dec.3rd.

HED:
- Minor issues: 1. DAQ aggregator slow again; 2. Saturday the proposal was finished due to issues; 
3. issues with Jungfrau (DOC contacted): experiment killed the rep rate with communication between Karabo and detector SA2 topic (Jungfrau not triggered at the right trains of laser pulses).
- Drop in HXRSS ending with on Sunday with 100uJ.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 16.11.2022, posted by Frederik Wolff-Fabris on 16 Nov 2022, 10:58 
General Announcement:
- With the winter maintenance period coming in two weeks, XO kindly reminds you to check the access rights for tunnels at the DACHS/DARF system. Please also remind your respective groups' colleagues.
- Steffen H. presents a summary for the ramp down plan of PLCs and Karabo relative to the Saturday's Electrical activity of Dec. 3rd. 
Please note that Karabo or PLCs based controls will not be available from Friday 11:00 up to Monday mid-day. XO will prepare an e-mail clarifying this information.

CTRL:
- Nothing to report.

DA:
- Concerning skipping of calibration: an e-mail with procedures was sent and is available at Alfresco. Instruments can look at it. 

EEE:
- Nothing to report.

VAC:
- All running fine.

XPD:
- Nothing to report.

DET:
- On last weekend: SPB/SFX documented at the e-log an incident of AGIPD detectors with modules replaced last Summer Maintenance. Three out of 4 modules are compromised. 
Steve A. said he was charged to propose a solution to be discussed with R. Bean.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- AMPHOS SA1 switched OFF this morning and investigation is ongoing to find reason. Beam is back on the table and will be available to FXE in few hours.

UNSYS:
- Nothing to report.

SPB:
- Nothing major to report.

FXE:
- Problems with beam with lower intensity than expected: XO informs that tuning for the North Branch happened yesterday late afternoon and performance was improved.
- Problem with PP-laser.

MID:
- All fine.

HED:
- Problems with uTCA crates with cards that do not show signal. Being addressed.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 14.11.2022, posted by Frederik Wolff-Fabris on 14 Nov 2022, 10:00 
General Announcement:
- As PRC, F. Wolff-Fabris says operation during the weekend was not optimal: 
1. on Friday evening the A6 started to trip several times; we first decreased the gradient in the same fashion as done on Wednesday morning but it did not help; On Saturday the A6 was removed entirely from 
operation after lunch time. 
2. On Sunday 9PM a PLC for the Dump/TLD stopped work and experts from Desy came to exchange it. Beam was recovered around 1:30AM. 
- Today, Monday, machine is being changed to 16.3GeV. Currently we expect beam delivery to start tomorrow at 7AM.
- Martin Doering presents a summary of major tasks planned for the winter maintenance period regarding e.g. limited access to the campus; timing issues; IT systems; gas supplies; media maintenance; cooling 
water; elevator; etc... 
An e-mail will be sent to xo-info@xfel.eu

CTRL:
- InfluxDB data was not available at Graphana: fixed and under monitoring.
- HED VAC loop6 update: test is being planned with EEE and HED.

DA:
- Calibration issue reported on Wednesday is fixed;
- Some OCD calls for calibration during the weekend but all have been addressed.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- InfluxDB: taken care and reconfigured; being watched.

XRO:
- Nothing to report.

LAS:
- Incident Friday on SA1 PP-laser with chiller; came back on Saturday morning after replacement.

UNSYS:
- All good; as OCD Mikhail Yakopov reports all went fine.

SPB:
- In house activities this week at nights 9.3keV.

FXE:
- Nothing to add.

MID:
- Users went home with data. Photon energy came back very OFF on Sunday night. 

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 09.11.2022, posted by Frederik Wolff-Fabris on 09 Nov 2022, 10:07 
General Announcement:
- Martin Doering informs on the winter maintenance period: XO will publish the final task list on next Friday. For next Monday a short presentation will be done in the XO Integration meeting.
- As PRC, F. Wolff-Fabris says many machine downtimes happened since yesterday afternoon due to the trip in one LLRF station, the A6. 
This early morning an intervention was done to reduce the gradient from 620MV to 530MV. Observation in coming hours will say if this has helped to suppress or decrease the ammount of trips.

CTRL:
- News on HED VAC loop6: interlock condition was flickering. Together with HED and EEE it was found the reason and update will be done soon.

DA:
- Calibration team: two weeks ago it was introduced a picture for automatic correction. MyMdc system is still showing bugs and permanent solution is being worked out. 
Until its deployment, please call DOC for solution. K. Wrona says bug happens only if at the beginning of the run it is forgotten to change the run type.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Graphana upgrade went OK. In case of issues in the coming days please contact ITDM

XRO:
- Nothing to report.

LAS:
- AMPHOS maintenance in SA2 is under way.

UNSYS:
- M. Yakopov repaired another encoder in SA3/cell22 phase shifter on Monday morning. Also as OCD the support for moving the HXRSS crystal is being done.

SPB:
- Yesterday photon intensity jumped down as BKR mistakenly tune down one corrector in SA1 undulators instead of SA2 (when tuning HXRSS). Recovered after 1 hour.

FXE:
- Nothing to add.

MID:
- All fine at MID.

HED:
- Setting up experiment for next week. Troubles with SmarAct devices under investigation.

SCS:
- Nothing to report.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 07.11.2022, posted by Frederik Wolff-Fabris on 07 Nov 2022, 09:57 
General Announcement:
- Jan Gruenert, as PRC, reports on the Saturday night access (SA2 remained running) and on Friday evening at XTD6 done by HED. The remainder of the weekend worked well with instruments.
- A. Silenzi, as DRC, says the SA2/HED loop6 had flickering conditions that makes it irresponsible for short times. Apart of it, it was a quiet week.
- A. Galler suggests groups to check the TS announcement concerning the Dec.3rd electrical maintenance as well as the interruption of drinking water from Dec. 2nd. 
It is suggested to reduce the number of people onsite after 15:00 on Friday 02/12.

CTRL:
- Issue with update of cameras: A. Parenti says that this morning an update for Bassler cameras was installed in agreement with A. Koch. 
It addresses the issue that after pressing "stop" at cameras the Karabo was irresponsible. Cameras will be re-instantiated and will be under monitoring for the next days.
- Unresponsiveness of VAC loop6 in HED will be followed up.

DA:
- Quiet OCD last week.

EEE:
- Nothing to report.

VAC:
- Saturday evening in SA3: failure of fast valve controller for interface to Desy. Access by VAC-OCD and PRC was needed to exchange the controller and beam interruption of 4.5hs in the north branch 
happened (investigation + access). 
Rack 3.1 was affected (located behind the concrete wall at the dump).

XPD:
- All fine with XPD.

DET:
- Nothing to report.

ITDM: 
- Status of "Readthedocs": the possibility to generate new documentation is now fixed by a workaround. In mid-term a different documentation system will be used - still to be decided.
- Pre-announcement: 
1. upgrade of InfluxDB to happen during the winter maintenance period; 
2. today the update of Graphana is taking place at a proposed time 15:00 (service down for a short period). An e-mail will be sent and in case of any concerns from other groups it may be shifted to next 
Monday.

XRO:
- Nothing to report.

LAS:
- Regular maintenance and tests being carried out today.

UNSYS:
- Issues with SA3 cell9 and cell17 undulators which had taper values blocking their movement. It was solved from remote action.

SPB:
- Good data were measured last week.

FXE:
- Nothing to report; experiment was successful.

MID:
- All fine at MID.

HED:
- Apart of small issue last Friday, nothing to report.
- Transmission with MONO was too low and HED decided to stop using it during the weekend. 
- J. Gruenert adds the recalibration of SA2 XGM has to be done when changing beam path or alignment of beam.

SCS:
- Preparation for beamtime; issue with motion being addressed.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 02.11.2022, posted by Frederik Wolff-Fabris on 02 Nov 2022, 10:20 
General Announcement:
- A. Galler informs groups are very welcome to contact XO for questions and discussions on the electrical maintenance task taking place on 3rd of December.
- A. Galler reminds on the beam quality Karabo device that was announced in an e-mail to xo-info@xfel.eu. 
Please instruments are asked to make use of it for that a database can be built to further investigate correlation between beam quality and environment and operating conditions.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- All fine with XPD.
- As PRC J. Gruenert informs machine had trouble on Monday while switching to 14GeV, which took longer time than planned. As consequence tuning started later on Tuesday. 
The HXRSS tuning is starting only this morning. The SA2 regular SASE intensity is still low but SA1 and SA3 runs fine.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Last week SA1/cell27 PS encoder motor was replaced. Suren K. says Unsys still has 5 spare motors to be used in such cases.
- Issue with stages of the Monochromator crystal in second chicane of SA2: X-axis, Y-axis and roll angle have to be controlled in local mode as encoders are broken. 
Crystal was inserted this morning into beam by Unsys staff using the local controls. Roll angle can not be seen in the camera, only Y and X-axis can be seen in camera with accuracy of 0.5mm.

SPB:
- Nothing to report.

FXE:
- Test on digitizer of a motor that worked nicely.

MID:
- Special thanks for support from Suren K., HXRSS team and XO during the weekend for providing HXRSS beam.

HED:
- Nothing to report.

SCS:
- Theta rotator last week: experiment last week went fine and motors are working.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 26.10.2022, posted by Frederik Wolff-Fabris on 26 Oct 2022, 09:59 
General Announcement:
- F. Wolff-Fabris as PRC says beam delivery is working fine and only last night it was interrupted for about 1 hours due to an issue with RF system. 
SA1 and SA3 beam is running in good performance and currently the HXRSS in SA2 improved as compared to yesterday and has achieved around 500uJ with 100uJ SASE background as of now.
- Gero Flucke as DRC says all is fine but suffering with shortage of people in DOC.
- A. Galler says that please contact XO for information/question on the power cut of December 3rd.

CTRL:
- Nothing to report.

DA:
- Nothing major to report.

EEE:
- Nothing major for the moment to report.

VAC:
- Not present.

XPD:
- No issues to report. All fine.

DET:
- Jungfrau issue reported by FXE: the detector was not expected to be used in burst mode and this probably caused the issue. The burst mode is not yet optimized (some experiments/tests were done At SPB) 
and this was not prepared at FXE.  

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Issue with SA1 PP-laser: trigger delay device at the instruments showed issues and yesterday a patch was deployed and it works now.
- SPB requested improvement in the beam shape and LAS colleagues are working on it today.

UNSYS:
- All fine.

SPB:
- Nothing to report.

FXE:
- A. Galler informs a new He gas delivery in on the way to EuXFEL.

MID:
- DOOCS device crashed overnight: e.g. information from the undulator was lost and the clone device was gone. Fixed by DOC. 
Wajid E. and Steffen H. comment that the "refresh" button helped to re-start; the server that runs the clones for MID crashed due to unknown reasons and the refresh button worked; reason under 
investigation.

HED:
- Nothing to report.
- HED will need XGM next week.

SCS:
- User operation and issue with theta rotation of a chamber. SCS will contact EEE and CTRL.
- Question on ReadtheDocs problem: SCS uses with users for documentation and shows malfunction. 
K. Wrona comments that the servers were put in operation but software is not in good state and not easy to fix. Progress is being done with preparing a workaround. Once a strategy is known ITDM will inform 
accordingly. 

SQS:
- Nothing to report. Estimation for pulse duration during last week: Alberto De Fanis will find out internally and inform accordingly.
Entry   Notes XO Integration Meeting 24.10.2022, posted by Frederik Wolff-Fabris on 24 Oct 2022, 09:47 
General Announcement:
- Processing of the maintenance tasks lists is delayed but effort in background is ongoing. Lists will not be published next Friday and scheduling meetings will take place during this and next week. 
The release will take place on November 11th.
- As PRC, A. Galler says that nothing major is to report apart of the laser interlocks issues on Thursday and Saturday, fixed either by SRP or the instruments.
- A. Galler inform on the e-mail sent to the xo-info@xfel mailing list on the the beam quality device at Karabo. Instruments are very much invited to use it at least once per shift or when beam conditions 
change.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Having group retreat today but OCD is available.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing major to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Incidents: AMPHOS was OFF in SA3 - reason not fully understood but OCD has brought it up again.

UNSYS:
- Nothing to report.

SPB:
- Last week's Extra-foam issue with AGIPD was solved by DOC.

FXE:
- Problem with calibration of Jungfrau: it was fixed but an issue still remains. DET will discuss together with Calibration team.
- Question regarding the He gas supply: A. Galler in forms there is no new supply apart of what was received two weeks ago. The central supply must have around 40 bars as of today.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 19.10.2022, posted by Andreas Galler on 19 Oct 2022, 08:45 

General Announcement:

  •  

CTRL:

  • nothing major

DA:

  • nothing special

EEE:

  • Group retreat on Monday, Tuesday next week --> OCD available
    • ion pump controller broken in XTD1

VAC:

  • not present

XPD:

  • nothing

DET:

  • 25th of October group retreat

ITDM:

  • nothing major
  • change of FastX on max-display from FastX2 to FastX3

XRO:

  • nothing to report

LAS:

  • AMPHOS Shutter Laser issue

UNSYS: 

  • ccell 25 SA1 fixed --> now only 6 motors are left.
    • Lead shields ETA beginning of February --> will have to be done through ZZ
    • broken motors and encoders are sent back to Beckhoff
      • repair time approx. 2 - 3 months

SPB/SFX:

  • Laser interlock error
  • extra foam 4 center modules from AGIPD
    • DOC / DRC to be contacted
  • jet motion
    • dynamic brake engaged because the cable was loose --> fixed

FXE:

  • extra foam issues had been sorted out
    • 16 cell mode of Jungfrau not being used

MID:

  • all fine at MID

HED:

  • collimated beam showed jitter --> downfocussing reduced the effect
  •  

SCS:

  • nothing major

SQS:

  • nothing to report

DRC

  •  

PRC

  •  
Entry   Notes XO Integration Meeting 17.10.2022, posted by Andreas Galler on 17 Oct 2022, 09:31 

General Announcement:

  •  

CTRL:

  • nothing major

DA:

  • nothing special

EEE:

  • OCD call on Friday
    • ion pump controller broken in XTD1

VAC:

  • see EEE --> additionally over the weekend the pump was taken out of the interlock

XPD:

  • nothing

DET:

  • JungFrau damagat at SPB/SFX in cw 40
    • two powder rings permantnly burned into detector

ITDM:

  • SA2 online system (gpfs) one enclosure is bahving strangely, --> fixed no replacement needed

XRO:

  • nothing to report

LAS:

  • crash of PPLaser in SA1 over the weekend
    • TRGDly was upgraded recently/ crashed for SPB --> TRGDly device being rolled back and PPLAS1 should be back up today.

UNSYS: 

  • ccell 25 SA1 fixed --> now only 6 motors are left.
    • Lead shields ETA beginning of February --> will have to be done through ZZ
    • broken motors and encoders are sent back to Beckhoff
      • repair time approx. 2 - 3 months

SPB/SFX:

  • Jet control stopped
  • PPLAS
    • on Friday there was no LAS output --> fixed
      • no LAS OCD in blue weeks, and on Friday no LAS group member on site --> earliest service on Saturday through good will.
    • shift change not successful due to miscommunication
      • SPB let the laser run over night for measurements --> FXE did shift change over night eventually destroying the SPB measurement
    • see LAS TRGDLY device
  • SPB requests to not upgrade software thorugh run for PPLasers.
    • recently there were some upgrades on a Monday which then later fail for operation
  • SPB notest that there is only limited OCD by LAS group and then LAS cannot cover critical components

FXE:

  • set up built for User Experiment
    • HallCrew supported in build up
    • LAS use --> see SPB/SFX

MID:

  • all fine at MID

HED:

  • user experiment being set up

SCS:

  • not present

SQS:

  • nothing to report

DRC

  •  

PRC

  •  

Entry   Notes XO integration meeting 12.10.2022, posted by Andreas Galler on 12 Oct 2022, 09:16 

General Announcement:

  •  

CTRL:

  • nothing major

DA:

  • nothing special

EEE:

  • nothing special

VAC:

  • XTD6 HED monochromator
    • pumping down continues

XPD:

  • nothing to report

DET:

  • nothing to report

ITDM:

  • SA2 online system (gpfs) one enclosure is bahving strangely, intervention may be required --> to be investigated

XRO:

  • XTD6/XTD9 tunnel works

LAS:

  • no issues

UNSYS: 

  • cell 19, 20, 21 motors for phase shifters had been replaced. Delivery for lead shields is going to be next year --> installation will have to be done through ZZ access
    • radiation damage is high after chicane, delivery time for new motors is 1 years, 7 are left in stock

SPB/SFX:

  • nothing special

FXE:

  • nothing to report

MID:

  • all fine at MID

HED:

  • nothing to report

SCS:

  • hRIXS combined motuion requires PLC to be exchanged

SQS:

  •  

DRC

  •  

PRC

  •  

Entry   Notes XO Integration Meeting 10.10.2022, posted by Frederik Wolff-Fabris on 10 Oct 2022, 10:09 
General Announcement:
- Wajid E. reminds DOC is not working this week but the DRC will take the calls over the week and redirect to respective OCD inside DATA department.
- Olivier M. mentions to use drc-xfel@xfel.eu for contacting the DRCs. However, the fastest way to communicate for urgent matters is using the regular DOC/DRC phone number.
- Martin D. updates the status of winter maintenance period: 
1. MTLs are in general with lower quality as compared to previous maintenance time (e.g. starting and ending dates); 
2. Groups will be contacted back by XO and meetings with groups will be scheduled in the coming days. 
- A. Galler shows the TTFinfo/schedule to inform on the schedule for this Blue/FD week starting today.

CTRL:
- X-ray feedback device reported by MID: device did not provide feedback for beam position. A bug fix was applied and it worked. 
CTRL proposes to apply to all other location today. No objections from the instruments appear during this meeting - so it will take place today.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- XTD6 was opened today for work on the high resolution Mono. It will stay open at least today and tomorrow.
- On Saturday VAC OCD approved to borrow a He bottle to MID. MID will return back to VAC today for He leak tests in tunnels.

XPD:
- Nothing to report.

DET:
- Nothing major to report.

ITDM: 
- Nothing to report.

XRO:
- Mikako M. enquires on the Blue week schedule: A. Galler says that requesters that got beamtime granted must be informed already.

LAS:
- SA1 PP-laser will test the trigger delay;
- LAS is performing SA3 PPL tuning for handling laser to SQS instruments.
- A. Galler says that optical sync was lost during the weekend in all instruments. The RF sync was on 30fs RMS performance which could be used.
UNSYS:
- Request for access in SA3 was done (fixing PS motors in cell 20 and 21): mostly to be done tomorrow or Wednesday.

SPB:
- Nothing to report.

FXE:
- PP-laser sync problems (6x last week) with loosing timing. It put the PPODL device into Error state; it could be recovered automatically but the laser timing wasn't conserved. 
So in about half the events the laser timing changed by 2-5 ns. Ticket was placed.

MID:
- Thanks to VAC for borrowing He bottle.
- Problems with optical sync; otherwise all fine.

HED:
- Nothing major to report.

SCS:
- Issues with Optical sync: drop happening on the Desy side (which do not have OCD on the weekend). After loosing Sync it took long to recover synchronization. At total about 15hs of beamtime was lost.
- There is no good alarm system indicating the sync was lost. This can be addressed at EuXFEL side. Steffen H. adds that a ticket is ongoing now and a good way for displaying will be worked out.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 05.10.2022, posted by Frederik Wolff-Fabris on 05 Oct 2022, 10:11 
General Announcement:
- XFEL got 12 bottles of He gas (50 l; 200 bar) which are connected to the central supply. Only SA1 will receive He gas from central gas supply in order to guarantee the run until the end of 2022. 
The pressure in the line will be monitored and the valve will close if unexpected drop happens. If one needs He gas please get in touch with XO.
- Winter maintenance task list: XO has received almost all lists apart of two of them. Groups missing shall submit the maintenance task list as soon as possible.
- Zunaira A. informs that if SEPS/AIBS is triggered (like last Saturday event) the procedure is to send an e-mail to rpo@xfel.eu.

CTRL:
- Follow-up of MID mirror feedback: problem is hard to replicate; yesterday happened again and recovered itself. MID reports it is stuck at exactly this moment. CTRL will investigate.
- Zunaira A. says on the aftermath of the Saturday AIBS alarm many automatic e-mails are kept to be sent and only today an e-mail saying problem is solved was sent. 
Steffen H. comments that it was informed that a test of the system has to be done due to an occurring bug and currently it has to be manually reset. The test is to take place in winter maintenance time.

DA:
- Nothing to report.

EEE:
- Nothing to be reported besides the Saturday issue with SXP losing power which affected the AIBS. Zunaira A. says devices are in the UPS system (Pandora, which did not give alarm). 
Oleg E. which will exchange components during winter maintenance time.

VAC:
- Not present.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- No news from LAS.

UNSYS:
- Not present.
- XO reports an issue with Phase shifter in SA3 (cells 20 and 21) which are stuck and need motor replacement. This is likely to happen next Monday as users at SCS do not plan to change photon energy.

SPB:
- Nothing to report.

FXE:
- Problem with BAM “S” not properly working. 
- As PRC, F. Wolff-Fabris says a work around is in place and shall use the BAM “M” instead. FXE shall get in touch with BKR for more details.

MID:
- AGIPD preview crashing and has to be restarted.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 28.09.2022, posted by Frederik Wolff-Fabris on 28 Sep 2022, 10:02 
General Announcement:
- Announcement: September 30th is the deadline for submitting the Maintenance task list. So far XO received 3 lists.
- Maurizio V. informs that this moment some groups are not yet aware of the 03.12 electrical intervention. The Maintenance time is therefore shorted. XRO will place in task list all planned activities but 
the confirmation if they take place depends on the actual time available for the work. 
A. Galler informs that a presentation wad done in this meeting series and also to the STGL who shall also communicate to their respective groups. It is also perfectly fine to mention that a task may not be 
carried out if it depends on timing plan. In any updates XO will inform via e-mails to xo-info or directly with affected groups.

CTRL:
- Nothing major to report. Follow-up today with MID (on the feedback mirror) in live session.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Concerning the timing system Detector: call to DOC was received and issue was solved.

ITDM: 
- Issue reported last Monday by ITDM (data migration / GPFS): ticket was created and is under investigation.

XRO:
- Nothing to report.

LAS:
- Discussion on the electricity work on Dec. 3rd: XO would like to discuss with LAS later today.

UNSYS:
- Small issue in SA1/cell9: water in the vacuum chamber. Solved by M. Yakopov and MKK. 
- Task list is submitted.

SPB:
- Nothing to report.

FXE:
- Naresh K. reports yesterday night the Hirex was setup for next week together with Peter Z. and it was done by 01:30AM. FXE had no plans for beam usage after that.

MID:
- Feedback to XRO: last week MID changed the mirror stripes from Platinum to B4C using the macros and it worked nicely.

HED:
- Done with compensation to users beamtime; currently changing setup for next user and will not use beam during the day and only few bunches tonight.

SCS:
- Experiment running: no issues.
- Noise with Fast ADC and the ADQ412 was observed when amplifiers were ON: To be checked.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 26.09.2022, posted by Frederik Wolff-Fabris on 26 Sep 2022, 10:14 
General Announcement:
- Steffen H. sent an e-mail to instruments scientists informing for a meeting on functional controls to the instruments: Please contact back Steffen H. for participation.
- A. Galler reminds that September 30th is the deadline to submit the winter maintenance period task list. For questions please contact Martin Doering.
- As PRC, Jan G. reports that machine worked nicely without issues last week. 
One issue in photon side was the malfunction of a mirror feedback in SA2 (issues that sometimes it suddenly stops after many hours of working); Another was a small SCS vacuum issue was reported and solved.

CTRL:
- Nothing to report.

DA:
- On the HED time with problems with files two weeks ago: work is in progress.

EEE:
- EEE-OCD received a call during weekend regarding SCS XRD chamber: EEE will get in touch with SCS today to investigate the issue.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- GPFS issue with SA2: data migration not functioning. It was solved but the expert will further investigation taking place today.
- On the HED files issue: looking into data analysis and will set up accordingly for this week.

XRO:
- SA2 Mirror is properly working, the issue with feedback at SA2 seems to be with software. 

LAS:
- Not present.

UNSYS:
- Issue with cell6/SA3: problem with bad connectivity. It is needed to have an access request today to fix the Ethercat card.

SPB:
- Preparing for this week experiment.

FXE:
- Observed the crosstalk when SA3 changes number of pulses when running in interleaved.

MID:
- Feedback mirror issue on Saturday; it was fixed on Sunday. Wajid E. comments it needs beam to further investigate; may be triggered by the Imager. 
CTRL will discuss offline with MID (it needs beam to further test). Jan G. points an e-log entry was done documenting the issue.
- GPFS issue happening.
- Continuously had to re-start the AGIPD pipeline (used as monitoring). P. Schmidt says that a fix may exist and additional investigation has to take place; mostly related to the wrong train-IDs. 
Jolanta A.-D. says it it is a similar problem already known at SCS and it has to filter the train in the analysis. DET and EEE shall further investigate.

HED:
- Starting tomorrow with compensation to the beamtime from 2 weeks ago (collecting into the proposal that is still open).
- Change setup on Thursday for next user starting on Friday.

SCS:
- Jan T.-D. asks on the ZZ access for the soft X-ray Mono: Raul V. is organizing together with Natalia G.

SQS:
- Continuing installation of spectrometer together with Swedish colleagues.
Entry   Notes XO Integration Meeting 21.09.2022, posted by Frederik Wolff-Fabris on 21 Sep 2022, 10:18 
General Announcement:
- A power glitch was detected at around 05:50AM today and it was transparent for the machine. Please check your systems are also running normally.
- A reminder will be sent to xo-info for the deadline to submit the winter maintenance task list.

CTRL:
- CTRL was able to reproduce the issue locally at the Imager and the work on a fix is ongoing.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Issue with SA3 FEL IMAGER yesterday morning: a damage to the YAG was found and it was adjusted to a new position. 
A reminder for SA3 instruments: please look at the watchdogs and at higher photon intensities it is preferable to start with the Diamond screen for tuning purposes.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Issue with a stuck phase shifter in SA3 / cell16 was solved by a ZZ by placing a spare motor. Cause is likely due to radiation damage. 
Purchase of Lead shields are ordered and will be delivered next year. 

SPB:
- Nothing to report.

FXE:
- Yesterday it contacted operators to discuss the RF window for SA1 which was set shorter than the requested.
- No further information on the "ghost" beam last week. It was seen only in the detector placed at the beam when SA2 or SA3 were set to zero bunches. 

MID:
- Trouble with hexapod during the weekend, which revealed to be broken. It was removed yesterday and is impacting the sample motion. A workaround is being put in place.
- New monitoring for Agipd gets stuck with calibration. DA is looking into it.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Installing spectrometer during this and next week.
Entry   Notes XO Integration Meeting 19.09.2022, posted by Frederik Wolff-Fabris on 19 Sep 2022, 09:54 
General Announcement:
- General announcement: reminder that on September 30th is the deadline to submit the winter maintenance task list. Tasks that are announced later may be included but it cannot be guaranteed to be 
scheduled in the planning.

CTRL:
- Nothing major to report.

DA:
- Nothing to report.

EEE:
- Update in SA3 EPS taking place today to add the SXP imagers.

VAC:
- ZZs taking place last Thursday to bring up VAC signal to North branch: currently looking into causes of XTD2 hiccups.

XPD:
- Thursday event with issues with hard X-ray PES: one channel for the digitizer saw an increased noise; also the MPODS that supply voltages did not restart and a ZZ is necessary to be brought the PES 
operational again.
- Another ZZ is requested by Naresh K. in XTD6. This is scheduled for today.

DET:
- Nothing to report.

ITDM: 
- Issue with loading of calibration factors taking long time: it did not happen again.

XRO:
- Nothing to report. As PRC Maurizio V. reported a quiet weekend.

LAS:
- Nothing to report.

UNSYS:
- Friday cell 12/SA3 phase shifter did not go below 11mm. If this is required again in the future one has to prepare working tables.

SPB:
- The 20keV operation was fine apart of the intensity slope trough the train. 

FXE:
- Nothing to report. No known issues with 12 keV operation on Friday.

MID:
- All fine at MID.

HED:
- Two user beamtimes were successful. 
- One hiccup was an issue with Cluster on Saturday night. That remain for 5-6 hours but was fixed by K. Wrona, who says that it is linked to the high number of created files. 
He increased it by a factor 10 to solve the issue. There are possibilities for improvements that will be discussed among HED, DA and ITDM. Similar experiment will happen again in two weeks.

SCS:
- Experiment taking place this week: electrical check ongoing and PLC connection also.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 14.09.2022, posted by Frederik Wolff-Fabris on 14 Sep 2022, 10:11 
General Announcement:
-	 

CTRL:
- Update concerning SA2 Imager issue reported by MID: CTRL is investigating with high priority and is working to apply a fix.

DA:
- Nothing to report.

EEE:
- Next Monday there will be an update of EPS in SA3 to integrate the SXP instrument into it.
- Also work on modification of pre-absorber is to be done together with Maurizio/XRO (also SXP-related).

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Concerning AGIPD 500K at HED: issues with electronics boards were found: it was disassembled and sent to Desy for investigation. 
It was fixed and re-installed back yesterday. Calibration is ongoing and is to be ready before beamtime.

ITDM: 
- Marcin S. says it took long to load calibration factors (around 14:30-15:00 yesterday). ITDM will investigate if something happened at the time.
- Fix for the GPFS mentioned on last Monday was applied in SA2.

XRO:
- No major problems to report.

LAS:
- SA3 PP-laser is back and running; maintenance still to be done today but laser is in good shape.
- LAS will access the other two PP-lasers for similar issues.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report; started to collect data and beamtime going accordingly to the plan.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 12.09.2022, posted by Frederik Wolff-Fabris on 12 Sep 2022, 09:55 
General Announcement:
- Machine tried the switch between 24 and 20keV at SA1 during the weekend: it was tuned 24keV at 280uJ max.; 
after changes only around 150-200uJ was found and recovery took many hours. Therefore we will run for this week at 20keV for SA1 instruments.

CTRL:
- InfluxDB issue is done.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.
- As PRC, Raul V. comments no major issues happened during the FD week.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Follow-up of GPFS problems: ITDM got a fix that will be applied today late in the day.

XRO:
- Nothing to report.

LAS:
- SA3 PP-laser: the water and humidity in the diode was removed/ dried. Today LAS will evaluate if no humidity is found to start up laser today.

UNSYS:
- Issue with SA3 motors in undulator segments (2 motors in different positions) were solved.
- Three errors in SA2 were solved by the BKR.

SPB:
- For 20keV intensity after tuning was about 500uJ.
- Helped XRO for the FD week: small issues were solved.

FXE:
- Nothing to report; commissioning going successful.

MID:
- Ticket to CTRL on the last MID Tunnel imager was sent during the weekend (software problem) and is being investigated. A. Koch saying that changing the GUI shall restore the system. 
Wajid E. says a bug was fixed and also a work around can be applied. Alberto de Fanis also reports that this has also seen in SQS. Needs further investigation from CTRL.

HED:
- Not present.

SCS:
- Moving the chamber will likely happen on Wednesday (needs Hall crew support).

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 07.09.2022, posted by Frederik Wolff-Fabris on 07 Sep 2022, 10:43 
General Announcement:
- With respect to the X-ray delivery parameters table: it is pre-filled with parameters agreed during the scheduling of user program. 
Should any deviation from the original parameters occur, this has to be discussed with XO to be seen if that can be accommodated. Please do not consider it just as communication and being granted.
- Manuel I. says the commissioning of mirrors for SXP will happen this FD week and they will try to bring beam inside experimental hutch.

CTRL:
- Reminder that interruption on data logger access today due to Influx-DB maintenance;
- Issue with PP-laser has been discussed yesterday and is under investigation by LAS if proposed solution is feasible.

DA:
- Off line calibration update today taking place: with 15-20 min downtime.

EEE:
- Investigating the digitizer artefacts from SQS.
- PLC team will recalibrate slits in SA3 tomorrow.
- Meeting in cw38 is scheduled for the timing issues with PP-laser.

VAC:
- Nothing to report.

XPD:
- All XPD devices are fine;
- Follow-up from SCS / access right in XGMs: The access rights for instruments were changed. This shall impede one instrument accessing controls for another beamline XGMs. 
Similar mistakes as seen last weekend shall not happen anymore.

DET:
- Nothing to report.

ITDM: 
- Follow up with GPFS problems last Tuesday at MID: something new was found this time and an update will be done in SA2 today (shall be unnoticed by users) and tested tomorrow. If successful to SA2 then it 
goes deployed to SA1 later.

XRO:
- Not present.

LAS:
- Meeting is set with P. Gessler and Tim Wilksen.
- Test tomorrow in SA1 taking place (trigger delay device).

UNSYS:
- Nothing to report.

SPB:
- All fine.

FXE:
- Nothing to report.

MID:
- XO can expect cw38 beam parameters this evening.

HED:
- Needs to move mirrors to Platinum strip this week for the next week run at 18keV. Naresh K. comments on the HXRSS studies this weekend at different photon energies and will communicate with XRO and HED 
on a strategy.

SCS:
- Announcement that end station will be moved inside the hutch on Friday or Monday.
- On the local power outage: reason is found and understood.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 05.09.2022, posted by Frederik Wolff-Fabris on 05 Sep 2022, 10:07 
General Announcement:
- If an instrument experiences a feature of machine that does not work, please do not hesitate in contacting the PRC, who is there to support you.

CTRL:
- Nothing to report.

DA:
- On Wednesday an update with minor interruption is due to happen.

EEE:
- DOC announcement: there will be no DOC but DRC is in place (Patrick Gessler).
- Jour-fixe meeting is happening today at 13:00.

VAC:
- Nothing to report.
XPD:
- SA3 FEL Imager: under investigation.

DET:
- Nothing major to report.

ITDM: 
- Maintenance of GPFS system on Tuesday (user system for offline storage will not be available tomorrow).

XRO:
- Ticket for follow up of the SRA XTD1 interlock (motor positions do not correspond to actual location - to be investigated by EEE).
- Maurizio V. will be in OCD for XRO this week (blue week).

LAS:
- Issues with timing and triggers: work around by switching OFF the pattern. Further discussion to take place.
- Laser-2 change caused a damage to SPB laser. No optical damage, only electronics.
- SCS reported laser “disappeared”. Meeting and work shall involve DESY group. XO will reinforce with Desy.

UNSYS:
- Nothing to report.

SPB:
- Issue with Laser;
- Issue with XGM: loose single shot. It was reported to the PRC. 
Laurent M. says they tried to setup XGM when it went down. He proposes to setup a specific Karabo device that works only with the one in use. XPD will discuss offline.

FXE:
- Work with new cryo system this week.

MID:
- Info for DRC: MID expects to use beam on Sunday during the day.

HED:
- All fine at HED.

SCS:
- Issue with BAM stabilization. It was requested but due to issues it was turned OFF during the weekend. It took time to realize it was OFF and to find experts to bring up again.
- Power outage in some devices at the experimental hutch. TS was called and came to fix it. 
- Liubov S. says problem relates to the laser interlock occurred: it searched few times before one could eventually set it.

SQS:
- Issue with ADQ digitizer of Spie devices: more than one in one crate and in interleaved mode it gives a random artefact. 
It was discussed with EEE: vendor says there is nothing what can be done. If someone else has issues please join forces with SQS.
Entry   Notes XO Integration Meeting 21.03.2022, posted by Frederik Wolff-Fabris on 31 Aug 2022, 10:16 
General Announcement:
- Announcement from Martin Doering on the next Winter maintenance period: 1. presented timeline for the coming WMP; 2. minor changes to the maintenance task list; 3. pre-announce the electrical 
interruption that will happen on Dec. 3rd;
- Release of MTL takes place in 02.09; deadline for submitting MTL on Sep.30th; release of summary task list on Oct. 28th. WMP starts on Nov.29th.
- Electrical Interruption on December 3rd: 
Two interventions to be done (by TS and MKK1) in order to connect power to XHO1 and XHV and to upgrade transformer at XHVAC (allowing uninterrupted maintenances in future). 
Affected locations: XHQ, XHEXP1, XHWS, XHVAC, media duct XHVAC and XHPSC; tunnels XTD4,6,7,8,9,10; XSDU-1 and XSDU-2. No power on 03/Dec. from 06:00 to 18:00. No access to campus during this time.
Ramp-down of equipment on 02.12 up to 24:00: all systems have to be powered off. 
Electrical work conducted on 03/12.
Ramp-up on Sunday 04 and Monday 05 December. Sunday is for critical devices that can not wait until Monday to be switched ON.

Safety choice is to power OFF all equipment, regardless of the secondary power line; Saturday is chosen as has the least overall impact at the facility and in working conditions. 

- For questions please contact xo-planning@xfel.eu.

CTRL:
- Issue with PP-laser bunch configurator still remains and is under investigation.
DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- FXE detector issue: problem remains but instrument manages to conduct experiment. Board has to be first exchanged by the expert who returns next week. 

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Issue with PP-laser multi pattern with CTRL.
- Random trigger issue with SA1:  had to set back-up again. DOC is investigating.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Beam operation last night: problems with 2-color in the night and also problem with a motor; both solved.
- Light from SA1 has been seen and will be investigated today.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 29.08.2022, posted by Frederik Wolff-Fabris on 29 Aug 2022, 09:56 
General Announcement:
- During the next Wednesday XO Integration Meeting a kick-off presentation by Martin Doering will be done to present the next winter maintenance including an electrical activity that will shutdown almost 
the entire campus.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- A ZZ together with VAC was done in SA1 tunnel yesterday night due to a failure of a terminal for a crate.
- Another ZZ to check piezo motors in SXP branch will happen today.

VAC:
- Apart of the downtime of yesterday nothing to report.

XPD:
- Nothing to report.
- Naresh K. as PRC informs that a mal function of a terminal for a VAC controller rack close to the XGM prevented vacuum operation and closed the XGM valve. After the ZZ by VAC OCD and EEE one could 
restart XGM.
- SA3 was down for 1:30 hours; after closing absorber in SA1 to allow SA3 beam only 30 bunches were allowed. To be addressed by the PRCs.
- Miscommunication with BKR operators on SAT at midnight asking for permission from SQS to change SA1 to 6keV, procedure that was done the whole week already. To be discussed with Desy RCs.

DET:
- Nothing to report. 
- As DRC Olivier Meyer informs it was a quite week, apart of the vacuum issue yesterday.

ITDM: 
- Nothing to report.

XRO:
- A ZZ together with EEE is requested today.

LAS:
- Laser operation was relatively smooth; few minor issues with trigger and timing delay; in contact with CTRL for solutions.

UNSYS:
- An OCD dedicated number for undulator issues is available: 9-4850

SPB:
- Nothing to report.

FXE:
- Problem with Jungfrau (data was noisy). Olivier M. comments that a call was received at the start of the week; an intervention was done and in his understanding no feedback from FXE was saying it was a 
show stopper.
- Changing in time by 1ns;
- E-log was giving error messages (unavailable). Patrick G. suspects of network issues but will be investigated.

MID:
- Users from two weeks ago will use beam next weekend at 12keV.

HED:
- Nothing to report; experiment was successful and has lots of data.

SCS:
- Not present.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 24.08.2022, posted by Andreas Galler on 24 Aug 2022, 09:28 

General Announcement:

  •  

CTRL:

  • nothing special

DA:

  • nothing

EEE:

  • actions from Monday (SA3 PLC master update,  PNACT testing) successful

VAC:

  • vacuum ok

XPD:

  • nothing

DET:

  • nothing major to report

ITDM:

  • nothing to report

XRO:

  • nothing to discuss

LAS:

  • nothing

UNSYS: 

  • nothing

SPB/SFX:

  • nothing

FXE:

  • all fine

MID:

  • all fine

HED:

  • undulator setting off by 100 eV --> HED had means to accurately measure the delivered photon energy and compensate for that.

SCS:

  • nothing

SQS:

  • nothing

DRC

  • nothing

PRC

  • nothing

 

Entry   Notes XO Integration Meeting 21.03.2022, posted by Frederik Wolff-Fabris on 22 Aug 2022, 09:50 
General Announcement:
- Power glitch on Saturday morning took two cryo streets down and beam was recovered more than 24:00 later.
- Naresh K. as PRC reminds instruments to retract CRLs and place beamlines in safe state after ending the beamtime on Mondays.
- P. Schmidt as DRC reports that minor issues were addressed on Sunday after beam was back.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- PLC team busy today for testing the tunnel PNACT remotely.
- SA3 PLC master upgrade also happening today from 10:00.

VAC:
- Saturday's power glitch did not affect any vacuum devices this time.

XPD:
- Nothing to report.
- Naresh K., as PRC, reports MID got 30mins more beam as agreed with operators.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Ask SCS for confirmation if it is needed to change PP-laser rep rate this week. SCS will confirm later.

UNSYS:
- Nothing to report.

SPB:
- Intervention last night was advertised 20 mins but took 1 hour.

FXE:
- Issue with digitizers for detector was solved.

MID:
- User experiment on THU/FRI went good.
- Second user experiment on SAT/SUN received about 12hs of beam delivery; no outcome.

HED:
- Nothing to report.

SCS:
- Suffered from downtime.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 17.08.2022, posted by Frederik Wolff-Fabris on 17 Aug 2022, 11:19 
General Announcement:
-  Machine is currently set at 12 GeV to best accommodate the requests for the next 3 weeks.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- SA1-PP laser update is done and no problems are seen now.

VAC:
- Nothing to report.

XPD:
- Jan G. informs as PRC the machine had difficulties to tune SA1 and SA2 yesterday. However overnight intensities improved by a factor 2 and are now higher or equal than 1 mJ (6keV at SA1 and 9keV in SA2).

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Started using beam to pre-align mirrors last night.
- Intensity is lower than expected to start with. To be seen if user program will be affected.

FXE:
- FXE performed the work as planned last weekend. When changing undulator gap on Sunday beam jitter occurred.

MID:
- Still need 352 pulses for this week; Pre-tuning at 12keV was done during the night with 500uJ intensity.
- A stage has to be implemented for the user runs together with G. Giovanetti.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Maurizio V. asks on the last week’s photon energies (lower values) and would like to discuss with SQS the performance of the beamline transport concerning the C absorption (mirrors). SQS will look 
together with XRO.
Entry   Notes XO Integration Meeting 15.08.2022, posted by Frederik Wolff-Fabris on 15 Aug 2022, 09:49 
General Announcement:
-  On Saturday 4AM there was a very short power glitch. Machine kept running and to our best knowledge only the SA3 GATT had to be reset afterwards. 
If any group find any other affected device, please inform XO or the PRC.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Updates for SA1 PP-laser are coordinated with LAS.
- OCD call yesterday to replace motor on site (HED?).

VAC:
- Issue with GATT on Saturday early morning. It was resolved by SQS and VAC-OCD. Under investigation; it may be related to a drop of cooling water flow.

XPD:
- Nothing to report regarding XPD and PRC duties.

DET:
- Nothing to report.

ITDM: 
- Small issue related to Graphana but fixed on Saturday.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Small issue with PS cell33/SA2: fixed and working by now.

SPB:
- Nothing to report.

FXE:
- No info on the beam usage over the weekend.

MID:
- All fine.

HED:
- Used beam from Friday until Sunday 23:00.

SCS:
- Using TOPAS for laser: some instability was found and shall be checked today together with LAS.

SQS:
- No news from the user program.
Entry   Notes XO Integration Meeting 10.08.2022, posted by Frederik Wolff-Fabris on 10 Aug 2022, 09:56 
General Announcement:
- Machine has restarted after the cryo failure: SA3 is receiving photons and tuning in SA1 and SA2 tunings are still ongoing.
- The SA3 beam pointing position (by the crosshair) was fixed on Monday. 

CTRL:
- Request on background effects on XTD2/SA1 Imager is ready to be deployed. SPB/SFX agreed to install now as there is no beam. A. Parenti will get in touch with SPB/SFX.

DA:
- Calibration constant (low) performance issue on the GPFS cache is solved. If issues still appear please contact Philipp S.

EEE:
- Nothing to report.

VAC:
- GATT SA3 is set with Ar operation. VAC needs to make tests (30 mins) regarding the injection issue that appears eventually and it will get in touch with SQS for defining a suitable time.

XPD:
- Nothing to report.

DET:
- Nothing major to report.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Nothing to report.
- Lasermet was contacted and no news by now.

UNSYS:
- Issue with cell33/SA2 not moving yesterday night was fixed by now.

SPB:
- Reports a misunderstanding with BKR on the requested 6keV photon energy.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Nothing to report. SQS will contact Martin D. for the tests on the GATT.
Entry   Notes XO Integration Meeting 08.08.2022, posted by Frederik Wolff-Fabris on 08 Aug 2022, 09:54 
General Announcement:
- The accelerator is down since Sunday morning. An oil pump of the warm compressor failed at around 7;00AM. In the afternoon a temperature of a cold compressor bearing raised and had to be exchanged. 
Cryo OK is expected today at 22:00. The operation for the current week will be updated by XO as soon as news are shared. 
- Harald Sinn as PRC informs the SA3 pointing is not so perfect (issues with crosshairs). Center of aperture is currently being used by SCS. 
SQS still has to find if actual position is good. When A. Koch is back this shall be revisited.

CTRL:
- Nothing to report.

DA:
- Nothing to report.
- Update of GPFS online analysis issues: mitigations put in place are working. 

EEE:
- One issue with a motor was solved by the DOC on Saturday.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.
- M2 mirror in SQS (new feature reported last week): no news.

LAS:
- FXE reported PP-laser to have long pulse duration and small beam profile at hutch. LAS is discussing and investigating with FXE. An update will be done by end of the day.
- SA3 PP-laser: SCS reported not been able to open instrument hutch. A restart /re-cycling of laser interlock was done and worked properly, consequently shall not be the issue's origin. 
SCS shall contact SRP and Lasermet. A proposition is to use dummy connector but needs to be discussed with SRP.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report; Program of last week could be carried out.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 03.08.2022, posted by Frederik Wolff-Fabris on 03 Aug 2022, 10:10 
General Announcement:
- Regarding the cw32 photon energies: it is expected for 8 GeV to have up to 6keV for the Hard X-ray beamlines. A third harmonic attempt at SA2 will be made. Expected photon intensities are in the order of 
500uJ.
- DOC shall run OK for operation regarding the number of available staff members. It includes people working remotely.
- SEPS interlock was approved last Monday and Tuesday. For questions please get in touch with Zunaira A.
- Harald Sinn as PRC reports: 
1. that yesterday there was a malfunction at SA1 and SA2 hutch search; together with Eric Boyd and Desy colleagues a fast replacement of devices was done; 
2. A confusion between change from SQS and SCS: not clear what time the change would have to be made and it was finally decided to do this morning; it requires Theo involvement.

CTRL:
- Follow-up of SA2 VAC loop: EEE changed the timing for the triggering updates and it seems to have improved; no slowness was seen since them. A fine tuning of the parameter will be made.

DA:
- Nothing to report.

EEE:
- Finishing the handover activities;
- PLC team working with CTRL to mitigate VAC loop issues;
- Fast electronics working with updates;
- Timing configurations were updated yesterday.

VAC:
- Apart of the VAC loop, nothing to report.

XPD:
- SXP Imager had a long exposure time but it is now fixed.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Recommissioned devices after the summer maintenance period. Feedback from instruments would be highly appreciated.
- SQS and SCS found features on M2 mirror in SA3 that needs more investigation (a fresh area of the mirror to be used was found).

LAS:
- SA2 PP-laser is working.
- PP-laser beam for FXE shall be ready for today; For SPB on next Monday.
- SA3 PP-laser for SCS is handled; for SQS will be ready on Monday.

UNSYS:
- Nothing to report.

SPB:
- Yesterday XGM was not instantiated but it may be solved by EEE.

FXE:
- Not present.

MID:
- EPS system triggered limit of 300 pulses; It seems to be related to a foil / diamond detector system. MID was not informed of this change in EPS. 
Nerea J. informs that the new entry at EPS was a request from XPD. Harald S. says an option is to the machine to increase the EPS to 360 pulses.  
- RF window was allowing only 272 pulses and not the requested 352 pulses.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Alberto Defanis says that the new mirror region found is not fully understood by SQS staff.
- Problem with the digitizer: shows an artefact and a discussion with the manufacturer is ongoing and may require its intervention. EEE is on the loop.
Entry   Notes XO Integration Meeting 01.08.2022, posted by Frederik Wolff-Fabris on 01 Aug 2022, 10:02 
General Announcement:
- Today the SEPS interlock tests take place at all SASEs. This happens usually after maintenance periods and shall use the full day.
- For cw32: above 6.5keV only intensities of 500uJ shall be expected. An e-mail will be distributed by XO.

CTRL:
- SASE2 and SASE3 vacuum loops were not responding; both VAC loops were restarted.

DA:
- Nothing to report.

EEE:
- PLC team is doing a ZZ in XTD6 and handover to the instruments.
- This morning timing servers to be restarted (5 sec intervention) - no control on triggers during this time; the signals for triggering continue to be generated.

VAC:
- Issues with SA2 and SA3 loops already reported.

XPD:
- All fine with XPD.
- Gas changes for XGM are organized with Theo.

DET:
- Nothing major to report.

ITDM: 
- Nothing new to report.
- GPFS problem reported last week: meeting with Desy experts is to take place.

XRO:
- XRO worked with SA3 on Saturday: M6 new mirror commissioned (found new position for this mirror); optical path for SCS and SQS is established.
- Vertical slit checked and not damaged; Device is working; Interlock was tested and an e-mail will be sent.
- Prepared for SEPS interlock tests of today (many modifications).
- Still to be done: beam illuminating SXP tunnel (maybe POP-IN imager is not working, but not sure); Still to check the soft-mono and the beam path.
- Question from Michael Meyer referring to hutch access today: as Interlock tests take place at 16:00, hutch access when closing the shutter has to be discussed with Safety / RPOs. 
- SA1 and SA2 beam recommissioning are done; except of the SEPS interlock tests.

LAS:
- SA2 PP-laser shall be ready to go;
- SA1 and SA3 PP-laser will be available at latest Tuesday next week. The 282kHz mode is now available for SA1. 

UNSYS:
- Air coils in SA3 cell 14 and cell20 had a problem and now it shall be solved after communicated between M. Yakopov and BKR.

SPB:
- Laser interlock issue was observed and solved.

FXE:
- Worked with D3 last week to recalibrate spare BTMs. Currently D3 had no spare parts and if the SA3 BTM would be triggered again it could stop North branch operation until a spare part would be available.
- There is an object in the beam path that can be seen: likely a cable belonging to the mono.

MID:
- All fine at MID.

HED:
- Nothing to add. HED is part of the ZZ in XTD6 together with EEE.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 25.07.2022, posted by Andreas Galler on 25 Jul 2022, 09:14 

General Announcement:

  •  

CTRL:

  • Today "bring up" works at FXE

DA:

  • Nothing special to report

EEE:

  • PLC team is trying to find solutions for slowness in big loops

VAC:

  • nothing to report

XPD:

  • nothing special

DET:

  • nothing major to report

ITDM:

  • SA2 GPFS updates today

XRO:

  • not present

LAS:

  • SA1 AMPHOS back as

UNSYS: 

  • K- Mono Scan last week
    • S. Arbeghyan assisted but new undultaor offsets will only be implemented after Aug 5th

SPB/SFX:

  • nothing special to report
  • bring up days are very successful

FXE:

  •  

MID:

  • ITDM please keep MID in the loop with SA2 GPFS updates, as MID plans to save data today
  • opening of the beam shutter is an issue
    • over the weekend MID was forced to open

HED:

  • shutter issue as MID

SCS:

  • nothing to report

SQS:

  • nothing to add

DRC

  •  

PRC

  • s

SH

  • VAC loops SA1 SA2, don't panic because of slowness

 

Entry   Notes XO Integration Meeting 20.07.2022, posted by Andreas Galler on 20 Jul 2022, 09:30 

General Announcement:

  • none

CTRL:

  • everzthing as planned
  •  

DA:

  • currently there is a gpfs issue affecting the online cluster
    • delays in online analysis have to be expected
    • delays in obtaining new constants, can take much longer than normally -->

EEE:

  • nothing to report
  • a couple of boards are not reachable, maybe connected to the power glitch we've had

VAC:

  • ongoing activities
    • XTD 6&9
      • HED Mono works closing
      • SXP beamline ready for beam
    • operation at very low photon energies at SA3:
      • GATT will use Ar --> System had been tested
  • power glitch yesterday was seen in water distribution

XPD:

  • ZZ on Tuesday for XTD1 SR imager camera
    • successful

DET:

  • nothing major to report

ITDM:

  • nothing

XRO:

  • nothing major to report
    •  

LAS:

  • nothing major to report

UNSYS: 

  • nothing to report

SPB/SFX:

  • issue with Elmo motors had been mitigated
  • DA and Detector recovery

FXE:

  • acces to air comperssor and support for moving LPD required for July 22nd for BTM tests.

MID:

  • after loop update wrong parameters had been put to LDM motors
    •  

HED:

  • not present

SCS:

  • nothing to report

SQS:

  • nothing to report

DRC

  •  

PRC

  •  

Entry   Notes XO integration meeting 18.07.2022, posted by Andreas Galler on 18 Jul 2022, 09:31 

General Announcement:

  • none

CTRL:

  • fastADC karabo Version updated
    • everything looks fine
  •  

DA:

  • nothing

EEE:

  • PLC and cabling as scheduled
  • fastADC update
    • MID and SPB issues being solved by lunch time

VAC:

  • HED Mono
  • SXP tunnel interface

XPD:

  • ZZ on Tuesday for XTD1 SR imager camera reset

DET:

  • DSSC update
    • test not yet conclusive on whether operation is safe or not.
    • current suggestion: postpone experiments until repair is done
  • AGIPD firmware update went well

ITDM:

  • nothing

XRO:

  • not present

LAS:

  • Timing issues solved, solved by Lars Froehlich
  • LAS may suffer from limited available resources

UNSYS: 

  • all fine

SPB/SFX:

  • issue with Elmo motors

FXE:

  • nothing

MID:

  • nothing
    •  

HED:

  • nothing

SCS:

  • mobile compressor will be used this week

SQS:

  • nothing

DRC

  •  

PRC

  •  

Entry   Notes XO Integration Meeting 13.07.2022, posted by Frederik Wolff-Fabris on 13 Jul 2022, 09:59 
General Announcement:
-  Today and tomorrow the TUV / Interlock tests are taking place. Emergency OFF are bridged and work in the area is possible only with an EQP present.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Planned the Run over of the shutdown with instruments: starting with SPB today but an issue with SPB Elmo controller has to be fixed first. Handover tests will start today or tomorrow.
- EEE was informed by M. Petrich that an ion pump in tunnel shows problems and is under investigation.
- A PLC update for the gas attenuator will take place today.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Progressing with tests for the cooling pipes at DSSC detector.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Timing system issues: ongoing with uTCA investigation; Lars F. from Desy is a contact point.

UNSYS:
- Issues with feedback of ambient field correction SA1/cell14: ZZ is scheduled for today.

SPB:
- Test of CTRL and EEE - some small issues to solve.

FXE:
- Nothing to report.

MID:
- Not present.

HED:
- Not present.

SCS:
- Testing devices: some devices issues in tunnels updates are solved.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 11.07.2022, posted by Frederik Wolff-Fabris on 11 Jul 2022, 09:52 
General Announcement:
-  User Operation Meeting will re-start on cw30 (Friday 29.07).

CTRL:
- Nothing major to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Tunnels were searched and closed last Thursday and photon tunnels XTD6 and XTD9 can be opened again when Interlock tests are done.

XPD:
- Nothing to report.

DET:
- Problem with in-vacuum cooling pipes at DSSC detector: reason is not yet known and is under investigation.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Issues with timing system; issues with Doocs also. LAS needs to discuss with EEE and Desy groups. Patrick G. points that there is ticket with Tim Wilksen ongoing. Investigation will take place today.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.
- It requests to get an information when TUEV tests are done on THU or FRI, if available.

HED:
- HED thanks EEE for solving last week's issues.

SCS:
- Nothing to report.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 06.07.2022, posted by Frederik Wolff-Fabris on 06 Jul 2022, 10:22 
General Announcement:
- Interlock tests in tunnels start today so there is no tunnel access today. Tests are finishing tomorrow and then tunnel search is taking place.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Deployment of new version of new ADC is taking place. Tutorials for new features are offered for interested groups. Please contact Bruno Fernandes for information.
- SA3 work is done (Nerea J. / Maurizio V.)

VAC:
- Not present.

XPD:
- Everything is fine.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Maurizio V. reports that vacuum level in M6 chamber in XTD10 is not progressing well and it is under investigation; some measures and discussions may take place in 1-2 weeks if things do not go well;
Apart of this, tests were successfully done together with EEE and CTRL. 

LAS:
- Back on track and PP-lasers are going up.

UNSYS:
- All good.

SPB:
- Preparing for tests and configurations for the start of next user run.

FXE:
- Today there will be Mono heater tests in XTD9 MONO.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Shutdown activities are ongoing; it will discuss with EEE and CTRL on updates.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 04.07.2022, posted by Andreas Galler on 04 Jul 2022, 09:30 

General Announcement:

  • M. Döring:
    • almost all of the activities that should have been done until last Friday had been done

CTRL:

  • last week karabo topic updates had finishedexcept for LAS
  •  

DA:

  • nothing

EEE:

  • SA3 exit slit

VAC:

  • leak search on M6 (SA3) chamber
  • leak search in XTD9
  • all in all well

XPD:

  • almost all tasks have been completed
  • XTD1 new crate connected on Friday,

DET:

  • nothing

ITDM:

  • all updates are finsihed
  • some activities continuing on the offsite --> should be comüpletely transparent
  • after the prox change there are some PCs which are using the old host names --> relavant people will be contacted by Janusz Szuba

XRO:

  • M6 mirror installation beign finished
    • end switch checks shoudl be finished by today
    • ramp up procedure being written down
      • instruments are asked to submit any additional requests for ramp up

LAS:

  • fastADCs should be finished by Wed this wek

UNSYS: 

  • control system has to be adjusted after removal of APPLE X, i.e. the control system looks for motors and

SPB/SFX:

  • checks

FXE:

  • motor commissioning ongoing

MID:

  • nothing
    •  

HED:

  • when modifying cables downstairs, make sure modules upstairs are switched off

SCS:

  • PLC updates

SQS:

  • not present

DRC

  •  

PRC

  • SCS incident on Monday, photon energy scanning script was left running --> had to be stopped manually

Entry   Notes XO Integration Meeting 29.06.2022, posted by Frederik Wolff-Fabris on 29 Jun 2022, 09:44 
General Announcement:
- Today tasks are going on: general infrastructure as per XO infra schedule: maintenance on electrical distribution; maintenance on Climatization; cranes tests; TUV tests on elevators and dirt trap 
replacement on cooling waters. 

CTRL:
- Done with Kababo update in SA1 and SA2. Today it continues with SA3.

DA:
- Nothing to report.

EEE:
- EEE is finishing updates in tunnels (today with SA2). It is going well.

VAC:
- All going accordingly to the plan.

XPD:
- All going as planned.

DET:
- Nothing to report.

ITDM: 
- Proceeding together with CTRL on tasks.
- Tomorrow there is in the morning euxfel gateway work and sessions have to be restarted afterwards.

XRO:
- Not present.

LAS:
- Everything going on the plan.

UNSYS:
- Apple-X undulators are moved out. 

SPB:
- Maintenance tasks are ongoing.

FXE:
- Problem with CRL in XTD2 was solved.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Not present.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 27.06.2022, posted by Frederik Wolff-Fabris on 27 Jun 2022, 10:03 
General Announcement:
- Tobias Clever confirms that elevator maintenance will take place as planned.

CTRL:
- Deployment follow-up ongoing from today on.

DA:
- Nothing of significance to report.

EEE:
- Nothing major to report. Maintenance tasks are ongoing as expected.

VAC:
- Tasks going well.

XPD:
- Not present.

DET:
- Working on tasks as expected.

ITDM: 
- Maintenance tasks are following the schedule.

XRO:
- XRO started to document at the E-log the actions that were done.

LAS:
- Everything going well so far.

UNSYS:
- The 4 Apple-X should have been removed last week; problem with transport car occurred and only one was removed; it was fixed and the remaining shall be removed today or tomorrow.

SPB:
- Not present.

FXE:
- Try to fix XTD2 CRL last Friday. Needs further assistance from EEE (already communicated).

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 22.06.2022, posted by Frederik Wolff-Fabris on 22 Jun 2022, 10:20 
General Announcement:
- An e-mail with DOC and DRC status during the maintenance period will be sent. There is no DOC but DRC will receive the calls. Also ticketing system is a way to contact. 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Fuse modification in tunnels and PLC updates: progressing well. 

VAC:
- No issues to report and busy inside the tunnels

XPD:
- Not present.

DET:
- AGIPD 1M at SPB: maintenance is over. Put back the faulty module online. It is working now.

ITDM: 
- Started the updates.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- Test for the Apple-X radiation: only 2 bunches were used; no signal in the Radfets and Pandora data has to be analyzed
- Yesterday started removing the cables of Apple-X.

SPB:
- Good news from detector side.

FXE:
- Nothing to report.

MID:
- All fine.

HED:
- All fine at HED; shutdown ongoing.
- Stability measurements: cooling / ventilation off between 14:00-15:00 on Monday. HED took data from HED POP-IN (two devices) and FEL imagers. 
It went well and it was seen 10-15% jitter reduction. Tunnel ventilation is not main source of jitter. 

SCS:
- Nothing to report.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 20.06.2022, posted by Frederik Wolff-Fabris on 20 Jun 2022, 10:33 
General Announcement:
- Summer maintenance period starts tomorrow; today the ramp down activities is taking place and two studies: beam stability at SA1/SA2 correlated to the air conditioning; radiation studies in SA3 
Afterburner. 
From tomorrow the tunnels are open at 07:00AM. Interlock tests at XHEPXP1 takes place between 13-15 July. In case of questions please contact Martin Doering at xo-planning@xfel.eu

CTRL:
- Starting to prepare the Karabo update that takes place from next week.

DA:
- Last week was quiet.

EEE:
- On the weekend an issue with digitizer for SQS: timing system card was misbehaving. This is a new issue, never seen before. The outputs of the timing card were generating wrong values. 
Fixed during the weekend by rewiring the digitizers/crates. Reason is not yet fully understood and may relate to config files at DOOCS.

VAC:
- Nothing to report.

XPD:
- Beam stability study this afternoon: influence of tunnel ventilation on the beam for SA1 and SA2. It takes place from 14:00-16:00.
- Participating on ramp down activities today.

DET:
- AGIPD 1M module at SPB: to be tested today.

ITDM: 
- Nothing to report.

XRO:
- Busy with ramp down activities.

LAS:
- Shutdown activities.

UNSYS:
- Nothing to report; preparing for the summer maintenance.

SPB:
- Starting with AGIPD intervention today.
- Successful last week night shifts.

FXE:
- Pulse numbering issue between Karabo / DOOCS: 1 and 0 pulses. To contact CTRL for investigation.
- Damage Si filter in XTD2 attenuator.
- Problems with beam stability during the weekend (lost 8 hours).
- FXE had data saving blocked. Origin was a not clear communication that first user should remain open until Monday 20.06. It was re-opened by ITDM after XO clearance on Friday 20:00.

MID:
- User run was cancelled on Friday evening as HXRSS was dominated by background. 
- Busy with maintenance period.
- Mirror chamber issue: it needs EEE to solve.

HED:
- Busy with tests today on the stability task. Parasitic alignment of monochromator with XRO.
- Starting shutdown activities.

SCS:
- Nothing to report.

SQS:
- Start the shutdown activities. Successful beamtime last week.
Entry   Notes XO Integration Meeting 15.06.2022, posted by Frederik Wolff-Fabris on 15 Jun 2022, 10:40 
General Announcement:
- Currently beam delivery is suffering with gun trips at every 1 hour or so. The RCs and PRC are discussing measures to improve the situation. 
Last Monday gun conditioning did not had the desirable effect in the number of daily gun trips.

CTRL:
- Nothing to report.

DA:
- All fine.

EEE:
- Preparing for the shutdown.

VAC:
- Issue with vacuum signal at SA1 yesterday morning 04:00AM in SPB branch (controller was having faulty settings). The BKR did not call the VAC OCD or the PRC. After a ZZ this mal-function of ion pump was 
fixed.

XPD:
- Nothing to report.

DET:
- Maintenance of AGIPD 1M at SPB: modules were exchanged this week. Unfortunately, one new module is not yet working and needs further investigation.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Not present.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID; under HXRSS tuning and have observed frequent gun trips.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 13.06.2022, posted by Frederik Wolff-Fabris on 13 Jun 2022, 09:48 
General Announcement:
- The cold compressor (stage 2) failed yesterday shortly after lunch time and beam delivery had been cancelled on the remaining of Sunday 12.06. 
For this week, the delivery is not expected to start prior Tuesday 15:00. Later today PRC or XO will know more on the machine status and will inform instruments.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report. 
- The issue with SA1 XGM last week was due to a short communication interruption. No need for further action.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Agreed with MID to recheck beamline alignment (change stripe from Platinum to B4C): has to be communicated when beam is available.

LAS:
- Nothing to report.

UNSYS:
- All fine with undulators.

SPB:
- Nothing to report.
- Second user still managed to achieve the goal of the experiment apart of the beamtime lost.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report; Second user schedule for the weekend was affected.

SCS:
- Users were struggling with samples at different temperatures. A second sample not achieve much as it was exchanged for Sunday.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 08.06.2022, posted by Frederik Wolff-Fabris on 08 Jun 2022, 08:15 
General Announcement:
- The maintenance task list was made available last Friday. Martin Doering distributed an e-mail including to the xo-info@xfel.eu list. 
In case of any question please don't hesitate in contacting us at xo-planning@xfel.eu
- An invitation for the Colleagues and families Company Summer Party was sent yesterday. 
The event takes place on July 1st and if you are around and wanting to take part of an Italian themed party, please place your registration.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Not present.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report; no info regarding the conditional trigger operation.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Damaged bellow at the DSSC (needed for this week): parts were exchanged and all is fine.
- Night problems with beam position / energy. It was fixed by the BKR. 

SQS:
- Not present.
Entry   Notes XO Integration Meeting 01.06.2022, posted by Frederik Wolff-Fabris on 01 Jun 2022, 09:52 
General Announcement:
- Martin Doering presents the status of the maintenance planning: currently XO is about to release the maintenance task list on next Friday; 
major tasks such as electricity, electrical distribution cabinets will be done (power outlets OFF, emergency lights off); 
cooling water maintenance will take place at XHEXP1 on 29.06.2022 (short interruptions); 
Online computer server replacement on 22-23.06 (tbc) and no DAQ available; 
elevator maintenance and TUV on 21-22.06 and 27-29.06, respectively; 
master oscillator and timing system update on 27.06; 
emergency OFF bridging and unbridging at XHEXP1 on 13-14.07 (need the EQP present if work is to be done at hutches).
- Total of 630 tasks are planned for this maintenance period. The infrastructure calendar available at Zimbra will contain the dates.
- When receiving the maintenance task list on Friday, please check for your submitted activities, the locations that are important for your group, and activities where your group is mentioned as support 
group. 
- In case of doubts or questions please contact Martin Doering at xo-planning@xfel.eu.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- On the reported issues with conditional trigger of LPD at FXE: no update at this time.

VAC:
- Not present.

XPD:
- Nothing to report.

DET:
- Issues with train-ID at the LPD: No new info on its status.

ITDM: 
- Not present.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Major action yesterday with motion sensor at quad mover in SA1/cell#18; the ZZ progressed during the whole day and the issue was fixed.

SPB:
- Photon energy request of 12.4keV: XO is working on that and will keep SPB updated.

FXE:
- Conditional trigger not yet tested.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Timing issue last week during beamtime: optical synchronization when used made the overlap with timing was lost. It is under discussion with LAS and Desy groups.
- Yesterday there was an issue with Vacuum with the DSSC: a bellow got damage due to overpressure. Working on a solution for next week’s beamtime. SCS shall contact VAC for available parts if needed.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 30.05.2022, posted by Frederik Wolff-Fabris on 30 May 2022, 09:42 
General Announcement:
-  A. Galler thanks the support from the instruments to the full train delivery to HED at the start of the last week.

CTRL:
- Nothing to report.

DA:
- On the reserved nodes reported by the user during last UOM: more nodes could be available if requested.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Issue with XTD6 XGM where a gauge was faulty. XPD will further investigate.
- XGM in XTD2 had an issue with high voltage. The XGM was fixed by Theo and configured for 9keV.

DET:
- Nothing major to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to repot.

UNSYS:
- A ZZ will take place today to move the Pandora in the Apple-X area.

SPB:
- Two user experiments from last week acquired data and they were happy.

FXE:
- Problem with conditional trigger of LPD (related to pulse on demand): EEE is working on it. David L. says that it is solved and a documentation has been written in how to set it up. 
Wajid E. adds the settings were reset and needs further investigation. The workaround is in place - what remains is the full understanding on how this happens in first place.
- Damage on XTD2 and hutch attenuators (Si screen) was found.

MID:
- All fine at MID.

HED:
- Commissioning with long pulse trains was done.

SCS:
- Not present.

SQS:
- All good at SQS.
Entry   Notes XO Integration Meeting 25.05.2022, posted by Frederik Wolff-Fabris on 25 May 2022, 09:25 
General Announcement:
-  Reminder that the UOM planned for Friday is taking place apart of the holiday on Thursday.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Two OCD calls related to FXE setups, but solved and working fine now.

VAC:
- Nothing to report.

XPD:
- ZZ on Monday went fine. Imager is repaired.
- Wolfgang F. planning a ZZ for K-mono in XTD1 but needs to talk with Nerea and XO.

DET:
- Nothing major to report.

ITDM: 
- Not present.

XRO:
- Yesterday there was stability data taken at HED; data to be processed.

LAS:
- Nothing to report.

UNSYS:
- Planned ZZ for next Monday to relocate Pandora.

SPB:
- Issue regarding Hexapod: trying to fix it for the user measurements; DOC, CTRL, EEE informed.

FXE:
- Preparing devices in the experiment hutch.

MID:
- All fine at MID.

HED:
- Nothing to report; not aware of stability measurements.

SCS:
- Experiment is running.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 23.05.2022, posted by Frederik Wolff-Fabris on 23 May 2022, 09:54 
General Announcement:
-  PRC reports the operation during the weekend run smoothly: 
Tests for crosstalk between SA1/SA3 were done on FRI 23:00-00:30 (SA3 could keep their spatial overlap); 
Desy phone numbers were not working on SUN morning for about 1 hour; 
Please instruments shall post at least one entry per day at the Operations-2022 e-log.

CTRL:
- Karabo framework for datalogger will be rolled out today at 13:00, taking 10-15 mins and transparent to the users.
DA:
- Nothing to report.

EEE:
- Go today at SA3 PP-laser to solve issue with timing system (EEE and LAS around 11:30AM).
- MID mono motor current was changing - under investigation by EEE.

VAC:
- Nothing to report.

XPD:
- ZZ ongoing in XTD10 for motor end switches of the Imager.

DET:
- Nothing major to report.

ITDM: 
- Gateway: memory usage was too high; some old Karabo sessions had to be closed as were using too memory. That prevent JDDD to be started. 

XRO:
- Can machine give beam to HED this night for beamline alignment.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Air conditioning issue with laser hutch; Power plug without electricity. Tickets were issues. XO advices SPB/SFX to call TS.

FXE:
- Not present.

MID:
- All fine at MID.

HED:
- Tomorrow start commissioning with long pulse trains (every 1000th to start around lunch morning after beamline alignment). Other instruments shall not change pulses without calling BKR.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 18.05.2022, posted by Frederik Wolff-Fabris on 18 May 2022, 11:02 
General Announcement:
- The cold compressor of the accelerator failed yesterday night at around 23:15. The current expectation is that beam shall be back on Thursday morning. 
Instruments and DRC were informed by the PRC via phone. A status entry can be found in the TTfinfo e-log, Operation-2022 e-log and XO Alfresco landing page.
- Update on the summer maintenance planning: Some groups have the review process finalized. Scheduling meetings are ongoing. 
If a group thinks it is needed to have an scheduling meeting please feel free to contact Martin Doering.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.
- SA3 PP-L parts that were not behaving properly are under investigation with LAS.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- High doses observed in Apple-X are under investigation; A plan to move undulators in the last night did not take place.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Yesterday a loop update cost time with loosing motor parameters but solved at the end.
- Broker pileup: root cause was the physical location of the board (configuration) was changed in between times. Location was changed when configuration was requested.

HED:
- Nothing to report.
SCS:
- Fast sample scanner has problems and needs to be fixed. Involved groups are informed.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 16.05.2022, posted by Frederik Wolff-Fabris on 16 May 2022, 09:53 
General Announcement:
- Another cryo failure happened yesterday night due to an overpressure. Expected cryo OK shall be around 10AM. Plan to tune today holds.
- Steffen H. reminds that instruments shall participate in the Jour-fixe today at 13:00.

CTRL:
- Nothing to report.

DA:
- Announcement from the calibration team: offline calibration will have a deploy today – minor intervention – to correct e.g. bug fixes

EEE:
- SA3 PPL has a card that behaves not normally. Needs an access and is been repaired right now.
- Pouhneh S. says that Saturday reason maybe be related to laser interlock. The whole SA3 went down. Lasermet was onsite and a wire was shorted circuit. Needs to look closely if it was interlock . 
It acted as if the emergency OFF was pressed. Zunaira A. says that this happened also in SA2 time ago: AMPHOS shutter has a sub-D connector and when this connects the fuse blows and power went down; LAS 
and Klaus Witt solved at the time and reason shall be related to the AMPHOS shutter. 
K. Wrona says as DRC he has got a call informing the power glitch. This morning the network switches in the room are still not functioning. Please call DRC using DOC number when power goes down.

VAC:
- Nothing to report.

XPD:
- Nothing to report.
- On the power glitch of SA3: only SQS and SCS hutch devices were affected by the power glitch due to the short circuit on the interlock/PPL.
- Switch to the 18keV in SA2 went smooth on Saturday.

DET:
- AGIPD in SPB showed radiation damage. On May 7th the detector was exposed to high radiation and investigation still ongoing. 
About 10% of pixels are damaged and need full characterization to find if still usable for users.

ITDM: 
- Nothing to report.

XRO:
- Last week on Friday: moved Mirrors M1 and M2 of SA2. Mirror positions seem to be in the right positions. 
When beam is handled over to MID the XRO group has to check alignment and it is already agreed with MID. Currently beam is in the Platinum stripe.

LAS:
- Power outage in SA3: seeder is back but interlock does not allow seeder shutter open (card to be changed). Many troubles with devices in the network.

UNSYS:
- ZZ for SA2/cell#2 to fix a problem.

SPB:
- Interesting program last week with stability investigation and beam usage on the weekend.

FXE:
- Got support from Data calibration: thanks!

MID:
- All fine at MID.
- Ulrike B. comments on the Karabo broker pile up over Easter: noticed now that there is a mismatch between what is written and triggered. 
Wajid E. says that will contact offline to MID to further understand. It is corrected as of now. Bruno F. says that there is a ticket ongoing (wrong timer connection affecting the configuration location).

HED:
- Nothing to report.
- Long pulse train tests were successful and shall be used on cw22 - a meeting takes place with BKR today.

SCS:
- No full power outage in SCS hutch (beamline was checked and seem to be fine). XGM did not get interrupted.

SQS:
- Suffer from laser interlock during the weekend – could not take PP laser. Got a damaged scroll pump.
Entry   Notes XO Integration Meeting 11.05.2022, posted by Frederik Wolff-Fabris on 11 May 2022, 10:02 
General Announcement:
- The accelerator is currently down. An electrical power issue lead to a cryo failure at 08:45AM and both cold and warm compressors went down. 
The expected cryo OK shall come in the afternoon and by 15:30 we will have further information.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Incident in MID branch/SA2 last evening with the V0 valve being closed: VAC received automatic message with spike around the CRL2 was detected, then closing the V0 valve. Solved in 5 mins. 
Please report to VAC group (08:42PM) when such incidents happen. Reason behind this even is still unclear.

XPD:
- Nothing to add.

DET:
- Nothing to report.

ITDM: 
- A Change in configuration of run controllers for the DAQ may profit today as machine is down. ITDM will discuss with groups and inform accordingly. 
To be done in tunnels, laser, 5 instruments apart of SPB/SFX. One has to reload projects afterwards.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Apple-X: massive losses of encoders were found and the FD program is cancelled. A ZZ will be done today.
- Heidenheim linear encoders need to be replaced, quote is placed but not sure if it happens in summer maintenance.

SPB:
- Reconfiguring the instrument for the weekend.

FXE:
- Problem with XGMd: under work by Theo and Finni.

MID:
- It has now the PicoAmpmeter; in touch with EEE and CTRL.

HED:
- Monday long pulse train test: seems to be fine; also beam pointing stability went fine for HED.
- XRO was working with mirrors: Mikako M. says that Maurizio M. will address with HED the tests of vertical positions.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 09.05.2022, posted by Frederik Wolff-Fabris on 09 May 2022, 10:30 
General Announcement:
- This week is a Facility development week: photon studies take place until Wednesday and then setup for 16.3GeV for the next weeks of operation.
- Martin Doering present a Dashboard for the Summer maintenance period. About 600 activities were submitted timely by the groups; currently the lists are being processed for checking for major error. 
- Jan G. adds as PRC that there were no major issues during the weekend. The FXE XGMd gave wrong values and is under investigation.

CTRL:
- Few devices are saved in the projects with wrong classID: A script is to be applied today at 13:00 to fix this configuration; it is transparent.
- Update of data logger to be done today at 13:00 (15min downtime) also to improve Influx.

DA:
- No announcements; past OCD was quiet.

EEE:
- This week: intervention to be done in SA3 to allow better slits movement (together with XRO).

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing major to report.

ITDM: 
- Nothing to report.

XRO:
- XRO will be busy next days with beamtime / FDs activities.

LAS:
- A water leak is found in SA1 laser hutch. TS is contacted and the suspicion lies in the humidifier from the roof. There is no estimative on time for repair.
- Maintenance works in SA3 PP-laser to be done until Wednesday.

UNSYS:
- Control system of Apple-X shows several encoders giving errors in several motors. Encoders were failing to start.

SPB:
- Experiments went well last week.

FXE:
- FXE has planned for PP-laser use.
- Martin K. asks if a ZZ for the Mono is happening today. A. Galler inform hat today there is ZZ and therefore the access request is not yet scheduled.

MID:
- MID colleagues still look for a picoampere meter.

HED:
- The Full train test is scheduled to take place today.

SCS:
- Not present.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 04.05.2022, posted by Frederik Wolff-Fabris on 04 May 2022, 09:59 
General Announcement:
- Issues with machine on Monday (misaligned photocathode laser). Beam delivery started only Tuesday at 15:00 instead of 07:00AM. Cause is understood and mitigation strategy is put in place by MXL.

CTRL:
- Nothing to report.
- Monday's Karabo deployment went well.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Part of PES detectors were repaired on Monday's ZZ (14 out of 16 are now working).

DET:
- Nothing to report.

ITDM: 
- SPB metro device causing Telegraph to stop sending data. Solved by DOC and a fix will be deployed today together with DA.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- Phase shifter cell 14 / SA3 is now fixed.

SPB:
- Few minor issues were solved.
- Gain were not closing - DOC is informed; 
K. Wrona says some runs do not close (1-2 runs per shift): root cause of not understand but solution exist (close the run manually at MyMdc and restart; DOC can help with that).

FXE:
- Thank to SQS for helping with gas valve.
- Continuing with commissioning activities.
- CRLs were in the beam last Monday and were retracted.

MID:
- All fine at MID.
- Looking for a Keithley Pico-Ampere meter to borrow for cw20. 

HED:
- Nothing to report.
- A. Galler informs a water pipe is blocking the construction of the pulsed room. It affects the cooling water. TS needs to coordinate with involved groups.

SCS:
- Experiment ongoing.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 02.05.2022, posted by Frederik Wolff-Fabris on 02 May 2022, 07:27 
General Announcement:
- Martin Doering gives update on the maintenance planning progress: a Dashboard will be introduced and updated every week and almost all groups have submitted the lists. 	 

CTRL:
- Reminder: today at 13:00 there is a deployment of Karabo Beckhoff in the tunnels (motors with newly features). No issues are expected; otherwise a reset may suffice.

DA:
- Nothing to report.

EEE:
- Nothing to report.
	
VAC:
- Nothing to report.

XPD:
- No incidents to report; 
- Two ZZs in tunnels are taking place this morning.

DET:
- Feedback regarding AGIPD at SPB (cw16): one module has to be replaced during the summer maintenance period. Reason behind the damage has to be investigated together with SPB staff.

ITDM: 
- Nothing to report. 

XRO:
- Nothing to report. 

LAS:
- Nothing to report.
	
UNSYS:
- ZZ taking place at SA3 cell 14 this morning.

SPB:
- Everything went smooth last week.

FXE:
- Couple of issues with Bassler cameras not connecting or acquiring data (DOC helped).
- Gun trips on the weekend means that one hour is needed to wait until running again Mono (using high heat load). Many gun trips were seen during the weekend.
Raul V. says that a possibility was discussed yesterday at around 09:45AM for an intervention to minimize the gun trips but after consultation with FXE staff it was decided to run in that condition. Peter 
Z. says that calling 9-4800 was not reachable.

MID:
- Everything looks good for the last experiment with HXRSS.
- It lost the timing after a big trip on Sunday. 
- Frequent broker Pile-ups happened and for mid-term has to be addressed (J. Hallmann). Gabrielle G. and Setffen H. say that a fix is known and in the mid-term it will be solved. 
- Problem with multipatern of Laser happened; reported by Angel R.-F. LAS will look into it.
	
HED:
- CRL3 was tested and enabled it back.
- Tomorrow the mirror vertical motors will be checked together with XRO.

SCS:
- Nothing to report. Only smaller issues that were addressed.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 27.04.2022, posted by Andreas Galler on 27 Apr 2022, 09:04 

General Announcement:

  •  

CTRL:

  • bug noticed in BEckhoof karabo device --> already fixed from some topics, see xo-info comm from yesterday

DA:

  • all fine

EEE:

  • CRL-HED-OPT isue solved

VAC:

  • two devices went into error --> likely because of Beckhoff Karabo bug

XPD:

  • nothing to report

DET:

  • AGIPD 1M at SPB partially vented yesterday --> detector went into interlock, no damage
    • who should be called at SPB (or any instrument for that matter)
    • Turbo pumps went into error state which triggered the partial vent --> karabo Beckhoff update?
    • Wajid comments: karabo beckhoff update does not correlate with this incident, judging from time stamps

ITDM:

  • no update

XRO:

  • nothing to report

LAS:

  • nothing to report

UNSYS: 

  • not present

SPB/SFX:

  •  

FXE:

  • software limits of phase shifter of PP Laser
    • DK solved by PP Laser

MID:

  • all fine at MID
    • HXRSS very much appreciated

HED:

  • HIREX offset

SCS:

  •  

SQS:

  •  

DRC

  •  

PRC

  • SCS incident on Monday, photon energy scanning script was left running --> had to be stopped manually

Entry   Notes XO Integration Meeting 25.04.2022, posted by Frederik Wolff-Fabris on 25 Apr 2022, 10:09 
General Announcement:
- Regarding the use of special diagnostics devices: on THU XPD received a call for supporting the use of HIREX in the tunnels. XO would like to ask instruments to inform XPD or XO well in advance for such 
requests, if possible. 
Please include that in the "Comments" column of the X-ray delivery tables.
- Deadline for submitting the 2022 summer maintenance period is next Friday 29.04.
- A. Silenzi reminds instruments to join the Jour-Fixe meeting with DRC today at 13:00.
- Thomas Michelat reminds that during the night the instruments shall call the regular DOC number and not directly e.g. the CTRL OCD number.
- A. Galler inform the operation affair on the FXE mono is to be prepared in the next week or so, following the updated process for Operation Affairs.

CTRL:
- CTRL reminds that today at 13:00 there is an update of Karabo device in tunnels (for Beckhoff systems).
- Also at 13:00 an update of Aravis cameras in tunnels will take place.

DA:
- Nothing to report.

EEE:
- EEE is continuing the work with PnCCD issues.
- A ZZ in XTD6 will be done today for HED Mono.
- Investigating a motor in a CRL that showed issues.

VAC: 
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Marcin S. says that one of the AGIPD central tiles was lost last week after a sudden beam jump. This will be discussed/investigated by DET / Olivier M. 

ITDM: 
- Sync&Share service is not accessible tomorrow 26.04.
- Today at 10AM the Redmine service will be updated.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Issue on Friday with SA2/cell33 not moving the gap. A remote reset solved the problem.
- Last night when moving SA3/cell21: it did not move and the cause was a strong applied taper. Now it is solved.

SPB:
- Experiments went well.
- AGIPD was affected due to beam movement.

FXE:
- Commissioned the Johann spectrometer last week and this week the plan is commissioning the Gotthard spectrometer.

MID:
- All fine at MID.

HED:
- Different settings for M1 and M2: changed positions have to be coordinated with MID, XPD and XRO when beam will be aligned again to HED. It caused problems for the HIREX alignment.
- A meeting/communication among these groups have to be organized. Angel R.-F. says that today and tomorrow morning work on the mirrors will work. XRO will lead and new positions to be communicated to HED.

SCS:
- Problems with cell21 last night.
- MDL devices for multi-pattern showed issues and will be discussed among SCS and CTRL.

SQS:
- Issue with two digitizers in the same uTCA board that can not be used in interleaved. Current understanding is that one has to ship device back to the manufacturer.
Entry   Notes XO Integration Meeting 20.04.2022, posted by Frederik Wolff-Fabris on 20 Apr 2022, 10:07 
General Announcement:
- Steffen H. reminds on the Karabo developer training that will take place next week. Registrations are still possible.
- Martin Doering informs that next week Friday 29.04 is the deadline for submitting the summer maintenance lists. In case of needed help, please contact xo-planning@xfel.eu.

CTRL:
- Issue with Influx issue in cw14: data logging is now protected and a Karabo update in only the data loggers machines has to be done. 
It is proposed to make it today at 13:00 (it is transparent for the users and takes about 30mins). An e-mail will be sent to the xo-info@xfel.eu.  
- Beckoff updates in software level to be performed on next Monday 25.04 at 13:00. This affects mainly tunnels; with instruments the coordination will be done.

DA:
- Nothing to report.

EEE:
- Minor things being supported but nothing major to report.

VAC:
- Nothing to report.

XPD:
- A. Koch asks on the Beckhoff update: only hardware in tunnels will be updated and only Karabo software.
- J. Laksman says that during the Eastern beamtime at SQS a gas needle opened very fast and the pressure of chamber went very fast, posing a damage risk. 
A Redmine ticket was placed for that it does not open too fast. An offline discussion will take place with EEE and CTRL.

DET:
- DSSC is back online at SCS after months of non-operation. There are issues to be fixed and investigations are in progress. The DSSC expert is on OCD this week and DOC can also help. 

ITDM: 
- Nothing to report.
- Marcin S. asks on the plan for limiting the raw data process per run in this current beamtime. SPB staff was told that they can't have more than 10 processes running; 
K. Wrona informed this was talked to users and it was agreed with the limited number of 10. An offline discussion will take place and if more is needed this can be accommodated.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- Nothing to report.

SPB:
- See Marcin S. question above. Nothing else.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Under operation and issue with DSSC was already mentioned.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 13.04.2022, posted by Andreas Galler on 13 Apr 2022, 09:28 

General Announcement:

  • No User operation meeting this Friday, instead cw 16 / cw 17 check will happen in Daily Operations Meeting at 15:30 on Thu Apr 14. Link available on ttfinfo in XFELelog

CTRL:

  • nothing major to report

DA:

  • nothing major to report

EEE:

  • nothing major to report

VAC:

  • nothing to report

XPD:

  • nothing to report

DET:

  • offline calib with JUNGFRAU --> tickets closed already

ITDM:

  •  

XRO:

  • request to SA1 instruments
    • please check the repaired XTD2 solid attenuators
    • attenuators cannot sustain too much power, offline discussion follows
  • SA2 mirror recalib
    • roll of M1 and M2 was completely misaligned, recalibration successful
    • geometrical center of the kinematic system roughly identified
      • required for Euler MDL,

LAS:

  • nothing to report

UNSYS: 

  • nothing to report

SPB/SFX:

  • nothing to report

FXE:

  • not present

MID:

  • pump probe looks stable and getting ready for the user
    • BAM doocsbridge stopped --> manual restart necessary

HED:

  • nothing to report

SCS:

  • nothing to report
    •  

SQS:

  • nothing to report

DRC

  • one hour data lost in influxDB in SA2

PRC

  •  

 

Entry   Notes XO integration meeting 11.04.2022, posted by Andreas Galler on 11 Apr 2022, 09:10 

General Announcement:

  •  

CTRL:

  • small intervention --> udpate of karabo-gui client exflagteway

DA:

  • maxwell gpfs software maintenance --> offline calibration pipeline affected see ITDM

EEE:

  • OCD call on rack 2.01 which was powered down. After fuse repaired

VAC:

  • see above ...

XPD:

  • Rack 2.01 --> Camera of SR imagare is not working
    • situation not clear, being investigated --> IP conflict?
    • Janusz suggests to powercycle the camera

DET:

  • many to report

ITDM:

  • 10:00 maxfell gpfs update

XRO:

  • SA2 mirror calibration

LAS:

  • remainder change of set point for SCS to 112 kHz

UNSYS: 

  • nothing to report

SPB/SFX:

  • nothing to report

FXE:

  • preparing for user experiments
    • concerned about optical sync of PP Laser, probelm of last week was fixed but no reason found
    • test last thursday optical sync lost again while moving optical delay stage
    • FXE

MID:

  • alignment of optical laser alignment in joined hutch.
    • please

HED:

  • nothing to report

SCS:

  • nothing to report
    •  

SQS:

  • last week Thursday night
    • mono drift investigated --> preliminary analyisis points to the grating as the drifting component

Entry   Notes XO integration meeting 06.04.2022, posted by Andreas Galler on 06 Apr 2022, 09:15 

General Announcement:

  •  

CTRL:

  • influxDB outage (telegraf issue)
    • SA1 and SA3 affected
    • currently fixed but linked to a device in SQS

DA:

  • nothing major

EEE:

  • PLC colleagues are working on CR and support requests
  • pulling cables for SQS and SCS
  • reported to XO uTCA in XTD1
    • remote reboot planned for Friday, reserve ZZ slot for Friday

VAC:

  • repair of XTD2 solid attenuator ongoing

XPD:

  • FD @ SA2

DET:

  • nothing to report

ITDM:

  • nothing to report
  • next Monday GPFS update will take place

XRO:

  • mirror calibration started in SA2
    • beam path through offset mirros not visible -> no beam on M3 pop in, but visible on M2 pop in MCP in beam?
    • JG: no MCP in beam, how about PBLM?
    • LS: no PBLM in beam
    •  

LAS:

  • Sync issue from Monday cannot be replicated by Sebastian -->
  • tests for SPB happening tomorrow

UNSYS: 

  • circular polratizaton lasing achievd in APPLE-X in left and right hand polarization, also linear horizontal and vertical and 45° measured at 900 and 700 eV
    • thanks to UNSYS and DESY APPLE-X comm team.

SPB/SFX:

  • no major

FXE:

  • nothing to add

MID:

  • all fine

HED:

  • nothing to report

SCS:

  • reservation of nodes for jupyter hub.
    • requested during drc hour fix to reserve 3 nodes
      • didn't work out
    • is it possible to reserve 3 nodes by default?
  • Olivier reports there was a misunderstanding and it got fixed very quickly
  • Janusz reports that by standard 4 nodes are reserved for each experiment.

SQS:

  • nothing to report

 

Entry   Notes XO integration meeting 04.04.2022, posted by Andreas Galler on 04 Apr 2022, 09:26 

General Announcement:

  •  

CTRL:

  • PP LAS restarting device servers for upgrading the device tag --> autoinstantiate some servers all topics

DA:

  • Planned maintenance today for Cal and gpfs delayed at least until next Monday

EEE:

  • nothing major to report

VAC:

  • 1 ZZ ongoing to XTD4 to shiled an ion pump controller, suspicion of radiation damage.
    • AK Dump XTD10? --> yes

XPD:

  • similar Diamond cracks as in solid attenuator had been observed in the transmissive imagers
  • Last weeek FEL imager issue had been clarified (image was rotated by 180 °, occured due to faultly config load)

DET:

  • AGIPD1M (SPB/SFX), Friday morning some DAQ issues induced train losses. Didn't happen again after careful checking

ITDM:

  • Issue at HED with data migration --> discussion will take place

XRO:

  • Tomorrow and after tomorrow late shift some CTRL support might be required

LAS:

  • PLL LAS SA1 sync issues (LbSYNC informed and arriving 10:00)
  • PPL LAS3 NOPA setup

UNSYS: 

  • ZZ ongoing

SPB/SFX:

  • Experiment went well, no major issue
  • Run Controller crashd a few times over the weekend. Could be restarted but crashes some time later and has to be restarted

FXE:

  • affecetd by LAS Sync issue
  • issue with doocs panel for shutters (yifeng)

MID:

  • all fine
  • SSRY motor issue (ELMO)
    • Nerea updated the ticket --> motor is working

HED:

  • DA1 got stuck for a while (fixed by restarting)
  • lot of short runs (1min) and only one train isneed from that -> requires fast data migration and analysis -> doesn't always work
    • discussion with ITDM commencing
  • PAM was missing from DAQ

SCS:

  • no major issues
  • RIXS on liquids went well

SQS:

  • mono shift becuase

DOC /DRC

issues with call forwarding

Entry   Notes XO Integration Meeting 30.03.2022, posted by Frederik Wolff-Fabris on 30 Mar 2022, 09:51 
General Announcement:
- A. Galler mentions that new Corona rules are in place. Please read the e-mail from Nicole E. from last Friday. In case of questions don’t hesitate in contacting SRP and/or taskforce.

CTRL:
- LPD motor issue under investigation. Report to follow later.

DA:
- Nothing to report.

EEE:
- Update on HED OPT uTCA crate: one last action was done and hopes to get it solved. Under monitoring to see if another intervention is still needed.

VAC:
- Nothing to report.

XPD:
- Issue after Karabo update: SA1 FEL Imager is not available for some time. Solved by CTRL/A. Parenti. For the BKR it took a little bit longer to get it ready. It may happen again.

DET:
- Nothing to report.

ITDM: 
- Question if it is possible for next week to update the GPFS client to fix the recent bugs with permissions (Maxwell cluster calibration pipeline - solved at the time with a hot fix). 
The complete version is ready to be deployed. One needs to update and restart service (matter of 1-2 hours) and the current proposal is to make it on Monday. An e-mail will be sent to XO-info.

XRO:
- Middle layer device of SRA in SA2 had the offset parameters placed to zero and as consequence it showed unreal numbers. M. Vannoni placed back old parameters and right now it shows the correct numbers.
It was positioned in the correct place but numbers were wrong. Wajid E. says parameters can be retrieved or please write a ticket to CTRL if it happens again.
- As PRC, machine had isolated problems yesterday night and this morning.

LAS:
- Synchronization for the PP-lasers went down. LbSync is informed.
- PP-laser in SA3 went fully down and SA2 is showing instabilities. LAS is working on them.

UNSYS:
- ZZ is planned for next Monday.

SPB:
- Problem with XTD2 XGM not solved and SPB/SFX is losing data. This seems to be a Doocs issue and needs to be addressed.
- Fast ADC issues under discussion with EEE.
- Machine performance is fine.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- The turbo pumps problems were solved; Not clear if current activity is affected due to the issues with PP-laser. It will be asked to the instrument people.

SQS:
- Experiments from last week went well accordingly to the internal group meeting.
Entry   Notes XO Integration Meeting 28.03.2022, posted by Frederik Wolff-Fabris on 28 Mar 2022, 10:09 
General Announcement and A.O.B.:
- BTM @ FXE was triggered on Saturday afternoon and only PRC was available to come onsite and fix the issue. Different procedures will be proposed to be put in place.
- SRI conference starts this week.

CTRL:
- Issue with data loggers last week: narrowed down to an issue with expected update of Telegraph. This time it caused a trigger in the broker pileup. Solved with help from ITDM.
- Upgrade in tunnels today (already agreed; see last meeting minutes).
- Issue with MID/SPB AGIPD middle layer: requires an upgrade of framework. Currently there is no agreed time with instruments but proposal is to make it on a Monday.

DA:
- Nothing to report.

EEE:
- Busy with FXE pump commissioning.

VAC:
- Nothing to report.
- Martin Dommach, as PRC, reports that energy change in SA1 was not permitted during the weekend (costing many lost shifts in SPB) due to crosstalk with SA3; 
on Saturday an event with BTM monitor in XTD9/FXE shutter happened and brought down machine. SA2 and SA3 was restored after 1 hour and SA1 after 3,5 hours.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Problem with shutter in SQS instrument laser hutch during the weekend: it could continue apart of the error state. Under investigation.

UNSYS:
- Next Monday a ZZ is requested to 1. get phase shifter SA3/cell26 working; 2. Investigate cell 25/SA3 Quad mover (horizontal movement in wrong direction).

SPB:
- Lost shifts due to crosstalk (2 night-shifts on weekend). Apart of that other shifts went well.

FXE:
- Incident on Thursday (LPD motor not working): after restarting it lost motor positions. Stefen H. says that A. Silenzi is preparing a report and updates will follow.

MID:
- Quite good week with small hiccups in data acquisition.

HED:
- HED asks when EEE plans to update uTCA; EEE advices to please contact Bruno F.

SCS:
- Issue with replaced turbo pump: new one enters in error mode after going to 400Hz. SCS is in contact with VAC; to be fixed today.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 23.03.2022, posted by Frederik Wolff-Fabris on 23 Mar 2022, 10:04 
General Announcement and A.O.B.:
- Sandra Plett announces that a fire drill will take place next Saturday 26.03 involving many areas at Schenefeld. It starts at 10:00AM and around 6 persons will conduct the drill. 
Please understand that this is only a training. An e-mail will be sent later.
- Theo M. says there is bridge problems in XTD2 XGM into the Doocs and Karabo side. Some trains are still missing. Other XGMs are fine. Stefen H. fears the solution lies more in the DOOCS side.

CTRL:
- The process to deploy Karabo 2.13.3 to mitigate the pipeline connection system is ongoing. Instruments will be managed in individual scheduling. Tunnels areas is proposed to proceed next Monday 28.03. 
An e-mail will be sent.

DA:
- Nothing to report.

EEE:
- Fast electronics has a small intervention at HED to change a crate issue. HED is informed.

VAC:
- Nothing to report. 
- A. Silenzi says he was informed by Martin D. that SA2 topics in e.g. InfluxDB or Graphana had an outage yesterday afternoon. Right now it is back to work but missed some data yesterday. 

XPD:
- XGMD in FXE: the ADC was replaced and is again online.

DET:
- Nothing to report.

ITDM: 
- Influx DB was down yesterday.
- Power glitch on Monday evening: cooling for 604 room at the XHQ ground floor was lost. A. Galler says XO will set a meeting with ITDM and TS to set an alarm when cooling fails.

XRO:
- Nothing to report.

LAS:
- Sandhya Venkatesan will join the XO. Int. meeting also.
- AMPHOS in SA1 and SA2 went down due to the lack of cooling water as consequence of Monday's power outage.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- XGMD is running again.
- Dmitry K. thanks Mattias Schoz for fixing an issue with beam. This is fixed. Operators loaded wrong file this morning and re-alignment had to be done.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Continuing with the clean of the chemistry chamber after an accident.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 21.03.2022, posted by Frederik Wolff-Fabris on 21 Mar 2022, 10:02 
General Announcement:
- A. Silenzi will be the DRC this week and reminds FXE, SQS and MID to be present at the jour-fixe meeting today at 13:00.

CTRL:
- Ongoing upgrade of Karabo framework on selected services to address issues with connection output signals: CTRL would like to do SA3 tunnel and SQS today (SCS already done); others next Monday. 
- Alberto deFanis says that colleagues from SQS prefer to do in a week without users. Steffen H. says that this is fine to do later. The tunnel devices have to be coordinated with SCS also. 
SQS will coordinate to a proposed date and inform CTRL.

DA:
- Nothing to report.

EEE:
- Continuing with support tasks in between user experiments.

VAC:
- Issue with ion pump in rack 3.1 taking down SA1 and SA3 beam: ZZ by VAC/OCD and PRC to exchange controller yesterday. Another ZZ will take place this morning. 
Downtime for the entire North Branch could be minimized (if V0 is closed, then at least SA1 could be running. Martin D. will look into optimizing the procedure).

XPD:
- Naresh K. as PRC says on the pump failure on Sunday. Downtime was longer for SA1 as machine could not decouple both SA1 and SA3.
- Naresh K. says the access the access ZZ is not so quick as it was done in dump area and machine has to ground magnets and power up again after the ZZ, making it take longer time (not only ZZ time).
- SCS turbo pump fail and the experiment stopped on Sunday around 15:30.

DET:
- Nothing to report.

ITDM: 
- Following last Tuesday with InfluxDB break: since Tuesday things are going smoothly and looks optimistic after applying the fix. Nevertheless, more monitoring time is needed to certify it.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Nothing major to report apart of the downtime yesterday.
- Some beam drift as usual was seen but not out of ordinary.

FXE:
- Problem with XGMD happened again and Theo M. is looking for spare parts.

MID:
- All fine at MID.

HED:
- Finished first of many experiments using RELAX laser. A minor problem is addressed by a ticket.

SCS:
- Turbo pump failure: have to be investigated and repaired again the whole vacuum until next week. Sunday at 15:00 it failed.
- SCS cameras and uTCA update is already done (see CTRL entry).
- XGM / HV inhibit problem is recurring once every week. SCS would like to be trained in how to recover it.

SQS:
- Nothing to add.
Entry   Notes XO Int. Meeting 16.03.2022, posted by Frederik Wolff-Fabris on 16 Mar 2022, 10:39 
General Announcement:
- The Summer maintenance planning period is approaching and next Wednesday at the end of the XO Int. Meeting a presentation of the changes/improvements will be made. 
Please communicate to the colleagues who are responsible for your group’s maintenance planning to join. This will be done after the regular round of discussions.

CTRL:
- Not present.

DA:
- Nothing to report.

EEE:
- Continuing with support tasks to the groups.

VAC:
- Not present.

XPD:
- XGMD was fixed (ADC broken down twice last week): Desy people is also investigating; root cause not yet found.
- FEL Imager (YAG screen) in SA3 is found to be damaged. It was moved to a different spot for the time being.
- Ventilation in all tunnels caused beam jitter for 30-40 minutes yesterday. 
It was caused by outside humidity (not common, 2-3 times per year) that filled up the filters and clogged it with water droplets leading to overrunning of the regulation schemes of pumps; then pressure 
changed in tunnels.

DET:
- Nothing to report.

ITDM: 
- InfluxDB: large issues yesterday (cluster crashed on MON evening); it took all day yesterday to brought up and data is now visible also at Karabo. 
- ITDM has a root cause now and DAQ matrix devices were switched OFF yesterday which provides a fix. Last crash there was a lot of data that had to be synchronized and lacked resources. 
- ITDM found a way to start without data from Monday evening to Tuesday 21:00. This data will be injected to InfluxDB / cluster in the coming days. In the meanwhile, one needs to use Graphana to look at 
this data, not Karabo. 
- Discussing future measures to trigger alarm to avoid the crash. 
- Please don't start DAQ without the GO from ITDM via e-mail.

XRO:
- FXE jitter last week: not yet clear if it was the clean tent or the cooling water for M1/M2 the real cause; hard to find as cooling water was refilled and the clean tent was switched ON accidently, both 
in parallel. 

LAS:
- Issues with Sync system in SA1 persists: spurious 10Hz signal. PP-laser still do not have optical signal. LAS has a rough idea of the cause and is in contact with instruments.

UNSYS:
- Phase shifter in cell11/SA3 the motor was replaced and more 10 motors were ordered as spare parts.
- Quad mover in SA1#cell 18 was fixed.
- Quad mover in cell25/SA3 (wrong movement direction) is still to be addressed. MXL will work together with UNSYS.
- Tables for Phase shifters of Apple-X still to be uploaded.
- One new PS on the Apple-X is not working; Frank Brinker is informed and a ZZ is needed before the next blue week.

SPB:
- Influx issue but could use Graphana.
- Pulse energy is low this week: 2mJ while last week was 3.5mJ;
- Crosstalk with SA2: SA1 energy gets worse when changes happen in SA2 but recovers shortly after.
- SPB did not see any vibration on Tuesday 15.03. Also last week beam was stable.

FXE:
- Nothing to add.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- This morning a filter of RIXS spectrometer broken and has to be exchanged (filter gauge valve). VAC group is helping with the exchange.

SQS:
- Nothing to report.
Entry   Notes XO Int. Meeting 14.03.2022, posted by Frederik Wolff-Fabris on 14 Mar 2022, 10:41 
General Announcement:
- On the Summer-22 maintenance period: In about 2 weeks (by end of March) the call for the summer/22 maintenance period will be send to the groups.

CTRL:
- Deployment of new framework in order to fix an issue (this week): instruments shall agree with CTRL contacts on a suitable time. It affects cameras and/or similar devices that are installed.

DA:
- Report on last week issue with processing on Maxwell including offline calibration: people were not able to open files that were there; small selected notes were not present and were corrected on Friday.
 Since then it seems no issues recurred.

EEE:
- Starting equipment installation of SXP racks in rack rooms.
- PLC side calls from SQS on weekend: issues with motors to be followed up; train-IDs not getting proper.

VAC:
- Not present.

XPD:
- XGMD in FXE hutch under investigation: new issue happened at the end of the week and may be again related to last Monday's one. People are working on it (XPD, FXE and Desy).

DET:
- One comment to DA: Jolanta S-D was on DOC and issue with offline for ePIX detector still occurring after Friday. Phillip S. says it was a different problem and it is fixed.

ITDM: 
- Issue (2x) with Influx): still not understood; Data was not lost on last occurrence. Hick-ups and recovered. So far under investigation.

XRO:
- Jitter at SA1 in FXE last week: mostly likely the cooling in M1 and M2 or clean tent.
- No big issues after that.

LAS:
- Degradation in SA1 PP-laser with trigger software; maybe there is damage to optics. Being investigated today and can't guarantee when it will be working again.
- SA3 change of setpoint for SQS taking one-two days. Not sure if ready today.
- SA2 is running well.

UNSYS:
- Phase shifter cell11/S3: a ZZ is ongoing also fix with remotely procedure.
- Issue with quad mover cell18/SA1 is fixed remotely.
- Issue with Quad cell25/SA3: the ZZ is needed.

SPB:
- Issue with Agipd detector: fixed (one module not sending data). 
- Agipd online preview devices: fixed;
- Laser timing issue: data was not collected.

FXE:
- Jitter problem already mentioned.
- XGMD issue under investigation.
- Laser problem: stop measuring on Saturday. Not sure if data was taken during the weekend.

MID:
- Difficult week.
- Broker pileup problem on Monday and Friday: Gabriele says it may be related to a memory leak - under investigation. 
On Friday there were there sources identified to help getting rid of problems (Jolanta S.D); also GUI was a second source. Not fully understood the main source of Friday. It came back stable.
- Seeding beam had to be tuned on weekend as energy decreased by factor 5 when comparing to the best lasing at the week start. No scientific output could be achieved but feasibility with setup was 
demonstrated.

HED:
- Wednesday optics hutch ADC was not working. Now it works fine.
- Full power with RELAX was tested and is being analyzed. Bassler cameras acquiring wrong train IDs. It shall be fixed.

SCS:
- Not present.

SQS:
- Successful week;
- Problem with motor being fixed by SQS, ME, EEE.
- Tool for online analysis was slow
- Heat load in the soft monochromator was seen and it has to be fixed in long term.
Entry   Notes XO Integration Meeting 09.03.2022, posted by Frederik Wolff-Fabris on 09 Mar 2022, 10:15 
General Announcement:
-	 

CTRL:
- Nothing major to report.

DA:
- Nothing to report.

EEE:
- Supporting instruments.
- Replacement uTCA in HED optics crate on Monday was done; being monitored during next two weeks.

VAC:
- Issue with SA3 broken ion pump controller in SA3; ZZ was done to replace controller.
- Issues when entering tunnel: XD2/4 PC turnstile crashed and D3had to reset software. Caused 30-min delay in entering tunnel.

XPD:
- Issue with FXE for XGM in their hutch: electronics did not work but was taking care by Theo / Fini. FXE has to confirm if this is fine now.

DET:
- Nothing to report.

ITDM: 
- Intervention on Monday accordingly to the plan with reboot of 2 servers at SA1/FXE. Maybe another server to change in later date.
- Influx database issue on Monday: all data until 22:30 in the evening are not reliable (SA1 and SA3). Mid-term plan with CTRL to split SA1/SA3. Under investigation to find the cause.

XRO:
- FXE stability issue: last night beam was stable after the ZZ was done to switch off cooling systems of mirrors and clean tent.

LAS:
- 3 PP-lasers in operations: working
- Max L. asks for news on the winter maintenance 8D report. 
- LAS send a ticket with TS concerning connection of front end UPS. Needs follow up.
- Announcement by TS on Saturday 25th June: concerning to LAS - what are the consequences? Max L. needs feedback to plan next summer maintenance period. 
Tobias Clever says it is connected to construction of office building; needing new transformators and concerns power supply and not 35degrees water. XO will help with feedback.

UNSYS:
- SA1 PSs problems seemed to be solved at Desy side (new gap program done by Lars).
- Error signal from ambient field coils in cell14/SA1: Fixed by Suren A.
- In SA3 a problem with stuck quad mover: fixed by Suren A. with workaround;
- Cell 11 / SA3 phase shifter motor: could be another damaged device. It needs ZZ access.

SPB:
- Nothing to report.

FXE:
- Feedback on the XGM will be discussed internally.
- Beam jitter observed yesterday; thanks to all efforts.
- Energy change this morning took longtime.

MID:
- Monday afternoon: Karabo issue with control room due to broker pile-up; all fine now.
- No issues with HXRSS; used beam yesterday.

HED:
- Continuing prep for next week; also investigation on shielding.

SCS:
- Preparation for Liquid jet.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 07.03.2022 , posted by Frederik Wolff-Fabris on 07 Mar 2022, 10:39 
General Announcement:
- Accelerator is now running at 11.5GeV for the next 4 delivery weeks. The SA1 and SA3 systems show already good photon intensities and at SA2 the Self-seeding setup is taking place today.

CTRL:
- ITDM would like to reboot control machines in SA1 and FXE. It will proceed around lunch time.

DA:
- Update of offline calibration: it went fine, successful.

EEE:
- Replacement uTCA of HED optics today.
- Past week cables installation went fine.
- Motors in SA3 SQS laser setup and motor to be updated.

VAC:
- ZZ on solid attenuator XTD2: adjusted solid attenuator in-position (driving 2mm less in) to get a fresh spot on Si foil.
- ZZ on XTD9 ion vacuum pump: shows noble gas instability; adjusted set point; hope to survive until shutdown.

XPD:
- Setting up HIREX for HXRSS.

DET:
- Nothing major to report.

ITDM: 
- Two servers to be updated (see CTRL report)

XRO:
- Nothing to report.

LAS:
- All fine with PP-laser.

UNSYS:
- Yesterday problem with cell 28/SA2: motor of undulator was stuck; after power cycle it worked.
- Issues with phase shifter in SA1: cell 26-31 is under investigation.
- Replacement of two phase shifter motors in SA3; possibly due to radiation damage.

SPB:
- Nothing to report.

FXE:
- Problem with LPD DAQ; ITDM solved last weekend.

MID:
- All fine.

HED:
- Exchange crate by EEE; busy preparing experiment.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 02.03.2022, posted by Frederik Wolff-Fabris on 02 Mar 2022, 10:12 
General Announcement:
- There is a high probability that we will run out of Helium gas due to difficulties with stock. If an instrument needs He on next weeks please get in touch with TS to verify its availability.

CTRL:
- Last Monday intervention on the SA3 GATT middle layer servers was successful.

DA:
- Today a major upgrade of offline calibration is scheduled during which services won't be available.

EEE:
- Supporting different tasks at SQS (recommissioning motors), HED (motor encoders), SCS and FXE.

VAC:
- Ion pump in XTD9 shows a potential risk of tripping interlock: a ZZ on Friday 14:00 will take place to change parameters.
- Another ZZ in XTD2 to attempt to fix the solid attenuator in SA1 (hole in the arms reported by SPB / 0.5mm Si damaged); try to change the blocking mechanism.
- Dmitry K. asks on the Si intervention in XTD2: Martin D. says a change of Si is a major intervention as it involves need of clean tent etc… and will not be done this Friday. 
The idea is to use a fresh spot on the attenuator. Conditions for interlocks have to be later checked with Liuba S.

XPD:
- ZZ on Monday to remove Shimadzu camera was successful.

DET:
- Nothing to report.

ITDM: 
- Problem with Influx cluster which did not accepted data for 3 hours: search for fixes last days and today a new configuration will be applied, followed by restart afterwards (minutes downtime). No effect 
in tunnels DAQ.

XRO:
- Commissioning beamtime for SA2 mirrors: available beamtime was short. The coating stripes were found in beamlines in respect to motor positions. More beamtime is needed to continue commissioning of M1, 
M2 and M3 in XTD6.

LAS:
- Nothing to report.

UNSYS:
- Apple-X commissioning ongoing: working on Control systems commissioning. Last cell was controlled; more tests ongoing today. The phase shifter tables are not yet ready.

SPB:
- Working with different groups during the week.

FXE:
- D3 was present on Monday to test the BTM; it was successful.

MID:
- Radiation alarm triggered due to a false alarm at MID hutch. Thomas P. from HED helped by calling RPOs; W. Clement, Eric B. and M. Prollius helped to solve it.

HED:
- Preparing for the high intensity laser and also working on motors.

SCS:
- Not present.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 28.02.2022, posted by Frederik Wolff-Fabris on 28 Feb 2022, 10:35 
General Announcement:
- This week a facility development week takes place without user operation. XO thanks the groups for posting at the Operations-2022 e-log.

CTRL:
- Update on the SA3 GATT loop (middle layers devices) to be done following to find a good time slot.

DA:
- Today from 10:00-12:00 the calibration system will be down due to an update.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report concerning XPD; SCS made an enter that XGM went OFF for a day.
- Regarding PRC, the machine was running well most of the time; problem with XTD2 Air conditioning due to a fire safety flap malfunctioning happened (downtime of several hours in SA1); 
on Sunday magnet power supplies at the accelerator had a problem and took few hours to restore beam delivery as it required tunnel access.
- The two-color was not created in the right order but it was corrected afterwards. The bandwidths were adjusted a few times and HED said it went well, including their spectrometer. 
- XO proposes that the info on the two-color (order) can be entered in the comment section of the delivery table. 

DET:
- Issue with AGIPD at SPB did not happened again and currently there is no plan for any intervention.

ITDM: 
- Janusz S. says the hardware monitoring needs to be rebooted for several servers (PC layers at SCS, MID) and a short downtime will happen. Proposition is to make today if no complains appear.
- Two control servers also need maintenance and proposal is to make next week.

XRO:
- Busy with activities in this blue week (e.g. Mirror calibrations); it may require CTRL support.

LAS:
- For next week a stage in SA1 will be replaced.
- A change of operation point in SA1/SPB and S3/SQS will happen this week. SCS also need a change working point to 1.1MHz.

UNSYS:
- Tests with the Apple-X to take place this week; preparation for commissioning and lasing attempt.

SPB:
- User time largely went OK; small troubles with DAQ and detector.

FXE:
- D3 is testing components in FXE hutch today. 
- CTRL, ITDM and FXE will discuss on the previously mentioned updates.

MID:
- All fine at MID.

HED:
- A ticket send to EEE is being under work.

SCS:
- XGM high voltages went down to zero and was restarted by powering on again. Cause it is not clear and will be followed up by XPD and SCS members.

SQS:
- Continuing work of moving chamber to prepare for next week beamtime. Some PLCs for the chamber have to be reset motors and other things. EEE is helping with it.
Entry   Notes XO Integration Meeting 23.02.2022, posted by Frederik Wolff-Fabris on 23 Feb 2022, 10:30 
General Announcement:
-  A. Galler reminds instruments and support groups to feel welcome in making regular entries on the Operations-2022 e-log.

CTRL:
- FastX of GATT middle layer devices was updated last Monday; the slowness issue is improved and fixed.
- Analyzing to upgrade the broker pile-up issue at Karabo: probably to be fixed by next Monday.
- On the BAM monitor: few properties were changed in the DOOCS side. Changes are transparent to DAQ and all the data must be able to be stored. 
Problem appears when data shall be analyzed and then must be looked to the new DAQ. In case of issues please get in touch with CTRL.

DA:
- Maxwell GPFS access rights bug: patch was deployed on Monday and went successfully.
- Next week there will be an update of calibration (further announcement to be done).

EEE:
- Started installing Coax cables for SXP.
- LBM in MID: EEE contacted Beckhoff and will try to get a fix done still this week.

VAC:
- Nothing to report.

XPD:
- Issues with Desy mobile phones: not all phones were equally affected. Issue seems to be fixed this morning.
- In SA2 the SRA slits were too wide open (probably from tuning times). They were closed yesterday night after users finished work.
- Beam delivery to instruments is running fine and smooth.

DET:
- AGIPD detector at SPB: issue with one of 16 modules not sending data since yesterday. Investigation ongoing with DOC and experts. 
Jolanta S.-D. says that this is a new issue which happened twice yesterday and Desy is contacted. An intervention for the hardware during the blue week shall take place. It may be related to electronics 
outside detector.

ITDM: 
- Issue with "phantom" data appearing at DAQ in SA3 instrument: investigation shows it can't be reproduced; maybe it relates to data arriving earlier. It was only visible at DOOCS devices (Undulators 
device). Under further investigation by ITDM.

XRO:
- CRLs in SA2 fixed by ZZ.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Nothing apart of the detector report.

FXE:
- Thanks to CTRL for addressing BAM issue.

MID:
- Thanks for solving CRL2 issue on Monday.

HED:
- Two-color mode working with nice energies. Investigation source shape from undulators with lenses.

SCS:
- Nothing to report.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 21.02.2022, posted by Frederik Wolff-Fabris on 21 Feb 2022, 11:57 
General Announcement:
- Philipp S. says a downtime for the calibration / GPFS update is to be done today at 12:00.
- Raul V. says that the biggest issue of last PRC week was related to the FXE beam pointing. In general, was a quiet and productive week. Please, instrument shall remind to make entries in the operation e-
log.

CTRL:
- In SA3 GATT activity will be performed today (fix to slowness) as beam is down and there is no activity.

DA:
- Announcement will come today: restart GPFS issue / Maxwell to be restarted.

EEE:
- One OCD on Saturday: issue with SDL motors in MID; to be followed up today.

VAC:
- Nothing else apart of the Gatt fix.

XPD:
- Shimadzu camera is installed in XTD6. A test has to be done and organized with instruments. 

DET:
- Nothing to report.

ITDM: 
- Fix to be deployed today: plan is to deploy Maxwell cluster done in the background; it shall not disturb any user of the system. All other storages with login to be done in March and still to be 
confirmed.
- Slow data investigated: get wrong values with time stamp that could be corrected. Further investigation will take place this week.

XRO:
- FXE stability pointing issues on Friday afternoon: Raul V. placed a report in Operation E-log.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Pointing issue from Friday;
- In DAQ the BAM device name has changed and could not be used. Please keep the compatibility for names; A. Silenzi will check with CTRL.

MID:
- Motor problems: in touch with CTRL.
- Today morning the CRL2 lenses were retracted but not giving the proper signal. It has been under investigation.
- Issue with DAQ: slow devices were saving empty data (no entries); at least happening with two devices. It has been reported and one is fixed and the second is under investigation.

HED:
- Initial setup this afternoon for the two-color operation.

SCS:
- Not present.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 16.02.2022, posted by Frederik Wolff-Fabris on 16 Feb 2022, 10:42 
General Announcement:
- XO launched a new XO Alfresco presence. Please check there for information related to operations and do not hesitate in giving suggestions or raising questions. 
Adam R. asks for the schedule for the PRCs and DRCs. A. Galler says that the PRCs are included in the photon delivery tables. A discussion with Olivier M. on the DRC will take place. 
Naresh K. asks on the status display: it is current a screenshot for the moment the page is loaded. It is not yet a live display.
- A. Galler reminds instruments to make entries to the Operations-2022 E-log to help the PRCs to track down and spot problems.

CTRL:
- Intervention on Monday GATT update: action to be done again next Monday to increase performance.

DA:
- Nothing to report.

EEE:
- Intervention on HED to replace a fast ADC card that lost communication to CPU. Replacement to take place today.

VAC:
- Nothing to report.

XPD:
- A. Koch reports that yesterday the Karabo fast-X was slow.

DET:
- Nothing to report. 
- Olivier M. also observed slow fast-X connection to gateway.

ITDM: 
- Janusz S. says the fast-X issues can be related to an overload yesterday.
- Login to Influx had intermittent connection for a half day yesterday n the afternoon. Investigation being taking place of it relates to fastX.

XRO:
- Nothing to report.

LAS:
- Issues with SA1 PP-laser: overshooting in the CM station. Maintenance this morning is taking place. Current timing is not as good as it could be.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report apart of the ADC issue.

SCS:
- All fine at SCS.

SQS:
- SQS shutter issue from yesterday 15.02: problem was solved and it was due to a card misbehaving. 
Zunaira A. says that the problem was with the Lasermet interlocks. Work done in the maintenance affected signals going to radiation protection interlocks. The particular signal was missing and after a fix 
it worked again.
Entry   Notes XO Integration Meeting 14.02.2022, posted by Frederik Wolff-Fabris on 14 Feb 2022, 10:02 
General Announcement:
- Thanks to instruments that posted at the Operations-2022 e-log. Please make regular entries that allow PRCs to recognize eventual issues that have to be tracked down.

CTRL:
- Nothing to report.

DA:
- Friday there was issues with Data Aggregators processing in several detectors. DOC found it was an issue with the new version. It was fixed by Saturday by working with a separate routing. 
This was a bug in the new version (time of template creation). A final fix will be installed in a suitable date. 

EEE:
- Nothing to report.

VAC:
- Intervention to solve issue GATT issues is postponed by CTRL (patch work is almost ready). To be discussed between Raul V., CTRL once deployment can be done only on Mondays.

XPD:
- Issue noticed that XGM data were showing missing trains at the start of last week. Tickets were issues and it was cured by end of the week – it affected only one XGM. Reason for missing trains must be 
asked to Theo M.
- SA1 pulse energy was around 4.5mJ; a really good performance.
- Preparing calorimeter in SA1 hutch for experiment.

DET:
- Two OCD calls (one from HED) and one from SPB on a detector. Both fixed by DOC / OCDs.

ITDM: 
- Incident on Saturday with influx DB cluster: happened by 3:00AM; started investigating during the morning. By 14:00-15:00 the cluster came back. Data synchronization is ongoing. Not sure yet if there is 
lost data, under investigation.

XRO:
- Main BKR scene will contain a button to Graphana page.

LAS:
- Working with CTRL on Nagios issues.

UNSYS:
- Nothing to report.

SPB:
- Saturday problem with history of motor position at Karabo: solved by DOC.
- Broken cable for encoder of focusing mirror still has to be fixed (MKB focusing mirror in hutch).

FXE:
- Preparing for the week.

MID:
- All fine at MID.

HED:
- Week went good: successful user experiment.
- Beam was drifting quickly between left/right. Not sure if this is related to the new HED feedback loops. Under investigation.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 09.02.2022, posted by Frederik Wolff-Fabris on 09 Feb 2022, 10:09 
General Announcement:

CTRL:
- GATT broker pile up: there is a fix available but not foreseen to be updated now. The middle layer will be fixed in cw09 (blue week). This will be coordinated with XO. 
- Raul V. completes that 1. slowness of the GATT from last week can be fixed next Monday (which triggers a pile up); 2. More invasive changes mentioned by Wajid E. to be done in a later point. 
- Wajid E. adds that if problems appear again (unresponsive middle layer), please call DOC.

DA:
- Nothing to report.

EEE:
- Finishing smaller tasks.
- Fast ADC issue is taken over by the fast electronics team. The cooling issue may be related to connection problems with the board. EEE monitors if last Monday fix was enough. 

VAC:
- Nothing else apart of the GATT discussion.

XPD:
- XGM issue in XTD2: someone changes the settings leading to an overload in the XGM. A. Galler says that BKR operators did not touch it and one still looks to find who triggered the changes.
- Calorimeter and laser polarimeter to be installed at FXE on next days.
- A. Koch says there was an update of the DAQ in tunnels; that was tested on Monday afternoon and if problems are found, please contact A. Koch.

DET:
- Nothing to report.

ITDM: 
- Nothing to report apart from ground floor room 604 work. 

XRO:
- XRO contact control integrations to work on motor layer devices for March.

LAS:
- Nagios Karabo system still do not work.

UNSYS:
- Nothing apart of the smaller gap limitation in SA2 system for the 2-color test last Monday.

SPB:
- Nothing to report.

FXE:
- Hiccup with train-IDs not being synchronized: a ticket was sent to CTRL.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Issues with middle layer devices that had to be restarted: Laurent M. will check on the status with SCS colleagues.

SQS:
- Issue with XTD10 PES digitizer: there is an open ticket in progress.
- Trigger of hutch shutter last week: the loose maglock has been addressed.
Entry   Notes XO Integration Meeting 07.02.2022, posted by Frederik Wolff-Fabris on 07 Feb 2022, 10:56 
General Announcement:
-  Power glitch on Sunday morning at around 04:00AM seems to have no effect at machine or Schenefeld site.

CTRL:
- During winter shutdown the bunch arrival monitor was updated. An e-mail will be sent reflecting the changes.
DA:
- Single OCD call was solved: configuration of train match bridge to eXtra foam.

EEE:
- Two tickets from MID shall be followed this week.
- Tickets from DOC on SQS (solved) and PES (to be fixed by DA).

VAC:
- All fine with VAC.

XPD:
- All fine with Diagnostics.

DET:
- Nothing to report.

ITDM: 
- Wednesday there will be shutdown of rack room in ground floor (604): details were sent by e-mail and there were no concerns/feedback from potentially affected people.

XRO:
- Nothing to report.

LAS:
- All 3 PP-lasers are stable and will be available by the end of the day.

UNSYS:
- Issue FRI/SAT: bad communication between balcony and SASE1 cells. It is solved but being further investigated.
- This morning there was a BKR request to go lower undulator gaps in SA2: gap can go as lower to 10.61mm.

SPB:
- Commissioning of AGIPD done; successful week.

FXE:
- Preparing the beamline; ready for beamtime.

MID:
- Issue with RF window: it was too short when they received the beam. Solved by PRC and instruments for fast solution.
- EEE had to solve an issue.
- Cameras in the tunnel monochromator may need a ZZ. This afternoon VAC will join for a ZZ and fix it.
- Week was successful.

HED:
- Quite successful beam usage last week.
- Issues with fast ADC devices not working until Wednesday. It worked for 24hs and then had to be restarted again and came out with wrong settings. 
This needs further investigation and is needed for users this week. CTRL will follow up.

SCS:
- Preparing with UAC from tomorrow.

SQS:
- Safety problem with magnet interlock in one door: a loose screw was fixed (for the time beam).
- Issue with digitizer: SQS will clarify with CTRL.
- Recheck calibration of monochromator (needs cameras looking to the motor): it seems that the camera has to be discussed with XRO. 
Martin D. says that currently Maurizio V. is in the tunnel and SQS shall contact for the possibility of a quick fix now.
- Zunaira A. says that if beam shutter closes without apparent reason: it can be related to emergency off, panic switch, air box or the maglock. It happens 3 times on the same day. If this happens again, 
it may trip the entire accelerator. 
People in safety group or laser interlock are responsible for fixing the maglocks. A. Galler asks Zunaira A. to send an e-mail to xo-info@xfel.eu. 
Alberto Defanis says that Eric B. has fixed. Zunaira comments that this fix was momentarily for the weekend. Further discussion will follow.
Entry   Notes XO Integration Meeting 02.02.2022, posted by Andreas Galler on 02 Feb 2022, 08:39 

General Announcement:

  •  

CTRL:

  • observation from DOC
    • macros some times after the upgrade to Python 3.8 --> please contact CTRL?

DA:

  • significant upgrade to Offline Analysis -->
    • proc data won't inlcude a copy of raw data any longer

EEE:

  • fast electronics

VAC:

  • no issues

XPD:

  • no incidents
    • 2 tunnel accesses on Monday --> succesful

DET:

  • DET commissioning at SPB (AGIPD JUNGFRAU 1M), MID (AGIPD), HED (ePIX, JUNGFRAU)

ITDM:

  • E0.604 rack room, Wed next week
    • fixing power distribution units in every rack --> TS and external company will need a full day
    • affected services are: Lab DAQ, LAB control servers (EEE; CTRL, DET), GitLab runners, one machine for data analysis, PLC database, karabo project database (?)
  • Yesterday short interruption with influx reading note --> test requested for next Monday causing a 1 hour interruption

XRO:

  • SA1 / SA2 M3 PBLMs have been equipped with diamond plates and can be used for beam stability measurements
  • Backlash Controls implemented last week --> values
  • report of lost positions of vertical slit in SA3
    • in case of similar issues please contact DOC prior to self fixing.

LAS:

  • SA2 PPL is good
  • SA3 PPL planned to be up today
  • SA1 PPL being investigated as agreed with SA1 instruments

UNSYS: 

  • transparency test  for APPLE X went successful

SPB/SFX:

  • SPB/SFX aligned since yesterday, no issues

FXE:

  • blown fuses in crates --> solved with EEE

MID:

  • all fine

HED:

  • Com yesterday
    • outstanding issue: fastADC not working EEE aware of that

SCS:

  •  

SQS:

  • GATT always worked but very slowly responding
    • OCD contacted
    • Raul comments that this is a known issue and should be communicated to CTRL
    • SH nesures that Raul creates the ticket
  • XTD10_PES
    • digitizer display frozen almost all time (connected to 2 DAQs) --> reported to DOC
    • SH comments that when connecting to two DAQs (tunnel and SQS), should be connected to only one DAQ.

Entry   Notes XO Integration Meeting 31.01.2022, posted by Frederik Wolff-Fabris on 31 Jan 2022, 10:03 
General Announcement:
-  On this current run, beam delivery to instruments will start on Tuesday at 07:00AM.

CTRL:
- New version of DeviceClone and Doocsml device will be updated today which contains a bug fix;
- Minor update on Karabo framework version on the datalogger machines will be performed today
- CTRL will proceed with the update today at 13:00 if they didn't hear any objection till 12:00. Intervention will not take longer than half an hour. No need to check afterwards.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Notification on power interruptions on the weekend: it seems to have no impact but please check the systems.
- Zunaira A. says the AIBS looses connections to network during glitches and has to be restarted if not masked. She will take a look.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- No big issues during the weekend; smaller ones were solved.

LAS:
- SA2 PP-laser is ON;
- SA3 PP-laser will need tomorrow to fix final things.
- SA1 PP-laser: LAS has negotiated with instruments to further investigate more.

UNSYS:
- SA1 issue on Saturday: problem with CPU;
- Ongoing tests with Apple-X this morning.

SPB:
- Aligning instrument to take beam tomorrow.

FXE:
- Nothing to report.

MID:
- All fine at MID.
- MID did not look yet in the PP-laser but will do so tomorrow or Wednesday.

HED:
- Waiting for DAQ rollout. In contact already with DA.
- Zunaira A. reminds on the reply for scheduling the hutch search training. HED will inform after their afternoon group meeting.

SCS:
- Nothing to report. SCS will also make a schedule and will contact Zunaira A.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 26.01.2021, posted by Frederik Wolff-Fabris on 26 Jan 2022, 10:46 
General Announcement:
- The cold compressor failed this morning and beam operation is currently stopped. We expect the beam operation for the alignment of beam systems will resume tomorrow morning (Thursday).

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Closing last tasks for the maintenance.

VAC:
- All fine.

XPD:
- Issues with PES were solved by CTRL.
- Jan G. asks when beam would be aligned to M1 and M2 in SA1 and SA2? (see XRO report).

DET:
- Nothing to report.

ITDM: 
- Work ongoing with company regarding Monday's report on offline storage system.
- Jan asks for the DAQ Karabo test with XPD. Janusz S. suggested to contact Partha who is on charge for this.

XRO:
- Ahead of schedule with alignment until this morning: SA1 and SA2 beam established in all experiments. SA1 beam on mirror but it needs to finish Bender calibration (nice beam at the end of the SA1 
tunnel).
- Currently cryo is down and pushes back next days plans: Today planned schedule of tuning 17.2 keV in SA1 as well as Apple-X in SA3 is shifted to tomorrow. 
If beam comes tomorrow morning SA2 is available for alignment. By end of the week one starts with SA3.

LAS:
- SA2 almost ready: it shall be finished by end of the day.
- SA3 Amphos maintenance is finished: maybe ready end of the week or start next week.
- SA1 is making progress: 1.1MHz operation shall be OK but 280kHz can be have some difficulties.

UNSYS:
- Power failure in SA1 central control node prevented communication to undulators during the evening. It was solved after power cycle.

SPB:
- Busy with aligning beamline.

FXE:
- Same as SPB; nothing else to report.

MID:
- All fine.

HED:
- Not present.

SCS:
- All fine.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 24.01.2022, posted by Frederik Wolff-Fabris on 24 Jan 2022, 11:18 
General Announcement:
- Steffen H. states DOC starts in special operation mode 09:00-17:00 for the weekdays. Jour-fixe also starts today at 13:00. Instruments are welcome to join.
- Regarding DATA OCD numbers, DRC started last Saturday: it did not work in some cases: please do not call directly any other OCD number, just the DOC or DRC number;
- Over the weekend an issue the bunch number pattern happened. It is ongoing and has to be tested.

CTRL:
- Nothing to report.

DA:
- Tomorrow DA members are in satellite workshop of their group.

EEE:
- Two OCD calls for ELMO drivers which lost configurations: solved.

VAC:
- No issues. 

XPD:
- Commissioning work during the weekend on SA3 tunnel (mainly): bunch pattern could not be changed in any SASE.
- Tickets were sent and people responded promptly.
- One MPOD crate was in error in SA3: a power cycle in XTD10 was done (helped by XRO) yesterday night and fixed.
- Commissioning of Imagers, PES in SASE3; hard X-ray PES in SA1 (missing some DAQ) started; MCP-detector; and Shimadzu in SA2.

DET:
- Nothing to report.

ITDM: 
- Relating to last Wednesday maintenance: a re-cabling at Desy side occurs and after that it observed unstable behaviors on the network. 
Maybe today or tomorrow one needs to make some tests leading to a break of GPFS operation (short interruption of migrating data from online to offline).

XRO:
- SA3 proceeding well and for SQS several mirror positions are saved.
- On Sunday there was a problem preventing to complete the SCS (control issues of translation stages of pre-mirrors). It was solved but happened a couple of times. 
Please experiments in SASE3 be aware that current translation stages positions may differ by 1mm. 
- XRO implemented two-steps backlash corrections in SA3 (as done before in SA1): to solve the different positions after moving mirror. 
Maurizio V. informs that instruments shall not be surprised if the motor overshoot and then return to correct position.
- SA2 beam transport: SRA calibrated; beam arriving to HED Pop-in instrument; PBLM was commissioned.
- SA1: starts today. This week focus goes to SA1 and SA2 realignment after the SESP interlock tests.

LAS:
- SA2 PP-laser: issues with ADQ card and smarAct: with help from EEE and CTRL, is fine now.
- SA3 PP-laser: AMPHOS maintenance this week; it shall be ready for user run.
- SA1 PP-laser: updating this one; LAS is working hard.

UNSYS:
- Beam trough in SA3; Working to correct some kicks in Apple-X.
- BKR requested to give a feedback that system is giving signals to BKR. Working on it.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Not present.

HED:
- All fine.

SCS:
- Not present.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 19.01.2022, posted by Frederik Wolff-Fabris on 19 Jan 2022, 11:00 
General Announcement:
- Machine status: SA2 is currently lasing @ 9keV and 2.5mJ. North Branch was closed yesterday and after a quick ZZ in XTD10 this morning the BBA and tuning will resume today and tomorrow.
- X-ray delivery tables for cw05 have been sent to the instruments and we thank to all that have already sent us a feedback.
- DOC will start next Monday. From MON-FRI from 9Am to 5PM. For the next weekend the photon staff in shift work shall send a ticket or only in case of urgent/critical matters call the DRC phone. The PLCs 
are providing OCDs.

CTRL:
- Bassler cameras were migrated to Aravis library.

DA:
- Nothing to report.

EEE:
- ZZ is ongoing to check a faulty switch signal in XTD10.

VAC:
- Benoit R. is currently in the tunnel on the ZZ;
- VAC systems are all fine and ready to take beam.

XPD:
- Aravis library installed and tested; all went fine.
- XTD6 ongoing tasks are under progress and may be finished already at the end of the day. If progress is made accordingly to the plan, XTD6 can be closed tomorrow. 
The new M-port crate was connected yesterday (upgrade of MCP). Almost all is finished; Wolfgang F. finishes small things.

DET:
- Nothing to report.

ITDM: 
- Offline storage system update scheduled for today (Dcache affected). E-mail will be send when finished by end of the day.

XRO:
- Nothing to report; all maintenance activities completed.

LAS:
- As aftermath of cooling water and air conditioning issues during maintenance: problems with misalignment of all lasers; LAS has troubles to align them.
- For SA2, LAS is confident will be fine with alignment. The SA3 is a bit behind of SA2;
- SA1 presents the biggest misalignment after T and H shock - long pump pulse. The 280kHz test is now in secondary priority. LAS will report day-by-day and is not so confident will be ready for instruments 
in February.

UNSYS:
- Finished to install air coils in Apple-X.
- SA2 phase shifter solved.

SPB:
- Nothing to report.

FXE:
- Interlock issues were fixed.

MID:
- All fine at MID.

HED:
- All fine at HED.

SCS:
- Nothing to report.

SQS:
- All good at SQS.
Entry   Notes XO Integration Meeting 17.01.2022, posted by Frederik Wolff-Fabris on 17 Jan 2022, 10:41 
General Announcement:
- SEPS interlock tests are scheduled for this Friday January 21st; Zunaira A. needs XTD6 closed by the SEPS interlock at 09:00. 
Martin D. will evaluate if it is possible to close XTD6 before Friday pending to finish the work (without closed vacuum we won't have beam in future).
- Machine is tuning SA1 and SA3 this week and XTD2/4 tunnels are opening today and tomorrow for finishing Apple-X works.

CTRL:
- Nothing to report.

DA:
- Preparing for start of operation; nothing out of ordinary.

EEE:
- Nothing to report.

VAC:
- Vacuum all is fine.
- Tunnels closures: XTD9 tomorrow afternoon; XTD6 on Friday or Thursday afternoon (see general announcement).

XPD:

- Camera library tests/migration together with CTRL (Aravis library) from today afternoon. Some cameras won't work for the update (5mins or bit more). 
Plan is to do all cameras - please keep in touch with A. Koch if cameras are needed.

DET:
- Nothing major to report: preparing detectors for start of the run.

ITDM: 
- Reminder on the storage system (offline side) update on 19.01: dcache won't be available for the whole day; connection between online and offline won't work also. An e-mail will be sent when activity I 
done.

XRO:
- Next week it starts the photon beamline alignment. Next Friday one needs the SCS or SQS hutch interlocked over the weekend.

LAS:
- Nothing to report.

UNSYS:
- Issue with phase shifter in SA2: BKR forgot to use the right operation mode. 
- Apple-X: waiting to enter tunnel today at 12:00 to install air coils and finalize hardware commissioning.

SPB:
- Controller was affected by power glitch; fix ongoing.

FXE:
- Interlock system problem was detected and under fix.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 12.01.2022, posted by Frederik Wolff-Fabris on 12 Jan 2022, 10:06 
General Announcement:
- SEPS interlock tests are scheduled for January 21st: starting early morning from 08:00 to 16:00 across all the SASEs; 
In parallel D-3 tests the interlocks in all hutches including SXP. An e-mail to instruments was sent and a reply has to be directed to Zunaira A.
- Disabling SEPS interlock yesterday night was not necessary. Further discussion with A. Galler will follow.

CTRL:
- No planned updates.

DA:
- No updates to report.

EEE:
- Yesterday the SA1 vacuum update took place.
- MPS contacted Nerea J. on the SEPS interlocks issue: Nerea J. to be included in further discussions.

VAC:
- Nothing to report.

XPD:
- Preparing for tunnel closure: finishing Hard X-ray PES tests; works in XTD9 are completed.
- Works in XTD6 finishing EPS switches and installing upgrade M-ports in MCP (crate coming on Thursday and update interlock connection).

DET:
- Nothing to report.

ITDM: 
- Remind on the Wednesday maintenance on the dCache and GPFS; Access to XFEL related data from Maxwell compute cluster is not guaranteed during the intervention. Please contact ITDM in case of conflicting 
with it.

XRO:
- Not present.

LAS:
- Failed to upgrade the SASE1 front ends during Winter Maintenance (company did not come due to Corona regulations). 
- 8D report for the Seeder shutdown issue at the start of the maintenance period: A. Galler informs that by the end of this week it shall be ready and distributed.
- Power supply connection: Max L. asks for XO support to follow up with TS.

UNSYS:
- Apple-X undulators are aligned and currently the intersection is being aligned together with air coils. Vacuum shall also be connected permitting to close tunnel tomorrow.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Thanks to SPB group for helping with providing a flange.

HED:
- Apart from the SEPS all is fine.

SCS:
- Not present.

SQS:
- All fine.
Entry   Notes XO Integration Meeting 10.01.2022, posted by Frederik Wolff-Fabris on 10 Jan 2022, 09:22 
General Announcement:
- The "Readiness" mailing list will be discontinued and substituted by the "xo-info@xfel.eu" list. This new list is owned by XO and please use it in future for sharing information to a broad audience.
- Next News on the Covid regulations will be communicated on Wednesday 12.01 or for the next Thursday's staff meeting.
- Please take attention to Zunaira A. e-mail on the radiation safety training. It shall be done until the end of January to avoid disruption in access rights.

CTRL:
- No major updates.

DA:
- Nothing to report.

EEE:
- SASE1 VAC loop will be update tomorrow including the PES system.

VAC:
- No issues to report. Continuing with small tasks being done at XTD2 and XTD6.

XPD:
- All continued tasks are fine, mainly XTD2, XTD6 and XTD9.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Carry on with maintenance works - SASE1 and SASE2 are in vacuum;
- XTD6 PBLM diamond to be exchanged this week as well as screens.

LAS:
- Not present.

UNSYS:
- Alignment for the Apple-X to be done this week and vacuum will be closed until Thursday.

SPB:
- Small issues with things moved into new racks; being followed with EEE.

FXE:
- Continuing with tasks.

MID:
- MID looks for a CL flange with SmartAct connection. Please contact MID or Joerg H. if you have one to help MID.

HED:
- All fine at HED.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 05.01.2022, posted by Andreas Galler on 05 Jan 2022, 09:29 

General Announcement:

  •  

CTRL:

  • no major updates

DA:

  • no major updates

EEE:

  • 1 MID plC dead
    • replaced on Monday
  • cable work planned for next week
    • HED, SXP

VAC:

  • In general excellent progress
  • closing of M2 XTD2 (SA1) in progress, sealing issues mitigated

XPD:

  • XTD10, XTD6
    • improvements, commissioning ongoing
  • clean room tent water leak reported on 23.12.
    • fixed by TS befroe X-Mas

DET:

  • no major issues

ITDM:

  • Jan 19: dCachce maintenance

XRO:

  • progress as planned
  • changes to existing components will be posted to respective elogs

LAS:

  •  

UNSYS: 

  • progress as planned

SPB/SFX:

  • Vac monitoring recoverd

FXE:

  •  

MID:

  • PLC outage on Jan 1 st caused VAC issues (reported by EEE)
    • fixed
  • no access to MID optics hutch due to interlock test

HED:

  • everything on schedule
  • leak on a hose to humidifier device in A12. This leaked a few litres on the floor.
    • to be fixed by Caverion

SCS:

  • progress as planned

SQS:

  • progress as planned
Entry   Notes XO integration meeting 20.12.2021, posted by Andreas Galler on 20 Dec 2021, 09:25 

General Announcement:

  •  

CTRL:

  • no update

DA:

  • nothing

EEE:

  • nothing

VAC:

  • nothing to report

XPD:

  • nothing special, shtudown tasks are in schedule, HXPES / XTED2 cable work ongoing

DET:

  • nothing special

ITDM:

  •  

XRO:

  •  

LAS:

  • lasers ramped down

UNSYS: 

  • APPLEXv inv place, VAC to be closed next year

SPB/SFX:

  • working on mirrors
    • checking vacuum today
  • not clear what is the status with the movement of racks wrt SXP (SPB/SFX optics hutch racks currently powered down)
    • electrical installation?
    • PG comments: Brad won't allow operation until 230 V power distribution is calrified, once Brad gives the OK, the racks can be switched on
      racks are being finalized by EEE, but some checks need electrical power
    • RB: SPB/SFX were promised that the move of the racks were finished before X-Mas, but it seems the electrical work is not up to satandards

FXE:

  • shutdown task in schedule

MID:

  • all fine
    • some loop updates planned for Today

HED:

  •  

SCS:

  •  

SQS:

  • nothing

AOB:

  • light OCD over X-Mas for XPD in case of floowings, power outages.lists will be

Entry   Notes XO Integration Meeting 15.12.2021, posted by Frederik Wolff-Fabris on 15 Dec 2021, 10:26 
General Announcement:
- Severe power cut affected Schenefeld campus yesterday: it seems to be associated to human error but investigations are still ongoing. As soon as information will be available, it will be distributed via 
e-mail either from TS or from XO.
- Regarding access regulations coming into effect Thursday evening (16.12): those who shared vaccination status with SRP will be able to enter via side gates or without showing vaccination certificates to 
the gate keepers. 
Without showing to SRP one can enter only via the main gate.

CTRL:
- Due to power cut some devices went to error state; a bunch reset helped to bring them up. If errors appear again please write tickets to CTRL.

DA:
- Nothing to report.

EEE:
- Issues with power cut: lost electronics in instruments; lost parts in tunnels (but recovered). Please check systems if they need to be reset.
- XGM in SA1 and SA3 were also affected.
- uTCAs are back and running after power cut.
- Work with cabling is ongoing accordingly to the maintenance planning.

VAC:
- PLC in rack room were affected and recovered with help from CTRL and EEE. So far nothing severe seems to be appeared but investigations still ongoing.

XPD:
- XGM is under investigation by Theo M.
- HIREX in SA1 has a motor not moving. Today on-site investigation will be done together with Bernard B,

DET:
- Nothing to report.

ITDM: 
- Power cut: problems with office switches had to be rebooted/recovered. It got stuck during the reboot process causing problems that switches had to be manually power cycled (maybe due to a second short 
power failure).

XRO:
- Nothing to report.

LAS:
- Affected by power cut; PLCs were off but running again after help from EEE.
- Seeder seems to do not suffer major issues.

UNSYS:
- Problems with electricity at XHU due to power outage were recovered later in the afternoon.
- Two Apple-X undulators were installed in SA3 yesterday.

SPB:
- Could recover the essential systems quickly enough; no big damages so far.

FXE:
- Working in tunnel this morning. Investigations related to the power outage ongoing.

MID:
- Issues were recovered with EEE.

HED:
- Could recover vacuum systems; Laser systems were turned OFF.
- SA2 gas alarm controller was damaged due to the power outage. So there is no operation with liquid nitrogen and other gases from now. TS need to discuss with HED as tasks must be performed by latest mid-
January (lasers and/or cryo activities).

SCS:
- Not present.

SQS:
- Damage in the air conditioning (electronic and physical) in room 509 due to the power outage. To be discussed between SQS and TS.
Entry   Notes XO Integration Meeting 13.12.2021, posted by Frederik Wolff-Fabris on 13 Dec 2021, 10:51 
General Announcement:
- The cooling water various types shall be working/restored and it seems that temperatures are back to normal. In case of finding deviations in temperatures let TS or XO know. Racks and racks rooms can in 
principle be closed.
- Tobias H. comments on the open rack doors: in general if racks have to be opened, please keep in mind the corridors in between the labs are fire safety doors and this has to be discussed with SRP or 
Michael Prollius prior taking place. 
The comment serves as a precaution for the future.
- An e-mail from SRP will be sent concerning disclosing the vaccination status and registration at the entrance gate.

CTRL:
- Upgrade/migration of all tunnel cameras to Aravis was concluded in tunnels.

DA:
- Nothing to report.

EEE:
- All runs smoothly at the moment.

VAC:
- Maintenance activities going accordingly with the plan.

XPD:
- Proceeding with shutdown tasks. Today alignment activities and vacuum activities at XTD2.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- This week resume the work in lab after restoring cooling water.
- XRO reminds the need to resume discussion with the ramp-up activities to divide commissioning days - a plan has to be done due to the high number of updated devices. 
A date for recommissioning of these devices shall be fixed. XO will discuss with XRO.

LAS:
- Restarting the lasers and proceeding maintenance.

UNSYS:
- Plan to install Apple-X from today on.

SPB:
- Installing granites in experimental hutch.
- Intervention in optics hutch today: please refrain to access it for staff other than the ones performing task.

FXE:
- Access XTD2 to check CRL; commissioning motors in hutch.

MID:
- All fine at MID.

HED:
- Laser interlock upgrade last week was successful with Klaus Witt.

SCS:
- Activities are going accordingly to the plan.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 08.12.2021, posted by Frederik Wolff-Fabris on 08 Dec 2021, 11:02 
General Announcement:
- The temperatures in the Hall are warming and accordingly to Tobias C. this is related to cooling water as ventilation is also affected.
- A. Galler reminds on an e-mail sent yesterday related to check-in at XFEL today: one has to show vaccination status at the gate. For next week likely one can register the Covid status at the badge reader 
and further communication will be sent.
- On next Saturday 11.Dec tunnels between Osdorf-Born and XHEXP1 will also be closed in the context of the fire extinguisher maintenance. 
It is also reminded that all Schenefeld campus buildings are inaccessible and only SRP, TS and external company are allowed in the site.

CTRL:
- After the control server network update, Karabo is up again in all the topics.

DA:
- Nothing to report also including calibration team.

EEE:
- All maintenance tasks progressing in tunnels and instruments.

VAC:
- Not present due to tunnel works.

XPD:
- Progress yesterday was done by bringing hard Xray PES in XTD2 which was installed in the beamline with help from VAC and MEA groups
- Loop update with EEE. Bernard B. says SA3 motion2 PLC will be updated/finished today.

DET:
- Nothing to report.

ITDM: 
- Commissioning proposals: interested people got an e-mail on the closing/reviewing of the current proposals. ITDM will eventually close it this week.
- Request for changes on new proposals have to be sent today to ITDM, before its creation. After being created, remains valid for the next half year. New proposals will be available for use from Monday.
- Maintenance tasks: online storage was finished yesterday evening. Currently everything online is available again. DAQ will be brought up today and cross-checked specially for SA1 where servers were 
exchanged (new clean installation).
- Exchange of switches for transferring data between Desy and Schenefeld was done.
- Early morning network maintenance: just two routers need further investigation by NOC (using old firmware). Action shall be unnoticed as there is a redundant system. 

XRO:
- Proceeding with maintenance planned tasks.
- Reminder on the delayed installation of the XTD2 new bender for SA1 because of problems with cooling/ air conditioning at the labs.
- XTD9 distribution mirror M3 for SA1: XRO noticed the soft limits were changed and position of one mirror was different. 
Changes in soft limits may be related to power cut; XRO has changed back to the proper values but this has to be checked again during re-start of operation.

LAS:
- Nothing to report.

UNSYS:
- SA1 cell#33 undulator and rack have been shifted to cell#2.
- Apple-X small hiccups but optimistic that will be good for next week.

SPB:
- Nothing different from Monday.

FXE:
- Usual activities ongoing; tests with robot software library and middle layer devices for movements to be done today.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Nothing to report. All fine with transportation activities.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 06.12.2021, posted by Frederik Wolff-Fabris on 06 Dec 2021, 11:54 
General Announcement:
- Cooling water situation at XHQ: initially there is no cooling water until possibly 13.12. To the best of XO knowledge all groups are informed. If this is not the case please contact XO. 
As soon as water comes back to normal an e-mail will be sent.
- Jorg H. asks on the safety trainings for employees (relates to the sexual harassment traning from an e-mail of Sven M. / Desy this morning). 
Sandra Plett comments that this is not mandatory to XFEL colleagues but it will be clarified today via an e-mail. The Basic training and hygiene trainings are the ones mandatory to all the staff.

CTRL:
- Last week Karabo deployment done except of the Lasers (to be done this week). If any issue is found please contact CTRL.
- Control network maintenance: control server maintenance takes place on Wednesday between 07:00 and 09:00.

DA:
- Online data analysis service is also down due to maintenance tasks.

EEE:
- Start this week with tunnel loop updates.
- Ongoing HED installation cables; also cabling work at SPB ongoing.

VAC:
- Continuing with shutdown activities (ongoing accordingly to the schedule).
- Power cut in XTD2 last Friday is not yet understood.
- Broken power supply that affected fire extinguisher system was resolved.

XPD:
- Continuing with maintenance tasks: XTD2 differential pumping systems; transport of hard X-ray PES taking place tomorrow at XTD2.

DET:
- Nothing to report.

ITDM: 
- Wednesday early 7:00 to 9:00 no control network due to switches upgrade.
- Today and tomorrow online storage system will be upgraded in offline mode by being disconnected from the clients (therefore it takes shorter time).
- Planned for today and tomorrow the exchange of switches to Desy.

XRO:
- Continuing the list of activities: due to the stop of cooling water the preparation of the re-installation of the bender in XTD2 is delayed. 
Lab is currently at 28C and when temperature is stable activities will resume. Only then will evaluate if intervention will be feasible or not.
- Tasks with EEE and motors will start next days.

LAS:
- Confusion with cooling water on lab area that was lost around 15:00 on Friday. Apart of that all is fine. XO will look into it when cooling water is back.

UNSYS:
- Two Apple-X undulators are in the shaft building for connecting vacuum pipes.
- Undulator SA#1-cell#33 to be moved to cell#2. Collimator/Pb shield was moved to downstream of Diagnostic Undulator.

SPB:
- Installations of hardware planned for this week.
- Working with EEE and others to get hardware moved to the new rack room.
- Needs to negotiate to keep vacuum running.

FXE:
- Not present.

MID:
- All fine at MID with maintenance works. 

HED:
- Laser interlock update at HED: laser interlock not functional this week;
- Tunnel activities by HED is done.

SCS:
- Activities are ongoing accordingly to the plan.
- Experimental chamber is moving to SCS hutch today.
- Contacted TS in order to run the air flow in the laser run (due to SXP installations): discussed and solved with Alexander K. (TS). About the rack room the 20C is running but rack rooms must be kept 
open. 
- Alarm of the Draeger cabinets appeared this morning but not yet understood.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 01.12.2021, posted by Frederik Wolff-Fabris on 01 Dec 2021, 09:49 
General Announcement:
- Info that today the 20C cooling water will be switched to the towers was sent. Please also open rack doors to help until further notice. Tomorrow we will understand if cooling water tower is working and 
if not, then A. Block and XO will communicate.
- Fire alarm happened this morning but not affecting people working at XHQ.
- Steffen H. says that DOC is not operational until middle January.
- Next Friday there won't be an UOM.

CTRL:
- Start with deployment today.

DA:
- Nothing to report.

EEE:
- Fully busy with preparation works and starting updates today.

VAC:
- Maintenance period activities been prepared. Tunnels are opened - if staff access rights are expired, please contact M. Dommach.

XPD:
- Not present.

DET:
- Nothing to report.

ITDM: 
- Starting the maintenance activities today; On-line processes are unavailable until end of the week.

XRO:
- Last Monday: ramp down activities (stored motor positions for instruments with proper beam trajectories; XPD also worked with MCP detectors for all 3 SASEs (not done in SCS); 
- XRO activities will be reported during this meeting series.
- Calibration SASE2 mirrors FD proposal was submitted for starting 2022.
- One PC at BKR (middle one) is extremely slow and shall be investigated during the maintenance time.

LAS:
- Maintenance on the PP-lasers are started.

UNSYS:
- Not present.

SPB:
- Not present.

FXE:
- Nothing to report.

MID:
- All fine at MID. It will investigate the water leak that happened this morning with chiller.

HED:
- Preparing XTD6 activity (exchange screen in monochromator) next week.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 29.11.2021, posted by Frederik Wolff-Fabris on 29 Nov 2021, 11:50 
General Announcement:
- Today and tomorrow are the two last days of operation with ramp down of tunnels components. On Wednesday many activities are planned for the start of the maintenance period. 
- Sandra Plett comments there are 1000 packages o Self-tests at EuXFEL with 5 tests each. Sandra P. also mentions that FFP2 masks can be taken from reception (few amounts) or warehouse (larger amounts).

CTRL:
- Karabo deployment will start accordingly to the maintenance planning.

DA:
- Nothing to report.

EEE:
- Preparing for maintenance tasks.

VAC:
- Nothing to report.

XPD:
- Naresh K. mentions the issue with emergency light test carried by TS. HED planned to make measurements with a dark room (all lights OFF).

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Not present.

SPB:
- Nothing to report.

FXE:
- Cooling issue in cw49 (opening rack doors): A. Galler says that for the experiments does not need to open racks. On 02.12 XO will inform if the cooling backup system for 20C water works.

MID:
- Training to operate air compression in the Hall was done. Normal state for MID compressor will be OFF and only switched ON when this is needed.
- Jan-Torben D. also asks for the training. This has to be scheduled with TS and XO can assist with it.

HED:
- Emergency light problem occurring on Friday: A. Galler says that this test is being done remotely every week on Mondays; The referred test was a maintenance task and TS was not aware of the presence of 
users.

SCS:
- Nothing to report.

SQS:
- Re-arrangement of the beamline starting today.
- SQS is also interested in the training for compressors also.
Entry   Notes XO Integration Meeting 24.11.2021, posted by Frederik Wolff-Fabris on 24 Nov 2021, 09:56 
General Announcement:
- Discussions on 3G rules access controlling are ongoing by the Covid task force. However, there is nothing else apart of what was recently announced.
- Next Monday and Tuesday (29-30.11) is dedicated to the ramp-down of the accelerator and photon systems and from Wednesday 01.12 it is the start of the Maintenance period.

CTRL:
- Nothing to report.

DA:
- P. Schmidt informs that instruments noticed early in the morning some issues with calibration. 
DA is catching up to make it stable again (it relates to the new measure/state for the expected high data on this week). Please contact DOC if issues can't be solved by staff instrument.

EEE:
- Nothing to report.

VAC:
- Not present.

XPD:
- SA2 Filter interlock is put back (EPS limit of 300 bunches).

DET:
- DSSC cooling system issue (reported at SCS operation e-log): chiller had an alarm due to low level of coolant. The detector was stopped; chiller was refilled and brought back to operation; it seems to be 
fine. 
DET is investigating why the level had dropped. SCS is also investigating if it relates to a leak or low temperatures. Monica T. is in contact with Jan-Torben D.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Confirm that data will be taken also during the night.

FXE:
- Nothing to report; happy with beam performance.

MID:
- Organizing to get a training for the compressor to be able to switch it off when this is not needed.

HED:
- User onsite at the end of the week.

SCS:
- PLC-1 crashed on Monday taking time away for the experiments. A fan went off. Patrick G. says this is recognized that the fan went off and some cooling had to be switched down. 
The maintenance of cooling systems is done by TS and it relates to a closed/sealed rack that can't exchange heat. 
A solution permitting to spot/alarm when issues with cooling system appears in the racks must be put in place.

SQS:
- Nothing to report. Users are expected this week.
Entry   Notes XO Integration Meeting 22.11.2021, posted by Frederik Wolff-Fabris on 22 Nov 2021, 10:13 
General Announcement:
- On Accessing EuXFEL premises at Schenefeld: it is no longer necessary to present the test result at the Gate; it is necessary to present the QR code for vaccination/recovery as well as the DACHS card at 
the new terminal. For non-vaccinated people an official test certificate is mandatory.

CTRL:
- No major updates this time.

DA:
- Nothing special to report.

EEE:
- On Saturday EEE had to exchange a fuse at a MID motor (motor burned).

VAC:
- Nothing to report.

XPD:
- Nothing to report.
- A. Galler reported that for SA2 the interlock conditions for the upstream filters in SA2 are temporarily lifted allowing to go to 350 bunches (limit is 300 bunches). This is an exception that is valid 
until tomorrow.

DET:
- Nothing to report; IT group is working to increase space for data.

ITDM: 
- It collected 2.2 Petabytes of raw data for one user (MID) plus the same amount of calibrated data and there is still one day of beam delivery until tomorrow. Also SPB produced about another 1 Petabyte.
- If such requirements are needed in future please communicate to ITDM well in advance, largely more than one week before.
- A. Madsen says that the reason such big amount of data relates to an exceptionally well run, so it is difficult to predict how many data will be collected. K. Wrona says the communication went very well 
this week. M. Turcato also says that when many detectors are running in parallel.
- Further discussions on this topic will take place.

XRO:
- Nothing to report; next Monday XRO plan to have the ramp down activities to have the current positions for the recovery. 

LAS:
- From tomorrow on only SA1 will use the PP-laser.

UNSYS:
- Nothing to report.

SPB:
- Issue with calibration pipeline with AGIPD is under investigation (performance of the pipeline is not the expected one). P. Schmidt says that used calibration can not be fully supported on the weekend so 
a fix can't be delivered in short time. In such cases it is better to use the old version.
- K. Wrona say one can plan for the maximum expected of acquired data but needs to have full resources for it. The current week was an exception. If one needs similar conditions like the current week it is 
a big challenge. 
- M. Sikorski completes that about 2-3 weeks before they can have an idea of how much data will be generated. 

FXE:
- Nothing to report. M. Biednov says that they work at 9.3 keV that machine performance was poor and that would need to retune on Tuesday (about 1.5mJ).

MID:
- Nothing to report; all fine at MID.

HED:
- Nothing to report.

SCS:
- Experiment running so far good with minor issues.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 17.11.2021, posted by Frederik Wolff-Fabris on 17 Nov 2021, 11:20 
General Announcement:
- XO will publish on Friday the full maintenance task list. Everyone is invited to also look at the Infrastructure calendar which contains main dates on this topic. 
Please contact XO in case you have questions. The task list will be published via e-mail containing also the file location in an Alfresco folder.
- A power glitch was observed today at around 07:40AM. Machine was not affected. Please check your systems.
- Jan G. asks on Zoom operation issues seen yesterday (link of PBS meeting was shared with non-XFEL staff). 
K. Wrona says that this particular case the link was posted at the website including the password and everyone from the world could access. ITDM will prepare an e-mail describing good working practices.

CTRL:
- No major updates.

DA:
- No major updates.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Systems were checked after this morning's power glitch and they seem fine. 
- The transmissive imager (Diamond screens) in SA1 and SA2 are still in. To remove them the instruments shall contact Andreas Koch.

DET:
- Nothing to report.

ITDM: 
- ITDM expects this week a lot of data for the user experiments that may overflow systems. ITDM is preparing contingency space for it. 

XRO:
- Nothing to report.

LAS:
- No effects were seen from the power glitch; lasers are running.

UNSYS:
- Last Monday the ZZ access in SA3 (cell#22) was successful and the Phase Shifter motor was exchanged. Currently discussions are taking place to evaluate counter-measures for the case it is related to 
radiation damage.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 15.06.2021, posted by Frederik Wolff-Fabris on 15 Nov 2021, 09:57 
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- Interruption during the weekend on the automatic data processing: was disrupted on Saturday night (proposal that was finished and treated as same priority). A change of priorities had to take place for 
HED having the data analyzed.

EEE:
- Faulty sensor at ATD broker - EEE will take a look.

VAC:
- No issues to report.

XPD:
- Nothing to report for XPD.
- Jan G. reports the machine overall performance was quite good without major incidents. Several issues were reported on the Operation e-log concerning the calibration pipeline and DAQ.

DET:
- Nothing to report.

ITDM: 
- On the prioritization (refers to DA): major reorganization of priorities took place. This results in the fact jobs that are submitted to the partition, (many jobs for a current beamtime) are killed. 
If instrument has beamtime please request reservations for the proper amount of jobs.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Planned access to exchange motor of PS21/SA3 this morning.

SPB:
- AGIPD data issues were seen and is in contact to DET and DOC. Issue relates to memory modules not sending data from time to time. Jolanta S.-D. says it can happen for 1-2 modules a train may miss and the 
DAQ will discard the data. 
This is not unusual and one has to look at the frequency which happens - there is nothing wrong with Detector; data looks as usual. Further discussions will take place.

FXE:
- Nothing to report. User beamtime seems to have run well.

MID:
- Restriction of priorities: MID jobs went through. Experiment jobs have priority and for this week one has to put back in priorities.
- K. Wrona says a system will prioritize the user beamtimes for each week, getting out of the system automatically.

HED:
- Two user experiments using AGIPD went nicely but a bit stuck due to the priorities list (slow data processing).
- Beam instabilities occasionally: appearing and disappearing from time to time (maybe related to mirrors). It was reported to the stability task force. 
Harald Sinn mentions about a crosstalk between SA2 with SA3. This HED case will be further studied.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 10.11.2021, posted by Frederik Wolff-Fabris on 10 Nov 2021, 10:16 
General Announcement:
-	 

CTRL:
- Issue with mc2 motor (pop-up issue for step-up command): it has been identified and fixed. New version will be deployed in the shutdown. Workaround until then is to stop and restart device.

DA:
- On the slow migration/calibration at MID: it is understood as overload of cluster nodes responsible for migration; mitigated by adding two more nodes. Calibration services shall run better from now. 

EEE:
- Drifts with SQS digitizers: yesterday Bruno F. was working on it and it shall be fixed now.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing else to add apart of DA report - still more investigation is ongoing.

XRO:
- Nothing to report.

LAS:
- All fine with lasers.

UNSYS:
- In SA3: two encoders that were exchanged (cell#17 and cell#20) on Monday's ZZ. 
- Another PS (SA3/cell21) stopped working. Motor has to be replaced in a next ZZ (request placed). 
Suren K. also says that the whole intersection is not working (not able to recover after restart the system - Quad stays in position for operation). 
- SA1/cell14 a coupler of the undulator terminal was replaced.

SPB:
- AGIPD issue also observed last week and is under investigation. DET is aware and under investigation.

FXE:
- Nothing to report.

MID:
- Issue with calibration: MID would like to test it in order to close the review.

HED:
- Running user experiment this week.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 08.11.2021, posted by Frederik Wolff-Fabris on 08 Nov 2021, 10:07 
General Announcement:
- During the weekend there was a cryo plant failure which caused more than 30 hours downtime. This was due to the cold compressor failure on Friday evening. 
Machine work hard to get back in operation and Sunday by 06:00AM beam was available to the experiments.
- Chris Y. asks if FXE had used the PAM. It seems not to be the case due to the beam downtime. C. Youngman will contact Yifeng J.

CTRL:
- Nothing to report.

DA:
- DA is interested on the MID migration problem (discussion is following below).

EEE:
- Problem with SQS digitizer regarding a drift when looking into pulse laser pattern. Problem seems to be coming from the source; to be further investigated;
- Beckhoff PLC at SCS had a problem and will be investigated today.

VAC:
- No issues to report.

XPD:
- This week XPD will measure at HED with the calorimeter.
- XPD needs confirmation from MID if Diamond detector was used at MID.

DET:
- Few OCD calls related to the AGIPD operation support.

ITDM: 
- The MID issue seems not be linked to migration in a first analysis. It may relate with calibration. Queue was busy as many experiments taking data simultaneously. 
By the other side, there were no indications of calibration being used. Today the migration was running normally.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- Another Phase shifter (SA3/cell20) presented a problem like the cell17. Waiting for getting access to fix and investigate the encoders. ZZ is scheduled for this morning.

SPB:
- Problem with AC unit at the laser hutch. TS was called onsite during the weekend and it was solved.

FXE:
- Nothing to report.

MID:
- Issue with data processing last night: if it looks good for IT and DA, then MID is relieved.
- Diamond detector use: looks reasonable and data was taken. The final analysis has still to be seen.
- MID refers that it was positively impressed how fast the seeding was brought back after the cryo failure.

HED:
- Nothing to report.

SCS:
- EEE got a call about scanner-y motor. A problem with cable was found and it was exchanged on Sunday morning. Since then it appears to be solved.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 03.11.2021, posted by Frederik Wolff-Fabris on 03 Nov 2021, 10:12 
General Announcement:
-	 

CTRL:
- Nothing major to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Not present.

XPD:
- Nothing to report.

DET:
- Issue concerning AGIPD cooling system at MID being not very effective: there is ice formation which stopped the flow of water. This already happened once but it is not so often. 
Fix consists in flushing with dry air. Later today Detector will be running again. 

ITDM: 
- Fire incident yesterday on the labs (ITDM/EEE) was caused by a broken cooling system; the lab cooling water did not work for hours and let to problems with GPFS system in the lab as well as with servers 
(same type of racks as the ones in the rack room). 
- ITDM suggests the handling of such alarms have to be improved.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Issues with SA3/cell17: Phase shifter can not move. After rebooting PLC system one had to power cycle leading to lose half the SA3 undulator system. 
A ZZ was done to recover downstream cells but finally the encoder of the PS motor is found damaged and need replacement. A request for access is created and is needed 4 persons for 2-3 hours.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine apart of the mentioned Detector issue.

HED:
- HED asks if the last Sunday's problem with machine (drop in intensity) is understood or if it may happen again. XO says until yesterday this was not fully understood and will enquire again with BKR 
colleagues.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 01.11.2021, posted by Frederik Wolff-Fabris on 01 Nov 2021, 10:10 
General Announcement:
-  XO is currently setting scheduling meetings with the groups for planning and cross-checking the preparation for the Winter maintenance 2021. Meetings will take place between this and next week.

CTRL:
- Nothing to report.

DA:
- Announcement on the online calibration: for SPB it will be upgraded to Karabo 2.11. Today is preparation and later this week it will be deployed for the user beamtime.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Together with CTRL and DA and HED/MID instrument: solving hardware problem of online cluster - one has to swap locations of SA3 and SA1. This is ongoing right now.

XRO:
- Nothing to report.

LAS:
- Water leak in SA1. TS is aware and fixing it. The PP-laser was not switched OFF.

UNSYS:
- All is good; The seeding crystal in SA2 is on the right position for the self-seeding. Support will be available for helping the expert.

SPB:
- Nothing to report; Interesting data was acquired along the week and analysis will take few weeks.

FXE:
- Nothing to add.

MID:
- All fine.

HED:
- User experiment;
- Yesterday after midnight beam intensity dropped down from 1mJ down to 300uJ and BKR did not managed to recovered it.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 27.06.2021, posted by Frederik Wolff-Fabris on 27 Oct 2021, 10:34 
General Announcement:
-	 

CTRL:
- Nothing major to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Not present.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Issue with mono in cell 18 / SA2 self-seeding: Encoder for the y-motor is found to be damaged. UNSYS tried to fix it during several hours ZZ but was unsuccessful. Encoder is damage for the y station. 
Later a solution with stepper without feedback (only image) was put in place and this managed to insert crystal in the proper position. 
- Probably re-writing software to switch from encoder to image feedback may be a solution. The full fix need to open the vacuum chamber. 
It is not sure if this action will take place during winter shutdown. This taks will be included in ME list and involves several groups.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine.

HED:
- It seems that beam @18keV was seen at the HED hutch, differently from the 30keV situation. 

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 25.10.2021, posted by Frederik Wolff-Fabris on 25 Oct 2021, 10:50 
General Announcement:
- An e-mail was sent to "xo-info" mailing list concerning the cooling water maintenance scheduled for one week starting on Dec. 6th. 
More information will be sent by the end of this week and if you have any concerns, please contact us at xo-planning@xfel.eu.

CTRL:
- Shimadzu camera at SPB to be followed up; Also, the pop-up motor at HED needs a feedback.
- Related to DRC: on Friday SQS was using the bunch patter server and the machine server was going back to zero pulses. Cause was another Karabo device at SCS topic which was working / forgotten and was 
setting bunches to zero. 
Important is that none was knowing this was running. Follow up with XO for new procedures.

DA:
- Nothing major to report.

EEE:
- PLC side: backlash 2 step compensation successfully tested.
- Cabling at FXE had some troubles and today there will be a recheck.

VAC:
- Friday incident with Interlock on SA3 (faulty gauge at GATT): reason is known and was communicated to the involved parts. Long term plan to mitigate is in place.

XPD:
- Involved at high energy tests in SA1 and SA2; SA1 worked well delivering beam at SPB; SA2 had 300uJ in XTD1 but a high intensity at HED was not achieved. On Sunday HED colleagues did some tests; 
Calorimeter did not see beam.
- Imagers YAG imagers could see the beam at the end of HED station. YAG is not too bad at these high energies (only factor 2x less). Diamond is not suitable as one needs to integrate lot of pulses to get 
signal.
- Upgrade on Imagers together with Andrea Parenti is already concluded, tested and shall be working fine. Some Karabo devices had to be restarted in SA1, SA2 and SA3. In case of issue, please contact 
Andrea Parenti.

DET:
- DSSC activities with DEPFET ladder measurements at SQS went well; happy with acquired data.

ITDM: 
- Nothing to report.

XRO:
- SA1 re-alignment of mirror was not immediately possible and therefore done in several attempts. Started from none position but went well at the end. 
- In SA2 re-alignment was not possible (settings of mirrors not ideal and therefore drop of beam intensity); In future a second attempt shall be made with the lessons learned. In SA1 went well.
- SA3 activities went well without problems.

LAS:
- From SQS high energy fluctuations were seen at PP-L and fixed after switching to another setting. 

UNSYS:
- Motor of monochromator of chicane 2 / SA2: remotely action did not recover it. Access is needed. Suren K. needs a 2-3 hours of access (realistic time) and there is no guarantee it will work.

SPB:
- Got beam at 24keV. 
- On Saturday a problem with camera Shimadzu not communicating to PLC was solved.
- Beam drift at downstream of SA1 (mm order) was seen.

FXE:
- Preparing for Users this week.
- Work with cabling ongoing.

MID:
- All fine.

HED:
- Having the 30keV beam and trying to align; Diffraction seen but could not say that the beam goes to the beam stop. Beam intensity too low for absorption edges.
- Preparing for Users this week.

SCS:
- Not present.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 20.10.2021, posted by Frederik Wolff-Fabris on 20 Oct 2021, 10:28 
General Announcement:
- XO received some enquires on the status of the winter maintenance scheduling: We have about 750 tasks submitted and we are currently analyzing all of them to spot conflicts to be solved as well as 
identifying the infrastructure dates. 
In case you have any question or would like to bring any point to our attention, please feel free to contact us at XO. 

CTRL:
- Nothing to report.

DA:
- Today a minor update of offline calibration system occurs at 10:00. No service interruptions will happen.

EEE:
- From the PLC team: 1. An e-mail will be sent as reminder for tomorrow SA2 move2 update (together with XRO); 2. Today SA3 GATT EPS update will take place.

VAC:
- Not present.

XPD:
- XPD team is busy with the facility development week as well as with a beamtime at Flash.
- SA1 is setting up to 24keV. Is under tuning and has so far achieved 500uJ intensity

DET:
- Nothing to report.

ITDM: 
- All fine.

XRO:
- SA1 beam transport is aligned with 24keV beam.
- SA2 will be also aligned from today using 30keV beam.

LAS:
- Not present.

UNSYS:
- Issue with 1 motor in the chicane cell#18 / SA2 (crystal) that triggered the limit switch. The motor is stuck and an attempt to remotely fix it will take place.

SPB:
- From tomorrow SPB/SFX will work with beam.

FXE:
- Preparing activities and all is OK.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 18.10.2021, posted by Frederik Wolff-Fabris on 18 Oct 2021, 10:14 
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- On the mention of offline calibration being slow: DA reminds to call the DOC as soon as the issue occurs. It is hard to find root causes at a later time.

EEE:
- Issue with SCS Scannery: solved during the weekend and follow up further;
- Coax cable installation in FXE to start from this Tuesday 19.10.

VAC:
- Nothing to report.

XPD:
- No issues to report; This week XPD is involved at Hard X-rays activities with 24keV in SA1 and >30keV in SA2.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Attempt to measure the beam position in SA2 this morning was missed as machine started to change parameters.

LAS:
- Not present.

UNSYS:
- Nothing to report.

SPB:
- Observed beam drift of up to 2mm on the 17.10; Theo M. confirms that horizontal direction moved up to 7mm at the XGM.

FXE:
- Nothing to add.

MID:
- All fine at MID; successful user beam time; Issues with Laser being helped during the weekend.

HED:
- Agipd-mini half back to HED; checked with DAQ; tests during this week.
- Also calibration for the single shot operation this week (Single shot with Agipd; picking only trains that have signal).
- Weekend to get 30keV beam: Zuzana K. is the main contact for communication and planning. 

SCS:
- Scanner-y issues: it does not run stable (not allowing to be used in automated motion); Beamtime successful.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 13.10.2021, posted by Andreas Galler on 13 Oct 2021, 09:26 

General Announcement:

  • This meeting is a tool to share information/experiences across scientific and technical groups

CTRL:

  • system are working

DA:

  •  

EEE:

  • next week
    • update on GATT and EPS loop in SA3 in roder to allow for new protection of GATT for the whole beaemtime
    • SA2 on Thursday (maybe Friday), try to correct backlash issue --> loop update

VAC:

  • all is running
  • HED VAC event
    • miscommunication between operators led to this issue

XPD:

  • no issue to report
  • next week, during the whole week there'll be a high photon energy test at SA1 and SA2 see a big involvement of XPD
    • 24 keV @SA1 (Tue)
    • ~30 keVC @ SA2 (Wed/Thu)
    • PI/Planner is Frank Brinker

DET:

  • investigating JF1M issue of 4-6Hz instead of 10 Hz operation

ITDM:

  • nothing

XRO:

  • SA1 M1/M2 drifts under investigation
  • XRO is involved as well with next weeks high photon energy effort as well as EEE loop updates

LAS:

  • sub sync

UNSYS: 

  • nothing

SPB/SFX:

  • user exp this week, 24 keV next week

FXE:

  •  

MID:

  • all fine at MID

HED:

  • next week high photon energy

SCS:

  • nothing to report

SQS:

  • next week material tests, maybe also detector group.

AOB:

  •  

Entry   Notes XO Integration Meeting 11.10.2021, posted by Andreas Galler on 11 Oct 2021, 09:27 

General Announcement:

  •  

CTRL:

  • nothing report

DA:

  • nothing to report

EEE:

  • several motors in SPB/SFX had trouble, all originating from the same crate

VAC:

  • VAC problems at HED last Wed
    • monochromator section in the tunnel, two unidentified vacuum bursts

XPD:

  • nothing to be reported

DET:

  • nothing to report

ITDM:

  • nothing to report

XRO:

  • FXE (PZ) reported a large jump in the bender setting, sebsequently Ry and pitch drifted for days and stabilized later
    • M1 M2 alignment changed as well
    • currently stable and being investigated

LAS:

  • nothing to report

UNSYS: 

  • nothing to report

SPB/SFX:

  • unstable pulse energy jittering ~ 35% over days.

FXE:

  • Experiment went well, apart from minor issue with calibration pipeline with JF

MID:

  • all fine

HED:

  • nothing to report

SCS:

  • not present

SQS:

  • not present

AOB:

  •  

Entry   Notes XO Integration Meeting 06.10.2021, posted by Andreas Galler on 06 Oct 2021, 09:28 

General Announcement:

  •  

CTRL:

  • nothing to report

DA:

  • nothing to report

EEE:

  • nothing to report

VAC:

  • nothing to report

XPD:

  • nothing to report

DET:

  • nothing to report (SPB reports JF1M issue --> suspected readout board issue)

ITDM:

  • issues with Nagios
    • misconfig by puppet mangement (DESY)

XRO:

  • nothing to report

LAS:

  • nothing to report
    • SA3 PPL up and running

UNSYS: 

  • Phaseshifter tables for higher energies in blue week had been uploaded
  • two quad movers from SA2 moved to 0
    • triggered by doocs --> quad movers moved back but it is unclear if they actually returned the BBA optimized position
    • clarification with M. Scholz confirms that quad movers did not move.

SPB/SFX:

  • JF
  • nothing to report

FXE:

  • User Experiment starts
  • C&C update requested until next week for LPD (uTCA)

MID:

  • all fine at MID

HED:

  • nothing to report

SCS:

  • not present

SQS:

  • nothing to report

AOB:

  •  

Entry   Notes XO Integration Meeting 04.10.2021, posted by Andreas Galler on 04 Oct 2021, 09:30 

General Announcements
none

 

CTRL
- late train IDs at XGM, being sorted

 

DA
- nothing to report

 

EEE

DET

ITDM
- nothing to report

XRO
-

LAS
- Failure of Power SUpply on AMPHOS in SA3, had been replaced over the weekend,
- observed jump on ODL in SA2 around midnight --> being investigated

UNSYS
- nothing to report
- PKG status to be discussed

 

SPB/SFX
- nothing major to report

 

FXE

 

MID
- Feedback for M2 stopped working, started calculating wrong values

HED
- nothing to report

SCS
- problems with DAQ: DA1 stuck --> DOC and ITDM are aware

SQS
- nothing to report

 

AOB

 

 

 

Entry   Notes XO Integration Meeting 29.09.2021, posted by Frederik Wolff-Fabris on 29 Sep 2021, 09:49 
General Announcement:
- Tomorrow 30.09 is the deadline to submit the winter maintenance task list. In case of questions please do not hesitate in contacting XO.

CTRL:
- Nothing to report; systems are fine.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
•	Nothing to report.

XPD:
- High pulse energy in SA3: about 15-16mJ was seen at 1keV and XPD confirmed the accuracy of this value. By the other side, XPD is checking for potential damages in the YAG screens (not yet identified but 
this is close to the limit).
- A. Koch sent information on the screen limits and corresponding watchdogs. Info will be shared at the readiness mailing list.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Lasers are running. Question on spectral stability in SA3 from Monday: LAS investigated but they lack some diagnostics; LAS will need to work with SQS colleagues (Gotthard) to further complement 
diagnostic.

UNSYS:
- Alarm that PKG of SA3 is off. Nevertheless, SA3 is well performing with good temperatures.

SPB:
- Issue resolved by DRC in seeing the beam.

FXE:
- Nothing to report.

MID:
- All fine at MID; all in progress.

HED:
- Setting up experiment.

SCS:
- Progress with new setup.

SQS:
- Nothing to add; in touch with LAS.
Entry   Notes XO Integration Meeting 27.09.2021, posted by Frederik Wolff-Fabris on 27 Sep 2021, 10:06 
General Announcement:
- The subscription for the User and Operation mailing list can be found at the regular announcements. Please forward the e-mail to new colleagues who are interested in getting the meeting link. 
- For any required operation that is not in the normal envelope, please keep in mind to discuss with XO in advance, to better planning and organization together with Desy-MXL / BKR colleagues. 
If possible, please let XO know with weeks in advance.

CTRL:
- No major updates from CTRL to be announced.

DA:
- Quiet blue week in terms of support.

EEE:
- Nothing to report.

VAC:
- Nothing to report for VAC.
- From PRC / Raul V.: photon intensity >15mJ in SA3 seems to be real. Spectrum analysis is under way and confirms >14mJ and it may be related to the chirp studies.

XPD:
- Self-seeding studies during the weekend (13keV @ HED): seeded signal of about 400mJ - data to be analyzed.

DET:
- Nothing to report.

ITDM: 
- Last week Gitlab update: some bug fixes were done during the weekend. In case of issues please let ITDM know. Gitlab is now available at the distributed link: gitlab.xfel.eu.

XRO:
- SA2 mirrors changed to platinum stripe.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID - thanks to XRO to have changed the optics.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Issues with spectral stability of PP-lasers. To be addressed by LAS.
Entry   Notes XO Integration Meeting 22.09.2021, posted by Frederik Wolff-Fabris on 22 Sep 2021, 09:47 
General Announcement:
- A reminder that in case staff members suffer from cold symptoms, please remain at home and do home-office.
- TS informs the restrooms at XHEXP1 are out of service. The fix is under way.

CTRL:
- Update of Beckhoff mc2 devices at all tunnels and experiments was done yesterday. No substantial problems occurred and first checks show also no issues. Please check if past configurations are used as it 
may cause a crash. 
- PP-Laser device (PPL multi-pattern device) will be update at instruments and down during this time. In case instruments do not want this upgrade, please contact CTRL / Valerii Bondar.
- No reports from DOC.

DA:
- Nothing to report.

EEE:
- Fast electronics: adding uTCA for SCS.
- Cabling installation at HED ongoing.

VAC:
- Nothing to report.

XPD:
- Yesterday ZZ with Gotthard was done and went as planned. It is now working nicely.
- XPD is prepared for the activities related to the blue/development week.
- Wavefront measurements were successfully done last Monday.

DET:
- First test of DSSC at SQS taking place today and tomorrow.

ITDM: 
- Reminder for the Gitlab update taking place tomorrow at 16:00.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Issue with SA3 quad movers that were blocked on Monday. A re-start of Movers and phase shifter was done which solved the issue.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- All good at SQS.
Entry   Notes XO Integration Meeting 20.09.2021, posted by Frederik Wolff-Fabris on 20 Sep 2021, 10:19 
General Announcement:
- On last week's cryogenic failure at the machine: the root cause is tracked to a failed temperature sensor that bring down several pumps.

CTRL:
- Time slot for Beckhoff update of Mc2 motors is tomorrow between 09:30-11:00. This update is for all topics in tunnels and experiments. 
Change of parameters must not occur (for the ones which are stored in Beckhoff). Nevertheless, it is good for groups to check parameters that are not stored. 
An e-mail will be sent to communicate it and a second one when the update is finished.

DA:
- Nothing to report.

EEE:
- EEE supports the mentioned loop updates (care of PLC system).
- Cabling installation in FXE and HED have started and are ongoing during this week.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Gitlab update takes this week, on Thursday at 16:00. An e-mail will be sent to readiness.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Stable operation during the weekend with a problem solved by DOC. A beam jitter was also observed on the weekend related to a feedback.

MID:
- All fine at MID.

HED:
- Finished user experiment; nothing to report.

SCS:
- Nothing to report.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 15.09.2021, posted by Frederik Wolff-Fabris on 15 Sep 2021, 10:37 
General Announcement:
- Machine stop running yesterday around 21:00 due to problems with the cold compression. A repair was done during the night but there are not yet stable conditions. It is unclear at what time today the 
machine will be back. 
By the other side, gun conditioning was done during the night which may help to have less gun trips.
- Steffen H. on behalf of DRCs reminds the instruments to please attend the jour-fix meeting on Mondays. 

CTRL:
- Beckhoff upgrade is set to take place next Tuesday 21.09 at 09:30 (during ZZ access). It relates to only Karabo devices with Mc2 motor loops; the PLC continues to run. 

DA:
- Nothing to report.

EEE:
- An update of SA2 motion loop to integrate the shutter / Gotthard is to take place next Tuesday 21.09 morning. Nerea J. will coordinate with CTRL (Valerii B.) and Naresh K. on the best time.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Reported last Monday that SA1 PP-laser was down due to air conditioning. In fact, it was a broker chiller that is repaired already Monday was a broker chiller. The PP-laser in SA1 is available since 
yesterday.

UNSYS:
- Nothing to report.

SPB:
- Change of setup happened yesterday. It will be ready for beam at 23:00 if possible.

FXE:
- Nothing to report; not yet clear if program will be affected due to the beam down.

MID:
- All fine at MID.

HED:
- Got beam yesterday morning and made use of it.
- Had issues with Interlocks (see operation-2021 e-log). A DACHS terminal stopped working and could not do hutch search. The Dachs terminal was replaced by Desy colleagues. 

SCS:
- Issue with the GATT mentioned last meeting: Jan-Torben D. has contacted XO (F. Wolff-Fabris). Discussions with further groups will take place.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 13.09.2021, posted by Frederik Wolff-Fabris on 13 Sep 2021, 10:04 
General Announcement:
-	 

CTRL:
- Next week CTRL will upgrade Beckhoff devices containing MC2 loops. This is done to avoid the PLC to crash. This is only Beckhoff devices and is for all tunnels and loops. This is a Karabo devices upgrade 
and not the PLCs. 
Naresh K. says systems are still needed on Monday morning. A. Galler tells that a ZZ will take place on Wednesday and this may be a better time for the update. XO and Valerii B. will discuss offline.

DA:
- Nothing particular; DOC and OCDs were quiet.

EEE:
- Nothing to report.

VAC:
- Yesterday effect of the power glitch at 15:03. VAC-OCD checked with SCS - the interlock reacted and GATT stopped for a while.
- SCS comments that the problem with GATT gave 300x more photons than expected to the sample and detector. A better safety / interlock is to be prepared. 
Raul V. says that topic was first discussed in 2019 with SQS (using the B4C block in the interlock loop for the GATT). It may require interaction from SA3 instruments, VAC, XRO, CTRL.

XPD:
- Small confusion on the SA3 XGMs during the weekend: BKR mixed the SCS and SQS XGM's not working and this triggered a few reactions on the weekend. A better way to do not mix up XGMs will be made. 
Please look to the right device before informing experts on possible errors.

DET:
- PnCCD detector is brought back to operation.

ITDM: 
- Next week (not yet date) a follow up of the Gitlab update will take place. Mostly likely on Wednesday; details will come by e-mail.
- Update of the GPFS metadata: to be replaced on a time without activity. Shall be transparent.

XRO:
- Nothing to report.

LAS:
- Lost SA1 PP-laser due to change of temperature and humidity at midnight this morning. No information when it will be made available for use.

UNSYS:
- Nothing to report.

SPB:
- Looks fine apart the fact it did get only 188 and not 202 bunches.

FXE:
- Nothing to report.

MID:
- All fine at MID - experiment running smooth; seeded beam running well. Only issue that Gotthard in tunnel has triggered Big Brother a couple of times. It was not a real signal. Naresh K. will talk to 
Ulrike B.

HED:
- All fine at HED.

SCS:
- Nothing else to add.

SQS:
- Successfully brought up pnCCD. It replaced physically one sensor. Reasons for the crash is understood at SQS (bad communication among the involved people). 
Entry   Notes XO Integration Meeting 08.09.2021, posted by Frederik Wolff-Fabris on 08 Sep 2021, 10:06 
General Announcement:
- Quick report of yesterday incident of water running down to XHEXP1: a washing machine in the clean room at ground level leaked; the water went down to the SA4/5 area of XHEXP1. 
Both ground floor and XHEXP1 floors were wet. The washing machine is taken out of service.

CTRL:
- The ticketing system "control-integration" is working again and can be used.

DA:
- Nothing to report.

EEE:
- Fast electronics announcement: tomorrow late afternoon EEE will apply the fix to DSSC camera to correct train-IDs.

VAC:
- A test on the signal optimization in SA3 vacuum loop was done. VAC found a fix that will be applied during the shutdown (together with CTRL, EEE).

XPD:
- Nothing to report.

DET:
- pnCCD risk analysis: DET says that there is a path to avoid accident again and has been discussed with instrument. The misbehavior of the bottom module is to be investigated and replaced.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Improvement of sync system in SA3 laser hutch took place this week. The laser is available to instruments.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to add.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 06.09.2021, posted by Frederik Wolff-Fabris on 06 Sep 2021, 11:00 
General Announcement:
- XO thanks the instruments for posting in the Operations e-log.
- Jan G. says calorimeter measurements last Friday on HED hutch took place in order to measure transmission of pulse energy in the hutch and compare with tunnel HED-XGM. 
It is found a factor 2 loss - half beam intensity arriving at the end of the hutch. 
- Lorenz K. says that the Barista machine triggered a fire alarm. TN did a check and may be caused by the self-cleaning program of the machine by producing enough steam.
- Call for tasks to be carried on next Winter maintenance period were sent out to the are sent out via e-mail last Friday. Groups shall submit one group list by 30.09.2021.

CTRL:
- From tomorrow morning all the mails sent to the "controls integration" ticketing service will be offline due to an update. Please contact DOC instead. An e-mail will be sent as soon as the service is 
back.

DA:
- Nothing to report.

EEE:
- OCD calls from SQS last week were solved. 
- Nerea J. and F. Wolff-Fabris say the issue with SQS EPS is temporarily solved by now (masked signal at the Big Brother). SQS has to plan when it wants the EPS running.

VAC:
- Quiet week in terms of OCD.
- Today in the morning: please refrain to use this morning any SA3 device like GATT.

XPD:
- Nothing to report.

DET:
- Follow up of the pnCCD detector: upper part of the detector has scratches after Thursday accident. SQS will replace parts this week. The lower part of the detector has also some issues (noisy). 
It is unclear if the detector can be used.

ITDM: 
- Today and tomorrow ITDM carries the integration of the offline storage into the new system (new storage blocks; it shall be unnoticed by the users). The old one goes out by replacement.

XRO:
- Apart of the beam point instability @ HED (stochastic instabilities that appear from time to time) there is nothing else to report.

LAS:
- Change repetition rate at SA2 PP-laser this week.
- SA1 has a higher jitter than normal that has to be investigated on-site.

UNSYS:
- All fine at Undulators.

SPB:
- Running night shifts: on SAT night some X-ray trains not arriving; It did not disturb operation but a bit disturbing.

FXE:
- Lost of pulses and many issues on Saturday such as instability and tuning without prior communication. To FXE team.
- F. Wolff-Fabris says the beam became more stable on Sunday afternoon after the restart of a server and the feedback for the compression.

MID:
- All fine at MID.

HED:
- Suffered from beam jitter: measurements were done with different mirrors settings, CRL configs; MID branch. Analysis ongoing this week (Sebastian Goede).

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 01.09.2021, posted by Frederik Wolff-Fabris on 01 Sep 2021, 10:36 
General Announcement:
- A change of meeting room occupancy will happen soon (increase by some %) and will be posted at each meeting room door. 

CTRL:
- Together with EEE, CTRL updated the pnCCD system and is working again. Hardware train-IDs acquisition was used by SQS yesterday afternoon and was successful.

DA:
- Nothing to report.

EEE:
- Nothing special to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Follow up for the pnCCD today (offline calibration fixed). Detector is being cooled down and then data will be collected. DET supports CTRL that one had to make better plan earlier.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report; Cell#16 in SA3 got repaired on Monday.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Yesterday the beam was available for delivery later than 15:00 due to issues with machine tuning.

SCS:
- Not present.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 30.08.2021, posted by Frederik Wolff-Fabris on 30 Aug 2021, 10:08 
General Announcement:
- XO will send next Wednesday the call for the Winter maintenance tasks. This time there will be a ticketing system and the call will be also send to Readiness list but please check with your group leader 
to submit a single task list per group.
- Please we ask instruments to place shift summaries at the Operations E-log.
- Suren K. asks TS for the trainings of TS staff as some people do not have access to tunnels areas. Lorenz K. will verify with TS members.

CTRL:
- Broker pileup issue at FXE on Wednesday: resolved with tracing on specific devices. Work is ongoing to prevent future incidents.

DA:
- Nothing to report.

EEE:
- Test on turbo pump on SQS to take place (by Bernard B. and VAC).

VAC:
- Nothing to report besides the test. This morning also a PLC test takes place.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- There is a problem with cell#16/SA3. A ZZ is currently ongoing to fix it.

SPB:
- Nothing to report apart of the intensity slope last week. It was improved during the weekend but still an issue for data collection.

FXE:
- Nothing to report.
- BYU trigger delay change was observed: it was fixed but root cause still to be found.

MID:
- Problem with AGIPD processing data (automatic calibration did not work): under analysis/fix.

HED:
- Not present.

SCS:
- Strong contribution of SA1 dedicated bunches last week; one need to have zero bunches at SA1 to be able to see the SA3 beam. Not interleaved mode may solve it but was not yet tested/tried.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 25.08.2021, posted by Frederik Wolff-Fabris on 25 Aug 2021, 10:08 
General Announcement:
- A power glitch happened this morning at around 5:46AM. The drop of voltage was seen in two stations (about 0.6kV) and it's smaller than the last Monday's one. In case groups find affected systems, please 
let XO know.

CTRL:
- Last night DOC informed on a Broker pileup at FXE. The FXE loop was restarted and mitigated the situation. Further investigations are ongoing and will be coordinated with FXE.

DA:
- Nothing to report.

EEE:
- EEE helps on the Loop 6 pileup reported by CTRL.
- Call from DOC reporting connection issue to Karabo (broker PLC was replaced and had to be configured the connection).

VAC:
- Effects of power glitch seem to be none. Cooling water for the vacuum systems was not affected.

XPD:
- XGM in SCS being offline due to surge of pressure. This was informed by e-mail from SCS last night; interlock tripped due to high-voltage. XPD checked and put back during the night. 
Laurent M. says it was not clear why the pressure was increased. It is under investigation and SCS will inform XPD.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Amphos were not switched OFF due to power glitch. PP-laser in SA3 are under maintenance.

UNSYS:
- Nothing to report.

SPB:
- Issue with EPS at 14:10 yesterday: beam permission was blocked by EPS despite both shutters closed and all gate valves open. The signals had to be manually restarted (this info was not transmitted and 
EPS blocked beam permission). 
Issue appeared when they use beam for the first time; EEE / Nerea J. will further investigate.

FXE:
- Nothing to report.

MID:
- After the power glitch the SA2 beam intensity decreased by 10%. BKR will not do any interaction right now. It is still fine for MID to work in such conditions.

HED:
- Nothing to report.

SCS:
- Apart of the XGM issue, nothing else to add.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 23.08.2021, posted by Frederik Wolff-Fabris on 23 Aug 2021, 10:03 
General Announcement:
- There were two minor power glitches on Saturday morning but with negligible effects to machine.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Update of EPS-SA1 loop was done this morning in order to enable the FXE imagers modes.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- DSSC is installed back to SCS and put into operation last Friday.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- All AMPHOS are ON and LAS is preparing PP-lasers for instruments today.

UNSYS:
- Issue with cell5/SA1 phase shifter: M. Yakopov confirms a power cycle was made to recover it.

SPB:
- Problem with Karabo (misread 2 of vacuum gauge values): the problem was a terminal of the crate was broken. After the terminal has changed, it works fine. 

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 18.08.2021, posted by Frederik Wolff-Fabris on 18 Aug 2021, 10:48 
General Announcement:
- In the aftermath of the severe power glitch, XO will be grateful if groups drop a message of what was affected in your groups. This will help us to understand effects of the latest power glitch.
- Status of machine: last night we had 2.3mJ in SA3 and 0.5mJ in SA1. Right now machine is under tuning - good chance of beam available for FDs today.

CTRL:
- Follow-up to the power glitch. CTRL had to restart the Karabo systems due to the main network to the brokers being down for minutes. Few follow-ups later that day but in general things have recovered. 
If groups experience troubles after running systems, please write ticket to CTRL.

DA:
- DA has deployed at SPB the latest Karabo 2.11.4. This concludes the cycle to all instruments.

EEE:
- Nerea J. informs Andreas K. detected that FXE imagers needs to be debugged by restarting the EPS loop. This will take out beam permission and may be organized for Monday morning. 
- Clock and control system was downgraded (confirmation from Bruno F.).

VAC:
- Nothing to report.

XPD:
- XPD had to restart manually many devices, macros and MDLs. One had to fix the broken Karabo bridges.
- No hardware and XGM gas supply were affected; they are running fine.
- SASE recovery only happened Tuesday afternoon and FD in SA2 was cancelled.
- A. Koch asks if Monday it is a good day for the IMG intervention. XO will check with MXL.

DET:
- AGIPD in SPB was the only detector ON during the power outage. It quickly recovered as it was in power voltage.
- DSSC being moved this week among SA3 instruments.

ITDM: 
- Network issue due to the power glitch (distribution layers switchers); connectivity of different parts of network affected. This in turn affected Karabo. 
- Gitlab upgrade today at 13:00.

XRO:
- M. Vannoni informs that to evaluate better tunnel devices (initially seems OK), one needs the beam back to check them in full.

LAS:
- PLCs and Karabo issues were found; in touch with EEE to make redundant power supply to PLCs. 
- Lasers went OFF and plan is to have PP-Ls available by Friday evening.

UNSYS:
- Problem with SA1/cell27 on Monday as motor drivers went in error state after the power glitch. It was recovered remotely. 
- Tables for 3keV @ 14GeV were updated on Monday.

SPB:
- Problem with Karabo and vacuum gauges (EEE is working on them).
- Problem with PP-laser shutter last week (unable to set interlock). It is now solved.

FXE:
- Detectors were OFF and therefore no issues due to the power glitch.
- Similar Karabo problems as described earlier.

MID:
- All fine at MID. Summary will of the effects of power glitch will be sent soon to XO.

HED:
- Lost the tests for the wavefront sensor as machine was down (FD). Plan to use beam tonight if it comes back. On Friday Karen A. plans to use beam for tests.
- Ulf Z. has sent a report to XO; Detectors were OFF and unaffected.

SCS:
- Not present.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 16.08.2021, posted by Frederik Wolff-Fabris on 16 Aug 2021, 10:07 
General Announcement:
- On frequent power glitches: it happened twice over the weekend. Machine was not affected and maybe this time the PP-lasers also. The origin is on the electrical power grid of Vatenfall and it is unclear 
how long it takes to fix it.
- TS requires location knowledge of all office chairs. In case you have taken yours to home, please let TS know.

CTRL:
- Reports from DOC with delayed train of DOOCS XGM for HED. It will be investigated.
- Reminder that it is a blue week and the DOC does not run. The DRC is available via phone.

DA:
- Issues with the offline calibration system: changes of data migration (how it works). Hot fixes are ready to be deployed (probably today); please check the migration and the auto-run; DA will update 
after the deployment.

EEE:
- Nothing to report.

VAC:
- No problems with power glitches.

XPD:
- XPD side: all fine.
- As PRC, Jan G. says that pump-probe laser at FXE was affected on Friday morning (Laser unavailable until the night). On Saturday and Sunday the lasers were not affected due to the power glitches.

DET:
- Nothing to report.

ITDM: 
- Gitlab update taking place this week.

XRO:
- Not present.

LAS:
- None of the PP-lasers went down this weekend in relation to the power glitches.

UNSYS:
- Nothing to report.

SPB:
- Adrian M. asks that, in case supply problems continue to happen, would that mean EuXFEL makes proactive action for operations? 
A. Galler comments that DOB will discuss the issue with lasers (exchange of pumps that are vulnerable to the power glitches is planned for the winter shutdown). From machine side, as it is largely 
unaffected, the operations calendar won't change.

FXE:
- Nothing to add, no news on clock and control upgrade.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Dismount the DSSC and give back to SCS this week. 
- SQS expect beam for the safety tests on Wednesday and Thursday.
Entry   Notes XO Integration Meeting 11.08.2021, posted by Frederik Wolff-Fabris on 11 Aug 2021, 10:45 
General Announcement:
- There was another power glitch last night. It seems that accelerator was not affected. If XFEL groups find affected devices, please contact XO.
- From healthy task force the Covid-19 measures stay in place as they are.

CTRL:
- Nothing major to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Running at SA3 at the edge of the energy range (3keV is at limit of the undulator tables (K near 4)). Sara C. says that with higher electron beam energy this won't be a problem. 
In addition, the problem was with only few cells and Suren A. is in contact with BKR. Jan G. says that will get in touch with Suren A.
- HED reported problems with beam pointing being instable. XPD and XRO will take a look on it and include XO for the analysis.

DET:
- Small hiccups but nothing major. Follow-up on the pipeline for DSSC and firmware for other detectors.
- Jolanta S.-D. is not aware of LPD/FXE update and will check with EEE/CTRL/FXE.

ITDM: 
- Announcement: ITDM would like to upgrade GitLab on next Wednesday 18.08 from early afternoon 13:00 and may take until the evening. Users of GitLab are contacted and no access to GitLab during that 
action.

XRO:
- Nothing to report. Maurizio V. will follow the HED beam instability.

LAS:
- Affected by power glitch: all PP-lasers / AMPHOS went down and warmed. LAS would need a solution for power glitches, considering power backups, UPS or batteries, as the controllers for this type of the 
pump goes down. 
- Jan G. says that XPD has a bunch of unused UPS and could offer to LAS.

UNSYS:
- Problem with cell6#SA3 quad mover is solved. Coupler was exchanged and it works. UNSYS has more spare parts and is in touch with Beckhoff.
- Sara C. says P. Gessler informed Karen had problem when changing undulator energies. Suren A. could not find any issue with Doocs / Unsys side. 
Patrick G. talked to Olaf H. and firstly BKR must try to change energies and if it works, then instruments shall try. Karen A. says BKR could moved energy and had no issues - the issue was in HED side. 
P. Gessler proposes that Unsys check with Olaf H. Further discussion will follow offline.

SPB:
- Couple of issues: 1. SBP Pop-in reached limit switch and had to be changed; 2. Affected by the PP-laser downtime overnight.
- A. Koch says there was about 0.5mm steps lost. He is looking into it if it is mechanical, motor, or control issue.

FXE:
- Wajid E. says work on the clock and control is ongoing for the LPD.

MID:
- Al fine and use of PP-laser is not needed currently.

HED:
- Nothing else to report besides of what was discussed during Unsys report.

SCS:
- Not present.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 09.08.2021, posted by Frederik Wolff-Fabris on 09 Aug 2021, 10:26 
General Announcement:
- XO reminds that the timing system maintenance is taking place now.
- Power glitch happened at around 5:15AM today. Accelerator had a downtime; please check components that use cooling water / pumps to check if they were affected or not.
- Liubov S. reported that the PRC phone could not be started and maybe calls were not answered.

CTRL:
- Follow-up on the timing downtime maintenance: CTRL advices instruments to please check DAQ afterwards. 
- Bug reports for cameras - 1. For Lima Cameras updated for new Karabo 2.1: new library has new features on rotation (a fix can be deployed); 2. Rotation in non-instantiated cameras won't work: one has to 
instantiate them initially.

DA:
- Nothing to report.

EEE:
- Downgrading clocking and control firmware today after this meeting. For questions please talk to Bruno F.

VAC:
- Power glitch propagated to the tunnel (shortage of cooling water) but it did not affect VAC systems 
(update 10:30AM: GATT-SA3 injection of gas stopped due to the water shortage being above 5-10seconds but less than 30s, as pumps continue running - SCS could set it up again quickly). 
- GATT loop: Steffen H. and Raul V. are setting up update and please refrain to use it today.

XPD:
- Issue with XGM in SCS hutch: it got shock vented with N2 last week. Fortunately, high voltage was not ON. Turbo pumps have issues with controller; on Thursday and Sunday the pressure gauge dismounted. 
XPD is on contact with SCS on it. 
Remark: Theo M. is on holidays and for XGM issues please contact Jan G.
- A. Koch asks Steffen H. if the Lima/Bassler camera fixes uses only DAQ and not GUI. Steffen H. says this is correct and for Karabo 2.11 only. A. Koch will send a list of cameras to Steffen H. 

DET:
- Nothing to report. DET aware of clock control downgrade.

ITDM: 
- Today afternoon ITDM starts activities in Influx: downtime of few minutes.
- Reminder on closing proposals: Please do it ASAP. If not done by next week a policy on non-accessed data will be done.

XRO:
- Nothing to report.

LAS:
- The cooling water for SA1 and SA3 AMPHOS went down on Saturday morning, bringing PP-lasers - due to another power glitch on SAT early morning. 
- Cooling water in the LAS R&Dlab remains down as of now.
- PP-Lasers will come up this afternoon but requires time to thermalize. It was put OFF in a controlled way this morning due to the timing system maintenance. The AMPHOS was not OFF during today's power 
glitch.

UNSYS:
- Issue with cell6/SA3: power cycle of whole cell is ongoing. Suren K. asks if a possibility to go to tunnel can be done. ZZ is not yet requested but will contact PRC to fix the coupler.

SPB:
- Complications with the delivered bunch pattern last week: coincidence of needing to drop bunches for detectors commissioning at same time SCS use particular bunch pattern. 
Nevertheless, it worked well enough for getting data, apart of few lost time to set the pattern.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- All good at SQS.
Entry   Notes XO Integration Meeting 04.08.2021, posted by Frederik Wolff-Fabris on 04 Aug 2021, 10:19 
General Announcement:
- There was a power glitch last night around 10:30PM at the Desy power distribution. XHQ and XHEXP1 seemed to be not affected - probably devices that gets cooling water from Desy could be affected. 
Please inform XO if it is found any affected equipment in the XHEXP1 side.
- Raul V. asks on the fix CTRLs has applied to the vacuum issues last week. Steffen H. will give details offline.

CTRL:
- Bi-directions of clones may not have been working properly and CTRL is investigating and preparing a solution for it. 

DA:
- Nothing to report.

EEE:
- Small issue with FXE timing (strange behavior of RTMs). It happens when communication to main timing system is interrupted and it affects mainly the FXE PLCs. Result is that devices may not correct 
trigger.
- Cable installation currently ongoing in HED and scheduled at FXE (cw33). 

VAC:
- Last night status of critical pumps was checked and seems that there was not water interruptions (very first time for a power glitch). These pumps stay working normally during the night.

XPD:
- No issues to report due to the power glitch.

DET:
- Jungfrau activities at SPB were delayed because of beam delivery issues with the number of bunches.

ITDM: 
- Nothing to report, also regarding to the power glitch.

XRO:
- Not present.

LAS:
- Unaffected from the power glitch. PP-Lasers are working.

UNSYS:
- Everything is fine with Undualtors.
- SA3/cell6 quad mover has a problem unrelated to the power glitch. As agreed with BKR, it stays as it is Monday when corrective actions to recover it will be made.

SPB:
- Beam delivery problems yesterday regarding the bunch number: A. Galler says that accordingly to W. Decking, when running in interleaved mode it may cause that problem if the suppressions does not work 
correctly. 
Further investigations are under way by MXL. If this is an issue for equipment BKR can install an interlock on the Big Brother and probably a detailed discussion with interleaved mode instruments can help 
in this direction.

FXE:
- Nothing to add.

MID:
- Looks like the beam today is very unstable. Data were collected and the stability task force will be contacted.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Yesterday a situation happens when 1 PLC went OFF unintentionally, causing a pump went OFF afterwards. SQS asks if this can be followed in a way the pump does not goes OFF in such events. 
Raul V. comments that 5Hz turbopumps at the tunnel have a configuration to prevent it by disabling the automatic switch in the component configuration. 
Nerea J. says that they can take both tunnels and SQS used configurations to bring them together. 
Entry   Notes XO Integration Meeting 02.08.2021, posted by Frederik Wolff-Fabris on 02 Aug 2021, 12:06 
General Announcement:
-	 

CTRL:
- Deployment announcement: there are two more motors to be updated on ARAVIS cameras (photonic and Bassler). CTRL proposes to do this afternoon. 
Cameras devices will be down after update, aimed to enable train-ID corrections. Please instruments check on Tuesday if cameras are back.

DA:
- Nothing to report.

EEE:
- uTCA CPU in SA1 balcony room is not reachable. Bruno F. is investigating.
- CPU of LOOP16-SQS is not reachable. Nerea J. will check it today.
- Issues with LPD and AGIPD are being tested in the lab and the check at FXE will be done later today.

VAC:
- Some OCD calls related to instability of SA3 vacuum loop. DOC is informed and shall be working on that.

ME:
- Alberto De Fanis asked if ME is present, willing to discuss topics. A. Galler says group was around a couple of times and if groups have questions please use this meeting series to address.

XPD:
- No issue to report.
- Steffen H. will check if some XPD tunnel devices are affected by the ARAVIS update.

DET:
- Nothing to report.

ITDM: 
- Influx problem on Thursday (disabling live-view on Karabo): with help of Influx data support this was fixed. The cluster is up and running well. 
The part of the old data during the time it was down was written by Grafana and will be synchronized back to the cluster during this week (tests are needed).
- Following on Friday for the Influx third node that went down (not related to the previous incident): DOC was blind for a couple of hours. Investigation ongoing. It's not related to Grafana. 
Instruments were not affected.
- Reminder of reviewing and closing proposals for the second half of this year. Please look at the sent e-mail and make a cleanup. 

XRO:
- Not present.

LAS:
- All PP-lasers are running.

UNSYS:
- Issue with phase shifter in SA3 for the 3keV use: problem is that at 14 GeV the tables of phase shifters go to 25.3mm gap and this is in the upper limit for making 3 keV. 
Phase shifter tables will be extended to a larger gap. Better to use 3keV at higher electron energies.
- For the UOM's mention on the update of phase shifters on the chicanes, this has to be prioritized. XO will discuss with Sara C.

SPB:
- Minor issues with SPB imager being saturated. A. Koch adds that it will be followed up and he is aware and will analyze better.
- Organization limitation: RF discussion for last weekend. The BKR / Operators were not aware they would use 404 bunches and costed 2 hours.

FXE:
- Nothing to report.

MID:
- All fine at MID.
- Laser went down for 12 hours due to the issues with HED interlocks on Wednesday (action taken due to the restart of laser interlock performed by SRP).

HED:
- Not present.

SCS:
- Issue on the scanning speed of monochromator. Parameters will be adjusted with Marijan S. today.

SQS:
- Loop for moving DSSC got a fault but has been addressed by EEE.
Entry   Notes XO Integration Meeting 28.07.2021, posted by Arvid Gebhardt on 28 Jul 2021, 09:29 

General Announcement:

- No general announcement.

CTRL:

- Problem with cameras / DAQ: fixed yesterday and tested at SA2/MID.

- Issues with SA3 vacuum loop: work ongoing and further investigations are needed.

DA:

- Nothing to report.

EEE:

- Cables available for HED to be installed next week – date to be discussed offline.

- Fast electronics side: working on FXE and HED issues;

- Nerea J. reports on the VAC/SA3 issues: instability with devices going into an unknown state. Alessandro S. works at the night shift in the DOC and will try to fix a permanent fix during the night.

VAC:

- SA3 issues are affecting also the gas attenuator (not only general SA3 vacuum loop but also GATT is affected, which has its own loop). There are no physical events - seems to be electronic. Stability issues to connect devices; Seems to be more related to infrastructure (PLCs). Further investigations are needed.

ME:

- Not present.

XPD:

- SPB imager: change setting of motors (it shall work now) and next week when A. Koch is back further investigations will be done.

DET:

- During the night after 02:00AM: SPB AGIPD K-bridge went OFF. Under investigation. Detector recovered this morning.

ITDM:

- Nothing to report.

XRO:

- Not present.

LAS:

- Nothing special to report.

UNSYS:

- Nothing to report.

SPB:

- Issues with wings of Agipd, causing also interlock trigger. Under investigation.

- 11PM last night: laser interlock triggered. It happened also in the past and SPB will get in touch with Safety today.

- XTD9 IMG: currently working but a permanent fix is welcome in the future.

FXE:

- Not present.

MID:

- All fine.

HED:

- Major issues with Agipd detector yesterday (thanks to DOC for help): 1. Could not kill the service and CTRL investigated; 2. Clock and control did not work (it has worked at CFEL last week). The issue was solved by changing the clock controller back to old configuration (EEE helped). Bruno F. comments that the clock control had to be downgraded in this detector (it worked in other detectors, only this one did not work). Further investigations will follow.

SCS:

- Change of speed from the monochromator was not possible. EEE and CTRL are working on it.

- Next week will run with a special train picker / bunch sequence pattern as the one used last week.

SQS:

- Vacuum problem as mentioned.

- Commissioning DSSC for future beamtimes.

Entry   Notes XO Integration Meeting 26.07.2021, posted by Arvid Gebhardt on 26 Jul 2021, 09:20 

General Announcement:

- Power glitch 3 times at night, what brought down the beam for 1,5 hour each time. Please report to XO if you find devices affected.

CTRL:

- Datalogger update to take place today between 16:00-17:00. Please inform CTRL in case of problems with this schedule.

- Aravis camera and bunch pattern decoder to be updated at around 14:30. Please inform CTRL in case of problems with this schedule.

DA:

- OCD side: no new problems.

- Follow up last Wednesday: better is to use the new Karabo with the fix and not to downgrade the Karabo version.

EEE:

- Ticket from SCS was solved.

VAC:

- Some trouble with the pumps in the gas attenuator SA3. It needs to be fixed today in the tunnel with a ZZ (30 mins).

ME.

- Not present.

XPD:

- Are investigating, if something is affected by the power glitch. So far nothing was found.

DET:

- Nothing to report.

ITDM:

- Two issues to follow with MID: 1. Bassler camera seems to be the data wrongly recorded at DQA. Tests need to be done; it’s a camera used for feedback. Ulrike B. will talk offline with K. Wrona.

- Second issue: on Friday there was one ADC from tunnels to be used from MID was requested a bit late. Data comes from the uTCA from Desy network. If this device is going to be used in full, it has to be set inside Desy network.

XRO:

- Not present.

LAS:

- Two incidents: the power glitch at 19:23 yesterday took Amphos in SA1 down. It is back and operational; In SA3 LAS is further investigating the Amphos.

UNSYS:

- No problem with the power glitch.

- The temperature in SA3 Undulators is stable.

SPB:

- SPB imager at XTD9: is not working and has to be changed the outcome needs to be fixed of XPD. Naresh K. will contact SPB.

FXE:

- Not present.

MID:

- All good at MID – not heard on affected systems due to the power glitch.

- Friday afternoon confusion with the fix of Extra Foam bridge. Probably DA is aware.

HED:

- Vacuum system ok after power glitches.

- Nothing to report.

SCS:

- Not present.

SQS:

- Not affected by the power glitch.

Entry   Notes XO Integration Meeting 21.07.2021, posted by Frederik Wolff-Fabris on 21 Jul 2021, 10:05 
General Announcement:
- XO would like to remind instruments that in case it is planned to use beam after 23:00, please put this information in the delivery table for that all involved parts are aware of it.

CTRL:
- CTRL has prepared the fix for the new Camera and would like to apply it. Instruments are in process to be contacted to arrange the best suitable time (10min downtime).

DA:
- MID observed incompatibility in Karabo bridge and framework. Two fixes can be done and will be arranged with instrument contacts. Upgrade of Karabo bridge must be less invasive. 
Steffen H. adds that on MID the hot fix did not make the expected result, so the less invasive is better option.

EEE:
- Nothing to report.

VAC:
- Not present.

ME:
- Not present.

XPD:
- Not present.

DET:
- Tests with LPD are being carried on (for the electronics; at FXE hutch last Monday). Detector has a small issue with configuration. If LPD runs correct, then it will be available. More information to 
come until next week.

ITDM: 
- K. Wrona mentions on the internal proposals. If one wants to have a logbook this has to be requested in advance as it is not automatically created. 
The procedure for the internal proposals is set in a way that a request for the creation of logbook has to be made (and not at the last minute).

XRO:
- Not present.

LAS:
- All laser available for delivery.
- SA1 laser timing system was changed last Monday morning. If someone wants to change timing system (or accidently has changed), please contact LAS.

UNSYS:
- Klima PKG in SA3 must be still OFF. Temperatures in the vacuum chamber are being monitored.

SPB:
- Nothing to report.

FXE:
- Started preparation for commissioning and user experiment. LPD test is prevented by issue with broker control.
- PLC crates installation/update is ongoing with Loop2. This has to be coordinated as they get beam today at 15:00. Nerea J. says there are issues with that crate and it is planned to be done today.
- Access into Doocs for changing XGM settings were not permitted (due to access rights). Desy colleagues from BKR explained that the mapping to accounts have been lost. The BKR colleagues are making the 
changes when requested by FXE.

MID:
- Not present.

HED:
- Thomas P. asks if the operators table had been discussed with XO as he was absent last couple of weeks. A. Galler confirms Ulf Z. had contacted XO and the tables have been shown at the recent UOMs.

SCS:
- Commissioning phase and looking forward to the beamtime.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 19.07.2021, posted by Frederik Wolff-Fabris on 19 Jul 2021, 11:37 
General Announcement:
-  A. Galler asks the instruments to also take a look at the operators table as they have a shift-by-shift information for X-ray delivery, not only into the delivery tables.

CTRL:
- Influx logging update: CTRL might have found the couple of devices producing the problem. Solution has been found by restarting and synchronizing the timing clock.

DA:
- Nothing to report.

EEE:
- Nothing to report.
- MID cabling is done.

VAC:
- Nothing to report.

ME:
- Not present.

XPD:
- Nothing to report. 

DET:
- Assessment of the humidity issue; minor problem with the control humidity (power supply) interlock.
- A. Galler asks when PP will be available to FXE. Answer is that there is not yet a fix date.

ITDM: 
- Nothing to report.

XRO:
- Harald Sinn says the three SASEs were aligned, excluding the Monochromators. Beam is available at the end of the tunnels.
- Issue 1: at HED the M3 mirror was with Platinun strip inserted for sometime and may be damaged (it has been changed). 
- Issue 2 with backlash: running in a single mode and must be two backlash – ticket issued to CTRL and may affect the MC motors. Nerea J. is aware and get in touch with Harald Sinn (info from Jorn 
R.).

LAS:
- Trouble with humidity changes and can't guarantee beam pointing. Next few days one must be able to get back the proper operation. Changes from Desy originated the change and TS was not informed.
	
UNSYS:
- Suren K. informs that the PKG in SA3 does not work. A ZZ is needed by TS (Christian Holz). A ticket has been written for ZZ. TS has only one person allowed to go to tunnel but one UNSYS technician can 
accompany TS.

SPB:
- Nothing to report.

FXE:
- Not present.

MID:
- All fine.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 14.07.2021, posted by Andreas Galler on 14 Jul 2021, 09:28 

General Announcement:

  •  

CTRL:

  • InlFlux logging, some statisitics had been gathered --> but no root cause had been found.
    • Load Balancer would needed to be restarted --> data inside buffer would be

DA:

  • all good

EEE:

  • PLC team is still busy with check up of the "fuse" issue
  • MID cabling going

VAC:

  •  

ME:

  •  

XPD:

  • one XGM didn't ecevice a signal
    • quickly resolved
  • downstream XGM's are running as well

DET:

  • AGIPD
    • dark procedure fixed and seems to be working now at SPB/SFX, has to be installed at HED and MID
  • LPD
    • 3 supermodules had been moved to the DET LAB --> so far visual inspection does not show major issues
    • no module powered yet
       

ITDM:

  • nothing to report

XRO:

  • SA1 was aligned
    • SPB/SFX done

LAS:

  • humidty in PPLAS
    • TS working on it
      • PKG after maintenance did not come back to specs

UNSYS: 

  • nothing to report

SPB/SFX:

  • nothing to report

FXE:

  • nothing to report --> shutter porblem solved

MID:

  • nothing to report

HED:

  • nothing to report

SCS:

  • triggers

SQS:

  • nothing to report

AOB:

  •  

Entry   Notes XO Integration Meeting 12.07.2021, posted by Andreas Galler on 12 Jul 2021, 09:29 

General Announcement:

  •  

CTRL:

  • InFlux, still experiencing delay with querying the database (20min, karaba; 5min Grafana)
    • Jan reports that in the XGM trendlines a similar effect is seen

DA:

  • nothing to report

EEE:

  • Friday call from BKR, because of MPS blocking
    • FXE SHUT MPS signal was not reset
    • ZA comments, that the reason is not yet clear --> ZA is contact with Rathjen and MPS experts

VAC:

  •  

ME:

  •  

XPD:

  • For the FXE SHUT it seems MPS and karabo data are differeing
  •  

DET:

  • LPD
    • Hazem is back on Friday --> Supermodules will be tested then in the Lab
  • AGIPD
    • special dark procedur currently not working well

ITDM:

  • nothing to report

XRO:

  • This week, component check in all SASE tunnels
  •  

LAS:

  • nothing to report

UNSYS: 

  • Friday
    • SA1 cell 10, Suren exchanged the coupler

SPB/SFX:

  • nothing to report

FXE:

  • nothing to report
    • PLC issues loop4 and loop7 solved

MID:

  • nothing to report

HED:

  • nothing to report

SCS:

  • nothing to report

SQS:

  • nothing to report

AOB:

  • Zunaira --> beam shutter keys

Entry   Notes XO Integration Meeting 07.07.2021, posted by Andreas Galler on 07 Jul 2021, 09:14 

General Announcement:

  •  

CTRL:

  • nothing to report

DA:

  • Nothing to report

EEE:

  • XTD 10 ZZ uTCA excahange

VAC:

  • nothing

ME:

  • nothing

XPD:

  • within next three days XPD equipment to be checked with x-rays
  • DAQ test next Monday
  •  

DET:

  • LPD
    • communication with RAL and STFC, no sign of corrosion --> single module to be taken out and test in the lab

ITDM:

  • nothing

XRO:

  • nothing
  •  

LAS:

  • redmine tickets

UNSYS: 

  • nothing to report

SPB/SFX:

  • ITDM DAQ test today

FXE:

  • nothing --> hutch being prepared
  • PLC loops 4 and 7 are down due to hardware issues on the PLC --> EEE on it.
    • sample stack --> loop4 preparation delayed

MID:

  • pre is going on, everything

HED:

  • nothing

SCS:

  • nothing

SQS:

  • nothing to report

AOB:

  • Zunaira --> beam shutter keys

Entry   Notes XO Integration Meeting 05.07.2021, posted by Andreas Galler on 07 Jul 2021, 09:07 

General Announcement:

- User Operations Meeting will resume on Friday

CTRL:

- Last week found small bug for the fastADC – short down time requested

DA:

- Nothing to report.

EEE:

- Fast electronics – are planning a ZZ

- Fuses issue – MID & HED medium priority crates fixed

- SASE 3 vacuum loop has to be updated – today afternoon or tomorrow around lunch timewill be coordinated by XO with EEE and MXL

VAC:

- Nothing to report

XPD:

- Start up of equipment

DET:

- Nothing to report.

ITDM:

- Nothing to report.

XRO:

- Nothing to report.

LAS:

- Alignment Laser interlock issue at SA3, being investigated

UNSYS:

- Nothing to report.

SPB:

- some motor issues after crate restarts in connection with but not caused by the works adressing the fuse issue

FXE:

- Nothing to report.

MID:

- all fine

HED:

- nothing.

SCS:

- Nothing to report.

SQS:

- Nothing to report.

Entry   Notes XO Integration Meeting 30.06.2021, posted by Frederik Wolff-Fabris on 30 Jun 2021, 10:55 
General Announcement:
- D3 starts the radiation interlock / TUV tests at XHEXP1 today. Initially by SA1, followed by SA3 area. 
Torsten Schoen will be available to bridge SA2 power supply only when tests are to be done in these instruments. One can work in SA2 until RPOs arrive to start tests in that hutches.
- Accelerator will start next week and first delivery beam to instruments is on cw29.
- First UOM starts on July 9th possibly discussing X-ray delivery parameters.

CTRL:
- Influx logger stress tests taking place this morning between 10:00 and 11:00. 
- Karabo 11.2 is out and instrument contacts will get in touch for deployment.
- Fix for the time zone configuration together with EEE: hopefully by the end of the week this will be fixed automatically otherwise it is done manually.

DA:
- Nothing to report.

EEE:
- PLC modifications at SQS is done; then followed at SCS and FXE.

VAC:
- Nothing to report.

ME: 
- Working together with VAC, XRO, XPD and UNSYS.

XPD:
- Andreas K.is working in XTD9, testing synchronization signal for Shimadzu camera (sync signal comes from PLC).

DET:
- LPD detector at FXE had water condensation yesterday. The chiller was ON with low temperature set (15 C). Together with EEE put detector in safe state (detector was OFF but not the chiller). 
Responsible person will be back in two weeks. Martin K. adds says that temperature setpoint was then set to 22 C and there is no apparent reason for the 15C set.

ITDM: 
- Nothing to report.

XRO:
- Info to SA3 instruments: XRO would like to test SA3 mirror motors from 10:30-11:30. Please do not touch mirrors in this timeframe. SQS and SCS do not see problems with it.

LAS:
- SA1 and SA3 PP-lasers are restarted and preparing for operation.
- Trigger for SA3 PP-L after Karabo upgrade does not work. The feedback also does not regulate. Tickets were sent to CTRL. After feedback it may contact also EEE.
- SA2 Seeder oscillator is exchanged and sync has to be restarted.
- A. Galler asks about spares for Seeders. Man J. says the spare was installed in SA2; one remaining oscillator is used in the lab and then LAS must stop R&D projects in case it is used as spare for one of 
the PP-lasers.

UNSYS:
- Nothing to report.

SPB:
- Richard B. says tunnels trigger that XPD works in tunnel have no relation to the timing trigger board.

FXE:
- LPD issue: chiller appears to be dry again this morning after setting it to 22 C.

MID:
- Nothing to report.

HED:
- Fuses activity to start today. EEE and Bruno F. confirm this plan. 

SCS:
- All fine at SCS.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 28.06.2021, posted by Frederik Wolff-Fabris on 28 Jun 2021, 10:28 
General Announcement:
- A. Galler reminds that Interlock tests are coming this week to the hutches. D3 did not make a schedule with respect to each hutch and when. 
As soon as the interlock tests are done in one instruments this will be informed to XO which in turn will communicate to the respective instrument.
- Thomas P. asks if there is a way to bridge instruments only for the tests and not for the whole two days. XO will check with TS and SRP; during the tests one can't access the hutches; 
in case one has the bridge done for the two days one can also work there with the presence of the EQP.

CTRL:
- Scheduling announcement: 
1. Bug in the current fast ADC devices. This is applied at LAS and will be deployed for the whole facility. Proposition for the tunnels is today afternoon; 
2. uTCAs in general: time zone is set to Greenwich time; it is not a major issue but CTRL will ty to fix that; 
3. CTRL will use the Influx logging by testing with the Interlock signals; 
4. Legacy Read the docs will be switched OFF.

DA:
- Nothing to report.

EEE:
- Today start cabling installation at SQS.
- Fuse changing currently ongoing in SQS and to start afterwards at SCS.

VAC:
- Information for tunnels: XTD9 may open again Tuesday afternoon for other works.

XPD:
- XPD is interested to work in XTD9 when it can be opened again.

DET:
- DSSC detector activities at SQS: commissioning without beam is over and was successful. Commissioning with beam to be done on cw30.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Finished all fuse works at SPB. Few issues were found on Friday and other tests are still ongoing. Richard B. will inform other groups on the issues via XO.
- Received DAQ test request from Parthasarathy T. and shall be ready for Wednesday.

FXE:
- Issue with uTCA bug on the 10Hz trigger appeared but has been fixed.

MID:
- All fine at MID.

HED:
- All fine.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 23.06.2021, posted by Frederik Wolff-Fabris on 23 Jun 2021, 10:41 
General Announcement:
- In case groups had issues with power glitch on last Sunday, please let XO know for that this will be discussed with Desy.
- Interlock tests are happening and will reach the hutches on next week. In the past there is little to no implications to the instruments. 
During the tests it shall be transparent but no access shall happen during the tests time interval. As soon as XO receives a detailed plan from SRP/D3 this will be 
communicated to the groups. 

CTRL:
- Influx logging issue has been solved by changing settings together with ITDM.
- Announced updates for the PLC (ELMO motors / settings of rotary encoders): to be deployed tomorrow early in the morning (PLC continues to run); 
For the tunnel topics CTRL proposes to make tomorrow at 8AM and instruments shall coordinate with contacts in case there is restrictions for this time.
- Found small issues with a fuse when connecting to the middle layer of Beckhoff devices. It has not been a problem.
- Natalia G. informed a motor was not working and EEE could solve it early enough. Checking systems in advance is a good practice.
- CC updates to be done tomorrow and rolled to the back properties.
- Read the Docs legacy mode will be switched off on 5th July.

DA:
- Reminder that today the offline detector calibration is not available.

EEE:
- Beckhoff terminals / Fuse issue work is ongoing. EEE waits for contact feedback from other instruments.
- SA3 balcony room and PP-lasers uTCA updates ongoing.

VAC:
- Not present.

XPD:
- One XTD2 door was defective and Jan G. reported on Monday evening to TS which informed Desy colleagues. Ralf E. informed this morning that the door was fixed. 
Issue was a disc of the magnetic contact which had fallen and therefore door was not working properly.
- Motor issue in XTD2 (stuck in inserted position): technosoft control motor for MCP detector. EEE and XPD worked on it and is mostly solved. 
One needs a feedback from CTRL to find why this particular motor looks different from similar devices.
- Tunnels works are done.

DET:
- DSSC improvements taken place and is progressing.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Proceeding with SA1 AMPHOS maintenance and expecting to be done by today.

UNSYS:
- Nothing to report.

SPB:
- Doing well with fuses changes. It tries to finish all of them in the next few days.
- Couple of issues with uTCA updates but Bruno F. is helping.

FXE:
- Nothing to report.

MID:
- Contacted Joern R. / EEE to give feedback on cabling.

HED:
- Nothing to report.

SCS:
- All fine at SCS.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 21.06.2021, posted by Frederik Wolff-Fabris on 21 Jun 2021, 10:56 
General Announcement:
- Interlock tests starting this week. An e-mail was sent to xo-info@xfel.eu and if clarifications are needed please get in touch with XO.
- Zunaira A. asks if XO knows if emergency OFF will be tested and power would be bridged. 
XO has no info on specific tests for emergency buttons and understands power will be bridged as it was done in the past. XO will confirm with Wolfgang C. / D3.
- From Wednesday of this week tunnels will be closed. If a task is pending, please contact XO.
- Jan G. asks if uTCA maintenance in tunnels are finished. Bruno F. says that tunnels are completed.
- Sunday morning 7:30AM there was a warning on the power stations but no systems faced power outage as much as it was reported. Please check your devices and systems for 
potential power failures yesterday.

CTRL:
- Control monitors update happening this week.
- Today CTRL needs exclusive SA3 access to motion loops for middle layer devices updates.
- Cameras with Clone work in the Lima version: intervention for these cameras between today and tomorrow.
- Influx logging system: CTRL asks XPD that there are messages being received frequently from the PES and needs to switch it OFF for a while. 
CTRL will contact Joakim Laksman if tests are being made otherwise it is not a problem to stop PES for minutes.

DA:
- Nothing to report.

EEE:
- uTCA updates to continue on Wednesday.
- SPB crates modifications ongoing and discussion with other instruments is taking place.
- Missing feedback from MID and HED for cable installation. 

VAC:
- Finishing tunnels tasks.
- Question to EEE on when the issue with SA1 vacuum loop could be addressed. Bernard B. says he will check the issue mentioned Friday afternoon by today.

XPD:
- SA1 alignment of Shimadzu camera ongoing; Other works from A. Koch are finished.
- Jan G. says that tasks are finished apart of a MCP motor in SA2 (ticket has being issued and Bernard B. will take care of it after this meeting). Issue is that motor 
does not move in reality.

DET:
- Nothing to report.

ITDM: 
- Reminder was sent on creating new proposals for the next half-year. Related in a change in how to clone the commissioning proposals. Please give a feedback to ITDM 
today.

XRO:
- Working in tunnels.

LAS:
- SA1 AMPHOS activity is ongoing and takes longer than expected. To be finished tomorrow or Wednesday. It has to be discussed with XO as other activities are planned 
which affect SA1 PP-laser.
- On Friday SA3 there was cooling water maintenance that switched off PP-laser. To be addressed by XO.

UNSYS:
- Nothing to report.
- Tunnels can be accessed until Tuesday 21.06. Zunaira A. adds that the Interlock tests started this week and go on during next week.

SPB:
- Supporting EEE with changing the crates. Good progress has been done.
- Problems with uTCA crates after the upgrades (fast-ADC can't be reset; previous settings are missed after the upgrade).

FXE:
- Nothing to report.

MID:
- All fine at MID.
- Contact to EEE will be made on the cabling feedback.

HED:
- All good at HED.

SCS:
- Nothing to report.

SQS:
- Last Friday tried to run digitizer again after upgrade: minor issue and if not solved today SQS will get in touch with EEE/CTRL.
Entry   Notes XO Integration Meeting 16.06.2021, posted by Arvid Gebhardt on 16 Jun 2021, 08:37 

General Announcement:

- Interlock test next 2 weeks starting on monday - from next wednesday the photon tunnels will be closed; Tests are the XHEXP1 take place on 30.06, 01.07 and 02.07 with the last date as reserve; An email is going to be send by FWF to the xo-info@xfel.eu list.

CTRL:

- List of items to be sent to readiness: 1. problems with lima based cameras (Lima library does not work – needs to be updated: instruments contacts shall get in touch); 2. In SA1 there is legacy Undulator Karabo scenes – vector properties have to be adapted; 3. Counter Clocking motor devices upgraded next week.

- A. Koch asks if SA1 was working this morning. Steffen H. says there were updates but must be running now.

DA:

- Next wednesday will be the Offline calibration update deployment

EEE:

- Shutdown activities going well; "Wille" is short in people but scheduling adjustments with FXE and MID is organized.

- If there are short circuits or mal functions in the Beckhoff crates and current is not high enough to trigger the fuse it may be a fire risk. Solution is developed without impact in firmware, just a replacement of fuses. EEE starts today at SPB the changes; Based on this experience a plan will be made for the other systems and EEE will get in touch with groups.

VAC:

- try to get the works finished in the tunnels

- waiting for the Beckhoff crate works

XPD:

- Most of the tunnels works have been done; others are ongoing; No surprises are expected.

- MKK logbook from Desy reporting about electrical issue. XO will check. (XO update at 13:30: automatic mailing system is being commissioned and under testig; no power failure happened at the time).

DET:

- Work with DSSC in SQS going as planned.

ITDM:

- Work currently being done at FXE.

- Reminder of Friday afternoon gateway update.

XRO:

- Not present.

LAS:

- Nothing special to report.

UNSYS:

- Greasing the linear stages for undulators but not in SA2 (missing grease).

- SA1/SA2 after middle plane alignment UNSYS redefined the minimum gap and will be communicated through XO.

- Cell#36/SA2 there is a cable disconnected that need to be fixed.

- SA1/SA2 working with PS tables for extending operating tables for higher photon energies.

SPB:

- Work with EEE changing all the crates (Beckhoff)

FXE:

- Nothing to add

 

MID:

- Several ongoing infrastructure works are going fine.

- Worried with Beckhoff fuses (reported two years ago by Konstantin). It will be good to hear experience with SPB.

HED:

- Nothing to add

SCS:

- Nothing to add

SQS:

- Nothing to add

Entry   Notes XO Integration Meeting 14.06.2021, posted by Frederik Wolff-Fabris on 14 Jun 2021, 10:15 
General Announcement:
-	

CTRL:
- Announcement: tomorrow starts Karabo deployment on FXE in SA1 as well as ITDM; Wednesday the MC2 upgrade for the rest of facility (already done in SA2) will take place.
- Device clone fix to be deployed today (e-mail sent to readiness).
- Two versions of ReadtheDocs exit (Old one will be OFF on the July 5th). If someone has an old project at the old version of ReadTheDocs please change to the new 
version.

DA:
- Nothing to report.

EEE:
- Reminder that uTCA systems are under maintenance this week (interruptions planned in balcony rooms).
- EEE received report last Monday from SPB with issues on motor cables from Beckhoff controllers. Electrical current could go very high but not enough to trigger the 
fuses and consequently overheats and has a fire risk. 
EEE is looking implementations to take place this week in crates. Ordered parts shall arrive beginning of this week. 
It is a large intervention to introduce 1-2 fuses in the modules/terminals of all crates in tunnels and experimental Hall. 
- Steve A. adds that the changes are piece cases, each crate will be touched; if 50% of the crates are changed during this maintenance, one reduces 50% the chances for 
fire. 
P. Gessler comments that one has to limit the current of the 24V terminals, by introduction the additional fuse. All crates will be touched but it is a linear change.

VAC:
- Investigating the situation with motor terminals. A. Galler says tunnels will start being closed next Monday and will find the exact date for XTD6 and XTD9 closure.
- Shutdown work ongoing but no issues to report.

XPD:
- A. Koch, N. Kujala and W. Freund say there is nothing to report.

DET:
- Nothing to report.

ITDM: 
- Reminder on the e-mail of the gateway maintenance proposed to take place on Friday. In case of issues please contact ITDM.

XRO:
- Nothing to report.

LAS:
- Nothing to report.
- Pouneh S. asks when AMPHOS engineer will come this week. Man Jiang (LAS) says that work starts today from 10AM with the amplifier in SA1. 
Man J. will inform back Pouneh on a detailed schedule for this week.

UNSYS:
- After a delay in Afterburner project activities with MEA group, the infrastructure problems at the beginning of last week were solved by TS. 
The work is currently ongoing for the afterburner project and mechanical elements have been installed. 
- Today there will be adjustment of the base plates pedestals; from tomorrow work with concrete filling takes place. Planned tasks for the afterburners will be completed.
- Cell18/SA1 problem: it was not needed to replace the quad mover.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- All fine at HED.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 09.06.2021, posted by Frederik Wolff-Fabris on 09 Jun 2021, 10:14 
General Announcement:
- Zunaira A. says that on HED on Saturday there was the 2 hour break on the search mal-function. It was solved by manual restart done by Eric B. (origin was the DACHS 
issue) and we do not have an OCD for this matter - basically depends on the goodwill of people. 
Jan G. says that there is no OCD for what Eric B. and Dennis K. did. It would be nice to find a solution for such situations - if this happens during the weekend, this 
may have the end of an experiment. 
Zunaira A. asked Eric B. to file a non-conformity report to be shared with XO.
- There is no UOM meeting next Friday.

CTRL:
- Karabo updates on most of topics are performed yesterday. Few issues in SA3 and HED are under work today. Few open points: 
1. new GUI features: a configuration may be an issue but an e-mail is sent; 
2. EuXFEL gateway hosts to be updated today after lunch with interruptions on running scenes. GUI 2.11 will be installed.

DA:
- Karabo installation on online calibration will be done under arrangements with instruments, mostly likely this week.

EEE:
- Monday point concerning cooling water effects: uTCA will not be affected (no interruptions for e.g. PP-Lasers).
- Next week schedule for uTCA maintenance: it does not affect LAS and balcony rooms. E-mails will be sent when maintenance is done and systems are available.
- SPB issue with PLC wiring on fuses - EEE is analyzing for proposing modifications.

VAC:
- Working on tunnels.

XPD:
- All XPD devices are in safe state.
- Beryllium covers in Hirex are placed.

DET:
- Nothing to report.

ITDM: 
- ITDM finished maintenance of online resources (clusters/storages/migrations). Most of the DAQ is back in operation.
- In the course of June ITDM close the commissioning like proposals. All PIs/contacts of instruments will receive an e-mail with details for procedures to be done.
- Plans for the usual XFEL gateway update: tricky to schedule. A proposed date is by the end of the next week, on Friday 18.06 later afternoon. 
Janusz S. and/or XO will send an e-mail to readiness for spotting eventual issues with this date.

XRO:
- Maintenance work is going well accordingly to the schedule.
- Karabo updates: Maurizio V. understands the gateway update just makes Karabo not usable and asks if it changes anything else. His concerns are with having time for 
check. 
Janusz S. says the operating system reboot only and Karabo installations are done before. Steffen H. says that today between 11:12:00 there is an update on the gatway 
already. 
No effects are expected for devices. New servers are to be installed and commissioned. Karabo updates are being done already and there is time for checks.

LAS:
- Nothing to report.

UNSYS:
- Monday's problem with MEA and Apple-X pre-installation works: It was solved and works continue from today. It is still planned to finish until the end of the shutdown.
- For Quad in SA1/Cell18 the problem was a loosen cable and simple to recover.

SPB:
- On the damaged 20um Si attenuator: it locates at SPB branch.
- Romain L. points to a communication issue with the DAQ maintenance done yesterday: Janusz S. says that this was submitted to the maintenance and happens every 
maintenance. XO will address the case.

FXE:
- Work with crate in the tunnel: cooling water for the Mono stopped. Nerea J. says that there is works by the VAC on this crate. Cooling water will be restored after 
finished work.

MID:
- Nothing to report.

HED:
- Issues with HED Karabo update are being taking care (issues with fuses).

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 07.06.2021, posted by Frederik Wolff-Fabris on 07 Jun 2021, 10:29 
General Announcement:
- Accelerator has been shutdown this morning and the Summer/21 maintenance period has started.
- A. Galler asks the instruments to check the beamlines are in safe state for that tuning and setup starts after the maintenance without potentially damaging equipment.

CTRL:
- Reminder that tomorrow CTRL starts the deployment of larger Karabo topics (details with contact persons).

DA:
- Nothing to report from OCD service.
- Detector calibration: Philipp S. reminds that the pipelines/services will be temporarily removed for updates but it will be brought back.

EEE:
- Nothing apart of maintenance tasks.

VAC:
- Nothing to report.

XPD:
- Jan G. reports as PRC many technical issues happened during the weekend: 
1. Problem with DACHS system (hutch search at HED was not able to be performed). This was a communication problem and DACHS server had to be rebooted There is no OCD over 
weekend). 
2. EPD went down due to network failure (down for all tunnels and was fixed on Sunday). Martin Dommach confirms that the entry at TXD9 was possible this morning.
- XPD reports on a comment from SPB on June 1st says a damage of 25um Si was found. Jan G. asks more details which device it is. 
M. Sikorski will check that. Naresh K. says it shall be in the SPB branch.
- XGMs are powered down for the maintenance.

DET:
- DRCs/DOC is OFF during the maintenance period. If support is requested, please contact support via ticketing system.

ITDM: 
- For the shutdown period, the emergency IT phone is available only for critical service (old number 98070).
- Storage systems will be serviced and will not be in operation all the time for the next weeks.

XRO:
- Not present.

LAS:
- SA2 and SA3 PP-lasers will be running next weeks for instruments.
- AMPHOS work taking place next week: needs cooling water and timing system until June 22nd. For short interruptions of 20 minutes the doors will be opened. 
Patrick G. says that local timing is a good solution. Tomasz J. says they have equipment to provide for 1 PP-Laser.

UNSYS:
- Quad mover issue in cell18/SA1 will be looked on today or tomorrow.

SPB:
- Nothing to report.

FXE:
- Nothing to report.
- A. Galler asks if cross talk was observed during the weekend. Jan G. says he talked to SQS this morning and they made checks and on Saturday they did not find any shift 
or cross-talking. 

MID:
- All fine at MID.
- Accesses in the optics hutches may be restricted. Also the experimental hutch has restricted access. If access is needed, please contact MID staff beforehand.

HED:
- DACHS system: one has to investigate further in the cache if this will happen again. 
Jan G. says that there is an entry by D. Kruse and the hutch search is another issue. Maybe the cache works only for one and not both issues.
- For the ADC T. Preston will investigate why the bunch pattern was not read correctly when changing the settings.

SCS:
- Nothing to report.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 02.06.2021, posted by Frederik Wolff-Fabris on 02 Jun 2021, 10:24 
General Announcement:
- XO reminds staff to check the safety trainings and the DACHS access rights/permissions for the tunnels when planning tunnel accesses during the maintenance period. 
- A. Galler asks all instruments who work with X-ray beam that in case it is found any damaged component, please take a snapshot and post in the operation e-log. 
This allows to get known prior/during the maintenance period.
- Last UOM prior maintenance period takes place next Friday. 

CTRL:
- For the maintenance period: CTRL will send around the Karabo schedule for updates such as MC2 motors. CTRL will get also in touch with affected people.
- Macro update announcement on Monday will not take place anymore.

DA:
- Nothing to report.

EEE:
- EEE is gathering and scheduling all shutdown tasks and will start next week with tunnel works.
- SASE1 VAC, EPS and MOV, and SASE2 MOV2 loops will be updated next week.
- EEE will also assist, if needed, on the testing of the Mc2 interface migration that Steffen H. / CTRL has informed.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- This is the last week of DOC operation. The DOC will re-start on cw28.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Man Jiang reports all 3 PP-Lasers are running.
- SCS can't open the shutter (interlock issue) but this is not related to LAS.

UNSYS:
- Nothing to report.

SPB:
- DOC has contacted SPB saying Maxwell calibrations failed. This will be checked.

FXE:
- Nothing to add.

MID:
- All fine at MID.

HED:
- Issue with camera at 10:30PM. It Needed to be power cycled. Steffen H. says that the camera worked this morning. Maybe case is already solved. One will keep an eye if 
it happens again.

SCS:
- Issue with Interlock mentioned by LAS. Pouneh S. is working on it.

SQS:
- User operation this week including optical laser. 
- Thomas B. says SQS struggles with temporal overlap but spatial overlap is fine. They have first to find clear signal to investigate more on the temporal overlap.
Entry   Notes XO Integration Meeting 31.05.2021, posted by Frederik Wolff-Fabris on 31 May 2021, 10:18 
General Announcement:
- Next Friday is the last User & Operation meeting for this run. We will have presentations of 3 user groups.
- Today 31.05 is a normal delivery beam day.

CTRL:
- Information for maintenance period: CTRL will update macros for compatibility at SPB and SCS instruments. CTRL will contact the instruments for scheduling.
- Undulator energies were not corrected updated in Karabo. Re-starting the servers may help. A mismatch of values with Doocs were found.

DA:
- Nothing to report - quiet OCD week from last Wednesday.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Couple of connection issues due to power glitch this morning at 4:56AM. All affected systems were recovered.
- The DOC is not operational today. Tomorrow at 7AM the DOC is back to operation. Calls goes today directly to DRC.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- PP-Laser in SA1 is down due to power glitch. Cooling water (8 or 11 C) for AMPHOS was affected and caused this downtime. Water has come back few minutes ago. 
- SA2 and SA3 lasers were not affected. There are different pumps for each SASEs. Lorenz K. is investigating (e-mails from GLT and no warning from MKK). 
- SA1 PP-laser will be stable by the afternoon as requires time for stabilization.

UNSYS:
- Nothing to report.

SPB:
- Laser interlock on Wednesday to Thursday night was triggered: panic button switch was falsely indicated that was pressed. It seems to be a failure in the system. 
Desy / BKR reset it and operation could be restored. 
Zunaira A. says that if panic switch is pressed, then the beam shutter will not be able to be moved (SPB will not be able to receive beam). 
There is no relation with the power glitch.

FXE:
- Nothing to report.

MID:
- Looks fine at MID. Joerg H. asks for an e-mail informing on situations like the power glitch for that groups be informed and check if devices are affected. 
A. Galler says currently the reason for the power glitch is under investigation and will be communicated. 

HED:
- This week will be a busy week due to energy changes already at 7:00AM.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 26.05.2021, posted by Frederik Wolff-Fabris on 26 May 2021, 10:23 
General Announcement:
- XO reminds the procedure for ZZ access is organized through the PRC. 
If a ZZ is needed, please get in touch with the PRC for advice and fill it up the Redmine access request (link located at the TTfinfo e-log). 
The PRC will organize and communicate the access with machine RCs, specially in cases of urgent matters. 
It is not beneficial to do not inform the PRC as components in tunnels have to be checked and/or grounded prior the ZZ access takes place.

CTRL:
- Announcement for the summer maintenance: when updating to Karabo 2.11 some instrument macros have to be changed. CTRL will care that and will get in touch with 
instruments to properly organize it.

DA:
- Couple of E-log entries referring to DA but nothing major to report.

EEE:
- Reminder to FXE, MID, SPB, SCS: please check processes for eligible documentation. 
Bruno F. And Joern R. inform that in Alfresco there are various folders with pending documentations (automatic e-mail was sent to referents). Please contact Jorn 
Reifschlager in case of doubts.
- PES system in SA3: digitizers were stopping after acquiring data for a random amount of time. This will be addressed during the maintenance period, as the fix needs 
several hours of ZZ access.

VAC:
- Not present.

XPD:
- Nothing to report.

DET:
- Couple of issues with FXE Jungfrau detector this morning: solved or under fix.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Everything is fine with Lasers.

UNSYS:
- All good with Undulators.

SPB:
- Progressing well with beam activities during the nights.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report. HED does not receive beam this week.

SCS:
- Nothing to report.

SQS:
- Nothing to report. PES digitizer issue affects SQS but one can continue with it until the maintenance period.
Entry   Notes XO Integration Meeting 19.05.2021, posted by Frederik Wolff-Fabris on 19 May 2021, 10:13 
General Announcement:
- A. Galler says the Interlock Tests schedule is placed at the EUXFEL Infrastructure Calendar. 
Concerning the TUV tests at Schenefeld side, this happens between June 30th and July 2nd (the 2nd is a reserve date). When a detailed schedule is made, this will be 
communicated. 
Tomasz J. asks on the effects for the PP-lasers when, e.g. triggering NOT-AUS. XO will enquire with Zunaira A.

CTRL:
- The ADQ digitizer fix for SQS is working well. If other instruments would like it deployed, please contact CTRL.
- Bassler camers upgrade worked for SPB. One can also contact CTRL for the deployment.
- ITDM will need to exchange memory module in SA2 - Karabo will go down. This has to be scheduled between tomorrow and Friday. It will be coordinated by the PRC and CTRL.

DA:
- Nothing to report.

EEE:
- Yesterday incident in SQS: faulty PLC CPU triggered the OFF for 5 CPUs. Four of them have recovered and the fifth one will be replaced or fixed today.

VAC:
- Not present.

XPD:
- FD studies are ongoing this week. Nothing else to report.

DET:
- Nothing to report.

ITDM: 
- Today the update on the Maxwell cluster. Action take place between 10:00 and 12:00 and running jobs are not affected. Submission of new jobs will not be possible during 
this time.
- Issues with Network yesterday: Janusz S. says they do not have yet the final e-mail from Desy-IT. 

XRO:
- A. Galler says that on Monday the beam power reached 32 W at 2125 bunches. Mirrors were working properly during the whole test period.

LAS:
- All fine with PP-lasers.
- Tomasz J. mentions LAS will ask CTRL for update on the functionality of sync system properties for the PP-laser. In case instruments have also interest on it please 
contact LAS.
	
UNSYS:
- Issue with cell#18/SA1 quad mover: it was agreed to run in this condition until the shutdown.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- All fine at HED.

SCS:
- Nothing to report.

SQS:
- PLC issue yesterday afternoon: vacuum was lost from ^-11 to ^-6. This was a near-miss and almost made SQS to cancel next experiment. It seems to be under fix now.
Entry   Notes XO Integration Meeting 17.05.2021, posted by Frederik Wolff-Fabris on 17 May 2021, 10:25 
General Announcement:
- Adrian Mancuso tells on the workaround for the crosstalk between SA1/SA3 documented by Harald Sinn. The idea was to switch off the feedback prior the bunch changes. 
Harald S. says that it is not sure if this has worked. Adrian M. says that fir the future this has to be addressed as both SA1 and SA3 would like to change bunch number.

CTRL:
- Follow up from the DOC last week: some cameras in HED started in unexpected states. This has been understood and when the update is ready the deployment has to be 
coordinated with HED.

DA:
- From DOC OCDs side only minor issues, that were solved by restarting devices.

EEE:
- Due to the special FD week starting today, there is no DOC this week. 
The DRCs (Patrick G. until Thursday and Monica T. from Thursday) will receive the calls: for normal issues, please send a ticket; for urgent cases call the DRCs. 
One can also contact directly the individual groups.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Incident at SPB with AGIPD detector: damage to several pixels. The cause for it is not yet known. 
The pixel modules have the replaced and the cause relates to intense radiation. It's important to follow up and understand how it happens. SPB will investigate and 
communicate findings.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Everything good with Lasers.

UNSYS:
- Issue with Quad mover in cell18/SA1 - Suren A. could address it without need of access but further investigations have to be done on-site.

SPB:
- Small injection incident over the weekend.
- Problem with one DAQ: number of pulses was OK but not the values. This was solved by the DOC and some data were wrongly saved for the users (attenuation values).

FXE:
- Timing tool tests at FXE during the night: crosstalk between SA1/SA3. When number of SA1 bunches were changed, the beam pointing was changing in SA3. 
So FXE was requested to do not change bunch numbers what hindered the tests.
- LPD issue: progress has been made last week and is being accelerated.

MID:
- Quick warning: until Wednesday some Seeding tests will be ongoing at MID.

HED:
- Successfully experiment last week: HED thank all involved people.
- Addressing CTRL deployment: HED will contact CTRL after this meeting to discuss some details before the deployment action goes on.
- On last Friday at 13:00 one camera corrected configurated did not acquire data and DOC was contacted.
- On Saturday the timing drifted linearly for 0.5ps. HED contacted PRC and DRC and is not yet completely understood.

SCS:
- Nothing to report.

SQS:
- Confirm what FXE has said on the crosstalk with SA1/SA3.
- Sometimes MCP detector was inserted and trigger the EPS to beam stop. Jan G. says that there was a mistake in the interlock configurations for going above 30 bunches.
When SQS wanted to go to 67 bunches it triggered the beam OFF.
Entry   Notes XO Integration Meeting 12.05.2021, posted by Arvid Gebhardt on 12 May 2021, 09:21 

General Announcement:

- User Operations Meeting takes place on next Friday 09:00.

CTRL:

- CTRL would like to excuse itself to people receiving an automatic SMS tonight for notification. This was a test message and now it’s turned OFF (Good side: test for lasers went well).

- ADQ digitizers: two fixes are driven and based for SQS commissioning. CTRL encourage instruments to get in touch with contacts for making the update for the last version.

DA:

- Follow up from Monday / calibration update (on behalf of cal team): it worked as planned. AGIPD seems to run faster now.

- For SQS Remi detectors/digitizers can also be used.

EEE:

- nothing to report

VAC:

- nothing to report

XPD:

- are preparing for FD studies next week

DET:

- Follow-up on LPD online calibration pipeline pointed last Monday’s meeting: work is on progress and is expected to be ready for next week.

- DAQ processing for AGIPD: a minor bug in validation is reported and under investigation. But it is currently working.

- Issue reported for SPB for data aggregators: follow up with CTRL.

ITDM:

- nothing to report

XRO:

- nothing to report

LAS:

- nothing to report

UNSYS:

- nothing to report

SPB:

- not present

FXE:

- Thank to DET and DA for pipeline calibration. Initially it looks promising.

- Last week: digitizer went to wrong configuration. To be fixed with new updated.

- FXE will use the beam during the nights. D. Khakhulin will inform PRC and XO via e-mail.

MID:

- all fine

HED:

- not present

SCS:

- nothing to report

SQS:

- nothing to add

Entry   Notes XO Integration Meeting 10.05.2021, posted by Frederik Wolff-Fabris on 10 May 2021, 10:05 
General Announcement:
- Two smoke sensors affected in SA3 triggering fire alarm: The first one could be reset but for the second one the reset did not work and fire brigade was in. 
Beam operation was recovered only after the External company came to reset it. The downtime of about 4 hours for SA1/SA3 operation happened.

CTRL:
- Nothing to report.

DA:
- On behalf of calibration team: this morning a major upgrade will be done. No access to calibration services during this time.

EEE:
- One loop in FXE was not working during the weekend. Issues with movs/motor loops and the cause has to be investigated (old scripts were in use). No devices were 
damaged.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Deployment for HED calibration taking place shall fix last week's issue.
- A fix for DAQ on AGIPD to be done.
- FXE issue with LPD calibration: still open. This is not related to the DA deployment today. Jolanta S-D. will follow it inside DET.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- Fire alarms in SA3 / cell#22-23 on Saturday evening: BKR informed that could be related to synchrotron radiation on the detector signal. Fire brigade was on-site but no 
fire was found.

SPB:
- Nothing to report.

FXE:
- Thanks to EEE help with Gotthard.
- M2 Mirror pitch issues seems to be back to normal as before. Antje T. (XRO) made ZZ to correct loose gear box.
- Motor loops issues found and addressed by EEE.

MID:
- Nothing to report.

HED:
- Motor stop working and ticket has been written.
- Preparing for experiment this week.

SCS:
- Zoom problems last week has been taken care; Thanks to ITDM.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 05.05.2021, posted by Frederik Wolff-Fabris on 05 May 2021, 10:20 
General Announcement:
-	 

CTRL:
- The device clone deployment went smoothly yesterday.

DA:
- Nothing to report.

EEE:
- Call from DOC referring to motor mirrors in SA1: XRO is investigating together with FXE. The issue is that pitch accuracy can't be reproduced as before.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Issue with offline calibration mention last Monday: the problem has been identified and a software fix is been worked (for HED detector). The calibration team is 
working on it.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report besides the SA1 mirror motors.

LAS:
- Problem with Optics in SA3 PP-laser (either coating degradation or lack of clean) was found. The mirror will be rotated.
- DOC reported a synchronization issue in SA2. It is not a LAS issue, has to be fixed by DOC.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Chris Milne mentions the steering issues with M2 and M3 mirrors and XRO is looking into it. 

MID:
- Synchronization issue with Laser is fixed.
- DAQ issue also fixed during the night.

HED:
- Things reported on Monday have been looked up.
- Train-ID issue: there is a walk around for it and test/fix to be done next week.

SCS:
- SCS asks for a solution to share screens with users in the control room (general solution also applicable to other instruments?). 
K. Wrona says ITDM has solutions that were tested last week at FXE and was working properly. 
An offline discussion between ITDM and SCS will take place to set the solution.  

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 03.05.2021, posted by Frederik Wolff-Fabris on 03 May 2021, 10:06 
General Announcement:
- The deadline for submitting the summer maintenance tasks is ended. In case you have not done so, please submit it as soon as possible.
- Monica T. as DRC invites people to attend the DRC jour-fixe meeting.

CTRL:
- Bug fix for the device clone is prepared and will be deployed today. The clone devices will go down for a couple of minutes only.
- ADC 412 bug: there is a fix and instruments shall get in touch with their contacts for the deployment.

DA:
- One OCD call related to Karabo bridge and usage of online monitoring: the problem was not related to Karabo but with an environment conflict.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- All PP-lasers are up and running.

UNSYS:
- Waiting for the ZZ in SA1 and SA3.

SPB:
- User experiments last week went well again.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- HED run last week went well - quite successful with tests with Laser.
- Missing Train-ID issue was reported to expert groups; All the devices are not correctly seen (arriving some trains later); 
Steffen Hauf says CTRL are working and will be ready to test. There is a chance for tests in the coming week or still this week. 
An offline discussion will take place between CTRL and HED.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 28.04.2021, posted by Frederik Wolff-Fabris on 28 Apr 2021, 10:04 
General Announcement:
- A. Galler points to the deadline for submitting summer maintenance task list on April 30th.
- XO would like to remind instruments that in case of operation failure related to Interlocks issue, please also include the PRCs (prc@xfel.eu) on the communications. 
The Photon Run Coordinators are the first contact point that can help in such situations.
- Tomasz J. asks on the reason for the water-cooling problems with SA1 PP-laser last Monday. A. Galler says the origin was a power glitch that caused the interruption of 
water systems. 
Raul V. says that it's also seen in some tunnel devices but because of the changes in interlock logics this worked nicely.
- Zunaira A. asks why many power glitches are happening. Andreas G. says there were this year 3 events with different causes. 
Last Monday's one was a real power glitch from distribution line; the one on Easter Sunday is under investigation via an 8D report and the one last week was caused by 
human error.

CTRL:
- A bug was found in the devices for HED (clown system). A test in HED will be done prior a full deployment.

DA:
- Not present.

EEE:
- Status of ADQs in SQS: Bruno F. says that it worked yesterday and suspicion is that data were saved locally. DOC and CTRL are following with this issue.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- All fine for Detectors.

ITDM: 
- New feature for data migration is set – main ADC.

XRO:
- Nothing to report.

LAS:
- All lasers are UP and running.

UNSYS:
- Issue with phase shifter in SA2/cell26 this week was solved (Doocs problem).
- Waiting for the ZZ access in SA1/SA3. A. Galler says that when time window opens this will be informed.

SPB:
- Experiment is going smoothly this week.

FXE:
- Last week HED had a few issues with brig brother server when scanning the undulators. The Big Brother was setting bunches back to zero. Issue will be followed up with 
machine.

MID:
- All fine at MID.

HED:
- Nothing to add; thanks to CTRL for looking after the scan tool.
- Test with Relax synchronization will be done tonight.

SCS:
- Started using the PES and recorded runs - about 35% of missing train-IDs. A. Galler says that one point of contact is via DOC. 
Steffen Hauf askes how many boards were using and Laurent M. informs 4 that run in the SCS topic.

SQS:
- Apart of the shift team in quarantine, everything seems to be going fine.
Entry   Notes XO Integration Meeting 26.04.2021, posted by Frederik Wolff-Fabris on 26 Apr 2021, 11:08 
General Announcement:
- The deadline to submit the maintenance task list is on 30.04. We thank all the groups that have already submitted. In case of any question and comments, please contact 
us at xo-planning@xfel.eu
- Patrick Gessler reminds on the DRC meeting on Mondays 13:00. This meeting is done together with instruments to exchange information for the weekly plan. The e-mail for 
contact is drc-jour-fixe@xfel.eu 
- Andreas G. says that with the new 7-11 operation mode, XO is interested in knowing how longtime instruments need to be ready to take the beam in the early morning.
Please inform us for that XO checks the efficiency of this model.

CTRL:
- Remind on Beckhoff training next Wednesday (following e-mail to readiness).
- Upgrades of two Karaboo Beckhoff servers today (Karabo devices go down for 5-10 minutes, proposed to be done today during lunch time): SA2 master tunnel loop; and the 
HED loop.
- Bug on ADQ for twelve devices, affecting SQS and others: EEE has discovered it and CTRL is analyzing to come up with a fix.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- PES in SA3 was provided and operated last week for instrument's usage.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Maurizio V. requests the SA2 experiments to provide information to XRO on issues related with mirror alignments or transport beamline.

LAS:
- Received info from Desy on a power glitch today at around 6AM. At the same time SA1 Amphos switched OFF due to not enough water. 
It’s under investigation with TS. Jan G. points that also there was a beam loss in delivery around the same time.
- SA2 and SA3 PP-lasers are still in operation.

UNSYS:
- Issue with undulator SA1 /cell33 and cell1/SA3 needs ZZ. Currently the impact in operation is minimal and ZZ is postponed to the next available date.

SPB:
- Nothing to report.

FXE:
- Run with beam delivery went smooth.

MID:
- Quite successful beam week with small hick-ups to be addressed with experts.

HED:
- Commissioning beamtime this week; Data analysis will be made this week.
- Test of the PLC synchronization with Relax laser to be done this week.

SCS:
- Not present.

SQS:
- uTCA in ADQ had been mentioned already by CTRL. It has been tackled.
Entry   Notes XO Integration Meeting 21.04.2021, posted by Frederik Wolff-Fabris on 21 Apr 2021, 10:50 
General Announcement:
-  XO reminds on the deadline of 30.04 for submitting the Summer maintenance task lists. For this, please do so sending the list to xo-planning@xfel.eu. 

CTRL:
- Update on undulator Doocs side: CTRL needs to test for two or multi-colors schemes and asks instruments to CTRL if there are plans to use it.
- CTRL will schedule a short practical training on Beckhoff devices for next Wednesday. An announcement will be made through readiness mailing list.

DA:
- Nothing to report.

EEE:
- From the PLC side, EEE is following up the MID/CRLs interlock case.
- If groups submit a change request needed to be implemented during summer maintenance time, please contact and inform EEE beforehand.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- The network cable exchange mentioned last Monday was done.

XRO:
- Not present.

LAS:
- All 3 PP-lasers are in operation.

UNSYS:
- After power glitch on Monday in SA1, about half the undulator cells were half power cycled. Most could be recovered expect SA1/cell33 and SA3/cell1. This will require 
ZZ accesses. 
XO states the power failure was man-made caused.
- Quad mover sudden move: Lars F. from MXL does not have records on the command given for the sudden move and therefore the root cause can't be traced.

SPB:
- Nothing to report.

FXE:
- Beam since yesterday; one interlock issues. 
Nerea J. says a ticket was received and the interlock issue was related to a Imager that always come up activated. This will be removed from the EPS.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Undulator photon energy couldn't be changed via Karabo. Jan-Torben D. will talk to Steffen H; David Hickin adds that the location was changed and the Karabo side is 
done/corrected. 
One needs the BKR connection/authorization and this will be organized by CTRL/Steffen H.

SQS:
- Issue with digitizer on work. It is needed for next week.
Entry   Notes XO Integration Meeting 19.04.2021, posted by Frederik Wolff-Fabris on 19 Apr 2021, 11:39 
General Announcement:
-  Remind on the Summer maintenance period: deadline to submit task list is April 30th. XO invite all groups to submit by this date.

CTRL:
- Remind on the update of some specific Karabo installations to fix bugs (Data logger installations) to start today (e-mail was sent to the readiness).
- Bunch pattern statistics devices need to be fixed today at the same time as the data loggers (relates to lose of time stamps in lasers).
- Upgrade on instruments are coordinated by ICIs; Updates of Mc2 motors today.
- Z. Ansari asks if updates of MID will affect interlocks as well; Valerii B. answers this is a Karabo update and not PLCs, so no effect is expected.
- On recent days CTRL finds Karabo broker pileup and this was successfully understood; DOC was preventively monitoring it and fixed it beforehand.

DA:
- No OCD calls for DA; 
- Collaboration and preparation for supporting SPB/SFX last week and for beamtime continuation in two weeks.

EEE:
- Today 08:30 it was found SA1 tunnel racks lost power. The uTCAs were also down but not the one in room 1.14. It affected SA1 tunnels loops such as Vacuum and motion.
The guess is on a power glitch. XO will bring up to the machine side and eventually correlated with the Easter Sunday's event.

VAC:
- Recovering the SA1 tunnel loops from 08:30 downtime. All seems to be fine right now.
- VAC asks if FXE is running cryo coolers. FXE tells they were running and will check the signals for possible issues.

XPD:
- HIREX motors in SA1 were OFF this morning.

DET:
- One OCD call was received and solved; DET is not aware of issues with Detectors. 

ITDM: 
- On the Wednesday problem with network (in SA1, the online calibration was down): Today a cable will be exchanged. 
- ITDM was involved with experiments together with DA on offline calibrations.
- As DRC, K. Wrona reminds today that 1PM there is the DRC meeting and the participation of instruments is strongly encouraged.

XRO:
- Nothing to report.

LAS:
- SA1 PP-laser is fine.
- SA2 PP-lase with small issue with regulations. Tickets sent to CTRL.
- SA3 PP-laser with several small problems: damage to optics (need to exchange one AMPHOS stage); interlock tripped due to door problems and LAS went OFF. 
LAS hopes to bring back laser and make available for instruments by tomorrow.

UNSYS:
- SA1/cell12 Quad mover sudden move last week: it was not related to a software issue and is under further investigation on Doocs side. A Doocs command was sent.

SPB:
- Experiment last week: quite successful and not many issues.

FXE:
- Nothing to add.

MID:
- All fine.

HED:
- A Motor on the CRL HED chamber was engaged and not moving (hardware issue). It may need a ZZ. It is not related to the CRL's arms.
- SEPS interlock tripped machine on Friday almost midnight (colleagues close shutter before moving CRLs). The beam permission was restored after lens removed from beam.
- ADC is offline. HED will contact Bruno F. offline.

SCS:
- Not present.

SQS:
- Commissioning for preparing next experiment.
- Issue with digitizers that can't be used: Bruno F. adds that action is scheduled for 14:00 as discussed with SQS's members.
Entry   Notes XO Integration Meeting 14.04.2021, posted by Frederik Wolff-Fabris on 14 Apr 2021, 10:50 
General Announcement:
- We would like to remind groups that the deadline for submitting to XO the feedback on the planned activities for the Summer/21 maintenance time is on April 30rd. 
In case of questions please contact XO via xo-planning@xfel.eu

CTRL:
- Updates announced on last XO Int. meeting will take place next Monday (unless if a group protests). This means a short downtime on data loggers in tunnels. An e-mail 
with a reminder will be sent.
- Upgrade for the bunch pattern statistics devices to take place (also will be offline for few minutes).
- Issues with MC2 motors: the workaround is to shutdown device and click/instantiate device. A fix will be deployed.

DA:
- DA involved and continuing with "Moonshot" coordination meeting.

EEE:
- Nothing to add.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Announcement with respect to Maxwell cluster: ITDM will change partition schemes in the next Summer maintenance. 
Three new partitions will be introduced, for calibrations and a special one for reservations for beamtime (UPEX related); 
A new feature is that if Maxwell is full of jobs, one can pre-empty it by killing jobs and putting back in the queue.

XRO:
- Yesterday beam going to HED: some problems were found regarding parameter configurations. 
XRO reminds SA2 instruments to be careful and check devices positions and parameters are they may be changed in relation to April 1st due to the issue with PLCs during 
Easter Sunday. 
- Zunaira A. says there were problems with CRLs arms configurations. Some devices had to be restored but worked normally.

LAS:
- All lasers are fine. 
- Shutters in SA1 PP-Laser were in maintenance mode - without defined reason.
- SA2 PP-laser is fine. 
- SA3 PP-laser has degradation due to the cleaning. XO will address the issue with LAS.

UNSYS:
- All fine.

SPB:
- Running user experiment. Low photon energy yesterday (0.8mJ) and drop intensity over the full 352 bunch train but today it got better.

FXE:
- Nothing to add.

MID:
- All fine.

HED:
- All motors lost positions, e.g. mono, screens being driven (some in and not supposed to be in). CRL1 issue the position was lost at the axis; motors not being homed; 
Zuzana K. will summarize main issues and forward to XO.
- Steffen H asks for a summary of encoders and Zunaira A. also asks on the use of interlocks and CRLs/shutter to evaluate if all is fine. Zuzana K. says HED did not work 
yet on the CRL2 but will communicate as soon as experience is get.

SCS:
- Question to CTRL on the workaround of MC2 motors. Steffen H. says to shutdown device, check configuration and instantiate it again. An instruction e-mail will be sent 
to readiness list.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 12.04.2021, posted by Frederik Wolff-Fabris on 12 Apr 2021, 14:40 
General Announcement:
-	 

CTRL:
- Broker pile-up on Friday: Alessandro S. says that was triggered by network configurations; it took time to recover situation. 
Started SA3 topics for deployment and for few tickets related to that, please get in touch with DRC or try re-starting devices.
- Deployments: 1. Fix for data loggers and timing servers. We propose to do next Monday; 2. Karabo 2.10.4 was released with few bug fixes. CTRL is in touch with 
instruments.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Found on Saturday a problem with SA3 gas attenuator. It was solved with the DOC.

XPD:
- Power increase tests ongoing this morning.
- A. Koch says two servers were not running this morning and will make contact to DRC.

DET:
- Couple of OCD calls received and fixed.

ITDM: 
- Network failure: systems are very sensitive to network failures (switch failure). Relates to replacement of devices.

XRO:
- Some SA3 cameras lost configurations (maybe related to the SA3 event during the weekend): fixed by M. Vannoni. 
- SCS/SQS teams: structure for the M6 chamber has to be fixed (motors): XRO will communicate with the instruments, to keep the motors in proper conditions.

LAS:
- PP-lasers are running. Small minor issues: 
1. SA3 problem with displaying number of pulses. Solved by CTRL by installing latest Karabo server;
2. SA2 still shows small problem with regulations/settings, spectrum started drifting. Can be fixed by OCD but ticket was created.

UNSYS:
- Nothing to report.

SPB:
- Preparing for user experiment this week.

FXE:
- Nothing to report:
- Last Friday PP-laser could not config laser pattern. Tomasz J. says the OCD laser is aware and asks to please also inform DOC/DRC in such cases as LAS can't help in 
this time. 
Monica T. confirms that one has to call the DOC and invite instruments that do not get beam to also join the Monday 13:00 DOC meetings.

MID:
- Suffered with SA2 PLC downtime - mono lost positions.
- Scan energies on the undulators will be needed on next week.
- Last week operation was smooth.

HED:
- Starting operation this week.

SCS:
- Nothing to report.

SQS:
- Spectrum of detectors - two spectras were split. This was reported to BKR and DOC.
Entry   Notes XO Integration Meeting 07.04.2021, posted by Andreas Galler on 07 Apr 2021, 08:52 

General Announcement:

  • .

CTRL:

  • recurrent error reprted by LAS  --> drift compensation in SA2 --> need feedback
  • minor issues reported instruments during startup

DA:

  •  

EEE:

  • Issue on April 4th --> 4 PLCs shut down without a cause, (looks like power cut)
  • MID crate went down at 9:00
  • SA3 utca shut down (could be voltage drop, could be ehternet) (9:35)

VAC:

  • VAC-OCD recovered SA2 vacuum state (valves, and ystem) (see EEE SA2 incident above)
  • VAC obseved that the MID Mono warmed up, the cryo warmed up presumably after a PLCs update which interrupted an interloop communication

XPD:

  • nothing report

DET:

  • everything running fine

ITDM:

  • SA1 baclony room checked
    • some racks lost power --> investifation going on (possibly happened on Sat. Apr 3rd 8:00 am)

XRO:

  • incorrect motor velocity in SA3 --> fixed
  •  

LAS:

  • small issue in SA2 with slow feedback --> see CTRL report

UNSYS: 

  • problem on SA1 central control node, after a power cycle aircoils and phase shifters were unresponsive

SPB/SFX:

  • Laser Interlock issue was solved, power spike involved that reported by MEA3 ( klaus Witt).

FXE:

  • no issues

MID:

  • M1 mirror was moved completely out on 1st of Apr.
    • --> Naresh Kujala moved M1 out.

HED:

  • Laser interlock issue on Tuesday
  • with regards to the MID Mono cryo, there had been HED PLC updates
  • calibration pipeline issue on AGIPD
  • HED utca in optics hutch went off

SCS:

  • no issues

SQS:

  •  
Entry   Notes XO Integration Meeting 31.03.2021, posted by Frederik Wolff-Fabris on 31 Mar 2021, 11:01 
General Announcement:
- There is no UOM on next Friday April 02.
- The next XO Int. Meeting takes place on Wednesday 07.04.

CTRL:
- Loop updates by EEE today - CTRL will follow in case of support is needed.

DA:
- Offline calibration pipeline update was done yesterday successfully.
- Online calibration pipeline update: on Monday it was done in SA2; today it takes place in SPB with tests on the afternoon. These updates are related to the Detectors 
for the upcoming next user experiments.

EEE:
- Update in SA3 and SA2 motion loops from 10:00 to 15:00.

VAC:
- Not present.

XPD:
- Information got on the test of PKG for SA2: tests foreseen for this week was postponed.
- XPD working on the calorimeter.

DET:
- Nothing to report.

ITDM: 
- Update of the dCache storage was successfully done yesterday.

XRO:
- Nothing to report.

LAS:
- SA1 and SA2 PP-lasers are fine;
- SA3 PP-laser problem with timing system was fixed but required longer than expected. Laser was OFF until this morning. SQS shall not count with available laser (50-50% 
chances) tomorrow morning. 

UNSYS:
- PKG test was shifted.

SPB:
- Problem with laser hutch interlock when closing the door: when closing the external door this breaks the interlock (laser hutch). SPB will contact SRP.

FXE:
- Nothing to add.

MID:
- All right at MID.

HED:
- HED loop update takes place tomorrow. Nerea J. will discuss with HED; there is no restrictions from HED side.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 29.03.2021, posted by Frederik Wolff-Fabris on 29 Mar 2021, 10:45 
General Announcement:
- The UOM does not take place on next Friday 02.April.
- Pouneh S. informs the SCS panic button is not properly working (the search hutch does not perform as expected). This does not prevent operation and will be look after 
in the coming days.

CTRL:
- Following the DOC developments; nothing major to be announced.
- Karabo 2.10.4 is to be released which contains features to facilitate opening scenes and has some bug features fixed. CTRL hopes for a wider adoption. 

DA:
- Nothing major to report.

EEE:
- EEE has a time slot on Wednesday from 10:00 to 15:00 to update loops in SA3 and SA2. Updates shall be transparent and an e-mail will be sent. 
A. Galler confirms there will be no beam operation during this time.

VAC:
- Nothing to report.

XPD:
- ZZ request for Shimadzu camera in XTD9: A. Galler says it is not yet scheduled. As soon as valid information is coming, it will be communicated (maybe on Wednesday 
during the loop updates time slot).

DET:
- Small things were fixed with DOC help on available calibration constants for one SPB detector was fixed.

ITDM: 
- Reminder of tomorrow's maintenance on storage system.

XRO:
- Not present.

LAS:
- Thursday's SA2 ADC problem was fixed. Today LAS and EEE will attempt to fix the SA3 missing triggers in the ADC cards.
- All PP-lasers are running.

UNSYS:
- Information: there will be from today to Wednesday tests in SA2 performance with and without air conditioning systems.

SPB:
- Few problems with last week solved by DOC.
- SPB shift crew said machine was running at 2.2MHz. This had to be informed to BKR Operators.

FXE:
- Nothing to report.

MID:
- MID requests that planned interventions in MID hutches that are longer than few minutes and restrict access to it shall be informed in advance. This allows proper 
planning of activities. 

HED:
- Started using PP-laser and preparing for next user run (also tests with THz laser).
- Konstantin S. would like to thank EEE for the help received during last week.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 24.03.2021, posted by Frederik Wolff-Fabris on 24 Mar 2021, 10:06 
General Announcement:
-	 

CTRL:
- In SA2/HED few interlocks are protected and not altered. CTRL needs to re-start the HEDloop1 and HEDcryo loop and SA2 EPS loop. It takes about 5-10 minutes without PLC 
restart. 
Suggestion is to make it today: XO will communicate to HED. 
- When submitting a ticket, please include the device ID on it. 

DA:
- Not present due to training. 

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Problem with SPB Jungfrau: M. Sikorski says the chiller was OFF and two modules are misbehaving. One can’t be fixed now and cards are ordered and have to be replaced.
The Chiller went OFF manually. It may become protected by EPS.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- SA1 and SA2 PP-lasers are fine;
- In SA3 still ongoing due to small problem of missing train-IDs in ADC cards. Consequently, no DAQ data can be taken for SCS and SQS. 
Nevertheless, the laser is ready for SCS use (not yet available to SQS). 

UNSYS:
- ZZ for the cell36/SA1 took place on Monday. The problem related to a coupler (spare parts are available and were replaced). It is fixed.

SPB:
- Start with data collection. Aside from detector, no other issues.

FXE:
- Nothing to report.

MID:
- All fine.

HED:
- Not present.

SCS:
- A problem was found on Monday regarding the door interlock. 
Zunaira A. comments that during a hutch search training it was found that a switch off (red button /panic switch) was pressed and did not release the magnet locks.
SRP has contacted a company and they have to come in to fix it. 
Zunaira A. sends another instruction to SCS staff in how to proceed in case of emergencies (one has to open door manually).

SQS:
- Nothing to report. Panic button at SQS works normally.
Entry   Notes XO Integration Meeting 22.03.2021, posted by Frederik Wolff-Fabris on 22 Mar 2021, 10:14 
General Announcement:
- The Covid-19 health task force is looking into testing schemes to be employed on-site. In the future there will be an opportunity to do the self-tests on-site for 
people who does critical works.
- The UOM series will restart on next Friday 26/03 at 09:00. Communication via e-mail will be send.

CTRL:
- Follow-up for delay train-ID: progressing with discussion on using longer time data.

DA:
- Thomas Michelat reports one issue with Agipd. The Maxwell server was restarted and then issue was fixed. If something similar happens again, the advice is to contact 
Maxwell team from Desy.

EEE:
- Today EEE perform the SEPS update for SA3 Interlock. For SA2 the test takes place on Thursday.

VAC:
- Not present.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- ITDM reminds on the storage/cache maintenance taking place next week (inclusion of additional storage place). Janusz S. will send an e-mail to readiness list.

XRO:
- Nothing to report.

LAS:
- SA3 PP-laser is off today due to work on interlock system. LAS hopes to get back as soon as possible (not before Thursday/Wednesday) for SCS use.

UNSYS:
- Problem in cell36/SA1 (communication error). A ZZ will be needed to recover the cell.

SPB:
- Ongoing with preparations for back-up user experiments; A problem with Jungfrau has been communicated.

FXE:
- Problem with Mono last week: positions for the crystals were shifted by 10mm. It is not known if this is a physical or only reading issue.

MID:
- Pressurized air by a compressor was moved to another location; the topic was discussed with TS and a big compressor will be installed until May 1st to solve problems. 

HED:
- Nothing to report.

SCS:
- Issued a ticket with EEE to verify possibility to averaging positions on middle layer servers.

SQS:
- Preparing for beam in April.
Entry   Notes XO Integration Meeting 17.03.2021, posted by Arvid Gebhardt on 17 Mar 2021, 09:15 

General Announcement:

- nothing.

CTRL:

- LAS reported the pulse statistics did not work properly: re-started systems due to lost connections.

- OCD call related to HED AGIPD test system: fix ongoing.

- Update on train-ID slow data on XGM: CTRL is in touch with Desy and Theo. Question to SPB and XPD: how much effort is needed for that CTRL and ITDM to place the missing information in the run. Involved parts will discuss an agreement by the end of the week. Steffen H. will prepare a summary to inform XPD.

DA:

- no important news.

EEE:

- no important news.

VAC:

- nothing to report.

XPD:

- nothing to report.

DET:

- nothing special.

ITDM:

- all fine.

XRO:

- Not present.

LAS:

Going fine: Laser pattern issue from yesterday was solved by CTRL.

UNSYS:

- Problem on Monday with quad mover cell18/SA1 took 6 hours on ZZ. It is now fixed.

- A problem with undulator segment on cell36/SA1 needs diagnostic and eventual ZZ access. RCs are contacted.

SPB:

- The samples to be used next week are challenging to prepare. 

FXE:

- Used beam yesterday. No problems to report.

MID:

- all fine.

HED:

- nothing to report.

SCS:

- nothing to report.

SQS:

- all good.

Entry   Notes XO Integration Meeting 15.03.2021, posted by Frederik Wolff-Fabris on 15 Mar 2021, 11:26 
General Announcement:
- Following Desy e-mail to all EUXFEL staff, the emergency call system of the elevators will be offline on Thursday March 18th during the morning. Please avoid using the 
elevators in this day. 
- On March 23rd is scheduled the SEPS interlock tests in SA3. On March 25rd is planned for SA2, pending a confirmation with the machine on the impact in SA1 operation.

CTRL:
- Progressing with investigating the train-ID issues, currently it relates to DOOCS/Desy.
- DOC: reports one fix today at 13:00 (following a call). Please respect a sign "we are in", "we are out" at the DOC to help staff focusing on issues. 

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- All working fine in XPD.
DET:
- Detector commissioning in SPB: AGIPD was completed as planned and Jungfrau seems to run properly (data to be analyzed.

ITDM: 
- ITDM will add more space to the storage system (data taking). Initial idea is to make it on March 30th to minimize impact. Acquiring data and data analysis are not 
impacted. 

XRO:
- Beam power increase ongoing.

LAS:
- An issue with SA1 interlock in PP-laser room: the inside doors were reported to be open on Thursday afternoon. 
As SPB was not using the PP-laser, the laser was put in safe mode and Interlock was broken to access and verify the situation. The internal doors were closed. 
Further discussions will follow. This door issue happened for the first time in SA1. 
- LAS is providing beam to SPB and HED as requested.

UNSYS:
- Couple of e-log entries on settings of air coils and phase shifter, all addressed during the weekend.

SPB:
- Detector program is completed. One measurement (which is not critical) is missing from Jungfrau.
- Interacting with DOC worked nicely.

FXE:
- Preparing for this week.

MID:
- Fully in preparation for first April beam. All fine.

HED:
- Nothing to report.

SCS:
- SCS asks for update of missing CPU from EEE. No news from EEE. Contact will be made.

SQS:
- Preparing to have beam in April.
Entry   Notes XO Integration Meeting 10.03.2021, posted by Arvid Gebhardt on 10 Mar 2021, 09:20 

General Announcement:

- nothing for now

CTRL:

- A few issues for DOC: Cameras IP addresses need to be reconfigured

- Continuing investigation of train-IDs on Doocs/XGM (they oscillate). CTRL will follow and close contact with Theo M. and Desy colleagues.

DA:

- nothing to report

EEE:

- nothing to report

VAC:

- nothing to report

XPD:

- Not present.

DET:

- nothing special – commissioning this week

ITDM:

- nothing to report

XRO:

- Maurizio V. reminds the SEPS interlock check in SA3 still has to happen as it is a condition prior beam operation. Zunaira A. says she sent an e-mail to xo-planning.

F. Wolff-Fabris asks if the SCS door is fixed or not, a pre-condition for the test. Zunaira A. replies the problem was with the power supply to the door and is fixed.

A date for the SEPS test can be planned by XO.

LAS:

- SASE2 interlock: LAS got unexpected calls when disconnecting AMPHOS cables (thus triggering SA2 Interlocks).

- SA3 AMPHOS no news since Monday. The ADC cards do not receive train-IDs.

- LAS suffer of lack of laser lab, missing PLC installation. LAS asks XO for a follow-up on prioritizations.

- Zunaira says that lasers are coupled to the interlocks (yesterday event happens as all lasers in room A23 and A07 are connected to the HED and MID interlocks). Thomas Preston says it triggers the warning lights for the laser lab. Zunaira A. says if shutters are closed it shall not be a problem if lasers reach this shutter signals. Tomasz J. says that ideally they must be decoupled.

UNSYS:

- nothing to report

SPB:

- going on with the plan; Detector commissioning from tomorrow.

FXE:

- the floor works are ongoing - looking good.

MID:

- not present

HED:

- nothing to report

SCS:

- A new experimental chamber (chemistry chamber) will be installed for beam commissioning on next month. A CPU in rack room is needed for recommissioning the motor an Martin T. waits for feedback.

SQS:

- Staff is getting the search training which was expiring.

- Noticed issues notice with DACHS system which show the access properties with delay. 

Entry   Notes XO Integration Meeting 08.03.2021, posted by Frederik Wolff-Fabris on 08 Mar 2021, 10:49 
General Announcement:
- SPB/SFX will continue receiving beam this week for commissioning.
- Issues with access to the Operations/21 e-log: SPB run coordinator wrote to wrote to the admin but no answer so far. Entries by Adrian M. while using VPN also did not 
work. 
XO will follow with IT (see below).
- Gerd W. reports that works in SCS chicane are done and the radiation interlock keys are returned.

CTRL:
- Some observations triggered by DOC regarding XGM trains coming too late (20s). An update will be made later on the day or next days.

DA:
- Not present due to DOC shift compensation day.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- A. Koch and Theo M. say no issues to XPD were reported. All operating fine.

DET:
- Commissioning beamtime with SPB detectors. The AGIPD program for last week was completed successfully.

ITDM: 
- Janusz S. says on the e-log issues that administrator of the e-log has the power to include new people. 
While using VPN access one can read the e-log and post entries using the copy function from another e-log. Nothing in the procedure has changed from past time.

XRO:
- Nothing to report.

LAS:
- SA1 PP-laser recovered power for SPB and is delivering in the nominal power level.
- SA3 AMPHOS was switching off at random during the weekend; no reliable operation in SA3. LAS is in contact with external company.

UNSYS:
- Cell4 and cell6 in SA2 required intervention from expert (Suren K.) during the weekend. 

SPB:
- Drift of horizontal beam position was observed on the weekend and reported to the DOC which provided a tool to diagnostic the drift. SPB/SFX would like to thank the DOC 
for the availability.
Beam pointing was changing every hour and was difficult to keep into M1 and M2. Theo M. says the XGM drift happened in the horizontal by many mm. DOC can not solve and 
then contacted Optics group. 
The observed drift seemed to be too big to be compensated. Richard B. says the movement was seen from XTD9 XGM and was a fast drift. 
Andreas G. will address communication channels between DOC/DRC and PRC (PRC was not informed). 

FXE:
- Floor refurbishment starts today.
- Last Wednesday it was checked the gate valves are corrected integrated in EPS and MPS. If shutter is open this signal is sent to the MPS and triggers closing V0.

MID:
- All fine.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- All good at SQS.
Entry   Notes XO Integration Meeting 03.03.2021, posted by Arvid Gebhardt on 03 Mar 2021, 09:23 

General Announcement:

- Hick-ups in the beam operation are happening since last night. There is no obvious indications on the origin of the problem and MXL is investigating to restore a normal beam delivery condition.

- There is an issue with “Operation-2021” e-log where some SPB staff can’t login to create entries. This will be addressed by XO/PRC and ITDM (see ITDM entry).

CTRL:

- SA1 DAQ was dropping some trains (the late ones) in the XGM. CTRL and ITDM are following up and will test the XGM late this week or next week. CTRL will contact XPD for deployment first in SA2 and SA3.

DA:

- News from the DOC: deployment of major updates ongoing/to take place.

EEE:

- nothing to report

VAC:

- not present

XPD:

- Commissioning and setting up for SA3 HIREX

DET:

- preparing for commissioning Detectors

ITDM:

- Janusz S. says the configuration for the “Operation-2021” e-log uses the same configuration as previously set for 2020. F. Wolff-Fabris likens the issue with possible new users and asks SPB to provide the name of users who can’t login into the e-log.

Janusz S. says one can use the copy function from instruments e-log to place a copy into the Operations-2021 e-log. Jan G. says that login is necessary to avoid the entry being as “Anonymous”.

XO and ITDM will address it offline.

XRO:

- not present

LAS:

- In SA3 PP-laser one had exchange of power supply for AMPHOS due to communication errors.

- In SA1 PP-laser one observes a loss of 1/4 of power in AMPHOS. LAS is not sure if there is enough power for users.

- Two problems with triggers on Monday: 1. a faulty board in SA3; 2. MCS group update timing system caused trigger loss in all hutches (due to a bug in their server).

UNSYS:

- nothing to report

SPB:

- Couple of Helps asked to DOC and SPB/SFX are thankful for that.

- Login at Operation-2021 e-log does not work for 4 people.

FXE:

- Prepared for AIBS. Few PLC problems remain but not related to AIBS.

- Next week between Tuesday/Friday there are no access to the hutch due to floor work ongoing.

MID:

- all fine

HED:

- all fine

SCS:

- sliding door will probably be repaired today with an external company.

SQS:

- nothing to report

Entry   Notes XO Integration Meeting 01.03.2021, posted by Frederik Wolff-Fabris on 01 Mar 2021, 10:49 
General Announcement:
- An e-mail from Steve Aplin informs on how to contact the DATA operation center during beam delivery times. It changes contact phone numbers for OCDs. 
Old numbers are discontinued. The 98089 is the new number.
- The lead scheduling for machine/operation can always be found at the TTFINFO link (BKR E-log). Any other schedule is not official.
- Hutch search training goes invalid for many scientists in the instruments. Please check your status at the DARF-DACHS system or with RPOs.
- If there is anything unclear with masks or Corona rules, please give feedback in this meeting series or to the corona task force.
- Gerd W. says that works on SCS chicane are taking place right now. Afterwards a check will be done until Wednesday. The SCS key is still removed.

CTRL:
- Next days CTRL would like to solve DAQ situations while restarting devices. For SPB it is under discussion when to proceed.

DA:
- Not present due to planning meeting for end-to-end DA commissioning.

EEE:
- Fast electronics: a problem with SA3 PP-Laser (timing issue) was found and a board will be replaced.
- PLC side: deploying SA3 laser interlock. EEE will get in touch with XO for agreeing on a date.

VAC:
- XTD6 is still open and will be closed tomorrow (Tuesday 02.Mar) afternoon.

XPD:
- Friday at 15:00 there was a wide spread network issue and XGMs were giving warnings. The XGMs came back rather quickly but beam was lost until Saturday.

DET:
- Preparing for the SPB detectors commissioning with beam this week. One module was exchanged and will be evaluated next Monday.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- SA3 PP-laser: issue on Thursday afternoon late; Replacement boards were received. Tomasz J. informs the triggers were lost in the last 5 minutes.
- Tomasz J. question if LAS is going to receive enough support on Mondays from the DATA center as they have to prepare lasers for Tuesday. 
LAS expect same level of support on Mondays from DATA department. Steffen H. says that the OCD and Data Run coordinator will support the activities.

UNSYS:
- Nothing to report.

SPB:
- Receiving beam from tomorrow on.

FXE:
- Working with EEE to get Beckhoff loops finished for the AIBS test taking place at FXE on Thursday.

MID:
- All fine at MID.

HED:
- HED asks for the status on the ADC issue. Bruno F. says it is being fixed today (crate is up and running) and objective is to finish by today.
- Question to CTRL on cameras: S. Hauf says that CTRL will ask HED to test the fix. HED will contact Dennis G.
- Pouneh S. says that for laser safety googles it is exceptionally allowed to use FFP2 masks with filters. A. Galler points that the Corona task force strictly forbids 
this type of masks at XHEL as protection against Coronavirus. 
This subject will be brought to the Task Force for more clarifications.

SCS:
- Sliding door issue is ongoing. Eric Boyd says that Zunaira A. is in contact with the company and they will come to XFEL on Wednesday (it is caused by the controller of 
the door).

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 24.02.2021, posted by Arvid Gebhardt on 24 Feb 2021, 09:03 

General Announcement:

- Due to a failure alarm in the smoke extraction system in XTD6+8+9, Desy colleagues will need to reboot a crate and exchange one module. This will bring down the air conditioning for the tunnels during about two hours. The activity is scheduled for March 1st starting at 11:30AM and it appears in the EuXFEL infrastructure calendar.

- It has been found a situation with one of the elevators to the XHEXP1 Hall. Due to corona regulations a maximum of 3 people is allowed simultaneously in the elevator. This number is indicated by signs/papers fixed nearby. However, someone unauthorized has modified the number “3” to an “8”. We are investigating the situation. The shields have been corrected back to “3” but we would like to remind signs and warnings must not be modified by unauthorized persons.

- Gerd W. informs that SXP chicane modification foreseen to take place today and tomorrow is shifted to Monday or Tuesday due to delays in delivery of components. Affected people have been contacted by PMO via but in case of issues with the new plan, please contact Gerd W.

CTRL:

- Few requests for tickets on Karabo devices were received. CTRL reminds to please add device ID in the ticket.

- SA3 motors: a few changes were done due to migration of MC2 motors. If someone or a group needs more input, please directly contact Steffen Hauf.

- Regarding Data Operation Center (DOC): CTRL would like to have a functional account to the instrument e-logs to be able to access it and track problems when OCD gets called. If instruments have any concerns with this, please contact Steffen Hauf.

DA:

- Nothing today.

EEE:

- No main issue.

- EEE also asks that when submitting tickets, please include the instrument and component name, preferentiably in the header.

- PLC side: ZZ to check motors.

VAC:

- Nothing to report.

XPD:

- Continuing today with beam commissioning of XTD6 components (HIREX and MCP).

DET:

- Nothing special to report.

ITDM:

- Nothing special.

XRO:

- Issues will be addressed when tunnels are open.

LAS:

- SA1 and SA3 PP-lasers are making progress.

UNSYS:

- Nothing to report.

SPB:

- Issues with Interlock and DACHS are solved.

FXE:

- Interlock issues are solved.

MID:

- Nothing special.

HED:

- Thomas Preston asks if the Covid regulations in hutches can be sent by e-mail. Sandra Plett will send the link to the documents after the meeting.

- The mask occupancy for the hutch was changed (are the signs updated or not?). Thomas P. says it was 4-5 but someone wrote new numbers in the signs. Sandra P. says that if everybody is using FFP2 masks, then more people are allowed than the max. occupancy.

- Pouneh S. says if people use laser safety googles, one can use FFP2 with filters. Sandra P. says that rules also apply for this case.

- Issues with cameras: DAQ did not run (did not take data, probably due to lost configurations). HED will send ticket.

SCS:

- Nothing to report.

SQS:

- Yesterday a meeting to review digitizers took place.

Entry   Notes XO Integration Meeting 22.02.2021, posted by Frederik Wolff-Fabris on 22 Feb 2021, 10:14 
General Announcement:
- In case someone has any remaining question on the use of masks in the hutches please feel free to ask in this meeting series or write XO an e-mail.
- Racks for the SXP will be delivered and moved around XHEXP1 in March. The calendar for such activities will appear in the EXFEL infrastructure calendar. 
The activity is coordinated by TS and in case of conflicts, please contact us or Ulf Brueggmann.

CTRL:
- Few configurations issues with motors are being taken care with EEE. 
- XPD found a bug in the middle layer device and it needs new deployment. CTRL will contact people involved.
- DOC will start going on next week. Further info will be sent around and contact to single points in the instruments will be made.

DA:
- Preparing the DA contribution to the DOC.

EEE:
- Nothing to report apart the work for the configuration of motors.

VAC:
- Vacuum interlocks triggered on Friday in SA3. VAC reminds that when someone opens the shutter, nothing behind must be left in the beam.

XPD:
- A. Koch says commissioning of SA3 components and Imagers take place. The Shimadzu camera was tested with beam in SA1 and signal was observed. 

DET:
- Preparing for regular support of Detectors.

ITDM: 
- A question arises if SASE3 also operating. A. Galler says there is an effort for commissioning beam transport on SASE3, but focus for operation still remains in SASE1.

XRO:
- XRO has commissioned beam transport in SA3 and in SA1. Overall beam was stable apart of few interruptions. Objectives for the weekend were successfully completed.
- Couple of issues need to be fixed; XRO will request ZZ access in XTD10 together with EEE. Tickets are sent.

LAS:
- No news from last week.

UNSYS:
- Nothing to report.

SPB:
- Issues with Laser interlock system and accessing hutches persists, as reported last Wednesday. SPB expects laser safety to be working on that. 
Romain Letrun confirms the problem is related to the DACHS access system.

FXE:
- It has faced similar problems with the interlock system as the ones observed by SPB/SFX.

MID:
- Hutch cleaning is planned this week.

HED:
- All fine.

SCS:
- Nothing to report.

SQS:
- Last Friday an interlock issue (no beam to hutch) was found but solved almost immediately.
Entry   Notes XO Integration Meeting 17.02.2021, posted by Arvid Gebhardt on 17 Feb 2021, 09:27 

General Announcement:

CTRL:

- update for GUI server this morning is finished.

-  CTRL advices people starting systems such as cameras, in case of connecting issues please try first to reboot the devices first.

DA:

- nothing special to report.

EEE:

- will update PPL update mTCA SASE3 - affects only LAS group

VAC:

- nothing to report.

XPD:

- Recommissioning diagnostics in SA1.

- Pop-in YAG screen in FXE/SA1 was found broken. Any information on when was working last time please send to Andreas K. In this Pop-in is a second screen with diamond which is working. YAG exchange is for next maintenance period.

DET:

- The offline calibration service update is finished and is available again. Please contact DET in case of issues.

ITDM:

- nothing to report.

XRO:

- Working at BKR yesterday with commissioning SA1 alignment; SA1 is aligned until SPB and FXE.

- Today continuing with SA2 depending on beam stability.

- Idoia F. mentions that computers were not running at BKR. A check after shutdowns and prior operation is welcome.

LAS:

- The AMPHOS in SA3 needs a new power supply. Expected delivery and exchange on Friday.

- PLC update in SA3 and uTCA upgrade on Friday.

- Advancing with SA1-PPL commissioning.

- LAS will send e-mail to Zunaira A. for that MEA3 personal is contacted on the problems with sensor boxes.

UNSYS:

- Ambient field coil was fixed.

- New minimum gaps will be calculated and communicated to XO.

SPB:

- After interlock test last week there is an issue with the new DACHS terminal. The hutches can’t be accessed. Pouneh S. says DACHS is working but this particular new terminal might not be activated in the system. An special permission must be given. Tobias Haas will be informed to contact MEA3.

FXE:

- Martin K. will ask FXE colleagues on YAG screen information. Currently he is not aware when this happens (similar event back in 2019). 

MID:

- all fine.

HED:

- all fine.

SCS:

- in contact with Eric B. to get the beam shutter back on Friday for closing hutches during the weekend.

SQS:

- Early next week review with the digitizer engineers.

- Pouneh S. asks that laser interlock in laser hutch does not work. The new parts have been shipped and arrive soon. Together with TS electrician one has to exchange the relay. Daniel Rivas is informed.

Entry   Notes XO Integration Meeting 15.02.2021, posted by Frederik Wolff-Fabris on 17 Feb 2021, 08:52 
General Announcement:
- It had been a cooling water issue with SA1 and SA3 PPLs on Saturday. Other groups are encouraged to check their components for eventual damage. Cooling water is back 
again.
- Change on definition of a critical work: everything that leads to operation is from now on considered a critical work (official communication will be send by e-mail).
- Tomasz J. says interlock tests in SA1 tripped the laser interlock due to the Seeder connection to the interlock. 
Andreas G. says there are care been taken to prevent this in future. More discussion will follow.

CTRL:
- Updates were done on the time servers and data loggers.
- GUI servers will be done this week as there was no access to GITLab. Current suggestion is next Wednesday morning before 08:00AM. 
Each topic will take a few minutes only. XPD is fine with the proposed day/time.

DA:
- Nothing to report.

EEE:
- Issue during weekend: signals to the absorber. EEE and PRC (Maurizio V.) will coordinate when it is the best time for applying the final fix. 
EEE needs to mask it for proceeding with the work.

VAC:
- VAC OCD was involved in the absorber EPS issue.
- Today around lunchtime the XTD6 and XTD9 will be closed.

XPD:
- EPS issues: any component driven to the beam was not protected by many bunches operation. The EPS was thinking the PNACT was closing but in reality, it was opened.
PRC/EEE/VAC/XPD OCDs solved by manually telling the system it is closed.
- Wrong bunch number sent to XGM: SA3 toroid was moved to a different position and the old name was not valid anymore. 
Info from this toroid was not received and the consequence XGM was receiving wrong bunch numbers. This makes impossible for the XGM to calculate correctly the number of 
bunches. 
Doocs servers were not updated (these programs would need to be informed of new naming). 
- Andreas K. says that XTD6 is clean. In XTD9 an intervention by EEE will take place. Bruno F. says that it is a simple task and we are accessing tunnels right now.
- Operation E-log 2021 is missing and must be created. 

DET:
- Offline calibration work is ongoing until tomorrow morning.

ITDM: 
- GPFS offline storage maintenance to be done today. 
- ITDM was notified by Desy that is necessary to reboot logins on Maxwell nodes (between 11:00-12:00).

XRO:
- Nothing to add to what was discussed on the EPS.

LAS:
- Affected by water cooling incident. SA1 came up without issues but in SA3 there is problem as AMPHOS did not restart.
- Trigger issue on last week are not the issue anymore. This was not repeated (but SA1 still on local mode).

UNSYS:
- BBA and photon BBA last week: new values to be implemented and minimum gaps will be updated accordingly.
- Frank Brinker tested the ambient field corrections. A ZZ is taking place this morning to fix SA2/cell12. 
Few other coils have different polarities and will be fixed today or in another ZZ.

SPB:
- Preparing for the first two weeks with beam in March.

FXE:
- Aligned the cameras in FXE mono.
- Crates to be installed in the rack room.

MID:
- Joerg H. raises the question on the FFP2 usage recommendation. Sandra Plett says the document containing guidelines will be prepared (hopefully today); 
It is mandatory to use FFP2 masks if you are not alone; it also depends on the room size and at the moment it is 3-5 people in the hutches with mandatory use. 
A. Galler says these are the current regulations and maybe this will change in future.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Trying to get a new DAQ and will talk to ITDM.
Entry   Notes XO Integration Meeting 10.02.2021, posted by Arvid Gebhardt on 10 Feb 2021, 09:20 

General Announcement:

- Tunnel closure: it has been decided both XTD6 and XTD9 will be searched and closed on Monday 15.02.

- Temporary tunnel access requests: for ZZ access please be aware of the new Redmine ticket for access requests. The link to it appears in the BKR E-log.

- Use of FFP2 masks in experiments control hutches:  Sandra Plett informs rules such as temporary stop of work after 75 minutes of mask use or a day off after two working days with masks are not mandatory - these are only a recommendation; If two people are <1.5m, one has to use masks. While Seated or alone you can remove the masks; However, if there are people running around, please use masks also if seated; The wearing time is just a recommendation - it is not mandatory to make the break.

CTRL:

- Graphical user interface update: there is a new version to install in the gateway and BKR.

- Update of data loggers and GUI servers to take place.

DA:

- all going well.

EEE:

- SA2 loop update (MOV) was done yesterday for Hirex and Shimadzu.

VAC:

- nothing to report

XPD:

- DACHS terminal in XTD9 did not allow access: database connection issue. Andreas K. has contacted M. Prollius.

DET:

- Deployment of offline calibration pipeline from today until Friday. It will be communicated when it’s finished.

ITDM:

- Two weeks ago, ITDM pre-announced an offline GPFS update. Preparations will be ready by Friday. Ideally ITDM will deploy on next Monday. Please let K. Wrona aware if this date is not suitable.

XRO:

- Not present.

LAS:

- Upgrade on uTCA crate in SA1 – ADC acquires data. A small problem with data acquisition was found and a Redmine ticket was created. In any case all is fine for switching PPL-SA1 on.

- Today between 2:00-08:00AM there was no trigger coming to PPL-SA1. It may be from Desy or from Balcony room. Bruno F. will investigate the balcony rooms.

UNSYS:

- Unsys will request access for next week to fix a SA2 ambient coil.

SPB:

- nothing

FXE:

- nothing

MID:

- All fine

HED:

- nothing

SCS:

- nothing

SQS:

- Issues with trigger are fixed.

- uTCA firmware updated; now fixed.

Entry   Notes XO Integration Meeting 08.02.2021, posted by Arvid Gebhardt on 08 Feb 2021, 08:30 

General Announcement:

- XTD10 tunnel was closed last Friday; XTD9 to be closed by end of this week; XTD6 is undefined – mostly likely by Monday. Any schedule deviation will be communicated.

CTRL:

- Deployment of offline services from 10.2 to 12.2. Services such as offline calibrations are not reliable in this time. An e-mail was sent and another reminder will be sent again.

DA:

- no news.

EEE:

- Update of PPL uTCA in SA1 today (laser);

- SASE2 PLC loop update to take place tomorrow at 13:00 (Hirex and Shimadzu camera).

VAC:

- Nothing to report

XPD:

- No issues to report.

- Andreas K. says in SA1 hardware activities are done; testing optical alignment.

- Hirex SA2 update is missing.

DET:

- nothing to report

ITDM:

- nothing to report

XRO:

- nothing to report

LAS:

- Switching on SA1 laser – after uTCA upgrade. Small issue relates to the missing trigger from Desy (dynamic triggers). Point of contact are Tim Wilksen and Lars Froelich.

UNSYS:

- Hick-ups with controls during the weekend. BKR opened gaps to 220mm and caused troubles (usually they open o 210mm).

- One ambient field coil needs ZZ for fixing (SA2/cell12); not urgent.

- Cleaning was done in XTD4.

SPB:

- setting up for the first set of commissioning

- Gotthard trigger seems to be solved.

FXE:

- nothing to add

MID:

- all fine

HED:

- nothing to add

SCS:

- not present.

SQS:

- uTCA digitizer issue: ongoing.

Entry   Notes XO Integration Meeting 03.02.2021, posted by Arvid Gebhardt on 03 Feb 2021, 09:26 

General Announcement:

- Automatic Power Switch Testing was done yesterday. The switches are working as expected and a protocol has been produced. Torsten Schoen informs this test is done every 4 years; from now on equipment can be connected again to the orange and green power outlets.

- Re-start of the accelerator takes place from last Monday. Currently the setup of the injector and LINAC is ongoing. There are no changes to the last plan for closing dates of the photon tunnels.

CTRL:

- CTRL works on the Doocs Undulator devices/panels that have to be changed.

DA:

- nothing to report.

EEE:

- EEE and LAS people are on-site checking the reported uTCA problems after the power switch (by LAS). Issue refers to no communication to the uTCA.

- SASE1 motion loop update yesterday was done.

VAC:

- Not present.

XPD:

- XTD6 and XTD9 Shimadzu cameras update continue.

- Next loop update for XTD6 will probably be next week together with Hirex changes.

DET:

- all fine

ITDM:

- everything is fine

XRO:

- VAC is busy in tunnel leaking check the XTD10 soft mono (pressure went down to 10-6mbar already) but it takes more time.

LAS:

- Yesterday the SA1 and SA3 PP-laser systems were lost. Tomasz J. and EEE are looking into it.

UNSYS:

- today ZZ in XTD4 for the cleaning at SASE3. PRC has informed the BKR.

SPB:

- Problems with trigger of Gotthard are reported by Marcin S. It may be also linked to a communication issue.

FXE:

- nothing to add

MID:

- all fine

HED:

- nothing to add

SCS:

- not present.

SQS:

- Wanted to run digitizer on uTCA but could not find/communicate to it. Under investigation this afternoon.

Entry   Notes XO Integration Meeting 01.02.2021, posted by Arvid Gebhardt on 01 Feb 2021, 09:06 

General Announcement:

- The test of the emergency automatic switch of power bridge is scheduled for Tuesday, 2nd of February 2021, 09:00. This will affect orange outlets in XHQ and green and orange outlets in XHEXP1. A short interruption in the power supply lines will happen. We expect all groups have taken appropriate measures to place devices in safe mode or connected to white power outlets.

CTRL:

- not much to report, things are running

- Read the docs is operational again. A given feedback to CTRL is welcome.

DA:

- Nothing special to report.

EEE:

- Tomorrow update sase1 motion loop at 13:00: an email will be sent to readiness mailing list.

VAC:

- Nothing to report.

XPD:

-  Maintenance work ongoing: Imagers in XTD6; Work with EEE in XTD6 and XTD9.

DET:

- AGIPD: new control with new gain is tested. DAQ issue with data is fixed (K. Wrona informs it was related to a wrong hidden parameter setting).

ITDM:

- Downtime on Offline calibration system / GPFS: update to be made in about two weeks from now. K. Wrona says that ITDM would like to have one day of GPFS maintenance; it is important to switch to the new scratch files before we start operation. Data taking shall not be affected by this.

- Jan G. asks when would be required by the earliest. K. Wrona says they need to copy a lot of data before the update and it is estimated in two weeks (+-2 days), to take place in the second half of February. As photon activities take place in the last two weeks of February, one needs coordination to find a suitable date.

XRO:

- everything fine.

- Today closing of soft mono chamber in XTD10.

LAS:

- Upgrade in SA1 uTCA: information will be given to LAS this afternoon.

- Two Desy colleagues needs access in SA1 hutches. Use of FFP2 masks is mandatory.

UNSYS:

- ZZ in XTD4 is planned for Wednesday (for cleaning undulator area).

- Suren K. asks if the balcony rooms are effected by test emergency power switch. This will be discussed offline.

SPB:

- Nothing special to report.

FXE:

- Nothing special to report.

MID:

- all fine

HED:

- Nothing special to report.

SCS:

- Nothing special to report.

SQS:

- Nothing to report.

Entry   Notes XO Integration Meeting 27.01.2021, posted by Arvid Gebhardt on 27 Jan 2021, 09:08 

General Announcement:

- FFP2-Masks needs to be used in the experiment control hutches from now on regardless the number of people working in this areas. Regulations concerning the maximum number of staff in this areas remain the same.

- SASE1 Laser interlock upgrade originally scheduled for this week was postponed to next week. As soon as we receive the information on the new date, this will be communicated.

CTRL:

-   Intervention for the new scenes for the size of the labels was originally scheduled for yesterday. This was postponed as additional tests will be conducted in CTRL lab. A new date will be announced. 

- Panel topics: some old types doocs undulator devices were replaced for a single device. CTRL would like to remove the old ones in 2-3 weeks and kindly ask groups to inform if they are still in use. CTRL will send an e-mail on this subject.

DA:

- Nothing special to report.

EEE:

- Nothing special to report.

VAC:

- Still working in XTD10 and XTD6.

XPD:

- Tunnel works ongoing in XTD6 and XTD9, e.g. Shimadzu cameras / Imagers.

- EEE will need to have access at the end of the Imager intervention of XTD6.

DET:

- SPB Agipd: issues with new data acquisition system. It has been under work.

- This week DET plans to test the new Control fix medium gain to be used in user experiments.

ITDM:

- Nothing special to report.

XRO:

- Not present.

LAS:

- After SASE2 AMPHOS update: there are issues with the interlock

UNSYS:

- Unfortunately neither Desy or EuXFEL could grant access to the external company for the XTD4 tunnel cleaning. UNSYS is trying to organize themselves. PKG shall not be switched on before the clean is done.

SPB:

- Tests with DAQ of the AGIPD: new version has issues with data assignment of aggregated version. Currently AGIPD is back in the old version.

- Work of EEE with some crates of rack room.

FXE:

- Nothing special to report.

MID:

- all fine

HED:

- Nothing special to report.

SCS:

- Nothing special to report.

SQS:

- nothing to say

Entry   Notes XO Integration Meeting 25.01.2021, posted by Arvid Gebhardt on 25 Jan 2021, 09:28 

General Announcement:

- Test of automatic switch of power bridge is shifted to Feb.2: this affects all devices connected to orange or green power sockets (no power for few seconds/minute). General e-mail will be sent. Instruments will need to care for equipment which is connected to these sockets. This also affects the E0 level as well as office space in XHQ. Pease plug devices out or re-plug in other sockets.

  • The Covid-19 regulations continue valid. Only critical work in the XHEXP1 or tunnel activities shall take place.

- Work on the Soft Mono in XTD10 (SA3) takes place this week. XRO and ME asks everybody to do not move any motors in this device during the whole week.

CTRL:

- New Script to fix label issues in Karabo is ready and will be run today. An e-mail will be sent.

- ITDM and CTRL managed to get updated the “Read the docs”. It runs properly.

DA:

- Not present due to Satellite Workshop.

EEE:

- nothing to report

VAC:

- continuing with tunnel works

XPD:

- Ongoning with few tasks in the tunnel

DET:

- Not present

ITDM:

- nothing to report. Offline GPFS under work today: no Maxwell access during this time.

XRO:

- Not present. Please see general announcements on the Soft Mono.

LAS:

- Error with remote operation on mirrors for SA3/SQS PP-laser is found. A discussion after the meeting will take place between LAS and XO.

UNSYS:

- Nothing to report

SPB:

- Nothing to report

FXE:

- Nothing to add

MID:

- all fine

HED:

- Nothing to report

SCS:

- Nothing to report

SQS:

- Nothing to report

Entry   Notes XO Integration Meeting 20.01.2021, posted by Frederik Wolff-Fabris on 20 Jan 2021, 10:32 
General Announcement:
- A. Galler encourages attendants to pose questions on the authorities decision of lockdown prolongation:  
Zunaira A. asks on travel restrictions between different cities: The commuting continues to be allowed, but not business travels; 
Adriano V. asks on business/meetings that were postponed (MID/AGIPD intervention) to February in order to plan work that will happen during the summer shutdown: Andreas 
G. says that if meeting can't be decided by Zoom, please send an e-mail to the task force with this enquire;
P. Gessler asks if EuXFEL considers to prepare documents (passport) again as in the first lockdown: A. Galler answers that this is in discussion but currently it will not 
to be implemented once no curfew is ongoing.

CTRL:
- Working with ITDM to get the Docs system running again.
- Working with EEE to have systems running by Friday.

DA:
- Nothing to report.

EEE:
- EEE reminds the update of SA1 motion loop (to allow work for Hirex) will take place today.

VAC:
- Not present.

XPD:
- Progressing with tunnel works, e.g. installation of viewports.
- A. Koch asks on the tunnel closure plans for XTD6 and XTD9. 
A. Galler says XTD9 will close around February 5th and for XTD6 one has to discuss with MXL-DESY on the possibility to keep it open for one week longer (until 12.02).

DET:
- Nothing to report on detector operation.

ITDM: 
- ITDM needs to finalize GPFS work which requires one day maintenance. The proposed date is next Monday 25.01. It means no access to data from Maxwell during the all day.
Instruments shall contact ITDM until tomorrow 21.01 in case of restrictions. 
- Tickets on e-mail lists (e.g. not authorized sending e-mails to some lists): ITDM is investigating.

XRO:
- XTD6 will have photon beam for recommissioning during the third week of February.

LAS:
- LAS asks instruments on their plans for when to use lasers (mid-February?). HED and MID confirm plans to have it by middle February. SQS, FXE and SCS will consult 
internally and let LAS known.

UNSYS:
- Two quad movers in SA2 are working again.
- Afterburner (winter shutdown tasks): Fire extinguishing system to be build; Cleaning the tunnel has to be made prior switching on the PKG.

SPB:
- Nothing to report.

FXE:
- Upgrade of Jungfrau and related work is postponed to Friday.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 18.01.2021, posted by Frederik Wolff-Fabris on 18 Jan 2021, 09:44 
General Announcement:
- Clarification on the definition of a critical work will be made this afternoon during a discussion with group leaders and will be communicated to the staff. 
It includes also tasks carried out by two different groups.
- On Thursday there is going to be a switch of MPS components in the balcony room. 
This affects the timing signal distributed to XFEL, e.g. Lasers will not be able to follow timing. 
- Test of automatic switch of power bridge is shifted to Feb.2: this affects all devices connected to orange or green power sockets (no power for few seconds/minute).
General e-mail will be sent. Instruments will need to care for equipment which is connected to these sockets. 
This also affects the E0 level as well as office space in XHQ. Pease plug devices out or re-plug in other sockets.

CTRL:
- CTRL enquires ITDM on the issue with DOC (disk space full error). ITDM will take a look into it. 

DA:
- Getting prepared for involvements such as the data operation center.

EEE:
- Update of SA1 loop motion to take place by Wednesday. Affected staff is already informed.
- Firma Wille work on cabling is ongoing.

VAC:
- Continuing with works in the tunnels.

XPD:
- Tunnels works in XTD6 and XTD9 are ongoing. No incidents to report.

DET:
- Working on data analysis calibrations and installing the DOC.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Regarding the Timing signal interruption mentioned in general announcements: it is not a problem as usually LAS keep the laser systems in the local timing during 
shutdown periods.
- Upgrading hardware that should be updated accordingly to the plans for the shutdown.

UNSYS:
- Works in tunnel are proceeding.
- Issues with SA2 cell 26 and cell27 were found and experts are going to the tunnel to solve it.

SPB:
- Working on making experimental plans for the Covid-19 beamtime.

FXE:
- Detectors: software upgrade taking place from today.

MID:
- All fine.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 13.01.2021, posted by Frederik Wolff-Fabris on 13 Jan 2021, 10:04 
General Announcement:
- Test of power grid switching affecting green and orange power sockets: this was planned for tomorrow 14.01 but it is not shifted to 02.02. 
For a second or so it may trigger power OFF in equipment. Groups have to identify devices that are connected to these sockets, for example at the instrument hutches. 
Devices shall be made safe. On the instruments rack room, equipment have two power supplies and therefore they shall be transparent to this intervention. 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Today EEE connects the new PLC for the AIBS project in SASE1 balcony room. One needs to restart momentarily EPS, SPB and FXE loops in SASE1 Tunnel after lunch. 
An e-mail was sent yesterday and clarified with instruments.

VAC:
- Tunnels are closed today for the interlock tests. XO thanks HED and FXE for making their hutches available.

XPD:
- Tomorrow XPD restarts with tunnel works, e.g., alignment of PES/XTD10 together with MEA.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Proceeding with small steps but lasers are OFF.
- LAS waits for feedback from SRP and MB on the safety issue. Thomas Tschentscher will bring the safety issue to be discussed offline with MB, LAS and SRP.  
Zunaira A. questions if there were problems to re-start the Seeder Lock-in. Tomasz Z. says it is currently locked but after much additional work (no guarantee it can be 
locked again if Seeder is once more OFF). 

UNSYS:
- Working in the completion of SA3 undulator system.

SPB:
- Drilling ongoing: please keep in mind access to hutch may be affected.

FXE:
- Nothing to add.

MID:
- Wille Firma is working on cabling installation from today afternoon.

HED:
- Expecting Wille will be working from today but shall not interfere with Interlock tests. Zunaira A. says that interlock activities take around 20 minutes during this 
afternoon.

SCS:
- An external company is currently working onsite.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 11.01.2021, posted by Frederik Wolff-Fabris on 11 Jan 2021, 10:54 
General Announcement:
- The Interlock test light in the hutches take place on January 13th. From tomorrow is starts in the tunnels. 
We understand no support from instruments are needed and we thank HED and FXE for making their hutches available for these tests.
- A Functional interlock test was planned for the end of January. This will be shifted to later point in time.
- XO states that planned maintenance tasks that are critical for operation can of course be performed onsite at the XFEL campus. 

CTRL:
- Updated the microTCA crates was done.
- CTRL is testing many other systems.

DA:
- Nothing general to report.

EEE:
- Critical task to do related to the AIBS CPU: one power bridge is missing. EEE has to check and may need to switch one PLC off to replace the power bridge.

VAC:
- Continuing with tunnel installation works: urgent tasks.

XPD:
- No incidents to report. Tunnel works are ongoing together with VAC.
- Jan G. informed that not all channels are working in fast-ADC devices. XPD has informed CTRL and Steffen H. says that CTRL and EEE will take a look together.

DET:
- LPD calibration pipeline work is ongoing.

ITDM: 
- Nothing to report.

XRO:
- Ion pumps in SA1/3 photon beam transport are running. Pressure is in the order of 10^-8mbar.
- SA3 mc2 library update: continuing with checks some small items will need to be commissioned with beam.

LAS:
- Nothing to report.

UNSYS:
- Finishing small tasks at SA3 tunnel.

SPB:
- Start planning the revised schedule.
- XO informs that the emergency power OFF test takes place today in SA1 instruments. 

FXE:
- Nothing to add.
- XO informs that the emergency power OFF test takes place today in SA1 instruments.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 06.01.2021, posted by Arvid Gebhardt on 06 Jan 2021, 09:05 

General Announcement:

  • Due to work restrictions, some of shutdown activities will not end as planned in time. This leads to a prolongation of the start-up phase starting next week. It means re-start of Accelerator and South branch will be delayed by 2-4 days while the North branch by about 1 week.
  • The first 2 weeks of X-Ray delivery (2.2-15.2) will most likely be affected and photon delivery cannot be guaranteed into all beam-lines at all days. Some flexibility in planning for the commissioning tasks is expected. A detailed schedule for an upcoming week will be available on the week before, latest on Friday.
  • Sara C. asks if tunnel access is allowed during this week. F. Wolff-Fabris understands tunnels still can be accessed this week apart of Covid regulations (in the context of tunnel maintenance tasks that have to be performed while tunnels are open). T. Tschentscher says the understanding is from Robert F. guidelines e-mail are still valid for this week and really important tasks may be conducted – an e-mail to Robert and Nicole pointing the task with the need of access could be sent. Steve A. reported from today’s Covid taskforce meeting that the regulations of last corona email are still valid - if there are any question send an email to health@xfel.eu.

CTRL:

- Due to incompatibility discovered after last update on Dec. 23rd, CTRL would like to update files on all microTCAs before user operation (Karabo devices) mostly likely next Friday.

- A network maintenance was performed by Desy. Please inform CTRL if issues are encountered.

DA:

- nothing to report

EEE:

- Preparing to finish the cabling in HED and MID.

- Nothing to report from PLC side.

VAC:

- nothing to report - tunnel update tomorrow

XPD:

- XPD OCD put in place during Christmas break had no emergencies calls.

- XPD expect earliest work to take place on next week.

DET:

- nothing to report

ITDM:

- Desy network team would like to do a update of the control network routers tomorrow at 1300 -> email comes to readiness

XRO:

- Proceeding with activities from last days of last year.

- No major updates. Testing the SA3 MC2 library update.

LAS:

- Lasers are down.

- SA2 seeder that took longer than expected time to be back in December after the OFF request by LSO. Probably on next OFF mode LAS has to exchange it.

UNSYS:

- Minimum gaps for SASE3 Undulator system is 10mm. Other SASEs shall be defined after the middle plan scans.

- Apple-X major work from Unsys is done.  

- Quad movers are working remotely.

- Remaining task: connecting fire extinguisher system in one rack.

SPB:

- nothing to report

FXE:

- nothing to add

MID:

- nothing to report

HED:

- nothing to report

SCS:

- not present

SQS:

- A High voltage power supply with double-polarity was installed. It is the first time this is installed at SQS.

Entry   Notes XO Integration Meeting 16.12.2020, posted by Arvid Gebhardt on 16 Dec 2020, 09:11 

General Announcement:

- Today is the last xo-integration meeting for this year. Xo wants to thank everyone for the participating in this meeting series while sharing information and giving updates.

- The next XO Int. Meeting will happen on 04 January.

CTRL:

- Beckhoff MC2 motor upgrades at SA3 is ongoing.

DA:

- no updates

EEE:

- all SA2 fast ADC tasks have been concluded.

- Cabling in HED is ongoing; On MID will happen next year.

- AIBS control at SA1 balcony room installation starts today.

- Testing Mc2 motor configurations in tunnel devices.

VAC:

- Trying to finish main shutdown tasks: GATT, new mirror chamber in SA3/SXP, SA2 M3 mirror chamber.

- M3 chamber InGa is clean and ready to be pumped down.

- XGM/SA1: broken gate will be replaced this week or next.

- Some members of VAC group are working on site next week.

XPD:

- XGM SA2/XTD6 was moved 4mm and is still in alignment (no damage found) -> Jan G and Harald S. will have a look today onsite. M. Dommach says the differential pump could not move that far away due to bellows. 

- Installing of switches for HRIX will be most likely finished this month and some maybe in January.

DET:

- nothing to report.

ITDM:

- nothing today.

XRO:

- Not present.

LAS:

- Laser Hutches are locked (no access allowed) by Safety and LAS members can not continue the work in laser rooms. LAS maintenance tasks can not be finished and may be delayed over the end of shutdown.

- Emission of SASE2 Seeder laser was put in OFF yesterday due to inspection by SLSO. This means laser was OFF and there is no guarantee the PP-laser will be available in February, as they will not start mode-locking again after an Emission OFF. 

- Typically the Seeder lifetime is 3-4 years. Each time it is switched OFF it shortens the lifetime by half. If Seeder is included in the Interlock system, and taking into account the interlock trips 1 time per week or month (case of SASE3), the availability of PP-lasers is in risk and consequently the whole operation for instruments.

- Alignment lasers will be no longer provided. This also relates to the safety decision - such lasers are not allowed to be operated.

UNSYS:

- not present.

SPB:

- nothing to report: quiet days.

FXE:

- Craning activities over the hutches due to SXP construction still ongoing: not always a notice from construction workers.

MID:

- all fine.

HED:

- nothing to report.

SCS:

- not present.

SQS:

- nothing to report

Entry   Notes XO Integration Meeting 14.12.2020, posted by Arvid Gebhardt on 14 Dec 2020, 09:00 

General Announcement:

- Please write to xo.planning, if something comes up with intteruption of the maintenance due to new COVID-19 regulations.

CTRL:

- Migration of Beckhoff MC2 motors at SA3.

- Checking operation (e.g. soft mono at SA3).

- Final checks together with EEE.

DA:

- nothing to report

EEE:

- Migration at SA3 MC2 PLC´s.

- Fast ADC: SA2 maintenance starts.

- Cabling to be done in SQS today and tomorrow at HED.

- Crate was sent to Poland and shall arrive this week.

VAC:

- not present.

XPD:

- problem / alarm XGM at SASE1 / XTD2  - Needs to re-cable and install new gauges; requires VAC group.

- PES was re-installed in XTD10 and has been pumped down.

- DAQ test on friday - things are fine.

- XTD6 XGM alignment starts today - used to be confirmed with VAC.

DET:

- AGIPD intervention: need some internal coordination also with DASY groups - it will let XO know, if support needed

ITDM:

- XFEL gateway next Monday

- pre-anouncement: 90% of maxwell cluster update to be done on January 4/5. Communication to be send to Readiness mailing list.

XRO:

- Testing Controls in tunnel devices - needs to fix SA3 expected bugs.

- XTD10 close the vaccuum for M6 mirror chamber this week.

- XTD6 some problems with M3 mirror: to be pumped down this week and checked start of January.

LAS:

- Small delay on works at SA3, but no risk for users.

- Question from LAS: is the SA1 laser interlock update takes place?

- SA2 AMPHOS: external company is coming today

UNSYS:

- not present

SPB:

- nothing to report

FXE:

- nothing to report

MID:

- all fine

HED:

- don´t have anything

SCS:

- nothing to report

SQS:

- nothing to report

Entry   Notes XO Integration Meeting 09.12.2020, posted by Frederik Wolff-Fabris on 09 Dec 2020, 10:24 
General Announcement:
- Regarding the e-mail related to the general radiation training and procedure to deliver a signed certificate, one can also send it by conventional post to Zunaira A.

CTRL:
- BKR machines has been updated to the new Karabo release.
- The Notification service update will follow form today.
- CTRL reminds on getting configuration from the timing feature on the GUI: right click on the device and then "get configuration". 
An e-mail with detailed instructions will be sent today.

DA:
- Nothing to report.

EEE:
- Fast electronics: SASE3 maintenance is finished; SA2 will follow.
- PLC side: SQS has some loops running but not all of them due to the cooling issue. SCS will get their loops soon running.
- Cabling works at FXE is completed; at HED is ongoing.

VAC:
- Not present due to tunnel activities.

XPD:
- XPD has completed PES beamtime at Petra. Would like to thank ITDM for the smooth work. XPD has collected data for over 300 runs.
- Today XPD brings back other PES to SA3 tunnel. There is an appointment with MEA and the plan is to connect to the beamline tomorrow together with VAC.
- A. Koch asks EEE at CTRL if DAQ tests on XPD tunnel devices can happen on Friday. 
Nerea J. points SA3 is not yet commissioned (has to check motors) but SA1 and SA2 can be done on Friday as it has only pending vacuum update. 
Steffen H. says that cameras can be tested in all 3 SASEs; connections shall be fine; requests a list of all cameras. 
Jan G. adds the idea is to verify the components can be operated and acquire data, following a test with XPD/ITDM. 
Steffen H. reminds that for testing the digitizers one has to re-start (faster ADC) the device server. 

DET:
- Not present.

ITDM: 
- Nothing to report.

XRO:
- Nothing present.

LAS:
- Lasers are on good track.
- Interlock tests: there was miscommunication. The SA2 AMPHOS is disassembled for maintenance and therefore the PP-laser test in SA2 is postponed to next week. 

UNSYS:
- Not present.

SPB:
- Nearly done with putting together the AGIPD. The Final test for DQA begin next week.
- Problem with timing but currently it has been running on local mode.

FXE:
- Not present.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Nothing to report.
- SQS has ongoing work on Beckhoff crates.
Entry   Notes XO Integration Meeting 07.12.2020, posted by Frederik Wolff-Fabris on 07 Dec 2020, 11:08 
General Announcement:
-	 

CTRL:
- Deployment updates: control network topics are through - SPB to be done in January.
- BKR and notification service updates to be deployed tomorrow or Wednesday.

DA:
- Nothing to report.

EEE:
- Cabling: finishing FXE and starting HED in the course of this week.
- Fast ADC: uTCA in SCS will be restarted for updated. SCS will contact Bruno F.
- SCS racks: cooling water is disconnected. Thomas Baumann informs TS needs to order cooling water lines and only in January will be connected. 
It is suggested to run with open doors in the meantime; Nerea J. says if one needs 1-2 loops then this is fine; Thomas B., Ulf B. and Nerea J. will discuss the details. 

VAC:
- Nothing to report.

XPD:
- PES installation will happen next Wednesday/Thursday. J. Laksman will contact VAC.
- Alarms in various XGM seem last week were due to updates. It is not a real problem.

DET:
- Nothing to report.

ITDM: 
- Lennart B. coordinates with instruments.
- Due to tomorrow timing update, the upgrade of DAQ on tunnels devices to start on Friday. Others will be contacted individually.
- Jan G. asks on issues of recording DAQ of PES during Petra ongoing beamtime. K. Wrona says it would be better to be informed in advance on the beamtime. 
The issue happens due to overload with a buggy script. If this script is not running, then the issue should not repeat again. 
At Petra it is used a standard control network which is different from the one at EuXFEL.

XRO:
- Not present.

LAS:
- All lasers are in local timing mode.
- LAS requests Bruno F. to have a crate update today as they have ongoing work in SA3. Bruno F. says the updates are agreed to be done today.
- Laser interlock upgrades: there is no news or known progress.

UNSYS:
- Not present.

SPB:
- Detector intervention ongoing and nearly finished. Test with DAQ and final test by end of this week. It is expected to be ready for Monday.

FXE:
- Elektro Wille firma working in the hutch.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Water leak last week was the only major event.

SQS:
- Nothing to add.
Entry   Notes XO Integration Meeting 02.12.2020, posted by Frederik Wolff-Fabris on 02 Dec 2020, 10:21 
General Announcement:
- Laser interlocks activities in SA2 are delayed by two days. Therefore, activity in SA1 will start later.
- Gerd W. reports the cooling water in SA3 was refilled; air conditionings are running and maintenance on them are ongoing; 
next week temperature and humidity stability in other SASEs will be working; water leakage in SCS (yesterday) has been taken care by TS (crates are not damaged).

CTRL:
- Currently working in SASE2 deployment. SASE1 deployment happened yesterday and went relatively smooth. 
- Fast ADC cards in lasers stop working. CTRL will need to look with EEE.

DA:
- Works on updates are progressing/done.

EEE:
- MicroTCA SA1 update is done. Next week continues with SASE3 update.
- Cabling installation ongoing in FXE. It will be followed by SQS, SCS and MID.
- SA2 and SA1 motion loops updates to be done this week.
- Fast ADC issue with Lasers: Bruno F. says the installed update is the last version and Karabo has also to be updated to its last version also. CTRL and EEE will discuss 
together.

VAC:
- Maintenance activities are going as expected, some tasks are ahead of schedule.

XPD:
- SA3 PES is in the lab and being replaced parts. Plan is to test it today. XPD will discuss with VAC to install back this week or next week.
- XPD received a beamtime shift in PetraIII for the PES. This influences XPD schedule as many people are involved. Beamtime starts this Friday until next Wednesday.
- DAQ tests on Tuesday morning are scheduled. XPD will talk to ITDM to postpone to after the mentioned beamtime shift. 

DET:
- Nothing major to report. AGIPD Intervention: so far, so good.

ITDM: 
- Updates ongoing.

XRO:
- Not present.

LAS:
- ADC cards problems are communicated to CTRL. 
- Observed issues with trigger delay signal and it points to issues with recent update. Currently the lasers use local timing. CTRL will investigate if this can be the 
cause.

UNSYS:
- Not present.

SPB:
- Doing OK with AGIPD intervention: expected to be ready with final tests at start of the next week.

FXE:
- Cabling installation ongoing; Today there is the crane activity for SXP.

MID:
- All fine at MID.

HED:
- Everything is fine.

SCS:
- Not present.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 30.11.2020 , posted by Arvid Gebhardt on 30 Nov 2020, 09:15 

General Announcement:

- /

CTRL:

- Karabo 2.10 FXE was sucessful.

- go on with SPB and go on with other instruments. On Thurthday 3rd all SASE3 topics.

- Connenting Gui clients, if gateway there is no need to write a tiket this week. If local installation, please make an update.

- network upgrade takes place at SASE1 tomorrow. Karabo will be updated later.

DA:

- /

EEE:

- MircoTCA updates today and on going. Timing won´t be avaliable for short period.

VAC:

- /

XPD:

- /

DET:

- /

ITDM:

- Tomorrow network update SASE1, but there no Karbo update.

- at the beginning of January DESY-IT will do some work on data center / maxwell clust. interuptions are expected. Schedule is still be to expacted.

XRO:

- Not present.

LAS:

- Tests on the mircoTCA failt. More tests needs to be done.

- LAS request comunication from instruments go thru XO.

UNSYS:

- Not present.

SPB:

- Aigipd intervention is running well. To be tested by the end of this week.

FXE:

- cable installation on going.

MID:

- all fine

HED:

- /

SCS:

- Not present.

SQS:

- /

Entry   Notes XO Integration Meeting 25.11.2020, posted by Frederik Wolff-Fabris on 25 Nov 2020, 10:14 
General Announcement:
- There is no UOM or XO Int. Meeting next Friday 27.11. We will continue with XO Int. Meeting next Monday 30.11.

CTRL:
- Karabo Deployment in FXE takes place today. Schedule for full Karabo deployment was sent to the Readiness mailing list.
- Two SA2/SA3 Beckhoff devices topics will be updated today (5-10 minutes downtime).

DA:
- No issues or announcement to report.

EEE:
- PLC side: tunnel updates to be started with CTRL.
- Change requests also to start today in a couple of instruments.

VAC:
- Not present.

XPD:
- PES/MEA: there are individual tasks ongoing.

DET:
- Nothing major to report. AGIPD intervention is goes faster than planned.

ITDM: 
- Offline storage update was done and is available since Tuesday.
- Online cluster update has started: SA1 already available since Tuesday. Today ITDM will finish SA2/SA3. Crosscheck and start DAQ will follow.

XRO:
- Not present.

LAS:
- Nothing special to report.

UNSYS:
- Not present.

SPB:
- AGIPD work is ongoing and fine.

FXE:
- Wille company is installing cables in the hutch.
- Issue with craning on SA3 / SXP activities above FXE area: FXE asks for coordination to avoid interrupting activities. 
Gerd W. says it shall not be a problem as crane will be used for few period. Martin K. will inform his phone number for arranging craning times.

MID:
- All fine at MID.

HED:
- All fine at HED.

SCS:
- Shutdown activities ongoing.
- Situation of JJ X-ray will be clarified by SCS staff. 

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 23.11.2020, posted by Frederik Wolff-Fabris on 23 Nov 2020, 11:33 
General Announcement:
- An e-mail to the readiness and stgl mailing lists was sent regarding the calendar share and updated task list. Please contact xo-planning@xfel.eu in case of any issue.
- Desy has made mandatory for the tunnel works the use a community mask all the time and a FFP2 mask if distance between two persons is less than 1.5m.

CTRL:
- CTRL sent requests to the DA colleagues. S. Hauf asks the colleagues to take a look and have a discussion afterwards. 
- Karabo deployment on FXE will take place on Wednesday. 
M. Turcato says one DET person must be back to work on that day to switch Detector off and on by again: Wed afternoon or Thursday morning it shall be OK.

DA:
- Nothing to report.

EEE:
- PLCs will start shutdown with planned activities on today and tomorrow in SA3 instruments.

VAC:
- Not present.

XPD:
- Plan for XGM/SCS is to keep it running (under vacuum). XPD reminds SCS people to keep XGM on vacuum. 

DET:
- AGIPD intervention: is progressing quite well and advancing. 
A. Violante says it is progressing faster than expected and many small issues were solved during the weekend; first quadrant was already re-mounted and tested. 
By the end of this week an update on time planning will be made. 

ITDM: 
- Today ITDM starts the update of offline storage system (unavailable all day).
- The update on the online cluster system will start today in SA1 and then SA2 and SA3. It will not be available until Wednesday.

XRO:
- Working on the winter shutdown.

LAS:
- Carrying on planned maintenance work.

UNSYS:
- Not present.

SPB:
- AGIPD intervention is going well and is under control.

FXE:
- Cabling works starting today in the hutch.
- A. Galler asks if calibration of LPD was done. D. Khakhulin mentions that the raw data was used and calibration constants were not used. 
M. Turcato says one has to discuss together with calibration team.

MID:
- All fine.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 18.11.2020, posted by Frederik Wolff-Fabris on 18 Nov 2020, 11:23 
General Announcement:
- Updates on the maintenance schedule will be made available in Alfresco. Guidelines in how to integrate calendars will be sent to readiness mailing list, for example.
- Please feel free to contact XO by to share any thoughts related to the Maintenance.

CTRL:
- Successful tests of HED pulser were done on Monday;
- CTRL is preparing Karabo 2.10 deployment: a schedule will be sent around per e-mail. FXE starts on 25/11. Remaining areas take place on Tue/Wed/Thu of week 49. 
SPB will be discussed later due to the AGIPD work.

DA:
- DA has received two messages from CTRL related to Karabo and data analysis deployment: first about deployment and second about bridge.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- XPD is involved on MID tests this week;
- Shimadzu camera tests/development is cancelled due to AGIPD intervention at SPB.

DET:
- Nothing to report.

ITDM: 
- Planning for next week maintenance and working with AGIPD/SPB intervention.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- A problem with SA2/cell37 coupler is found and will be fixed during shutdown.

SPB:
- Work on AGIPD is going OK. It has been found the expected minor issues. SPB expects AGIPD experts on site.

FXE:
- Nothing to report.

MID:
- Fast-ADC issue is under investigations together with EEE/Bruno F.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 16.11.2020, posted by Frederik Wolff-Fabris on 16 Nov 2020, 13:14 
General Announcement:
-	 

CTRL:
- Further improvements on the SA3 vacuum loop will continue during the shutdown.

DA:
- No issues to report.

EEE:
- 1 OCD call from SCS call related to PLC: hardware issue.
- Fast electronics side: MID timing system problem is still present. Frequency that this issue happens is reduced.
- For the Winter maintenance, EEE will ship some crates to Poland. Due to Covid-19 situation, only crates with non-critical changes for next run will be sent. EEE is in 
closed contacts with instruments.

VAC:
- 1 OCD during the weekend was related to GATT and promptly solved.

XPD:
- Nothing to report.

DET:
- Last Friday problem with offline jobs was solved (it had to be followed by IT).
- SPB activity for AGIPD baseline intervention/correction to start today.

ITDM: 
- Maintenance on the offline storage will happen next Monday 23.11. An e-mail was sent this morning. The system will be OFF and all data will not be accessible that day.
- ITDM will also start the maintenance of online cluster on 23.11. They will not be available until the end of maintenance (about 3 days).

XRO:
- Nothing to report.

LAS:
- OCD calls from SCS: 1. observed crystal degradation in SCS side; 2. laser pattern server could not be changed (LAS forward the message to CTRL).
- All other PP-lasers are fine.

UNSYS:
- BKR tested air coils in the last SA2 undulators cells for performing work on Wednesday for photon beam alignment (there was a problem with Cell37/SA2 not responding).

SPB:
- Instrument and beam delivery were running successfully last week;
- This week SPB starts working with AGIPD: one aim to work as fast as possible to finish before Christmas break.

FXE:
- D3 is currently preparing the tests.

MID:
- Continues to use beam this week for detector tests. 

HED:
- Tested AGIPD during last weekend. Currently HED is changing setup to use High Intensity laser this week.

SCS:
- Not present.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 11.11.2020, posted by Frederik Wolff-Fabris on 11 Nov 2020, 10:49 
General Announcement:
- XO is in contact with some groups regarding the winter shutdown, in order to get additional information or solve potential conflicts. 
If there are any question, please contact us in this meeting or via e-mail.
- Steffen adds on the idea of using FXE for initial deployment of updated Karabo version. It will take place after 23/Nov.
- Jan asks how XO needs to be informed for tasks that groups deal with each other. A. Galler says XPD is on the list for setting a date to discuss this. 
Groups are encouraged to communicate with other support groups beforehand.

CTRL:
- Misbehaving timing server at MID yesterday was initially solved by EEE. EEE replaced the hardware of the timing system itself but problem continued. 
System seems now to be healthy but from time to time there are small timing interruptions. Investigation is ongoing and will be discussed in the digitizer meeting of Data 
department.
- One CTRL ticket on Doocs device at SCS: it was a problem with custom installation. CTRL asks to be informed in case groups have custom installations. This may pose a 
risk when deploying new updates.

DA:
- AGIPD train-ID issue: a small workaround until shutdown is in place. One has to set the individual channel and seems to be now working. Next intervention to take place 
during Winter maintenance time.

EEE:
- Nothing else to report aside of the MID timing system.

VAC:
- Nothing to report.

XPD:
- SA3 XGM was switched to Ne as requested by instruments.

DET:
- Preparation for activities on AGIPD at SPB/SFX during the winter time is ongoing.

ITDM: 
- Pre-announcement: at the start of the maintenance, ITDM has activity on the computer cluster. A separate announcement will be sent.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- No issues to report.
- Intervention date of AGIPD: SPB requires due to highest priority work that between 16/11-18/12 no interruptions of electrical power or the need of EQP may happen. 

FXE:
- Crosstalk SA1/SA3 was not seen yesterday as SQS used only 1 bunch.

MID:
- Nothing to add besides what CTRL and EEE have mentioned.

HED:
- Next week HED does not use X-ray beam: commissioning of the high power laser and test of pulse on demand are planned. A. Galler says it pulse on demand was fixed by 
CTRLs and can be used. 
- Question on use of ADCs: Bruno says some trains will not be recorder or be repeated. This may be related to the timing issue like in MID. 
But data can be acquired. It is under investigation accordingly to Bruno, with CTRL, DA, ITDM.

SCS:
- Not present.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 09.11.2020, posted by Frederik Wolff-Fabris on 10 Nov 2020, 10:53 
General Announcement:
- Maintenance summary task list has been made available at the S:\ folder as well as in the XO Alfresco page.

CTRL:
- On Thursday laser1 went down: error on deployment related to fix zero train ID.
- Lasers safety deployment is fixed.
- SA3 vac loop: progress was made and new version of Karabo needs re-start this morning.
- SA3 fixed MC2 motor issues. Coordinated with instruments to do tests today.

DA:
- 1 OCD was received and solved during the weekend.

EEE:
- Announces that on tomorrow's PBS there will be a EEE presentation on the Digitizer instruments.

VAC:
- Nothing to report.

XPD:
- No issues. The switch of XGM settings at different energies went well.

DET:
- Nothing to report.

ITDM: 
- Meeting with MID on train-ID is set. There is a mitigation error plan which will be implemented.

XRO:
- Nothing to report. Minor issues on CTRLs but are not stoppers.

LAS:
- PP-laser for SPB run was interrupted for 45 minutes.
- Issue with synchronization / motor becomes unstable, relating to motor slippage. Hardware will be replaced during the shutdown.

UNSYS:
- Nothing to report.

SPB:
- Finished user experiment: went OK but machine not very stable. Intensity and pointing very unstable. After beam losses timing came quite different. 
Data for pointing quantification to be analyzed.

FXE:
- Unstable beam the whole week. 
- Crosstalk between SA3 and SA1: sometimes BKR could fix/work on it, sometimes not. This happens when FXE runs at 150 bunches and SA3 varying 1-100. 
SA1 intensity goes down by factor 2.

MID:
- DET and ITDM contacted during the weekend.

HED:
- Not present.

SCS:
- Not present.

SQS:
- Crosstalk SA1/SA3: night shift crew said it is not a problem for next week if run without Interleaved.
Entry   Notes XO Integration Meeting 04.11.2020, posted by Frederik Wolff-Fabris on 04 Nov 2020, 10:55 
General Announcement:
- XO reminds on the 4.5MHz operation: MXL tested a 12hs switching mode and this will be used along the week. 
The night shift operates at 4.5 MHz and day shift at 2.25MHz to avoid sending unnecessary bunches to the dumps.

CTRL:
- Issues with MC2 motors (bug in moving, mainly in SA3). CTRL has a fix but it is hard to find a proper time slot this week to apply it. The idea is to deploy next Monday 
only in SA3 first. 
If issues are found beforehand, please contact CTRL.
- SQS mentions a bug in the mirror observed yesterday which relates to the above described issue. SQS has to observe it to verify it moves all the way and then one can 
wait until Monday for the fix.

DA:
- Nothing to report.

EEE:
- Crate issue in SA2: it was not needed to exchange the crate. A reboot on Monday afternoon helped to bring system back. 
Crate works as normal. During winter shutdown EEE will replace crate and power modules.
- MID and LAS reported issues with train-ID / timing servers. Triggers have not been delivered in 10Hz. This is in discussion with DESY. 
One solution is an update of the DOOCS timing serves that do not show errors which does not interrupt timing servers. In MID this may be related to data recording. 
For the PP Laser further discuss with Desy colleagues will be made. This affects only MID because the use of old version of Doocs server. 
- MCP problems reported by XPD: mismatch on the firmware version and EEE plans to upgrade this week. 
- Preparation for the winter maintenance is ongoing and installations can start on 23/11.

VAC:
- VAC would like to thank EEE and CTRL for the SA3 loop vacuum fix.

XPD:
- XPD found another issue with MCP: wrong assigned triggers. A ticket will be created. 

DET:
- Update of MID AGIPD is still an issue but this is not critical at the moment.
- CTRL has accessed the LPD detector issue.

ITDM: 
- K. Wrona informs ITDM has the reservation of Maxwell for data analysis during next two weeks. 
The user groups have to be informed that one has to use Maxwell reservation to quick analyze data.

XRO:
- Nothing to report.

LAS:
- SA1 SPB PP-laser had to increase energy and is on work.
- SA2 PP-laser missing trigger from around 7PM yesterday. Laser went OFF due to this and luckily LAS was watching it and was able to switch ON quickly. LAS is in touch 
with EEE and Desy. 
A fallback solution could be to generate triggers by hardware but there is no progress from Desy side. LAS will prepare specifications for this module.

UNSYS:
- Small hiccup in one SA2 undulator that was remotely corrected.

SPB:
- Trying to align beam: SPB sees elliptical rings. Andreas G. suggests if this continues please communicate to the PRC.

FXE:
- No further information on issues with the LPD.

MID:
- Tomorrow it takes place the AGIPD train-ID meeting.

HED:
- Vacuum valves in differential pumping system were strangely closed on Friday 2AM. HED discovered this only yesterday. Pressure slowly went up. HED will further 
investigate.

SCS:
- Not present.

SQS:
- 4.5MHz operation had gun trips due to the overheating of the dump. 
F. Wolff-Fabris comments that was due to the radiation alarms on the dumps that removed beam permission by about one hour around 4AM.
Entry   Notes XO Integration Meeting 02.11.2020, posted by Frederik Wolff-Fabris on 03 Nov 2020, 08:39 
General Announcement:
- A. Galler reminds the attendance that this meeting is also an opportunity for making comments/questions on the new Covid-19 rules that start to take place.

CTRL:
- Main issue last days was related to the SA3 VAC PLC. The applied fix was left running during the weekend. So far it works faster and reacts faster for diagnostics. 
CTRL is getting some statistics in order to get the final solution. If something goes wrong, please call OCD.

- No OCD calls during the weekend.

DA:
- No issues or news.

EEE:
- uTCA crate of SA2 balcony room is not reachable. A quick fix on Friday was not successful and EEE needs to power cycle or replace the whole crate. 
This will interrupt timing for PP-laser and the signals sent to MPS. Meeting between EEE, lasers, instruments and XO will take place. 
- (Note after meeting: the power cycle of the actual crate will be done today after lunch. If this does not helps then immediately exchange of crate will be done 
afterwards. 
PP-laser will be brought to a safe state and takes about 4-5 hours to restart it).

VAC:
- Nothing to report.

XPD:
- Worked at BKR with MCP detectors. XPD reported to CTRL an issue with ADC - some channels see no signal or not standard ones. 
EEE knows and runs some scripts - this happens from time to time and may affect recording data.
- In general, from XGM side, Theo M. has prepared a way to switch settings to extreme changes of photon energies.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Motor problem with SA1/cell31 last week was repaired and undulator should be working fine.

SPB:
- STAB campaign last week went fine and collected data that has to be analyzed.

FXE:
- Nothing to add.

MID:
- Waiting for invitation to a meeting on the AGIPD train-ID.

HED:
- Requests the beam delivery schedule in order to know if has to schedule people for Tuesday night.

SCS:
- Not present.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 28.10.2020, posted by Frederik Wolff-Fabris on 29 Oct 2020, 08:11 
General Announcement:
-	 

CTRL:
- SA3 VAC loop - 2 approaches to find out the root cause (discussed also with EEE):
1. Thursday 8-11:00AM to test the whole loop by partitioning batches of devices. This may pinpoint the single device that cause the problem.
2. Reproduce the problem at lab level. Based on the reproducibility this approach will be continued in parallel. 

DA:
- Nothing to report.

EEE:
- PLC colleagues are troubleshooting SA3 VAC loop.
- DET reported that measurements are carrying on wrong train-IDs. Tests are being made in the lab (not reproducible) but EEE is working on it.

VAC:
- SA3 VAC loop is main activity - interaction with Michaela P.

XPD:
- Group mainly busy with Photon Diag Conference this week.
- Supporting STAB and not heard any major issues in this effort.

DET:
- Report on the train-ID. This affects all the AGIPDs including the mini-half.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Preparing for next week operation.

UNSYS:
- Nothing to report.

SPB:
- Collected lot of data last few days: SPB/SFX thanks LAS and accelerator teams for support.

FXE:
- Nothing to report.

MID:
- All fine.

HED:
- All fine.

SCS:
- Issue with door interlock: Eric B. has investigated this morning. Problem seems to be with the maglocks and has been solved for now but a long term has to be worked on.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 26.10.2020, posted by Frederik Wolff-Fabris on 26 Oct 2020, 11:18 
General Announcement:
-	 

CTRL:
- SA3 vacuum loops problems: seems to compromise some experiments. Beckhoff loops are changing states very quickly and compromises the whole system. 
CTRL ask for the instruments to give info on the type of command given that makes motors change states. CTRL investigates together with EEE as more data has been produced 
as compared to the past. 
This problem does not happen in SA1/SA2 and may be related to the PES which will be checked this afternoon.
- Please call the new OCD numbers: 6541 and 6542. Specially on weekends it is the fast way to contact. This number is valid since last spring.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report except of SA3 vacuum loops.

XPD:
- Not present.

DET:
- XO asks on the train-ID progress of Agipd. Monica T. says that the plan is to correct in the DAQ level during the next shutdown. 
K. Wrona adds that the fixing takes long and the current investigation focus on doing in the DAQ level during January.

ITDM: 
- Maxwell nodes used to login in the Maxwell will be rebooted today, causing access limitations.

XRO:
- Nothing to report.

LAS:
- Bunch pattern in demand: LAS assume XO will take care of this topic. Andreas G. says XO will take care but need to be informed on what is needed. 
Tomasz J. mentions it needs some coordination between instruments and machine.

UNSYS:
- Couple of issues in SA3 undulator cell: it got stuck, mostly during machine development times by running out of range. This was corrected during the weekend.

SPB:
- Moving on with WP8. Continuing today.

FXE:
- Nothing to add.

MID:
- MID makes a general reminder on the train-ID development with AGIPD: MID expects to have a meeting to discuss a long term solution plus the test procedure for 
implementation after the quick fix. 
This has to be planned in advance.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- SQS has suffered during the weekend with the VAC issue.
- CTRL side can look at the PES this afternoon.
Entry   Notes XO Integration Meeting 21.10.2020, posted by Frederik Wolff-Fabris on 21 Oct 2020, 11:11 
General Announcement:
- XO thank the effort made by preparing the activity lists for the maintenance period. In few cases XO is contacting groups back with questions and/or comments.
- The Winter maintenance period was adjusted yesterday. The ending period is now on January 13th, 2021, instead of January 4th. 

CTRL:
- CTRL is reaching conclusions on recent Beckhoff problems: 
1. CTRL would like to upgrade most of installations in instruments next week (upgrade of motors software). This upgrade is in general a step forward for the PLC 
connections when it is dropped (re-starting). 
2. For SASE installations, CTRL will make next week during machine days. 
3. The GATT will not be upgraded now – this will start during Winter maintenance period. Upgrade of GATT is a priority for CTRL (has been added to the maintenance list 
submitted to XO). 

DA:
- Nothing to report.

EEE:
- Intervention in SA3 PP-laser was done.

VAC:
- No new issues to report. 
- Maintenance on SA3 vacuum loop: in case of problems, one has to restart in PLC level with EEE staff and may result a bit longer recovery. 
Steffen H. comments it has been worked on and may be solved in the next day or so. The restart procedure is easy but lengthy. CTRL/OCD knows what to do.

XPD:
- One of vacuum pumps lost Beckhoff connection.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Not present.

FXE:
- Nothing to report.

MID:
- All is super at MID.

HED:
- All sounds great at the moment.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 19.10.2020, posted by Frederik Wolff-Fabris on 19 Oct 2020, 15:29 
General Announcement:
- A Vacuum issue in one of the dumps brought machine down at around 1:30AM. Only around 7AM machine could re-start running and tuning again.
- XO thanks the groups who have already sent the maintenance lists. For the remaining groups, please contact at the xo-planning@xfel.eu.

CTRL:
- Few minor OCD calls during the weekend: One relates to a camera triggering.
- Issue with SA3 vacuum loop seems to be currently fixed but needs further investigations.
- Update of Beckhoff motors is planned for this week. CTRL will get in touch with Instruments.

DA:
- Nothing special to report.

EEE:
- Nothing to report.
- Question to XO on Maintenance: Could we have a draft of tasks list before Nov. 6th? 
Andreas G. answers that XO is working on it and as soon as lists are finished this will be published. In case info on partial parts is already needed, may be provided 
depending on the progress.

VAC:
- SA3 vacuum loop issue was mentioned by CTRL (see above).

XPD:
- Nothing to report.

DET:
- Nothing special to report.

ITDM: 
- Update will be done on DA acquisition of HED. This has been communicated with instrument personnel.

XRO:
- No bad news to report.

LAS:
- SA3 PP-laser presents small power drop in the laser beam: LAS will take care this week.
- SA1 PP-laser has a problem with ADC and stop acquiring data.
- Need to update firmware of ADC cards to get train ID's in SA3 PP-laser. This was requested to EEE. This may bring laser down again and may not be ready by Thursday. XO, 
LAS and EEE will discuss offline. 

UNSYS:
- Nothing to report.

SPB:
- Last week was smooth.

FXE:
- Problems with tunnels last night at around 1:00AM. More than half the shift was lost with no beam delivery: main user data was therefore not acquired. 

MID:
- Nothing to report.

HED:
- Beam was lost between 1AM to 7AM. Last data has been taken between 8:00 and 9:00AM. 
- During the weekend, beam drift was observed at Pop-in at the end of the tunnel. There are data and has to be analyzed.
- Discussion on implementation of Dynamic trigger will take place.

SCS:
- Not present.

SQS:
- Minor issue with Data: one data aggregator was not working properly. OCD and SQS personnel have solved it. 
K. Wrona comments that too many properties overloaded the aggregator. A long term solution will be worked on.
Entry   Notes XO Integration Meeting 14.10.2020, posted by Andreas Galler on 14 Oct 2020, 09:22 

General Announcement:

  • .

CTRL:

  • problems in SA3
    • VAC loop unstable, devices cannot be brought into a stable state --> what used to be a restart every  two weeks, cannot be recovered these days
    • issues with motors developing a short time out
      • somewhere there is a beavy load on Beckhoff loops
      • TM comments: at times the movements happen very late after issuing the command
    • influxDB sees high load
      • any modification of or running a new macro?
      • Please let CTRL know
    • the issue started with VAC --> devugging shoud start there

DA:

  • extrafoam OCD call

EEE:

  • working together with CTRL on SA3 issue
  • OCD call from SCS but call was not correctly frowarded

VAC:

  • not present

XPD:

  • no issues

DET:

  • OCD call from SCS --> was fixed

ITDM:

  • nothing to report

XRO:

  • nothing to report

LAS:

  • no issues

UNSYS: 

  • nthing to report

SPB/SFX:

  • all fine

FXE:

  • people on shift could not initiate a hutch search
  • GABS access right missing (Gebietsabsuche)
    • introduced without informing FXE

MID:

  • waiting for invitation AGIPD trainID solution

HED:

  • JUNGFRAU issue presists
  • HexaPOD is working again
    • work around

SCS:

  •  

SQS:

  • DAQ issue
    • no data was recorded without
  • vac is an issue but not endangering
  • motor issue is vital to the instrument

Entry   Notes XO Integration Meeting 12.10.2020, posted by Andreas Galler on 12 Oct 2020, 09:12 

General Announcement:

  • .

CTRL:

  • issues SA3 vacuum loop
    • gets more and more diffcult to recover
      • problem not clear, PLC comminucation is lost without obvious reasons
      • no software changes took place from either CTRL nor EEE ... component issue?
  • fastadc issues --> EEE
  • mirror in SA3 not always following a move ommand XTD10 M1

DA:

  •  

EEE:

  • OCD at HED --> hexapod
  • fineDelay

VAC:

  • preventive action in XTD10 for GATT scroll pump

XPD:

  • SA2 imager XTD6 pop in 45 after M3 small mark on the imager --> imager still usable

DET:

  • nothing to report

ITDM:

  • OCD call data aggregator at MID
    • need to understand better how to avoid the situation
  • users complained to maxwell service (DESY directly) about limited resources becuase of high load by other users
    • there are reserved nodes --> use them!
  • issues with scratch
    • more than 300 TB had been accumulated within a relatively short time
      • it seems that data was calibrated to scratch not to proc
      • MID comments --> a special calib mode was used that could not save to proc which is why it was saved to scratch
  • problem with one of the proxy servers --> degraded performance of data migration

XRO:

  •  

LAS:

  • issue at SA1 with Galvo
    • after shift change to FXE, laser was not working --> Galvo was out of phase
    • FXE resetted something (not clear) and the laser came back
    • LAS investigating the issue

UNSYS: 

  • nothing special
    • a couple of times the undulators opened suddenly without any command issued.
    • O. Henssler from DESY proveds the logs

SPB/SFX:

  • coupling with SA1 and SA2 (SA2 using train on demand) is an issue
    • beam walks off the XTD9 XGM aperture
  • offset mirrors M2
    • pitch movement got stiff
  • smaract cotnrollers
    • most fixed by increasing timeout windows

FXE:

  • shutter can be opened despite closed vavales

MID:

  • used pulse on demand
    • users were happy

HED:

  • damage on M3 mirror
    • due to focusing scheme --> 9keV and intermediate focus --> during alignment unfortunately the focusing point came too close to M3
  • meeting with XPD and XRO at 11:30
  • hexapod issue reported to EEE is not quite fixed
    • ´status is not reporting the correct status of the hexapod
    • hexapod started working at some point and fell back to weird operation later again
  • CRL arm7 seems to be at the limit of the x-axis
    • if FEL stays where it is, XTD1 chamber might need to be moved
  • JUNGFRAU issue
    • up to a point the data is fine in the preview
      • after some runs data seen in the preview is not written to file

SCS:

  • nothing to report

SQS:

  • l
Entry   Notes XO Integration Meeting 07.10.2020, posted by Frederik Wolff-Fabris on 08 Oct 2020, 08:52 
General Announcement:
- Discussion on access rights based on FXE issue:
- The new Dachs system does not send notification that access rights will expire. Every staff member has to identify at the system when his/her rights will 
expire at each location. 
- Thomas T. says EuXFEL has made a request to Desy in order to modify this and currently it is at the pipeline at Desy.  
- Jan G. mentions that for the labs in his responsibilities he can see the access rights are being expired soon and he manually notifies the people.

CTRL:
- Two OCDs on Tuesday night: 1. SCS motor not moving (was fixed); 2. One SPB smarACT device server crashed (fixed). 
- CTRL is following up both incidents as well as a motor in HED/SA2.

DA:
- Agreement with CTRL (see last Monday's minutes) was done.

EEE:
- Nothing to reports on EDS, PLC.
- CPU for SA1 PP-laser was replaced last Monday. No issues observed since then.

VAC:
- Nothing to report.

XPD:
- No news to report.
- SA3/XGM operation this week (change of settings due to different photon energies range) is less problematic than initially thought. 
Procedure has been integrated to the BKR operators who will make the adjustments at each shift change.

DET:
- Nothing special.

ITDM: 
- Nothing new.

XRO:
- All ongoing, nothing to report.

LAS:
- SA1 PP-laser is running again after exchange of CPU.
- All PP-lasers running.

UNSYS:
- Tests with quad movers: helping with STAB task force.

SPB:
- SmarACT issue: communication error between local control and Karabo.
- SPB reports beam instability issue when SA3 changes, for example, the photon energy or bunch number. BKR was contacted and is aware of it. 

FXE:
- Issue with Interlock yesterday: new access rights for all staff in FXE. GABS has blocked the search prevention. 
Zunaira A. mentions that Frederico L., Dmitry K., Martin K. and Peter Z. can grant access to the staff members. Zunaira A. is not allowed to provide this 
access grants.

MID:
- All fine.

HED:
- User experiment this week. 
- The CRL1 in XTD1 had issue while moving arm in y-direction. A ticket was sent to CTRL. Contact for this ticket is Thomas Preston.

SCS:
- User beamtime this week.

SQS:
- Two color operation with magnetic chicane ongoing this week during day time, making use of the PES and XGM.
- One issue with saving digitizer settings. We open a ticket to ITDM.
Entry   Notes XO Integration Meeting 05.10.2020, posted by Frederik Wolff-Fabris on 06 Oct 2020, 10:36 
General Announcement:
-  XO has sent to the support groups and instruments the call for the winter maintenance tasks. Deadline for submission is Oct. 16th. 

CTRL:
- Friday night incident with signals of SA3 vacuum loop. It took hours to recover the system.
- A deployment/restart of online cluster nodes will be done today meaning 10 minutes downtime. Devices / clone devices shortly unavailable during the 
deployment.
- CTRL reminds that tickets that may require Doocs bridge are better worked if sent during the week time. 

DA:
- No major issues to report.
- DA will carry an offline discussion with CTRL on the cluster nodes deployment. CTRL says this is for the CPU nodes.

EEE:
- Nothing major to report. No incidents during the weekend.
- Looking into PL/fast ADC mTCA issue with SA1 PP-laser. To be discussed separately with LAS, XO after the meeting: next solution is to exchange CPU - 
needing coordination with ITDM and CTRL.

VAC:
- No major issues. Karabo SA3 VAC loops look fine now.

XPD:
- PES: ZZ on Friday to fix issue with a broken gauge, mostly likely related to the power failure. Cables had to be switched. PES works again. 
- Tests next week using PES: Joakim L. will set the system.
- Change of SA3 XGM settings during this week: Theo M. will change setup during weekdays.

DET:
- Nothing major to report.

ITDM: 
- No OCD calls during the weekend.

XRO:
- Nothing to report.

LAS:
- Shutdown AMPHOS in SA3 PP-laser (SCS/SQS): LAS asks for one single point of communication with the instruments; This laser needs work today morning to do 
not compromise the week. 
- E-mail for communication can be scs@xfel.eu and sqs@xfel.eu where all group members receive the message. 
- SA2 PP-laser is ready for next week.
- SA1 PP-laser still show problems with ADC cards. CPU will be exchanged - to be discussed after this meeting.

UNSYS:
- ZZ intervention last week.
- Couple of hiccups remotely fixed.

SPB:
- Nothing to report, besides issues with PP-laser.

FXE:
- ADQ with different sampling rates issue was solved by EEE.
- Plan is to work on the Jungfrau commissioning.

MID:
- MID requests if there is planned a meeting to discuss the train-ID issue. Steve A. comments that yes, a meeting will be organized next week. 

HED:
- Asks on the request for a pulse on demand test during today. F. Wolff-Fabris says this has been sent to the machine RCs and will be discussed during the 
RC meeting at 10:00. 
As soon as a decision is done this will be communicated.

SCS:
- Nothing to report.

SQS:
- Nothing to add apart of PP-laser issue.
Entry   Notes XO Integration Meeting 30.09.2020, posted by Frederik Wolff-Fabris on 30 Sep 2020, 12:08 
General Announcement:
- XO informs the Call for the Winter Maintenance tasks will be sent to the support groups and Instruments today. 
Please note it is not named "shutdown" anymore are critical services such as basic infrastructure must be maintained. At least in this round it will be called as "Winter 
Maintenance" to avoid confusion among the staff. 
The tasks list shall be sent to xo-planning@xfel.eu. 
- In case of need to go to tunnel via ZZ, please contact the PRC at 9-4800.
- Gerd W. informs on the SXP construction work that starts on Nov. 23rd. The plan aims for a minimal impact in SA3 area at XHEXP1. 
There will be new connections to the cooling water system in SA3and civil constructions. 
Cooling water will be cut from Nov. 23rd until Christmas. This means rack rooms and laser will be affected. 
- Gerd W. answers Raul V.: the cut cooling water supply does not involve tunnels. 
- Tommaso M. says instruments need to have permanent cooling water supply. 
Gerd W. states the electronics must be shut down and will not be able to re-start before Christmas as it takes time to empty the system, weld, do pressure tests and fill 
it up again. 
- XO suggests that SA3 instruments must coordinate closely with Gerd and also involve MB (Serguei M.).
- Nerea J. asks if this applies to SA3 balcony room also. Gerd W. says that the rack rooms will be affected. 
- Gerd informs there is a series of meetings taking place on Thursdays at 14:00 and this construction work can be addressed. The SCS and SQS group leaders have been 
invited to this series. 
If someone else wants to participate, please contact Gerd W. for getting the Zoom link, 
- Monica T. says that this lack of cooling water may impact the DSSC move to SQS by delaying its test.

CTRL:
- CTRL experiences some login hiccups related to information sent to InfluxDB. This will be fixed Sunday night (Monday at 02:00AM). There is no reason this issue will 
affect devices until the fix is done.

DA:
- Train-ID investigation for AGIPD offset is ongoing.  DA understands from now on DET is responsible for the leading efforts. 
- Monica T. comments it has been identified the issue related to the AGIPD firmware (2019 version, accordingly to Jolanta). This will require a significant change and to 
do it now is not an option. 
The good news is that this is a systematic issue and DET know how to take care of it.
- A. Galler asks the small task force on the train-ID to make a small presentation during next XO Integration Meeting. 

EEE:
- ADC in PP-laser (SA1) is confirmed to be solved.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Issue with DSSC yesterday: one Interlock signal was permanently enabled. EEE solved after restarting the device. It will be further investigated. 
ITDM: 
- Desy/IT requested ITDM a time slot to fix redundant parts of the routers between "ours" and "accelerators". To do so Desy/IT and MXL suggests to apply the fix (do not 
expect side effects) today before lunch time. 
No relation to the timing system of lasers is expected (low risk). None in this meeting's audience raises an issue against the proposed time.  

XRO:
- Nothing to report.

LAS:
- All 3 PP-lasers are up. Currently LAS still make some studies and instruments must send a message in case the need of use. Lasers are ready to be provided to 
instruments.

UNSYS:
- A ZZ is currently ongoing to fix issues with failed couplers in SA3 control cabinets.
- Beckhoff replies the cause of failure is either an overload of current or relations to temperature. Temperature seems not to be the issue (accordingly to UNSYS).

SPB:
- Nothing to report.

FXE:
- Plan to test digitizer (HQ412): issue is that sampling rate is not reproducible as in the lab. Probably it will happen tomorrow together with PP-laser use.

MID:
- The vacuum issue with the monochromator is under control.

HED:
- Preparing the user next week (that uses the pp-laser).

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 28.09.2020, posted by Frederik Wolff-Fabris on 28 Sep 2020, 11:02 
General Announcement:
- Andreas G. informs the winter maintenance period will happen in two months approximately. The call for tasks will go out this week to the support groups and 
instruments. 
- XO informs Desy and TS are investigating the Thursday's event of power cut but do not yet have a clear reason for it.
- Jan G. informs that SCS hutch will be closed and searched this afternoon for the FD on Gain Studies.

CTRL:
- Notification service informed on a broken event. After a Karabo shutdown the FXE topic is fine again. 
- Power cut: CTRL sees no issues as leftovers.
- Investigation of missing data in DOOCS (10 seconds outdated): CTRL has two colleagues looking into it.
- Supporting EEE and LAS on the ongoing working with PP-lasers.
- Update of dataloggers has to be made again. It means a 2 minutes downtime during the course of today/afternoon if nobody has something against.

DA:
- Question to CTRL: a notification service was forward to us. DA needs further description on that. Steffen H. says it was related to the python server and this is not 
deployed by CTRL. 
This is the reason why was forward to DA.

EEE:
- Follow up from Friday recover on the power glitch of Thursday: some cards in SA1 balcony rooms were not reachable anymore on Friday. These lead to a complete restart of 
the whole crate (means interruption of timing). After additional local intervention communication to the MPS was restored. 
- Changed the fast ADC of PP laser in SA1.

VAC:
- Nothing to report.

XPD:
- No issues to report.

DET:
- Agipd was power up after the power cut and had no issues.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- SA3 PP-laser: problems with SQS site. It misses the power energy (dropped down) and is under investigation. Maybe it is related to some optics assembling.
- SA2 PP-laser: power supply for AMPHOS was lost on Friday. The spare part arrives today at 11:00 and will be changed this afternoon.
- SA1 PP-laser: problem with uTCA (no ADC running and not possibility to login). Crate hangs after every few hours. Working together with EEE (100% in EEE side).

UNSYS:
- The problems with cell1/SA2 not moving were fixed by Suren K.
- Cell2/SA3 hardware problems (couplers) found this morning relates to an Ethernet card which needs to be replaced by ZZ. This cell is not operational.
- Phase shifters in SA3, cell4 and cell5 are not moving. The hardware works and it may be some higher level controls.
- Couplers were sent to Beckhoff for further investigation in order to find solution for decreasing the number of failures in future.

SPB:
- Nothing to report.

FXE:
- Due to issues with PP-laser the FXE did not test the timing tool during the weekend.

MID:
- All fine: still minor vacuum issue in the optical room but MID hopes to be solved soon.

HED:
- Pulse on demand tool was tested last Monday.

SCS:
- Nothing to report.

SQS:
- Nothing to add.
Entry   Notes XO Integration Meeting 23.09.2020, posted by Frederik Wolff-Fabris on 23 Sep 2020, 11:05 
General Announcement:
- XO is anticipating in one week the delivery table preparations to gain more time to spot possible problems related to beam delivery. The cw42 table was sent to the 
instruments last Monday.

CTRL:
- CTRL confirms but updates on the dataloggers and time servers were done successfully.
- LAS brought some issues to CTRL that are under investigations.

DA:
- Nothing to report.

EEE:
- EEE conducted yesterday the SA1/SA2 ATT interlock logic modification. Summary can be found in these links:
https://in.xfel.eu/elog/SASE1+technical+commissioning/1982
https://in.xfel.eu/elog/SASE2+technical+commissioning/830

VAC:
- VAC reminds in general that EuXFEL staff shall check their access rights in the DACHS database. To have trainings up to date is not enough. 
In case your rights are expired, please contact Martin Dommach via e-mail. 

XPD:
- FD week had a good start with GATT bleaching studies. Today there is the FD K-mono 4-Bounce ongoing.
- Machine switched back to 14 GeV on Monday; XGM/SA1 gas was exchanged back; graphite screen in SA1 is inserted.

DET:
- Nothing to report.

ITDM: 
- The SASE2 online data storage was diagnosed and reconfigured.

XRO:
- A. Trapp adds on the solid attenuators interlock modification for SA1/SA2: from now it is not possible to remove the diamonds if the silicon is in. 
For more info please check the e-log or contact M. Vannoni: 
https://in.xfel.eu/elog/SASE1+technical+commissioning/1982
https://in.xfel.eu/elog/SASE2+technical+commissioning/830
- Yesterday there was a ZZ in XTD9 for SPB to inspect BPLM: seems to be OK but minor issues to be resolved for the winter shutdown.

LAS:
- SA1 in maintenance: no risk for FXE during the weekend. It must be operational tomorrow morning. 
- SA2: issue with ADC cards - the NOPA is lost. Reported to CTRL.
- SA3: no issues.

UNSYS:
- ZZ in SA2/Cell31 is scheduled for tomorrow (24.09) morning at 09:00AM.

SPB:
- Involved in the update of attenuator. 
- Helping the stability task force activities this week.

FXE:
- FXE informs the second Gotthard is back: Karabo can't start or reset. CTRL suggests that when there is an urgent case one shall call the OCD. Otherwise sending a CTRL 
ticket is most suitable.
- Last week issue with digitizer: A new card was installed but has different sampling frequency. EEE is aware and is looking into it.
- FXE comments it is hard for the instrument staff to attend the two Graphana trainings due to night shifts/compensation, etc. FXE asks on possibility of additional 
trainings. 
Steffen H. says one can organize an extra training. A blue week is more suitable for the instrument staff. The extra training will be organized for the coming days/weeks. 

MID:
- Train-ID issue is progressing.
- MID asks for help from technical and engineering staff to find parts with M20 holes adaptors in order to lift granite stone.
** Post meeting update: VAC group helps MID.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 21.09.2020, posted by Frederik Wolff-Fabris on 21 Sep 2020, 16:06 
General Announcement:
- Last week issue with Oracle database upgrade was fixed by effort during the night. People entered tunnel by ZZ after this communication issue was fixed.

CTRL:
- It is planned to happen a Data loggers update today. 
- Time server update: related to a bug which happened twice in five years. It will be carried out today afternoon (after XPD beamtime) or tomorrow morning.
- A. Galler asks on updates on pulse pattern decoder: Steffen H. says it is ready to be deployed and tested.

DA:
- DA received only one OCD call last week: no specific issues during the week.

EEE:
- XO informs that the ATT interlock PLC update will be done tomorrow (22.09) morning.

VAC:
- OCD call on Friday from MID related to the cryocooler of monochromator: it was clear issue was related to the power supply. TS was involved to solve the problem by 
exchanging cryocooler. 
VAC informs the OCD number to be dialed is 9-4900 and not 4900.

XPD:
- It was observed problems with SA2/XGM spinning motor gauges.

DET:
- Nothing special: quiet week.

ITDM: 
- There is a problem with SASE2 online data storage. It happens data were not migrated from Schenefeld to Desy or it was very slow which in turn affected MID. Partially 
solved by making system live. 
- ITDM needs to diagnose the GPFS filesystem in SASE2 in order to understand the issues we experienced over the weekend. This may lead to some instabilities or even 
unavailability of the SASE2 online data storage. 
- XO suggests ITDM to coordinate separately with MID and HED.

XRO:
- Nothing to report.

LAS:
- SA3 had power drops and today LAS makes tests regarding Daniel Rivas info.
- SA1 currently replacing laser diode and updating uTCA system.
- SA2 nothing to report.

UNSYS:
- Terminals for SA2/cell31 have arrived and are ready to be installed in next ZZ access.
- Problem with air coil in SA3/cell12 this morning will be taken care.

SPB:
- Commissioning last week using 5 keV beam.

FXE:
- Mono commissioning.

MID:
- Recovered vacuum issue on cryocooler on SAT morning with help from TS. Beam was back on Saturday morning (+-10AM).
- Timing tests were running on Friday by EEE. MID waits for results to be analyzed. Train-ID issue seems to be progressing and many people work on it.

HED:
- User beamtime was very successful. Stability was very good.
- Pulse on demand test aimed to be able to have single PP shot synchronized with FEL. Today from 10AM CTRL and LAS will temporarily change bunch pattern (communicated to 
the PRC). 
No need for X-ray beam to the hutch.

SCS:
- No special issues to report.

SQS:
- Two weeks ago the monochromator was used. X-ray beam was twinkling and not reproducible. Seems to be connected to higher heat load when using 300 pulses. 
SQS says that this needs to be addressed when beam is back again.
Entry   Notes XO Integration Meeting 16.09.2020, posted by Frederik Wolff-Fabris on 16 Sep 2020, 10:20 
General Announcement:
- Yesterday evening a ZZ in XTD10 was planned but it turned unsuccessful due to no access in the turnstiles. D3 solve the problem in the middle of the night and since 
then ZZ is possible again.
- Eric Boyd mention on the SQS shutter: a XTD10 ZZ was planned for 8:30AM. He has currently no news so far.

CTRL:
- XGM Pulse pattern decoder issue is under investigation.
- Vacuum issues (giving unknown state in Karabo): also under investigation.
- Next Monday CTRL plans to update Karabo login system. Groups shall inform CTRL if there is any issue against this.
- Last Influx training will be next Friday An e-mail to participants will be sent. 

DA:
- No issues to be reported.

EEE:
- SA1/ Solid Attenuator Interlock problems: EEE is investigating and news will follow. FXE found an issue within the motion loop last night and XRO also helps. 
It is the Interlock on the attenuator itself and not in the EPS.

VAC:
- Nothing to report.

XPD:
- XGM signals were monitored when SA1 went to 5keV for a short time yesterday night. No issues were observed.

DET:
- SCS made an OCD call on the DSSC which has been fixed.
- Agipd issue: under investigation together with ITDM (a ticket was opened to ITDM). This is not a calibration issue. 

ITDM: 
- ITDM will follow on the Maxwell issue with Agipd. 
- CTRL and ITDM working and progressing on the bunch patter issue.

XRO:
- Issue with SA1 solid attenuator: same behavior can be expected also in SA2.
- Mirror inspection in XTD2: it shows no big damage on it. A full service will be made later. Next Monday inspection on XTD10 mirror to understand situation.
- Meeting to investigate possible upgrades to drive motors faster will take place. Participation of CTRL, DA and instruments.

LAS:
- Nothing to report.

UNSYS:
- Suren K. informs Beckhoff Hardware for cell#31/SA2 was received and is under test. As soon UNSYS is ready for a ZZ it will inform PRCs for scheduling a date. 
Mostly likely ZZs will occur on Tuesday and not Monday due to continuation of 11.5 GeV studies. 
- Communication problem with one undulator on Monday was quickly fixed.

SPB:
- Working on nano KB mirrors.
- 5 keV last night: gives right trajectory. It looks like the beam performance was sufficient for SPB alignment. Fine tuning has to come.

FXE:
- Affected by the shutter problem during the tentative ZZ access yesterday.
- Solid Attenuator issue in discussion with EEE.
- Sampling rate of ADC has changed. Peter Z. contacted EEE and it has been accessed.

MID:
- Not present.

HED:
- User experiment ongoing.
- Some stages worked intermittently and has to be investigated (related to crystal alignments).
- Pulse picker is not behaving correctly. It may be a Hardware issue and has to be investigated. Then HED will communicate to EEE.

SCS:
- PP laser was down last night and the OCD was contacted. There is the suspicion the crystal is damaged and the OCD informed it will be fixed this morning. 
Daniel Kane will try to get some info inside LAS and report back t SCS.

SQS:
- It has users this week and shutter becomes a serious issue. In Karabo the shutter state changed but it is disconnected. It is not clear if the ZZ team is progressing 
right now.
- Problem is that when trying to close the shutter via JDDD interface it went to an intermediate state but shutter did not close. 
This cause interlock not opening the hutch and the beam could not be sent to the hutch. No beam since 5PM yesterday. Also locally operated in the panel it does not work. 
The JDDD interface worked nicely the whole last week. Eric Boyd asks if problem appeared at the first operation. Tommaso M. says they did a lot of times prior having this 
issue.
- Waiting for updates from CTRL mentioned.
Entry   Notes XO Integration Meeting 14.09.2020, posted by Frederik Wolff-Fabris on 14 Sep 2020, 15:34 
General Announcement:
- None.

CTRL:
- CTRL will deploy an update on time server configurations for SA1 and SA3. Bunch time decoders will be down during few minutes.
- SPB and SQS reported during the weekend they do not have pulses per train correctly presented. This relates to the update on server configurations. CTRL is looking into 
it with SPB today.

DA:
- Minor OCD calls during the weekend with no severe issues.

EEE:
- EEE works with SPB on configurations of motors (in general with several other instruments).
- Looking into XPD issues.

VAC:
- It notices quite often one has to restart C++ servers due to communications issues. CTRL and EEE are investigating: it does lose connection and then does not properly 
restart. 
PLC continues running in the background. CTRL recommends restarting CPP server as workaround. 

XPD:
- XGM in SA3 shows not accurate number of trains per pulse. First pulses of a train were missing. It will be followed up with CTRL and SQS.
- There is an agreement in how to enable the 5keV operation. Instruments shall be aware of ahead planning when changing photon energies (band region of resonances which 
requires exchange of gases). 
In general SA1 and SA3 instruments are aware.

DET:
- Working on calibration issues.
- Problem from SCS with Karabo device going in unknown mode has been under investigation.

ITDM: 
- Comment to DET: it has been understood issue with Maxwell nodes last week - jobs running and certain nodes were in bad state. It was a particularity of the 
configuration. This affected the calibration. 
- Bunch pattern issue: we were communicated around 2AM on an issue that data recording was not the same as the scene. ITDM asks for communication of major issues must be 
done in earlier times when experts are around. 
XO will talk with CTRL and ITDM, as well as SQS.
- exfelgateway and Karabo installation: we will move today the installation. Link will redirect to the next location. No changes in how to start Karabo GUIs.
- Tomorrow a maintenance affecting Oracle databases will take place from 7AM to 1PM. For example, DACHS/DARF, UPEX will be down. 

XRO:
- Nothing to report.

LAS:
- Nothing critical to operation to be reported.

UNSYS:
- Beckhoff terminals for the cell31/SA1 are ordered. Components are to arrive.
- Problems with SA1/cell7 yesterday have been fixed.

SPB:
- Hardware exchanged late Friday and during weekend.
- Bunch pattern recording issue was discussed with CTRL last week during the day. It is of importance to correlate the data with number of bunches.

FXE:
- Minor issues with components motors: when pressed step up /step down in the motor, the Karabo interpret that we pressed twice. It is not critical but annoying. Issues 
are related to MC2 motors. 
CTRL will get in touch with EEE in an offline discussion. Issue has a different nature compared to the HED problems with motors.
- Tests on Monochromator show energy drifts. For long range scans one has to correct manually the calibration. FXE will report to CTRL today or tomorrow.
- Friday beam instability due to horizontal jitter: FXE took some data and will communicate. 

MID:
- Number of bunch train issue was also observed.
- Train IDs going to AGIPB are correct and verified.

HED:
- CRL must be investigated (motors). It moves one way but not for backwards.
- We made a ticket for Mono1: problem came up again during the weekend.
- EEE wants to make uTCA installations (after HED request) on next Tuesday. HED and EEE will discuss a suitable time together.

SCS:
- Issue with DSSC mentioned by DET.
- Nothing else to report.

SQS:
- Issue in past weeks: shutter does not respond but it seems to be working now. F. Wolff-Fabris will ask the Desy colleagues for an update on the situation.
Entry   Notes XO Integration Meeting 09.09.2020, posted by Frederik Wolff-Fabris on 09 Sep 2020, 10:10 
General Announcement:
- XO reminds the groups to please inform staff to check for self-rescuer training date in the DACHS system. In case this is expired please contact Michael Prollius or SRP 
group.
- Martin Dommach informs fthe access rights to the photon tunnel and accelerator has also expired for several people in August. Please check that.

CTRL:
- Yesterday evening XPD informed on an issue with Karabo GUI for exflgateway. It has been under work. LAS has a work around. CTRL encourages to do not work until it is 
fixed (likely in the next 30 minutes).

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- All is fine. XPD asks CTRL to please send instructions to bypass the Karabo GUI issue mentioned by CTRL. CTRL says it will be fixed in next 30 min.

DET:
- OCD call yesterday has been solved. 

ITDM: 
- Video conferencing system is on the HED control room and under test.

XRO:
- Maintenance in SA1/M3 mirror for Tx spindle took place on Monday as a ZZ. Mirror/spindle seems fine and we did maintenance without affecting mirror position or 
settings. 
XRO waits for spare parts to be delivered for additional maintenance.

LAS:
- SA1 and SA3 lasers are in operation; SA2 laser is in maintenance.

UNSYS:
- Problem with SA2/cell31 is serious: the complete bus terminals are damaged in the rack. Currently SASE2 works up to cell 31.
- New set of terminals is needed from Bekhoff to replace the full instance of the rack. Suren K. will inform on updates/status and when parts arrive for asking tunnel 
access. 
The old ZZ request is still valid. Order will be placed soon and Beckhoff promises delivery in one day after receiving order. 

SPB:
- Minor Problem with one motor but it is under investigation. 

FXE:
- Problem with a motor: EEE is informed and today they will check it.
- Andreas G. asks if FXE sees changes on mirror positions due to Monday maintenance. Martin K. will inform the group to verify during the night shift.

MID:
- Not present.

HED:
- M3 re-alignment is very good. HED get the first Mono aligned and continues today with preparations/alignment. 
- Thomas Preston says issues with a motor stages is under investigation (it worked in the past).

SCS:
- Yesterday morning machine had tuned beam to SCS photon energies. Somewhere this has been lost and SCS and BKR had to do it again on the afternoon. PRC will investigate 
with RCs.
- Smaller issue: For 2x already there is an issue with pulses that DSSC send to online read (sometimes we get only 8 pulses). 
DA states it is related to the calibration pipeline when this is reset (default is 8). 
One has to change/correct manually in the config manager. DET asks SCS to place a ticket for the support. 
SCS plans to use DSSC for user experiment this week. It is not critical issue but it would be nice to fixed for once.

SQS:
- Preparing for user's time on next week. SQS has commissioned the Monochromator with grating for the first time. 
Entry   Notes XO Integration Meeting 07.09.2020, posted by Frederik Wolff-Fabris on 07 Sep 2020, 14:37 
General Announcement:
- XO thanks instruments and support groups for using the E-logs while reporting activities. Please place names and groups in the entries to make a follow-up easier.

CTRL:
- SA3 vacuum loop is recovered.
- Today afternoon we want to move SA1 gui's to a more powerful server. If someone has an issue please contact CTRL.

DA:
- Not present.

EEE:
- Tests for MID to take place this afternoon.
- Cabling activities are ongoing.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- The video conference system needs to be tested in the control hutches. ITDM wants to set procedures with WOCO and also mounting it in experimental hutches. 
Instruments that are willing to help with the test can contact ITDM. The idea is to test in a Linux machine and test with remote users. SQS and HED are initially 
interested. 

XRO:
- Not present due to M3/SA2 re-alignment.

LAS:
- SA2 updates must be done by the end of today.
- SA1 and SA3 must be operational by the end of the day.

UNSYS:
- Requested ZZ to go to tunnel to fix communication issues with SA2/cell31. PRC arranged with RC to take place this morning.

SPB:
- Preparation for a couple of experiments next weeks.

FXE:
- Nothing to report.

MID:
- All fine at MID: checks with EEE to be done this afternoon and on Wednesday.

HED:
- Preparing M3 and other internal activities for user run next week.

SCS:
- Users will have beam time this week.
- SCS asks on the time window: Andreas G. says it is typically 400us but one can find in the delivery tables. 
If instruments request for more, please communicate to XO and OB will discuss it together with RCs.

SQS:
- Preparing next beam times.
- Shutter remote control: waiting for an update.
- Absorber in SA3 is currently in an unknown state. Nerea J. will check with Maurizio V.
Entry   Notes XO Integration Meeting 02.09.2020, posted by Frederik Wolff-Fabris on 02 Sep 2020, 13:33 
General Announcement:
- If instruments find the machine is not performing as you expect when comparing to previous weeks, please contact PRC that he may help you to address it. 
This is also valid for changes of beam parameters if not previously reported in the operation tables. 

CTRL:
- CTRL is supporting the ongoing Laser installations. 

DA:
- Nothing to report.

EEE:
- Fast ADC in HED: this is solved. The only limitation is if the system is restarted the ADC is misconfigured. In this case please inform EEE for loading the 
configurations.
- SCS switch issue is also fixed.

VAC:
- Working on the M3/SA2 mirror. Mechanical problems were fixed by XRO. Leak test ongoing and closure of the tunnel afterwards. Beam can be back to XTD6 this afternoon.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- No big announcements at this moment.

XRO:
- M3 mirror: mechanical axis was disconnected and mirror was not moving. XRO and VAC fixed the problem. Hopefully beam can be injected to XTD6 this afternoon. 
- It was chosen not open the full chamber to make the repair in 2 days' time. As beam is there XRO will re-align mirror. Cooling system is disconnected.
- After closing tunnels, it will allow beam in MID certainly and to HED we will look after the re-alignment of the mirror (to be scheduled). Maurizio V. is open to 
clarifications/discussions.
- Ulf asks on the plans for re-alignment of the beam: Maurizio says either after the Self-seeding on Friday or on Monday.

LAS:
- Upgrades are ongoing in all lasers: a bit behind schedule.
- SA1: ADC has to be serviced by EEE; SA2: delays due to microTCA.
- SA1 and SA3 shall be available tomorrow afternoon.
- Tests with HED laser pattern on demand: LAS demands to be included in discussions for October use of PP-laser. Synchronization must be developed to run properly.  LAS 
can't guarantee it will work from the first try.
- Cw37: SCS needs laser, as well as MID has preparations. LAS states both lasers shall be back in operation on THU afternoon shall be available.

UNSYS:
- Nothing to report.

SPB:
- Getting ready for test experiments and commissioning.

FXE:
- Nothing to report.

MID:
- Setting up for user experiments.

HED:
- Waiting for M3.

SCS:
- SCS/XGM presents issues with interlocks being activated due to pressure levels. This required intervention from expert. 
If this happens in the middle of the night, SCS proposes to develop an automated way to reset it or to be trained by XPD experts. XO, SCS and XPD will follow up. 
- Extra-foam: SCS asks on the possibility for access to remote users. DA says is under discussion between DA and ITDM to extend the service but no decision has been made. 
It will anyway need access to online clusters.  

SQS:
- Not present.
Entry   Notes XO Integration Meeting 31.08.2020, posted by Frederik Wolff-Fabris on 31 Aug 2020, 11:31 
General Announcement:
- XO reminds every day at 15:00 there is an informal BKR chat where one might get interesting news and ideas. If you would like to join, the link appears in the BKR e-
log.
- K. Wrona asks instruments if there are things to be improved regarding remote user communication or process, please send suggestions and/or comments to him/ITDM.

CTRL:
- Electronics team is installing new digitizer with LAS group.

DA:
- Nothing to report: OCD was quiet during last week.

EEE:
- Fast ADC system issues: problem with HED hutch. Signals were not properly given due to wrong configurations. It has been solved.
- All XPD systems had same issue: last Karabo update had a default address wrongly set and was the cause for reading wrong numbers. 
This was solved with help of CTRL but one crate remains to have the ADC card re-started, probably today. 
- SCS auto scanner: suspicion links to the loop that runs the motor is not fast enough.
- SCS and SQS have cabling installations planned for this week.
- Theo M. asks which ADC had a train-ID issue. Patrick G. answers that looks the XTD10, crate 3.2. It has been taken care already.

VAC:
- PRC contacted VAC on Thursday with XGM in XTD1: faulty pump that survived the weekend. VAC will exchange it today.
- HED problems with M3: VAC and XRO are working on it now and it probably to exchange an spindle or mechanical structure.
- SCS GATT stopped working on Saturday: power glitch caused a long shutdown of cooling water that switched OFF pumps and GATT.

XPD:
- Restarted XGM; also SCS XGM had a faulty gauge.

DET:
- Nothing major: Detectors were working during the weekend.

ITDM: 
- Not aware of any major issue.

XRO:
- M3 issue: mirror looks fine but the mechanical structure to move the mirror horizontally failed. Mirror surface looks mostly fine, only one InGa drop is seen. 
XRO and VAC are in tunnel to try to make it a fix now. There may be also a problem with Platinum coating if drops of InGa are on it.

LAS:
- SA1 laser will be down for the entire week for exchanging parts.
- SA2 laser uTCA update today: shall be back on Tue/Wed;
- SA3 laser issues with Amphos are being exchanged/fixed. Probably by WED afternoon this laser is back.
- Upgrade of control PCs ongoing this week.
- LAS states SA3 laser is planned to be available tonight.

UNSYS:
- Yesterday night a problem in one cell in SA1: fixed today in the morning and is fine.

SPB:
- No major issues during the week.

FXE:
- Continuing with commissioning this week. 
- Helium supply was exchanged yesterday during the weekend. 
- FXE also says they had remote users and process/communication worked nicely.

MID:
- Would like to remind about the bunch train-IDs. MID need feedback to inform users who have experiment in two weeks.
	
HED:
- Stopped operation On Friday night due to M3 issues: photon beam can not be directed to HED.
- Problems with ADCs and controls last week: help was received.

SCS:
- Not present.
- Remote experiment also seems to have worked.

SQS:
- Remote shutter control seems that worked once but no reasons/correlations were observed.
- Experiment with remote users worked nicely.
Entry   Notes XO Integration Meeting 26.08.2020, posted by Frederik Wolff-Fabris on 26 Aug 2020, 13:49 
General Announcement:
-  XO is looking forward to receive today the Delivery and Operator tables from the instruments.

CTRL:
- CTRL has carried out the time server deployment with newest version for devices and upper channels. 
- Nothing else severe to report.

DA:
- Working with HED on recording data - ongoing today.
- K. Wrona states that should be treated as experimental issue. An offline discussion will take place in defining how to interpret and run in the proper way.

EEE:
- The implementation of SA3 pre-absorber into the Interlock system was done, tested and it is working.
- 

VAC:
- Systems are running well.

XPD:
- Graphite filter in SA1: SPB has checked and found out the graphite filter is not damaged. The crack related to an attenuator. 
XPD will find an agreement/compromise for operation at higher energies when filter is retracted due to the wave-front distortions for the hard X-ray in SA1 and SA2. 
XPD needs more info from instruments. Discussion will follow.
- XGM resonances: a clarification is made that no matter which gas it is there is a resonance. Exchanging gases requires XPD to make an intervention for about 1 hour.
This has to be taken into account when, e.g. SCS and SQS require such changes.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- The Karabo GUI for SA3 is redesigned due to the presence of the pre-absorber. XRO will be happy in hearing comments and suggestions.

LAS:
- All Laser working accordingly to the specifications.

UNSYS:
- All is fine.

SPB:
- Operation going fine.
- Timing team found 2 issues: 1. Pulse pattern recording device seems not be synchronized with train IDs of other devices; 
2. Bunch arrival timing monitor has 25% repeated data (they have the same time stamp but different train IDs). 
K. Wrona says this may indicate there is no data. Robert Schaffer states the bunch arrival had no changes, so it seems to be another issue.

FXE:
- Starting user experiment and all going fine; pump probe signal seems good and FXE thanks LAS for fixing it yesterday; Digitizer issue was resolved by CTRL yesterday.
- Bunch arrival monitor is also repeated showing same numbers for the different trains.

MID:
- All fine.

HED:
- DAQ tests ongoing.
- The Shot on demand for laser stopped working at 3:00AM today (BBP signals). It seems to be a PPU problem. Nerea J. will contact T. Preston to look into it.
- Trying to get the A0 monitor working. After restart uTCA it solved one out of 2 problems. HED need someone to look into it onsite at the instrument.

SCS:
- Issue with pop-in imager last night: not allowing interlock. It has been under work now and is a similar issue as the SQS pop-in last week. This time it is the SCS-
XTD10 Pop-In IMG-PI (type I).
- Reducing SA3 bunches number were affecting SA1.

SQS:
- Nothing to report. All good so far.
Entry   Notes XO Integration Meeting 24.08.2020, posted by Frederik Wolff-Fabris on 24 Aug 2020, 11:39 
General Announcement:
- The safety rules require the use of masks when moving around as well as the limitation on the number of allowed people per room. 
XO asks people to stick to rules of 1 person per office as well as using masks when working closely. 

CTRL:
- Few minor issues during the weekend. Major one related to SQS optical spectrometer which did not reach 10 Hz.
- Today an upgrade in the archiving system will take place. The update of timing servers for all SASEs will take this afternoon. 
The property “bunch pattern table” will not be filled anymore.

DA:
- Few OCDs calls were all manageable. DA reminds instruments and groups to let system online to be monitored.

EEE:
- One OCD call during the weekend.
- Cabling with Detector group to happen.
- EEE asks if the SA3 interlock/pre-absorber will be tested today.

VAC:
- Nothing to report.

XPD:
- There was a problem with XTD2/SA1 graphite filter accordingly to Operation E-log entry. Maybe it got damaged between 20. and 21. This will be further investigated 
between XPD and SPB/SFX.

DET:
- 1 OCD call which was easily solved.

ITDM: 
- Friday the Scratch system (for temporary data) was out of space and data were removed (70Tb). It may be a problem again and ITDM would like to remind people to keep 
data only for short time. 
There is 1.5 Petabytes storage with currently only 60Terabytes free space.
- An e-mail about this issue was sent to a distribution list stating that from 01/09 data will be removed. ITDM asks people to clean their data in the proposals 
directories. 

XRO:
- Preparing for ZZ accesses in XTD2 and in XTD10.

LAS:
- SA1 laser is temporarily fixed with stable operation during the weekend. It required changes in software. This PP-laser is working and further exchanges are postponed. 
- LAS reminds that OCD calls regarding timing synchronization between laser pattern and beam must be addressed with CTRL OCDs.
- Jan G. offers assistance with 5Hz operation on diagnostic cameras. A. Galler suggests to include also EEE and CTRL in discussions.

UNSYS:
- Nothing to report.

SPB:
- Graphite issue: inserted on Tuesday for 15 keV and was in the beam for 4 days until Saturday. J. Gruenert says this is not wrong. An e-log entry was done by Romain 
Letrun.
- 1MHz images in camera worked during the weekend.

FXE:
- Issues: 1. Electron bunch arrival monitor recording did not work; 2. When SASE3 changes to many bunches, then FXE sees decreased intensity; 3. PP-laser seems not 
suitable for our operation. 
- For #1, ITDM will have a look in it; For #2, this will be discussed with machine; For #3, further discussions will happen in separate meeting.

MID:
- No issues: Split delay line is under commissioning. It was quite successful week.

HED:
- Successful week.
- The shot on demand feature was tested with EEE and CTRL.

SCS:
- Issue with saving sample position.

SQS:
- SA1 and SA3 interactions: FXE suffers when we have many pulses. M. Meyer proposes to have discussion with machine. 
A. Galler proposes to discuss during the machine meeting at 10AM and asks for additional info per e-mail.
Entry   Notes XO Integration Meeting 18.05.2020, posted by Frederik Wolff-Fabris on 19 Aug 2020, 12:08 
General Announcement:
- A. Galler reminds the audience on the daily informal BKR chat taking place at 15:00: link was sent by e-mail. 

CTRL:
- Tests on the HED bunch patter / 5Hz were done yesterday;
- Five devices related to the timing server will be re-started on Monday. This update of timing server shall be transparent.
- Other requests will be discussed separated in another rounds with respective involved groups.
- For Laser switch between SCS/SQS please call LAS OCD for troubleshooting (experts mean faster solutions). 

DA:
- DA reminds the group on its Redmine ticketing system that was implemented in February and helps on the planning and scheduling of activities. Instruments are encouraged 
to use the DA ticket system.

EEE:
- Initial test with HED 5 Hz pulse on demand went successfully yesterday.
- Missing crate in HED will be installed.
- SCS installation of cables will be done. 
- The special trigger for overlapping bunch in SQS was fixed this morning. CTRL was asked to prepare another parameter in Karabo. 
This shall be OK and tomorrow it shall be fine to use the adjusting the timing. S. Hauf points a device has to be adjusted. 
- A. Galler informs the tentative date for the SEPS update will be next Monday. 

VAC:
- ZZ done on Monday to check status of SA3 devices.

XPD:
- X-ray PES undergoing tests at Petra-III / Desy.
- A SQS pop-in could not be driven out of the limit switch this night. This was solved in the morning (back to work) and it was related to a problem with motor counts. 

DET:
- Preparation for user run at SQS: still some data to be taken with DSSC but it has been under work.

ITDM: 
- Together with CTRL and DA, it was set dedicated server for logging in to get more insight in the experiment. 
- In the main page of user proposal there is a permanent Zoom link to be used for communication with users. It stays for 2 weeks: SQS is working and other two experiments 
will be set today.
- In addition each experiment will have a dedicated zoom room.

XRO:
- SA1 M1 continues stay in place. By the other side, XRO would like to ask for a ZZ to complete the chiller level.
- Interlock tests in SA3 did not happened (changing of Interlock from GATT to pre-shutter) Z. Ansari informs that from her side it can take place on Monday 24th.

LAS:
- SA1 laser: the front-end is switching off in regular base (3x since Monday). There is not enough power for experiment. 
Meeting with manufacture take place today at 10 to build strategy to investigate and decide next steps. LAS will inform next steps. 
PP-laser is expected to be working for this and coming weeks. 
- SA3 Amphos: it can be operated. A final fix will be done in the in next blue weeks or during winter shutdown. 
- SA2 laser is fine.

UNSYS:
- Nothing to report.

SPB:
- Working on CRL alignment and also testing of camera. 
- Some alignment activities were interrupted due to the Laser issue. At 20% lower energy, it is not enough. Impact on commissioning if laser is not back may affect user 
experiments later. 

FXE:
- Nothing to report.

MID:
- Commissioning of the split delay line: lower branch is successfully done.

HED:
- Setting up for experiment; few issues with diodes.

SCS:
- Nothing to report.
- XO reminds the protocol to increase bunch numbers out of what is agreed on the delivery tables: 1. try to discuss with other experiment first; 2. call the PRC.

SQS:
- The zoom account was tested last night.
- Meeting with DET today. 
- All are going fine.
Entry   Notes XO Integration Meeting 17.08.2020, posted by Andreas Galler on 14 Aug 2020, 10:40 
General Announcement:
- An informal Run coordinators' BKR chat to exchange ideas happens every day at 15:00. 
It is a forum in case technical and scientific people wish to make formal requests. XO will send an e-mail with Zoom link.
- XO would like to ask instruments to pay attention to the parameters of the Delivery and Operators table, especially regarding the bunch limits for the North branch.
Ideally we shall discuss one week before beam delivery.
- H. Sinn notices that if SPB move some motors, this is temporarily cutting SA3 beam due to MPS. SQS has not observed this effect. Harald will further investigate. 
Adrian M. says SCS impacts SPB in different ways.
- A. Galler mentions that SRP/task force will distribute updates related to the currently raising Covid issues.

CTRL:
- One group of motors at the same SCS/PLC was not accepting changes. A re-start with servers in small loops must help.
- Timing servers (switching off archive): CTRL wants to perform today or tomorrow morning the installation of the new version. Nobody seems against it.

DA:
- Nothing to report.

EEE:
- EEE understand the team request regarding the 5 Hz trigger will be done tomorrow.
- EEE waits for confirmation of SEPS update, possibly happening today or tomorrow. XO mentions Z. Ansari will be able to confirm today after lunch time.

VAC:
- Nothing to report.

XPD:
- Not present.

DET:
- XO inquires on the DSSC activities in SCS: DET says it may be delayed a bit due to other activities; DET got a ticket regarding operation; DA believes the DSSC was 
running and used.

ITDM: 
- Comment on DSSC: it was used but we shall not forget that on the first day there was not a preparation and we could expect hiccups.
- A faulty memory module must be replaced and the exflgateway will be shut down shortly for this activity at around 12:00. An e-mail will be sent but nobody seems against 
to it. 

XRO:
- Nothing to report.

LAS:
- SA3 AMPHOS photodiodes still has problems. System is partially working and can be operated. LAS knows beam size and pointing do not change but not if loses power. 
AMPHOS is contacted. 
The consequence is that switching ON and OFF takes more time because it is done manually. Further measurements will be done and SA 3 instruments will be updated 
accordingly.
- LAS informs its OCD team is not responsible for synchronization issues. 
- SA1 and SA2 lasers are fine.

UNSYS:
- Small issues with SA3 PLC crashes: SA3 is operated without first cells. A re-start of the servers is needed, probably today or tomorrow. UNSYS will inform SCS and SQS 
when this is fixed. 

SPB:
- Nothing to report.

FXE:
- FXE says that SQS will need to perform some tests: this will be discussed in separate round.

MID:
- All fine.

HED:
- Data recording on Saturday night was not saved. Shift crew realized at the end of the shift that it was not saved - main data for the shift. 
- ITDM investigated the issue after ticket arrived yesterday. It confirms data was not recorded and can't see why this happens as ticket arrived late. Even the folder of 
the data was not recorded. 
For the future: there is an assumption to look at the data every few minutes. ITDM will share procedures. Further discussions on flexibility for different systems/setups 
have to be done.
- HED says the 5Hz test must be tomorrow by the morning. XO states that currently this is only a test then we will see what happens. HED has this understanding.
- HED has recorded several hundreds of microns in horizontal jitter. XRO says that it is important to work together for investigating the jitter. 
HED will send the data to XRO and/or the coordinator of stability task force.

SCS:
- Not present.

SQS:
- Preparing next week user operation; still some problems with Zoom connection: SQS and ITDM will discuss the issue.
Entry   Notes XO Integration Meeting 12.08.2020, posted by Frederik Wolff-Fabris on 12 Aug 2020, 10:52 
General Announcement:
- Andreas G. thanks all instruments that have so far sent back to XO the cw35 Beam Delivery tables and reminds the missing ones to do so until Thursday (tomorrow).
- Jan G., as PRC, informs the access to SQS shutter will probably happen on next week. In case of possibility during this week he will directly inform the respective persons.
- Steve A. mentions on the timing related issues: it has been investigated with the help of instruments.
- XO asks groups for any time feedback on issues related to Covid rules, e.g. amount of masks. 
- Jan G. informs several members of XPD team (and also CTRL and ITDM personnel) will be working at PetraIII while performing beamtime, from Thursday until mid-next week. 

CTRL:
- Activities on GATT: Follow-up of Karabo update shows incompatibility with new version. CTRL, Raul and XO rolled back to the previous version and it works again.
- At around 8:00pm a notification service in SASE3 was sent: watchdogs went in unexpected state.

DA:
- Nothing special to report.

EEE:
- Today we bring back the crate for MID/STL and we start with HED requested changes.
- XO thanks Nerea on yesterday's work of Interlock conditions for the solid attenuators in the tunnels. 
To protect the silicon screen first one has to insert the diamond screens. Nerea J. says this is in the motion loops and not EPS.

VAC:
- Raul V. thanks for the quick reaction of CTRL and XO to solve the code of GATT (which is 2.5years old). 
If we have a chance during the next winter shutdown a change on the software system will be planned to permit the use of new Karabo versions.
- VAC has requested a couple of ZZ's for next days/weeks: on SQS shutter and other devices inspections.

XPD:
- No incidents since Monday to be reported. However, last Saturday there was a downtime on the XTD1/XGM due to a high voltage setting. 
Probable cause was a wrong command at the DOOCS server. XPD believes it was a onetime incident and will look into it if it happens again.

DET:
- Working with Jungfrau in SPB; DSSC in SQS/SCS.
- Supporting other groups' activities.

ITDM: 
- The DAQ update has been finished: so far it looks good.
- ITDM is ready to act but waits for more clarifications on the SRP requested work on Interlock. 

XRO:
- Not present - group has helped with solid attenuators activities.

LAS:
- Everything is running and interlock is set.

UNSYS:
- Nothing to report.

SPB:
- Detector program ongoing with Junfgrau and AGIPD.

FXE:
- A ZZ was done to switch off the M3 cooling. The jitter has then reduced from 295u (RMS) to about 211u. FXE considers this only moderate jitter and will proceed with commissioning.
- Feedback system is fixed with parameters configurations – we are following it up to find when this was changed (if so).

MID:
- Issues with feedback Macro are observed and Robert S. investigates together with MID.

HED:
- Not present.

SCS:
- Not present.

SQS:
- Nothing to report.
  
Entry   Notes XO Integration Meeting 10.08.2020, posted by Frederik Wolff-Fabris on 11 Aug 2020, 11:01 
General Announcement:
- Beam delivery starts this week. XO reminds the reason to send the Beam Delivery table is to provide machine with parameters. Please take in mind that we shall not fill 
out tables during Friday's UOM. 

CTRL:
- Two configurations changes planned for today if agreed: 
1. In SA3 machine changes the 10Hz and may affect the archiving. This means time serving in Karabo has to be changed during the day today; 
2. CTRL updated last week most of Karabo devices in instruments, but few tunnel instruments remain and shall be done today - few time down and then re-starts.
- HED issues with VAC/SA3 have been investigated together with EEE.
- InfluxDB update was done and OK.
- LAS comments a laser pattern is required in order to compare laser status between different runs. Follow-up discussion with beamlines, LAS, CTRL is needed.
- AG asks if SA2 and SA3 are aware of the 5Hz operation mode. Tomasz from LAS says all servers see the bits are changing. 
- Steffen concludes that CTRL will proceed with updates today and by next Monday CTRL will switch on the archive again with the solution we will have by then. 

DA:
- Nothing to report.

EEE:
- Taking out crate of MID; making changes on the request of HED.

VAC:
- Nothing to report - all running.

XPD:
- Nothing to report.

DET:
- Not present.

ITDM: 
- DAQ recent bugs were mostly fixed: today FXE and HED will be fixed. Afterwards all are done.

XRO:
- Nothing to report.

LAS:
- SA3 laser had a probably on Saturday: warming up devices. LAS may be able to fix today (Sunday's effort did not work).

UNSYS:
- Issues in SA2 with cells #1 and #33 have been fixed by ZZ on last Wednesday.
- Also hardware problem in SA3 cell#14 was also fixed.
- Software development in response to MXL complaints is under work and needs a maintenance and/or shutdown time. 

SPB:
- Nothing to report.

FXE:
- Meeting with EEE to look in the digitizer - issue could be solved, it is now running stably.
- Used Beam feedback to stablish the beam position was not working reliably: spontaneous jumps were observed. FXE will look together with CTRL on Wednesday. 
One idea is to pick beam position from imager. No other instruments have this observation.

MID:
- Synchro will arrive today and thus SA2 laser will not be available.
- Train matching offset between AGIPD and XGM reported two weeks ago: MID is asking for an update. SA will check today and give information on Wednesday.

HED:
- HED had problems with MC2 axis in Beckhoff motors during last week and asks to have a follow up from EEE. Events of losing parameters are happening quite often.
- Karen A. mentions they added manually parameters and they had to reset again. HED-LOOP1 will not be reset today (Steffen). SA2 loops will have to be checked. 
- Steffen and Marijan add the issue is now understood by sacrificing one of the HED PLCs. One has to fix the code of the framework and this can't be solved by Wednesday.  

SCS:
- Motors of the DSSC support were also lost. They have been fixed.
- Issue with pump is also solved.
- New installed devices during shutdown (pressure gauges) were tested on Friday.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 05.08.2020, posted by Andreas Galler on 05 Aug 2020, 09:02 

General Announcement:

  • .

CTRL:

  • SA3 vac loop
    • devices lose connection to the PLCs every now and then (every few days)
  • karabo fix for small movement error on MC2 motors
    • for the tunnel topics CTRL suggests to do that Thursday morning
  • InfluxDB

DA:

  • no issues
  • upcoming commissioning
    • da infrastructure up and ready

EEE:

  • cw36, cable installations require

VAC:

  • no issues, normal activities

XPD:

  •  

DET:

  • no issues

ITDM:

  • continuing with Monday tasks

XRO:

  •  

LAS:

  • increas priotity on karabo integration for lasermet interlock
  • SH: for SA1 and SA2 much of the interlock data is

UNSYS: 

  • today ZZ --> cell 33 should be fixed today as well as cell1

SPB:

  • nothing outstanding
    • DAQ testing
    • VAC intervention

FXE:

  • FXE and XRO is switching off M3 cooling
  • no update on the digitizer issue

MID:

  • no issue

HED:

  • MC2 motor timeout problem, karabo fix seems to work
    • there are other time out errors that ar not addressed by this
    • SH: suggests a zoom session for demonstration of these
    • TP: e.g. stop button gives time

SCS:

  • no issues
  • installation of girder
  • bestec is working on hRIXS
  • recommissioning of Mono

SQS:

  • laser interlock issue
    • Lasermet is visiting today

Entry   Notes XO Integration Meeting 03.08.2020, posted by Andreas Galler on 03 Aug 2020, 09:23 

General Announcement:

  • .

CTRL:

  • few issues on SA3 vacuum server, over the weekend.
    • twice some devices were not running,
    • when restarting Beckhoff loops from the GUI please remember that it takes time until they are back
  • device servers with - in their name. restarting with the service manager cannot cope with this --> fix is underway
  • scheduling:
    • Beckhoff: small movement error fix is underway and it is suggested to update karabo Beckhoff servers later this week.
    • influxDB data logging
      • current version does not allow easy correlation data from two devices in Grafan (web front-end) an update to the next higher version would cure that
        • suggest to update Wednesday morning early
  •  

DA:

  • no issues

EEE:

  • utca OCD calls
    • nothing serious
  • PLC no OCD calls
    • some updates are planned for FXE, MID SCS on Beckhoff

VAC:

  • no issues

XPD:

  • no issues

DET:

  • comm AGIPD detectors
    • detectors are stable, but issues with online processing

ITDM:

  • new version of DAQ had been tested
    • should be deployed this week
  • 1 OCD call for recording data with ADQdigitizer
    • requires coord between CTRL and ITDM and EEE
    • this operation mode had been tested
  • 1 OCD call JUNGFRAU SPB in burst mode --> did not work
    • SH: was the receiver crashing?
    • KW: not clear, nothing was working in that config
    • SH: the problem had been identified at FXE --> fix should be deployed at SPB as well

XRO:

  • update:
    • follwoing up the issue with the attenuator damage in SAx
  •  

LAS:

  • all three laser are running
    • some problems with shutters
      • SQS: shutter in ILH, cooling water refilled --> but interlocks could not be set
        • XO to coordinate discussion with Pouneh

UNSYS: 

  • no issues

SPB:

  • karabo sessions lost connections to GUI server on exflcon026
  • JUNGFRAU receiver crashing
  • DAQ took long time to change state
    • even switching to ignore after run take a long time
    • this relates to JUNGFRAU
  • GOTTHARD specref device crasing multiple times
    • restarting had to be done multiple times
  • optics interlock hutch was observed to be broken on Thursady night

FXE:

  • digitizers at some point stopped
    • connection to boards and triggers
    • BF: this has to be investigated!
  • beam stability
    • mirror cooling
  • EXAFS within 700 eV had been measured
  • PP Laser was very stable

MID:

  • VAC incident in CRL2 --> which closed V0 --> VAC solved the issues
  • due to high pulse energies small damage to attenuator and instrument component had been
  • DAQ update scheduling
  •  

HED:

  • beam is jittering (when collimated 100 um are observed)
  • CRL scene optics hutch is mixed up for one or two motors --> Thomas Preston investigate

SCS:

  • no issues

SQS:

  • interlock / shutter issue
Entry   Notes XO Integration Meeting 29.07.2020, posted by Andreas Galler on 29 Jul 2020, 08:59 

General Announcement:

  • .

CTRL:

  • INfluxDB migration is running smoothly, tomorrow the last topics will be switched to influx only
  • some Basler / Andor cameras not working at 10 Hz is related to the data network --> depends

DA:

  • n

EEE:

  • Company Wille is on-site for hardware installations
    • hRIXS,
    • HED cable installations
    •  

VAC:

  • no issues

XPD:

  • i

DET:

  • commissioning shifts with AGIPD
  • pn CCD at SQS also on commissioning

ITDM: 

  • issue from Monday wrt crippled DAQ when having no sow data in a datasource
    • the fix reported on Monday only works partially --> earliest estimate for fixing is now next week
  •  

XRO:

  • s

LAS:

  • n

UNSYS: 

  • no issues

SPB:

  • OCD for Basler cameras
  • OCD for MC2 stages (problem with encoders, EEE is informed)

FXE:

  • Major issue with the machine wrt to big brother
  • JUngFRAU seems to be more affected by the DAQ glitch
  • GOTTHARD detector should be re-integrated into the DAQ
    • K. Wrona clarifies that only a reconfig of datasources is needed

MID:

  • beam looks unstable
    • horizontal jitter is higher than usual

HED:

  • no issues

SCS:

  • no issues
    • Daniele: is the soft-mono solved?
    • TM comments: the pre mirror is in place piezos are working

SQS:

  • no issues
  • pnCCD commissioning
Entry   Notes XO Integration Meeting 27.07.2020 , posted by Andreas Galler on 27 Jul 2020, 09:05 

General Announcement:

  • XO discusses the need for sharing information.

CTRL:

  • support calls
    • small movements cause errors on MC2 motors, fis is going to be tested today and it will be communicated when ti is going to beployed
  • swithcing to influxDB only logging, if not heard otherwise then this should happen this afternoon (Monday)
    • SCS, SPB, HED, MID
  • switching to influxDB in SA1, SA2 and SA3 to follow as well
  • notification service updated such, that only more serious messafe are being send out

 

DA:

  • no issues

EEE:

  • cable installations in this week at HED, should start from tomorrow, 1.5 days (Jörn)
  • few OCD calls,
    • soft mono in SASE3, motor not working
    • mirror
    • FXE motor runs into emergency stop --> fixed in the latest PC framework, but FXE is running an earlier version
    •  

VAC:

  • no issues

XPD:

  • i

DET:

  • Thursday, OCD was not scheduled, despite some calls

ITDM: 

  • bug for big detectors in DAQ had been addressed and should be deployed soon
    • this bug seems to also affect some slow detectors
      • only happens when there is no slow data added to the aggregator
  • data reduction effort
    • one outcome: record bunch pattern in every run
      • instruments are asked to include the datasource XXX_timing
      • SH comments: in the future the bunch pattern information will be made available in the pipeline

XRO:

  • some recommissioning last week
  • sometimes mirrors are not moving

LAS:

  • no issues

UNSYS: 

  • c

SPB:

  • good run for the first wek
  • trouble with detector, not being able to record darks -> fixed next day
    • issue with a device that checks correct datasources
  • FXE imager EPS interlock issue

FXE:

  • FXE imager EPS interlock issue

MID:

  • successful week
  • a couple of OCD calls
    • CTRL, EEE, DET, everything solved
  • AGIPD trainID offset by 1 wrt to the XGM
  • karabo update --> changes are incompatible with existing scenes
    • e.g. number of digits
    • SH comments that it would be appreciated if those issue were reported to CTRL

HED:

  • no issues
  • MC2 motor update, is that going to be done today?
    • SH: yes and if possible for HED, then 11:30 - 13:30 would be the preferred time window.

SCS:

  • exit slits did not move --> EEE OCD could help
    • SCS requests tthat components are tested before tunnels are closed
  • Navitar didn't work
    • focussing lens lost position
  • when component software is updated/upgraded, SCS would liek to see a test
  • NG comments: motor parameters are sometimes wrong
  • If things need to be modified, test beforehand

SQS:

  • no issues

Entry   XO integration meeting 22.07.2020, posted by Andreas Galler on 22 Jul 2020, 09:22 

General Announcement:

  • Default beam positions are being implemented for each SASE at the FEL imager to reduce re-alignment offers for the instrumetns after shutdowns and facility development weeks

CTRL:

  • minor OCD calls
    • 6541, 6542
  • few MC2 motors not working -> target velocity was set to 0
  • in SA1 the bunch pattern changes @10 Hz --> data logging system (with timers) gets overloaded ...
    • if this was to become a normal mode of operation, the system would need to be adpated --> as for now bunch pattterns are not logged anymore
  • remote user access to karabo
    • soo to be tested with SQS
  • inlfuxDB
    • FXE 95% migrated, probably 100% at the end of the day
    • LAS SA1 100% migrated
    • MID, SCS shall reply when migration is possible (causes a short down time of datalogging)
    • SPB, HED shall reply s.a.

 

DA:

  • nothing to report

EEE:

  • issue with encoders in SPB --> some errors had been disabled --> checks for cable lengths (OCD call)
  • SQS interloop comunication working? EEE, yes, need to investigate
  • N. Jardon reminds about the default parameter procedure
  • pre shutter in SA3 works commence when Zunaira, Martin and Maurizio

VAC:

  • nothing to report

XPD:

  • intervention Monday in SA3, PES is operational

DET:

  • no issues

ITDM: 

  • last week new DAQ deplyoed in HED, FXE and SPB and tunnels, the three other instruments had been delayed
    • MID today, SQS yesterday
  • scratch space in gpfs --> running out of space --> data needs to be removed
    • procedure not yet agreed upon
    • all involved parties should identify data that can be removed from scratch
    • 100 TB are left
  • internal proposals for commissioning time needed
    • in the future please prepare those in advance

XRO:

  • during the weekend, XRO was recommissioning of the beam transport
    • some qctivities were completed on Tuesday, M3 repositioned from damaged spot
    • recommissioning is completed --> however small problems are to be expected over the frst few days, please contact XRO

LAS:

  • no issues

UNSYS: 

  • cell 33 in SA2 communication crippled, ZZ planned for next monday

SPB:

  • reasonably succesful first night with beam, instrument aligned with alignment laser
  • tunnel EPS system --> the FXE_XTD9_popin blocked SPB to 1 pulse
    • MPS signals from SPB might be masked by the machine -> needs to be checked
  • 1 OCD call to EEE
  • dMigration to influxDB can be done

FXE:

  • re align beam to FXE pop in
  • mono re alignment
  • issue with FastValva --> naming convention on the PLC level had been changed, now only capital letters are allowed --> Bernard is looking into this
  • tunnel project using step function with motors throws an error on the slot
    • CTRL is workig on a fix already, it happens for very small steps
    • J. Nardon: was also reported by SQS
  • all TView devices had to be restarted as they were out of sync

MID:

  • alignment went smooth, until diagnostic endstation
    • data loggers are fine today to migrate to influxDB
      • Steffen aims at afternoon
  • pre shutter
    • for CRL2 not possible to laign as the pre shutter always moved in
      • XRO looks into it

HED:

  • beamline aligned
    • beam profile excellent in fornt of hutch
      • spatial jitter present, and horizontal movement
    • mirror feedback macro not working
  • XGM investigation together twith Theo
  • IPM didodes are not read out --> comment by Peter, check the timers
  •  

SCS:

  • no issues

SQS:

  • beam from around noon, beamline aligned, set points on imagers need to be re found

 

 

Entry   Notes XO Integration Meeting 20.07.2020, posted by Frederik Wolff-Fabris on 20 Jul 2020, 14:18 
General Announcement:
- Regarding Operation, VAC and PRC had a workaround to restore the North branch beam permission on Sunday. 
- XTD9 Turnstiles were not working this morning for ZZ access planned by FXE. 
During the meeting we heard the information that Michael Prollius / SRP has fixed it by rebooting the computer. 

CTRL:
- Since Wednesday CTRL had one OCD call regarding the SA3/GATT gauges and controller configuration.
- SQS server - issues with interactions. Work ongoing.
- INFLUX roll out: test on CAS monitor topic is successful. For the double loggers, there will be an impact of 5-10 minutes down time when login. 
This will happen on FXE (2x10min without data): it is OK for FXE and for LAS today. IF that is successful, CTRL will contact other instruments.

DA:
- Nothing to report

EEE:
- It has been working on the follow-up of HED topics.
- EEE OCD had a call on the SA3/GATT gauge controller.

VAC:
- Severe trouble with SA3 GATT: damage on the gauge controllers was a result of series of problems.
- Bearing of a downstream booster pump make vibration and developed two leaks; then pressure went bad; 
vacuum gauges showed wrong numbers and resulting in electronic damage in the controller cards.
- The booster pump was exchanged on Friday; on Sunday a leak test found a broken vacuum welding and part was removed. 
Currently ZM3 at Desy is fixing it. Expected to be ready for tunnel installation by 10AM.
- Sunday from 13:00: the GATT was in UHV mode to allow beam permission and lasing in SA1 and SA3 up to Monday 6AM.
- Currently XTD10 is open for GATT repair and PES exchange of turbo pump.
- CTRL mailing service worked quite well: an alarm e-mail of GATT fault was sent every 12 hours.

XPD:
- SA3/XGM valve was also OFF on Friday. Martin Dommach will contact Theo while in tunnel.

DET:
- Business as usual.

ITDM: 
- Nothing to report.

XRO:
- Not present due to the night shift for beamline transport alignment activities.
- F. Wolff-Fabris informs the pre-shutters are commissioned by XRO during Sunday's shift.

LAS:
- Nothing to report

UNSYS: 
- Nothing to report

SPB:
- Work is ongoing.

FXE:
- Preparing for beam operation: no big problems.
- Thursday we reported issues with motors not moving. EEE helped and it was found the current of the motors were not correctly migrated. 
Now motors are working. Currents were set too low - this no risk of damage.

MID:
- Preparing for beam.

HED:
- Preparing and checking equipment.

SCS:
- Preparing for beam tomorrow.
- FFT end station problems reported last week are solved.

SQS:
- Waiting for the beam.
Entry   Notes XO Integration Meeting 15.07.2020, posted by Frederik Wolff-Fabris on 17 Jul 2020, 10:19 
General Announcement:
- SASE3 tuning will start this afternoon and possibly will last until Thursday afternoon. SCS and SQS will share the closures of their hutches.

CTRL:
- Swap server of one of the two Karabo GUI servers for SA1 (mail to readiness): suggestion is to do Friday 9-10AM. Please let CTRL know in case you have any issue.
- Status on INFLUX roll-out: testing to take place at the end of this week. A coordination with SA1 has to take place due to the running macros. 

DA:
- Not present.

EEE:
- EEE is working in FXE and HED with the open issues.
- EEE gives an update of the discussed points on Monday:
   Communication: From now on EEE will include the contact persons, as well as to the instrument mailing list.
   SA1 motors in OFF state: after a PLC update the safest configuration for re-start is bringing them back in OFF state. EEE will continue with this procedure. 
If instruments want differently, please make a list of devices that has to be changed.
   HED issue: EEE is talking with Konstantin and found it was just a misconfiguration.
   HED pump controller: Konstantin is already working together with VAC;
   XPD turbo pump in SA3: no relation with PLC update. Yesterday's ZZ showed that the pump has to be replaced.
- Nerea and Patrick will provide a write up to ensure the problems are followed up and solved.

VAC:
- ZZ yesterday to install the Neon gas minican to allow the monochromator calibration in SCS/cw31.
- Exchange of PES turbo pump will take one day and break the interlock - North brunch will see no electrons and photons. 
A date has to be found in agreement with involved groups and facility's operation.

XPD:
- Turbo pump in PES: pump itself is the problem. Vacuum beamline is safe but PES does not operate. We need the PES for some user experiments still in 2020. 
- Operation of beam in XTD6 was not possible with multi-bunch due to devices in the beam. We do not know if in reality they were in beam or not. 
Karen Appel confirms the devices were out of beam. This has to be followed up.
- This weekend, together with XRO, XPD will do the further recommissioning of beamlines and diagnostics. 

DET:
- Vacuum issue reported on last Monday was confirmed to be related to the gauge.
- Started with DAQ tests with instruments. All ongoing.

ITDM: 
- Not present.

XRO:
- Not present.

LAS:
- SA2 laser maintenance taking place on Friday.

UNSYS: 
- Nothing to report.

SPB:
- Preparations are going smoothly. All good in the SPB's plan.

FXE:
- DAQ test with LPD deployment - all work fines but for one module need to be fixed in the detector. It is already under care;
- EEE/Bernard is finishing the loops.
- Monochromator commissioning next days (we need a ZZ to align the camera).

MID:
- It is scheduled MID DAQ test for Monday next week.

HED:
- Ulf will investigate with Konstantin on the EEE issues. In XTD6 there were two motors with wrong parameters configurations. HED will communicate directly with Nerea.

SCS:
- EEE is needed to solve issue with the FFT end station.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 13.07.2020, posted by Frederik Wolff-Fabris on 14 Jul 2020, 13:45 
General Announcement:
- XO will reset the calendar invites for the XO Integration Meetings of Mondays and Wednesdays as well as for the User&Operation Meetings on Fridays. Usual times will be 
kept.
- Machine is on startup and the RF window will be 400us instead of 600us in the first 2-3 weeks. Instruments can expect about 160 bunches in this time.
- Instruments must take tunnel components out of beam path, especially in case they are connected to the EPS which could potentially block beam operation.
- XPD and HED report on turbo pumps that failed last week. One has to investigate of it is linked to the Karabo re-start due to the DESY-NOC activities last Tuesday. 
FXE also reports motors in tunnel components were OFF.

CTRL:
- Further investigations are ongoing with Basler cameras that did not start after Karabo reboot.

DA:
- Not present.

EEE:
- Waits for feedback on the FXE XGM commissioning.

VAC:
- Nothing to report.

XPD:
- SASE XGMs are started and being operated. 
- Lasing in SASE2 was confirmed in the FEL-IMG; SA1 was lasing @2mJ last night.
- Re-alignment of SASE3 was not yet confirmed - no beam visible on the XGM or FEL IMG, only spontaneous radiation. 
- XPD did a successful DAQ test. 
- ZZ in XTD10 will be required to investigate failed PES pump. This will take place on Tuesday.

DET:
- Poor vacuum SPB/AGIPB last Friday: under investigation (may be a 40 gauge) and will be followed up next days. 

ITDM: 
- New DAQ version was released to fix detectors and slow data acquisition: tested in SPB and FXE (Agipd and LPD). 
- This week ITDM makes upgrades in all instruments but MID takes place next week; SCS still needs to agree on the date for this week.

XRO:
- Plan for the week is the recommissioning of the beam transport. XRO has shift plans for the weekend.

LAS:
- All lasers are running.

UNSYS: 
- Nothing to report.

SPB:
- Vacuum issue with the 40 gauge under investigation by DET.
- No big problems for the start of next week.

FXE:
- DAQ test taking place today.
- XGM is going with the plan but for a cable that may need to be exchanged.
- Upgrade of Beckhoff system: motors were not moving. There is a lack of communication between the Beckhoff upgrade, control support and instrument scientists.

MID:
- Not present.

HED:
- HED had to check and/or entry the motor parameters after the reboot of the control systems that place motors in OFF state. 
CTRL informs the information must be stored in the PLCs / Karabo. It is solved but it demanded a lot of work during last week.

SCS:
- Not present.

SQS:
- Problems occurring with turbo pumps. There is a particular controller in one rack that had to be replaced 7 times in 2 years. 
EEE and SQS will investigate and do inspections on this rack. 
Entry   Notes XO Integration Meeting 08.07.2020, posted by Frederik Wolff-Fabris on 10 Jul 2020, 13:50 
General Announcement:
- Machine start-up continues to be ahead of schedule. Beam transmission to T4D and T5D has been done during the night (with open undulators). 
- An Invitation for the User&Operation Meeting on next Friday 09:00 was sent to the user&opmeeting mailing list. If you did not receive it, please contact XO.
- XO Integration Meeting takes place only on Mondays and Wednesdays at 09:30AM. 

CTRL:
- The synchronized shutdown, f/w update, configuration and restart of both CTRL network routers by DESY-NOC was performed yesterday. 
This included the Karabo shutdown and restart in tunnels, instruments, etc.
- Problems linked to the re-start: in LAS a miss-behaving ADC and a faulty host cpu issue; in CTRL some obsolete deployment information. 
- This Router update has to be schedule during the shutdown to avoid above mentioned issues. 
- CTRL observed two Basler cameras which did not reestablish a network connection after the router updates: Please try power cycling the camera to restore system.

DA:
- No complications due to routers update.

EEE:
- Cabling installation in SCS is in progress. 
- Technical staff will commission the FXE's two new brakes for XGM.

VAC:
- Not present.

XPD:
- Re-starting X-ray photon diagnostics devices this week.
- XGMs are ready for recommissioning.

DET:
- Nothing to report.

ITDM: 
- Maintenance of ELOG server and update of application has been done last night. System has restarted.

XRO:
- Not present.

LAS:
- All LASERS are back today.
- Due to the router update, SA1 laser was the most affected due to loose of thermalization and was OUT of operation a full day. SA2 was OUT only for the afternoon.

UNSYS:
- Nothing to report.

SPB:
- Getting ready for beam: few DAQ issues still open but being worked out.

FXE:
- All motors in SA1 were OFF due to Karabo re-start linked to router update.

MID:
- Update of Linux computers: ITDM will communicate with MID for the re-installation. 

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 06.07.2020, posted by Frederik Wolff-Fabris on 07 Jul 2020, 13:23 
General Announcement:
- Since the end of the shutdown last Friday, the current Program is "Access/Tuning/Setup";
- DESY/MXL has started ramping up the Gun, powering and testing the Magnets and phasing the RF stations. 
- Currently it has electron beam transmission up to the TLD and is ahead of the planned schedule for these days.

CTRL:
- Data logger issue: Friday CTRL has rolled back to the old data login system. Meeting today at 11:00 with involved groups to define next steps. 
Information will follow via readiness mailing list. 

DA:
- No issues to report.

EEE:
- Issue with HED PLCs: a fuse has been tripped and it has been replaced. A CPU was broken and is believed to have caused the fuse tripping. 
This is the first time this happens in the facility.
- Cabling activities in SCS is scheduled to take place this week.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- ITDM has made a request to DESY-IT for a routers restart. This will cause the network to be interrupted and restarted. Also Karabo will restart. 
A meeting today will define the proper time for this action, currently schedule for tomorrow morning. Information will be send to the readiness mailing list.

XRO:
- Not present.

LAS:
- All lasers are up and running again. 

UNSYS: 
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Few problems with motors were already solved last Friday by EEE.

HED:
- All going fine.

SCS:
- Not present.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 03.07.2020, posted by Frederik Wolff-Fabris on 03 Jul 2020, 14:21 
General Announcement:
- The Interlock tests are finished in all tunnels and XHEXP1 areas, following information from D3 and SRP.
- From next week we will continue with XO Integration Meeting only on Mondays and Wednesdays at 09:00. The Fridays' XO Int. Meetings will be terminated.
- Next Friday 10.07 the User and Operation Meeting will re-start at 09:00 in the virtual format. Invitation and corresponding Zoom link will be send in a separate e-mail.

CTRL:
- Preparation for operations has started. Three issues have been addressed: 
1. XPD issues are currently been worked and will extend over next week; 
2. XFEL gateway troubles seems linked to a router configuration; 
3. Migration of old data logger: problem with MID LA2 and SA3 (running wrong migration). 
- Recovering complex configurations: meeting 12:00 with ITDM - please wait until Monday for update.

DA:
- Not present.

EEE:
- Follow-up of the shutdown activities is ongoing; Modification of PLCs was done. 

VAC:
- Vacuum at beamlines are running; Shutters are ready.
- VAC plans to open XTD6 again from next Monday up to Friday, allowing HED access and work.
- Please inform VAC if XTD09 is needed to be accessed. Currently a ZZ is foreseen for this tunnel (EEE request).
- XTD10 can be accessed by ZZ during next week.

XPD:
- Small bugs on the DOOCS side of XGM were observed: bridges were checked and looked fine.
- XPD is planning the re-start of devices and support for machine tuning in coming weeks.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- SA2 laser: Train-ID showed issues (Update software failed).
- SA1 laser: went down due a crate failure and is warming.
- SA3 laser is fine.

UNSYS: 
- Nothing to report.

SPB:
- AGIPB update needs to be fixed. 

FXE:
- LPD new DAQ could not save data.
- Calibration pipeline for LPD is OK.
- Calibration pipeline for JungFrau does not work - also CTRL fixed the crash with DAQ (how the image gets the train ID's). The crash is not observed anymore.

MID:
- Discovered problems with motors in Laser room: EEE is informed and investigates.

HED:
- Will need access to XTD6 for final checks from Monday. Please inform VAC when access is finished.

SCS:
- Not present.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 01.07.2020, posted by Frederik Wolff-Fabris on 01 Jul 2020, 13:53 
General Announcement:
- Interlock tests are starting in SASE3 instruments right now. Zunaira, Eric and Wolfgang Clement are coordinating the TUV tests in the XHEXP1.
- MXL announced a draft for the machine start-up schedule which is published at the BKR e-log. The link to the schedule is: 
https://ttfinfo.desy.de/XFELelog/show.jsp?dir=/doc/Schedule&pos=2020-06-29T15:40:57

CTRL:
- Group has a plan to switch the data loggers today; MID was already done in the past; Migration of old data was already done in advance. 
- There was a report of issues with the GUI server. Currently it is under investigation. A workaround is to disconnect and reconnect again or move to a second GUI. 
More information will follow.

DA:
- DA has two major plans for the upcoming days/weeks: 
1. Implement auto triggering in pipelines for the instruments (used for data analysis); 2. Stablish a plan to have spread knowledge on development tasks.

EEE:
- Installation of a SCS component is arranged for July 8th. 
- Cabling in HED is scheduled to be performed in cw31; EEE will contact FXE to fix a cabling installation date.
- More than 50% of Beckhoff modules are changed.
- Working on PLCs business as usual.

VAC:
- All fine: nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- DESY/NOC needs to perform software update of the control network routers for all SASEs. 
This will take place next Tuesday, the 7th of July, between 6AM and 8AM in the morning. An e-mail will be sent to the Readiness list.

XRO:
- Not present.

LAS:
- All lasers are running.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to add.

MID:
- All running fine.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 29.06.2020, posted by Frederik Wolff-Fabris on 30 Jun 2020, 08:50 
General Announcement:
- The Photon Run Coordinator will re-start next Friday July 3rd. Please also feel free to contact him/her (9-4800) for daily coordination and communication with the 
machine/BKR. 
- Interlock / TUV tests are ongoing in tunnels. Next Wednesday it starts in the experimental Hall / SASE instruments.

CTRL:
- CTRL has a plan to switch the Data Loggers on Wednesday. This will cause a downtime on this service for about 5 minutes. A follow up will be announced afterwards.

DA:
- Not present.

EEE:
- EEE has made an agreement with HED on the cabling issues. 

VAC:
- Tunnels are closed: maybe next week after Interlock tests the XTD6 and XTD9 tunnels will be open for a couple of days.
- If access in tunnels are needed (not only XTD6 and XTD9), please make a request by filling the table at the Desy/BKR elogbook 
(https://ttfinfo.desy.de/XFELelog/index.jsp), located under "Access Requests".

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- All lasers are fine.

UNSYS: 
- Nothing to report.

SPB:
- It has tested the new Karabo for the Jungfrau detector and result is OK.
- This week SPB plans to test cameras.

FXE:
- Nothing to add.

MID:
- All fine.

HED:
- All fine.

SCS:
- Not present.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 24.06.2020, posted by Frederik Wolff-Fabris on 25 Jun 2020, 10:27 
General Announcement:

- Exceptionally next Friday the XO Intergration Meeting will not take place. The meeting will resume next Monday. 
Please send us an e-mail to xo@xfel.eu in case of any issue.

- Details on the Interlock Tests: 
1. D3/SRP has the responsibility to carry on the tests; 
2. TS and XO (communication) are supporting groups; 
3. There is no rehearsal date; 
4. Tests on the Instruments/SASE wll take place on July 1st, 2nd and 3rd (reserve date); 
5. Access to the instruments and optics hutches is forbidden; 
6. Access to the laser rooms are not restricted, apart from the HED laser which needs clarification; 
7. Emergency off will be disabled on July 1st at 08:00AM. As soon as the emergency offs are tested, they can be enabled again; 
8. The participating EuXFEL Radiation Protection Officer can inform the instruments as soon as tests are ready with the respective SASEs for resuming access and work.

- Maurizio V. and Nerea J. mention that an EPS check must be scheduled prior beam delivery. XO will check with Zunaira/SRP on its status.
- Suren K. points the PKG in SA3 undulators is still switched off. TS shall switch it on prior tunnel closure.
- Suren K. asks on tunnel access for next weekend. XO states tunnels will be put in Interlock tomorrow (June 25th) and shall remain interlocked until the next shutdown.
Access to XTD6, XTD9 and (maybe) XTD10 can be done for few days after the interlock tests. Access to all other tunnels must be via ZZ. 
Tunnels will not be open for the weekend. (after the meeting DESY/MXL confirms this procedure).  

CTRL:
- Nothing to report.

DA:
- Working on small requirements with the instruments.

EEE:
- SA1 VAC signal's issue from last Monday: it has been fixed. There was problems related to filter in the train-ID communication: the addresses were not properly set. 
- Cabling is ongoing on SCS; HED cabling waits for time/schedule for installation (to be discussed between EEE and HED); 
Cabling works ongoing with DESY-MPS which connect MID to PPS.

VAC:
- Closing the activities - SA1 VAC signals are OK.

XPD:
- Nothing to report.

DET:
- XO asks for an status on the MID/AGIPD train-ID issue from last Monday. S. Aplin and K. Wrona say it has to be further investigated as is not clear where the problem 
lays. 
The DAQ gets data from AGIPB, DOOCS, Karabo, labelled with train-ID and the labeling have to be checked for consistence. This is not a new issue and has to be addressed 
in the frame of data reduction. 
- A clear independent signal has to be also checked. P. Gessler says it is needed to get various patterns for a complete understanding. A clear strategy to develop and 
address has to be made. 
- S. Aplin will overlook the efforts among different groups.

ITDM: 
- DAQ installations: this morning a fix for big detectors is done; after leaving DAQ for longtime there are some issues that will be fixed next week. 
- Majority of acceptance tests are done - slow data is fixed.

XRO:
- Everything is done. The last check on tunnels was performed. 

LAS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Finished with the tunnel components check.

SCS:
- Nothing to report.

SQS:
- Nothing o report.
Entry   Notes XO Integration Meeting 22.06.2020, posted by Frederik Wolff-Fabris on 23 Jun 2020, 14:12 
General Announcement:
- The User & Operation Meeting that took place at beginning of this year on Fridays will re-start on July 10th. 
Proper announcement and Zoom link will be sent. In this context, the XO Integration Meeting will continue only on Mondays and Wednesdays. 

CTRL:
- Some of XFEL Elogs were not working during the weekend. ITDM is taking a look into the problem.
- SA1 Vacuum devices show some errors (not running). It seems the problems comes from the PLC and is under investigation. 
The controllers in the tunnel were OK and pumps were placed in safe state. 
This has affected all SA1 loop, at XTD2 and XTD9. Also the devices were not properly communicating.

DA:
- No issues to report.

EEE:
- Issues with the SA1 VAC loop.
- Updates of timing systems affecting LAS were successfully done on Friday. EEE encourages people to report in case of problems. 

VAC:
- Reporting on the SA1 VAC loop issue.

XPD:
- Last Karabo update done on Thursday.

DET:
- No issues to report.
- MID observe a train mismatch between AGIPB and data sources such as SA2 XGM. The AGIPD has a shift of 1 train-ID. 
This issue involves several groups and coordination and solution still miss.
- LPD/FXE also takes the train info from clock control but shows no mismatch.

ITDM: 
- Investigating the Elog access issue.

XRO:
- Not present.

LAS:
- Maintenance in SA3 and SA2 are done. All lasers are running.

UNSYS: 
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report - checking the vacuum.

MID:
- Report on the AGIPD train-ID.

HED:
- Working with big lasers.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 19.06.2020, posted by Frederik Wolff-Fabris on 19 Jun 2020, 14:28 
General Announcement:
- Next Monday it is planned the NOT-AUS experiment in the frame of Interlock tests and the emergency off will be disabled. 
Only groups with EQP persons can continue working in the hutches. An e-mail was sent by TS.
- There will be test on smoke extraction in Tunnels on next Monday and Tuesday. Information was sent to Readiness mailing list.
- An e-mail to Readiness list was sent this morning regarding TUV/Interlock tests in SASE areas on July 1-3: 
No access or work on the experimental and optics hutches is allowed in these days. More specific details will follow in the coming week. 
If you have questions, please contact XO.

CTRL:
- Finished 2.9 deployment - control rooms also have the updates;
- CTRL is working on the XGM together with Theo (XGM does not update some properties). This came after an update done at the Desy side.

DA:
- Nothing to report.

EEE:
- Shutdown activities are ongoing. 
- Migration to mc2motors was ongoing. EEE encourage groups to check motors after start running again.
- For next week: cabling work in SCS and PLC modifications with the help of two external colleagues.
- Timing system update: SA1 and SA3 timing system laser and instruments are done; EEE will do the SA2 this afternoon; Still to be arranged a date for the balcony rooms.
If problems occur, please contact Bruno Fernandez.

VAC:
- Finished all shutdown activities. 
- The recovery of HED pulse picker branch needs help of HED staff. HED points Konstantin is around today.

XPD:
- Finished all XPD tunnel works.
- Testing ongoing: SA2 motors after mc2 migration.
- Checking the trigger on uTCA crates after upgrade.
- DAQ test was successful with ITDM.

DET:
- New DAQ system has some issues with AGIPD in SPB (did not store data) - to be followed next week.
- Deployment of new calibrations is ongoing.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Warming up SA3 laser.
- SA1: LAS maintenance is not finished. So we ramp up later. Bruno reminds SA1 must be back and switched on again.

UNSYS:
- Enclosure of panels in SASE3 has been installed and all tunnel activities are done.

SPB:
- Nothing to report.

FXE:
- Works on Detectors are ongoing.

MID:
- Nothing special.

HED:
- Activity with lasers alignment.

SCS:
- Not present.

SQS:
- Nothing to report. Working in different things/parts.
- SQS has planned activities for July 1st-3rd. It suggests that more specific communication on TUV tests and access restrictions must be done differently
than the e-mail distributed on June 8th and today. XO will look for improvements.
Entry   Notes XO Integration Meeting 17.06.2020, posted by Frederik Wolff-Fabris on 18 Jun 2020, 13:40 
General Announcement:
- Today and tomorrow it takes place the tunnel ventilation maintenance between 6:30 and 8:00AM;
- An e-mail was sent to readiness list with tunnel access restrictions for next Friday morning at the Osdorf Born site in and XTD4 work between 10-11AM.
- Today there the maintenance of the SA3 hutch crane is scheduled.

CTRL:
- CTRL will follow up the uTCA updates.
- Mc2 migration in SA2 is almost done - only XPD needs to test some componenents.
- CTRL is working in some layout problems in scenes of the latest GUI update (new Karabo). Groups are encouraged to write tickets to CTRL if they require changes. 

DA:
- Nothing to report.

EEE:
- Shutdown activities are ongoing with, e.g, VAC loop updates and PLC updates;
- The firmware updates affecting the PP-laser timing will take place on next Friday (19.06) in all SASEs. 
- EEE is following the delay on the MID cabling related to personal interlock. 

VAC:
- Shutdown activities in XTD6 and XTD10 are ongoing. 

XPD:
- Currently finishing own summer shutdown tasks in tunnels.
- First DAQ test together with ITDM: had to wait the timing server re-start. To be continued today also after full mc2 migration.

DET:
- Calibrations of detectors at instruments are ongoing.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- So far all in good state.

UNSYS:
- Nothing to report.

SPB:
- DAQ update was not an entire success - but it has been taken care. DAQ is needed for the calibration test of detectors.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Nothing special.

SCS:
- Nothing to report.

SQS:
- PC updates are ongoing.
- SQS raises the question on hutch access during the disabled emergency off planned for next Monday. It is possible that SQS EQP will be in sick leave on that day. 
XO will contact Torsten Schoen to get more details on the time schedule and possible access for that day.
Entry   Notes XO Integration Meeting 15.06.2020, posted by Frederik Wolff-Fabris on 16 Jun 2020, 13:32 
General Announcement:
- There will be additional ventilation maintenance on all tunnels, scheduled for next WED/17th and THU/18th between 06:30AM and 08:00AM. 
We request staff to do not enter in tunnels during this period.
- TS has sent information on the hutch crane maintenance starting today up to Wednesday 16th. Please make sure one instrument colleague is present.
- XTD4 will be closed on next FRI/19th as part of Interlock Tests (§88 - TUV Prufung).

CTRL:
- Few minor things were solved on Friday.
- Notification service worked as expected in SPB; VAC also got notification.
- CTRL will follow the uTCA updated after EEE is done today.
- CTRL is working on the PMO projects.

DA:
- Nothing to report.

EEE:
- Activities running well.
- Today afternoon migration plan for tunnel crates and tomorrow SA2.

VAC:
- Nothing to report.

XPD:
- Nothing to report. 
- XPD will check the uTCA crates after its update/restart.

DET:
- Data has been taken at SCS; also performing online tests.

ITDM: 
- Nothing major - Continuing updates with SQS, MID and HED instruments.

XRO:
- Nothing to report.

LAS:
- Scheduled SA2 maintenance on Tuesday. EEE firmware update also takes place. 
- Timing related updates on SA1 and SA3 are under discussion between the groups.

UNSYS:
- Everything is OK - All work in tunnels are done.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Water leak from last week: TS has contacted the external company and a faulty air humidifier was the cause. It will be changed/fixed.

SCS:
- Not present.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 12.06.2020, posted by Frederik Wolff-Fabris on 12 Jun 2020, 13:48 
General Announcement:
- There will be tunnel ventilation additional maintenance on two mornings next week from 6:30 to 8:00AM. An e-mail to Readiness list will be send when dates are known.
- There was again a situation that the interlock door between XTD4 and XTD10 was blocked open. SRP reminds all that please do not leave this door opened. 
Further investigation with Desy side will be done if this was a mistake done by an external company. 
- EuP training: Tobias Haas has extended trainings until end of August. There will be refreshers and first time trainings starting on week 26 as in-person EuP training.

CTRL:
- CTRL is done with 2.9.0 deployment - now DAQ and calibrations checks are ongoing.
- No major issues during deployment: still few devices need to be updated again; CTRL is working on it.

DA:
- DA has released new version of extract data. Documentation will be send around and people are invited to give feedback.

EEE:
- Activities are running fine.
- PLCs side: this week there is migration for mc2 in SA2 - EEE ask people to crosscheck systems.
- Two cables in MID will be finished late next week (regarding personal interlock).
- EEE is conducting migration microTCA systems/crates: SA1 and balcony rooms.
- Timing for the Lasers updates has to be arranged with LAS. CTRL and EEE recommend making it during the shutdown. It needs green flag from LAS and Instruments. 
- Upgrade of firmware of timing system: this will not be done to avoid stop timing system for lasers. Tunnels are done.
- Puppetization work is ongoing. SA2 and SA1 tunnel remains to be completed at beginning of next week. 

VAC:
- No issues to report.

XPD:
- Follow up of SA2 mc2 migration: we recheck motors in tunnel; update scenes with CTRL.
- XPD is almost finished with large interventions.

DET:
- Test of Agipd with new Karabo is successful. The DSSC is also working.

ITDM: 
- DAQ updates: to be started today or next week.
- Hardware updates in SASEs that ITDM will be performing.

XRO:
- Nothing to report: XRO is finished with big installations. Only small tasks to be done next week.

LAS:
- The broker update caused the timing in SA3 to be lost. It took several hours to bring up the system. 
- Updates in SA2 (affecting timing) will be performed next Tuesday.
- SA1 and SA3 have to be scheduled and it depends also on instrument's plans. 

SPB:
- It has planned tests on the calibration of pipeline / DAQs for next week.

FXE:
- It has upgraded to new Karabo and some controls will be updated today.

MID:
- Work ongoing as planned.
- CTRL test the influx data logger today and Monday and this causes loosing of information for few minutes. 

HED:
- Water incident in SA2: Water spills caused a flooded experimental hutch. TS have repaired and will check with the external company if systems have been exchanged. 
Such events must be avoided in future. 
- In many hutches there are water sensors in the floor which are not connected: TS and SRP shall take a look.
- Summer shutdown: there was scheduled task (presumably from Desy groups) on June 8-10th that nobody showed up. By the other side, suddenly someone was working inside the 
laser room. 
Ulf would like to see Desy people working with better planning and coordination. As positive, EEE tasks on microTCA are an example of good practice in communication and 
coordination. 

SCS:
- Not present.

SQS:
- No issue to report.
Entry   Notes XO Integration Meeting 10.06.2020, posted by Frederik Wolff-Fabris on 10 Jun 2020, 11:12 
General Announcement:
- Maintenance in the Tunnel Air Conditioning is completed. No more work restrictions are in place besides the regular COVID-19 rules. 

CTRL:
- Deployment of Karabo 2.9.0 started yesterday accordingly to the information sent to readiness mailing list. So far the work goes with the plans.
- CTRL mentions Broker servers need update and will bring down Karabo again. Possible intervention date (early morning) will be discussed with LAS and Instruments.
A warning e-mail will be send 1-2 days in advance.

DA:
- Related to new Karabo: in case the upgrade is not covered, please contact DA.

EEE:
- Migration of mc2 done in SA2. 
- Preparing call for tender of HED cabling; other instruments follow up next.
- There will be maintenance in SA1 and SA3 balcony rooms. A discussion with LAS is in place (risk of possible shutdown can be accepted).

VAC:
- Not present.

XPD:
- Nothing special to report - resuming tunnel activities after AC tunnel maintenance.

DET:
- Nothing to report.

ITDM: 
- The updates on the online cluster side are almost finished. Only a check has to be done.
- Access to online cluster is labelled.
- DAQ has to be re-started.
- Updates are planned for tomorrow: reboot exflgateway at 10:00AM - an e-mail will be send to readiness mailing list.

XRO:
- Not present.

LAS:
- SA1 and SA3 lasers are in operation.

SPB:
- SPB asks for sending warning notice a day or two prior the Karabo restart intervention.

FXE:
- Nothing to add.

MID:
- MID will inform ITDM today on the dates for the updating the linux PCs in the hutches.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- SQS will also inform ITDM on possible dates for updating PCS.
- Some macros are not running (they were not able to start).
Entry   Notes XO Integration Meeting 08.06.2020, posted by Frederik Wolff-Fabris on 09 Jun 2020, 15:47 
General Announcement:
- SA2 lasing: up to 2mJ@9keV was achieved with strong linear and quadratic tapering with 250pC bunch charge. 
Lasing with 500pC achieved 0.45mJ@9keV and with 100pC achieved 0.75mJ@9keV.
- From today we start the summer shutdown phase.
- Please note the last minute information on air conditioning maintenance in tunnels between Tuesday 15:00 up to Wednesday 08:00. 
We ask groups to shift planned works to outside this time slot. In case you need to be in tunnel, it is mandatory to use FFP2 masks.

CTRL:
- Karabo 2.9.0 deployment will start tomorrow and follow over the week. Typical activity time is from 8AM-16:00 each day.

DA:
- No problems. 

EEE:
- EEE plans for tomorrow the mc2 migration.

VAC:
- HED mono has adjusted gap between crystals. All other tunnel activities ongoing.

XPD:
- Major task for the coming week is related to the PES maintenances. All other tasks are also organized.

DET:
- Will carry tests after the Karabo installation.

ITDM: 
- Group will be busy with updates to be done this week.

XRO:
- Completed big shutdown activities: M3 cooling mirror - leak tested OK and pumping during the weekend.

LAS:
- All lasers are in operation.

SPB:
- Progressing with regular planned tasks.

FXE:
- Nothing to report.

MID:
- Nothing to add.

HED:
- Working with EEE activities.
- HED requests suitable dates for testing the THz laser. This date has to avoid infra-structure, interlock and other works. 

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 05.06.2020, posted by Frederik Wolff-Fabris on 05 Jun 2020, 13:44 
General Announcement:
- Many summer shutdown tasks have been scheduled already and information has been sent to the groups with tunnel tasks.
- XO will not fully engage with tasks in the instrument Hall carried by the Instruments. Please contact XO if there are difficulties in organizing these works. 
- Be aware of date for potential power off: 22 June (MPS group runs upgrades that may trigger the emergency power off); 
- Be aware of date for hutch access restrictions: July 1st and 2nd (D3 will test interlock system in experiment hutches); 
3rd of July is a reserve date - please expect only limited access to the hutches due to this tests.
- Safety information: Desy is now recommending each person to take a FFP-2 mask for tunnel works to be used in case of close proximity work. 
EuXFEL will follow this rule: SRP has available masks and groups with tunnel activities can collect these masks with SRP
- A schedule for summer shutdown activities will be send soon to the readiness mailing list.

CTRL:
- CTRL has distributed schedule for updates. For example, the BKR machines will be performed on Tuesday; 
- The update of exflgateway will take place on Wednesday next week.

DA:
- Nothing to report.

EEE:
- It is planned to perform the loop update for the MC2 library on Tuesday. 
- Changes requests on cabling are being finalized. 

VAC:
- Currently carrying on the SA2 work on HED mono together with XRO on alignment; SA3 re-alignment activity is done; 
SXP installation is ongoing and preparing the exit slit installation.

XPD:
- The DPS remaining problem in XTD2 is solved. Pressure is going down (<10e-8).
- Work on motor calibrations on HIREX: one (XTD6) to be done next week after migration library.
- For next week there will be activities of maintenance in the XTD10-PES.
- SA2 is operating until Sunday and machine is currently using 100pC bunch charge.
- Works on the clean rooms/labs are ongoing. Acceptance test on the new PES prototype may be finished today.

DET:
- Nothing to report - small issues have been worked and solved.

ITDM: 
- Preparing shutdown activities that start on Monday: update of control servers together with CTRL; updating PC layer servers, computer clusters, etc... 
There shall be interruptions in the DAQs systems;
- Updating Karabo 2.9 and exflgateway: at the same time ITDM will update also Maxwell and reboot gateways to be taken place on Wednesday (joint effort CTRL, ITDM).

XRO:
- Proceeding well: Mono in XTD6; vacuum in XTD9.
- Possible summer activities are on hold and XRO will inform XO accordingly.

LAS:
- Laser down due to maintenance/updates: SA1 PP-laser on Tuesday 9/6; SA2 on Wednesday 10/6; and SA3 on Thursday 11/06.

SPB:
- Works are going well.

FXE:
- Nothing special to report.

MID:
- Nothing special to report.

HED:
- Activities on the Split and delay line (cleaning), on PP-laser, among others. No faced issues.

SCS:
- Not present.

SQS:
- No answer from external company on the active fiber.
Entry   Notes XO Integration Meeting 03.06.2020, posted by Frederik Wolff-Fabris on 04 Jun 2020, 13:31 
General Announcement:
- Summer shutdown is nearing. Few dates on crane maintenance at XHEXP1 were sent to the readiness mailing list. Please be aware on the dates when planning activities. 
- MPS software updates are planned for the summer shutdown - an update on potential emergency off situations will be informed.
- Groups and instruments are encouraged to make questions/comments.

CTRL:
- Continuing with shutdown tasks: CTRL will deploy Karabo 2.9 next week: an e-mail with information on dates for the installation in instruments will be sent.
- For SASEs areas: SA2 deploy takes place on the 9th June; SA1 an SA3 will follow on the 10th. Dates will be sent to the readiness mailing list. 
- Please contact CTRL for any comment/question.

DA:
- Nothing to report.

EEE:
- There are planned tasks on migration of Mc2 and Vacuum eps updates.
- EEE is working with regular tasks together with the instruments.

VAC:
- Working as planned in the tunnels: MID pre-shutter is installed; SA3 re-alignment is done; Continuing with SSP shutter in SA3; Loop updates.
- Desy-MXL will contact VAC on the SXP slits installation. 

XPD:
- Finishing the tasks in tunnels.
- XPD has been supporting the tuning efforts on SA2 lasing during this week.

DET:
- DET will communicate with CTRL on dates for tests and potential conflicts.

ITDM: 
- Maxwell related issues: System does not work well, probably due to a bug. ITDM and DA will check. Desy service shall be contacted in case of troubles.
- Instrument control room PCs: FXE is already equipped with new computers, as well as SCS and SPB. An Update of control PCs in experimental hutches of SQS, MID and HED 
has to be done. 
- Each of those three instruments has to inform ITDM when this can be take place - a complete new installation will be made - please backup the PCs! 
- CTRL also remarks Karabo installation has to be done in some instruments. 

XRO:
- Not present.

LAS:
- Synchronization issue is fixed (due to broke delay line). This week Desy colleagues will work on improvements of communication to lasers.

SPB:
- Working together with LAS, CTRL and EEE to solve small issues.

FXE:
- Update on the Jungfrau status has to be clarified.

MID:
- Progressing with the works on the split and delay line.

HED:
- Group is busy with PP laser and other regular business.

SCS:
- Not present.

SQS:
- No news from the external company on the laser active fiber issue.
Entry   Notes XO Integration Meeting 29.05.2020, posted by Frederik Wolff-Fabris on 29 May 2020, 14:22 
General Announcement:
- Due to the public holiday this meeting do not take place on Monday.
- Safety related questions: 
1. DACHS issue that XPD staff could not enter the lab in E0.505: there was a false entry in the DARF-DACHS system that was corrected. It shall be working now;
2. It seems DARF-DACHS system shows incorrect dates for training expirations. SRP will check on possible corrupted dates; 
3. EuP trainings validity will be extended until end of June.
- Safety masks: A warning was issued by Hamburg authorities. EuXFEL has some masks that belong to the batch mentioned in the warning but with different production dates.
Currently SRP has no info if these masks are not suitable for use but will keep staff updated.   

CTRL:
- Nothing to report.

DA:
- Not present.

EEE:
- SQS cable installation: some issues related to the over lengths will be fixed by the external company during next week. 

VAC:
- Nothing to report.

XPD:
- Planned tunnel work is ongoing.
- For next week: 1. A differential pumping station in XTD2 will need to be locally checked next Wednesday. 2. Additional housings on XGM will be done.
- SA2 K-mono measurements were performed in BKR. Evaluation of results need to be made with a new software tool (ticket has been sent). 

DET:
- Ongoing work on various detectors (located in different instruments) will continue next week.
- CTRL has to be informed on the plans for the next week: the calibration pipeline must be followed and time for deployment. DET will check what the plans are.

ITDM: 
- Nothing to report.

XRO:
- XRO installed InGa in M3 mirror in XTD9. Group had good experience while working with masks and face shields inside clean tent.  
It was found a small damage in the mirror that will be further investigated and reported next week. Next week there is a plan to close the chamber and pump down. 

LAS:
- SA1 and SA3 lasers are in operation.
- There are ongoing work in SA2 laser synchronization; Laser operation will be back after today.

SPB:
- Nothing to report.

FXE:
- XGM cabling going on;
- FXE contacts CTRL on the Jungfrau crashing issue that happens when 2 Detectors operate simultaneously. CTRL states this issue is being investigated while in operation
and is not reproducible. In addition, it seems to happen only at FXE and not in SPB. Further fix needs to take place prior start of operation.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- No news on the active fiber were received.
Entry   Notes XO Integration Meeting 27.05.2020, posted by Frederik Wolff-Fabris on 28 May 2020, 13:58 
General Announcement:
- It seems EuXFEL was not affected due to the power glitch at the Desy site last Tuesday (no device was found in off state or damaged). 
- TS informed no indications of power failure at EuXFEL. Groups are encouraged to inform XO if they find components that have been affected. 


CTRL:
- CTRL has deployed a new cross-hair in images for all instruments; XPD is fully using it. This cross-hair will be also used in the Doocs panels 
allowing BKR to use it as tuning tool. CTRL reminds that if operator does not disable it then it ends in the DAQ.
- CTRL is in contact with instruments to arrange New Karabo2.9 installation.

DA:
- Working with contact persons for the Detector Advisor committee.

EEE:
- EEE raises a question on the Shutdown planning procedure for the task scheduling. 
XO plans to use a summer shutdown process that coordinates with individual groups the tunnel scheduling. 
Starting in the next few days XO will contact the groups for individual scheduling. 
Tunnel activities will be initially scheduled and try to schedule without resources conflicts.
- EEE plans planned to make a SA3 loop update tomorrow.
- A MPS board in SA2 is not properly working and has to be replaced. Contact with DESY was done 
and this shall not affect operation or risk triggering the emergency power off.
- Today the remaining cable work at FXE will be concluded.

VAC:
- Not present due to tunnel activities.

XPD:
- There was an incomplete update of SA1 Vacuum loop. EEE informs there are issues with some gauges and by tomorrow EEE 
must have it fixed and will conclude the final update.
- Yesterday re-cabling SA3 (SS3 brunch) was done; exit slits are being reconnected. The main Karabo shows the two exit slits not connected. 
For the IMG it is needed support from CTRL and XO.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Installing the cooling in XTD9 (M3) during next days and then VAC will take over by next week.
- Actions in XTD6 are needed in order to receive beam for possible operation during June 6th-7th (for the self-seeding activities). XRO will send a summary to XO.

LAS:
- SA1 laser is back: SPB and FXE shall measure energy to confirm all is fine. It is still unclear the cause of water leak in the SA1 laser last week.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to add.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Everything is going as planned. 
- Regarding the active fiber laser, SQS is waiting for the company reply.
Entry   Notes XO Integration Meeting 25.05.2020, posted by Frederik Wolff-Fabris on 25 May 2020, 15:29 
General Announcement:
- Machine started SA2 lasing last weekend. Currently photon energy is 0.5mJ at 9keV.
- CTRL OCD was called Friday on the SR slits position and movement. It was quickly solved.
- XO ask people who carries work in tunnels to use this meeting to raise questions and concerns. 
- XO also ask people to discuss during this series of meetings possible resource conflicts among the support groups for the upcoming week(s).

CTRL:
- New Karabo version installed at MID is working nicely. Instrument staff is creating new panels with Karabo9 and CTRL hopes to integrate 
this Karabo version in the whole facility during summer shutdown.

DA:
- Not present.

EEE:
- Working in normal duties.
- Cabling installation in SQS is done. The FXE installation has a mismatch with a rack planning (XGMD) and responsible company for installation
may come back on Wednesday to solve it. 

VAC:
- Tunnel works are nicely ongoing.

XPD:
- Working on tunnels and looking at lasing in SA2.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- A water leakage in an amplifier box in SA1 laser occurred last Thursday. It is repaired but LAS will have to investigate on possible damages on optics
(due to water inside). Laser operation will be possible only tomorrow or at the end of the week. LAS will provide further details on Wednesday. 

SPB:
- Nothing to report.

FXE:
- Nothing to add besides the cabling installation issue mentioned by EEE.

MID:
- New Karabo is working nicely up to now.
- Tunnels work is also finished; MID staff continues with work on the hutch/optics.

HED:
- No issues to report.

SCS:
- SCS will be busy with an external company and needs assistance of SRP on hot work permit. Sandra Plett will communicate with Michael Prollius.
- SCS has informed DET that there is data in the computer to be saved. DET is aware and has taken needed actions.

SQS:
- Nothing to report: activities are progressing normally.
Entry   Notes XO Integration Meeting 20.05.2020, posted by Frederik Wolff-Fabris on 22 May 2020, 08:57 
General Announcement:
- XO Integration Meeting will not take place next Friday 22.05 due to the bridge holiday.
- MPS group shared some info on the SA1 emergency power off event that happened last week. Further investigations are ongoing. 
- No conflicts have been reported for the activities on control network systems.
- Today 20.05 is the deadline for the groups to send via e-mail the updated summer shutdown tasks.
- MXL/Desy has planned to start on next Saturday and Sunday the SA2 photon search and operation.  

CTRL:
- CTRL works together with XPD in the Doocs images for the IMG devices. A new control update will be deployed. The data is no longer corrupted.
- Today CTRL is deploying Karabo9 at MID. This serves as a small scale test prior the deployment on the other parts/groups of EuXFEL. 
During the summer shutdown it will be deployed at the BKR photon computers. 

DA:
- Working with the Karabo deployment. 
- Group is available for data analysis and troubleshooting in devices, e.g. the Detectors.

EEE:
- EEE reminds the cables in the MPS room still remain to be connected (linked to the emergency off event of last Friday). 
MPS group do not know yet when this will be done. As soon as XO know it will be informed.
- SQS cabling installation is done. FXE cabling work has started: it has an open issue with HV cables but it will be solved today. 
Over lengths of cables are currently stored in the instruments but will be moved later. 

VAC:
- Working in tunnel activities: MID pre-shutter; SA3 re-alignment ongoing.
- SA3 re-alignment: today we end at the PES - work ongoing accordingly to the plan. Upstream side of the gas attenuator will start on next Monday.
- No issues to report.

XPD:
- XPD is finishing XTD2 and XTD9 tunnels works: water cooling, pumps, boxing electronics; XPD will try to do activities in XTD10 in parallel with the re-alignment.
- All working fine - an updated file for the summer shutdown list will be send later today.

DET:
- The AGIPB detector at MID was re-started yesterday.
- SPB detector will be tested today or Friday (complete test after the emergency off event).

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

SPB:
- Nothing to report. No damages due to the emergency off event but still has to test the detectors.

FXE:
- Nothing to report - no damage associated to the emergency off event.

MID:
- It is planned to check the power modes. 
- MID gets confirmation it can access XTD6 today.

HED:
- Not present.

SCS:
- Not present.

SQS:
- Just protective rules on the OFF buttons were changed - nothing has been done on the functionality side.
Entry   Notes XO Integration Meeting 18.05.2020, posted by Frederik Wolff-Fabris on 18 May 2020, 14:53 
General Announcement:
- Starting today 18.05 the XTD1 tunnel will be closed. It is not accessible until the summer shutdown. All other tunnels remain open.
- XO and PMO have sent a communication for updating the task list. Please indicate if tasks were already carried out. Deadline for submitting it back is Wednesday 17.05.
- SA1 instruments emergency power off on Friday 15.05: originated from PLCs on ProfiNet from Desy. 
It is still under investigation and we should make sure that sudden power off does not happen again, which may harm equipment such as detectors. 

CTRL:
- SPB informed issues on the notification service. CTRL appreciate the feedback and is working on it.
- It is planned to deploy the new Karabo 9.0 at MID this week.
- CTRL is working in few problems with Imagers (corrupted data) - data is flowing but not being displayed.

DA:
- No conflict or issues: working as planned.

EEE:
- SA1 VAC loop update is schedule for today.
- Friday power off on SA1: problem came from the Desy signals. It may require extra work at Desy - PLC cables are still disconnected.

VAC:
- No issues to be reported.

XPD:
- IMG issue with corrupted data was informed to CTRL who is investigating. SA2 IMG has to be fixed for use on next Monday 25.05.

DET:
- AGIPB detector at SPB suffers from power off but its Chiller was recovered without consequences. The detector itself has to be checked. 
- DET has placed the detectors in safe states, but there is nothing to protect the detectors against power outages.

ITDM: 
- Nothing to report. 

XRO:
- Nothing to report. 

LAS:
- SA1 PPL1 laser switched off on Friday around 14:30. The reason is possibly linked to low air flow. It remains unclear if there is any relation with the instruments 
power off.

SPB:
- Last week worked on Jungfrau and AGIPB detectors.
- Nothing else to report other than the power outage in the hutches.

FXE:
- Instrument recovered well from the power outage.
- It is planned the cabling installation for the next couple of days.

MID:
- Continuing with installation and commissioning. On Wed it is planned to check devices in XTD6.

HED:
- All work goes as expected.
- A plan for the XTD6 work will be done this week. The activity in tunnel shall take place next week.

SCS:
- Nothing to report.

SQS:
- Cabling installation is done. SQS reports that due to lack of crane operator in the group they had to wait some time until a crane operator was available. 
Entry   Notes XO Integration Meeting 15.05.2020, posted by Frederik Wolff-Fabris on 15 May 2020, 14:35 
General Announcement:
- Judging by feedback and communication to XO both Tunnel and control network works are progressing.
- Friday is a good opportunity to discuss the Karabo tasks to be submitted next week as well as direct questions to SRP.
- The summer shutdown will have tunnels open for two weeks due to the interlock tests that, in turn, need tunnels closed. 
Current plan is photon beam will be available after the interlock tests.
- Due to next week's holiday bridge, the XO Integration meeting will not take place on Friday. 
- XTD1 will be closed next Monday and reopened for the summer shutdown. By its side, the XTD6 will remain open.

CTRL:
- DET confirms task list for this week has possible prolongation for next week on the AGIPB work. CTRL is aware and will prepare support for next week.
- Today a new Karabo version is released but general deployment will be made during summer shutdown (MID will do it earlier).

DA:
- Nothing to report.

EEE:
- A question arises on filling the dates for the summer shutdown task list. It does not need to be necessarily filled, unless if constraints are made. 
If a date is proposed, we shall stick to that day. Entanglement with other groups will be taking into account for a final scheduling. 
- Cabling installation going as planned: SQS cabling may be finished today and the FXE installation will follow. 
- EEE plans to start with change request of modules. For PLC control crates there may be delays. Subject will be communicated to the groups.

VAC:
- Tunnel tasks are progressing: upgrade of SA2 solid attenuator pneumatic system; SA3 pre-shutter is installed; preparing for SA3 re-alignment to start next week.

XPD:
- The planned activities are progressing well.
- Few activities originally planned for the summer shutdown are anticipated to the re-start phase. The summer shutdown task list will be updated accordingly. 
- Preparing for beam delivery in SA2: XPD is prepared for the XTD1 tunnel closure on Monday. The XGM of XTD1 will be available for operation from next Wednesday, 
as well as Imagers. It is expected to receive photon beam by May 23-25 (EEE is informed). 
- The photon delivery is only for XTD1 and beam dump. XTD6 will stay open until the shutdown.
- XPD will regularly use the big clean room from next week with 2 staff members (not continuously, but larger part of the time).

DET:
- Activities on DSSC, Jungfrau, AGIPB are ongoing without major issues.
- DET do not plan to work in the bog clean room, only eventually going there to pick small components. 

ITDM: 
- IT infrastructure is properly running.

XRO:
- Progressing with planned activities, e.g. magnetic limit switch for XTD6 mirror. 
- Preparing for cooling installation in XTD9 together with VAC. Work currently being prepared in the labs.

LAS:
- No problems that require attention: LAS is progressing - all under control.

SPB:
- Jungfrau has been installed and works well besides small issues with data transmission (staff and support are working on it).

FXE:
- Preparing things for cabling installation in hutches; Questions to SRP are clarified.
- In parallel FXE conducts activities with Jungfrau detector.
- Alignment of optical laser is postponed due to staff's sickness.

MID:
- The CRLs check in XTD1 was done and no more tunnel access is need. There were no changes on the CRLs. 
- MID access XTD6 next week and is busy with other re-starting tasks.

HED:
- Progressing with lasers and split delay line.
- Internal staff and Wille company pulled cables in A12.
- Detectors are under tests since yesterday.

SCS:
- Not present.

SQS:
- Activities in hutch proceeding smoothly.
- New spectrometer setup must be finished today.
- SQS plans to start with vacuum and to integrate the locally developed interlock system during next week. 
Entry   Notes XO Integration Meeting 13.05.2020, posted by Frederik Wolff-Fabris on 13 May 2020, 13:51 
General Announcement:
- SRP will join this meeting series. If you have questions please raise the points.
- DET has questions on the policy in how to proceed with team work (how close and what is the interaction that different teams can have, e.g. when working in the same
room?). The subject has been reviewed by the Covid-19 task force and a guideline will be announced soon.
- There is a smooth re-start of activities regarding the Control Network tasks. 
Groups are encouraged to use this meeting to present questions and discuss open points in this matter.
- General: the group of janitors was spotted smoking together in close distance in the designated smoking area. 
It is remarked that the 1.5m distance between persons has to be respected. Information will be send to TS. 

CTRL:
- Planned work is going smoothly.
- Group's OCD phones are working. Please do not hesitate in making use of it. 

DA:
- Not present.

EEE:
- Ongoing with regular tasks. 
- The cabling company is onsite but stopped at the gate house due to missing training. 
After access is granted, work will start at the SQS. Joern will inform XO on further details.

VAC:
- Planned work is ongoing. 
- Preparing for the alignment task in XTD10.

XPD:
- Nothing special to report.
- Housing of XGM distributor boxes and Femto amplifiers in XTD1 is ongoing this week.

DET:
- Work runs smoothly. 

ITDM: 
- Nothing to report.

XRO:
- Installation of magnetic switch in XTD6 is done; cooling installation is on progress.

LAS:
- Proceeding accordingly to the plans: FXE and SPB lasers were handed to the instruments;
- Currently working in SASE3 laser.

SPB:
- Plans are in place for activating the detectors.

FXE:
- Ongoing as planned; Waiting for cabling installation after SQS is done.

MID:
- It has placed a task request to be done in XTD1 (to inspect CRL-1 device of SASE2) - XO is trying to schedule it this week, most likely for Friday.
- Majority of tasks at the instrument goes well; there were pico motor issues with monochromator. 

HED:
- All activities are going well.

SCS:
- Not present.

SQS:
- Nothing special apart from the cabling company stuck in the gate.
Entry   Notes XO Integration Meeting 11.05.2020, posted by Frederik Wolff-Fabris on 11 May 2020, 14:53 
General Announcement:
- The proposed works on the Control network are fully organized for this week;
- Safety: The EuXFEL task force for the Covid-19 discussed this morning the safety issues here presented last Friday. 
On Mondays and Wednesdays there will be a SRP representative in this meeting to address related questions and on Fridays Tobias Haas will be attending. 
- General: there was a short notice from MKK2 regarding cooling maintenance in tunnels to be performed today. This short notice is a communication error. 
The task was a summer shutdown work anticipated to today and was not properly communicated. No EuXFEL group raised concerns to this activity taking place today. 
- General: 30% staff presence restrictions - so far it seems that this number is fine. Groups are encouraged to think if there is a need to increase this number,
especially in the instrument side. Please inform XO. 

CTRL:
- The tickets with requests to be carried out this week are all planned.
- Group is moving to more usual tasks with instruments and support groups.

DA:
- Planned activities are in progress.

EEE:
- There was no observed master time reset from the Desy side after the Covid-19 accelerator shutdown. 

VAC:
- Nothing to report.

XPD:
- Last week's planned activities went fine.
- It is agreed with VAC that on Wednesday one section of XTD9 will be vented, in preparation for an activity.

DET:
- Nothing special to report; DSSC pump/cooling issue is being taken care.

ITDM: 
- Nothing to report.

XRO:
- A test of a motor in a magnetic switch of a XTD6 mirror will be made this week - proper ticket will be send to CTRL.

LAS:
- SA1 PP-laser is OK; others are progressing. Work goes smooth.

SPB:
- Starting the instrument. All fine until now and this week there is a plan to test Detectors.

FXE:
- The works are going as planned.

MID:
- Continue with technical commissioning: activities under control.

HED:
- Nothing special - group placed tasks with Controls and also need help from EEE, all under control.

SCS:
- Minor issues while switching on the beamline: CTRL is informed and is taking care.

SQS:
- Ramping up the vacuum: so far all going well.
Entry   Notes XO Integration Meeting 08.05.2020, posted by Frederik Wolff-Fabris on 08 May 2020, 16:44 
General Announcement:

- Q&A session with SRP/Tobias Haas:
1. External companies have to provide self-assessment to show they have measures in place that comply with EuXFEL regulations on safety related to Covid-19. 
The EuXFEL online training is installed at the gate house and the companies have to make the Covid-19 training. EuXFEL groups have to inform the external companies.
Slides of the training will be provided to the groups for being send to the external companies.
2. One has to observe the maximum occupancy of each room and follow the EuXFEL training. If you stick to the max occupancy, you can work without masks in case minimal
distance is respected - otherwise mask is mandatory. For control hutches we admit only 2 persons. 
3. SRP finds a good idea and encourages instruments to implement additional measures for the hutches that e.g. cover use of tools, computers and/or disinfection 
procedures. 
Nevertheless, such extra local rules must not overrule the EuXFEL rules covered in the training. 
Extra regulations shall be printed and make available at doors, for example. Responsible for rooms and and hutches or local staff must make sure these additional
regulations are explained and followed. 
4. EuXFEL will not provide PPE to external companies.
5. Tobias will check with MB if EuXFEL has to provide PPE to DESY employees. In principle, EuXFEL applies the same rules as DESY.  
6. There is currently no decision on which rules apply to external visitors regarding the summer shutdown. We assume initially they will not be able to come. 
SRP encourages groups to send questions to health@xfel.eu and the Covid-19 task force will discuss the matter.  
7. There is no decision yet if the FFP-2 masks will be disposed after use or treated for re-use. Initially EuXFEL assume they will be disposed. 
It is yet unclear how long time a mask can be used before loosing efficiency. The slides presented at staff meetings contain suggestions in how to use the masks.

- General: There is no current issues to be discussed today regarding the tunnel access and related work;

- General: No issues have been pointed on the control network activities scheduled for next week. 
XPD must send to CTRL information on when a test of a shutter valve of gas supply will take place (still to be defined) in order to test the notification service. 

- The EPS work in SASE1 was rescheduled to next Friday and has been confirmed with XO and VAC.

- Please note that XTD1 will be closed from May 18th. Do not hesitate in contact XO in case of issues/activities affected due to this.



CTRL:
- Nothing out of ordinary to report; No issues concerning the re-start of instruments.

DA:
- Nothing to report.

EEE:
- SQS installation of cables will happen at beginning of next week, followed by FXE installation.
- EEE Technical side is doing onsite support for the instruments.

VAC:
- Making progress in the tunnels.
- A particle test on FFP2 masks was conducted and values are higher that the recommended in the clean rooms. 
Please use the normal multi-use protection in top of the masks.

XPD:
- Making progress in the tunnels.
- PES prototype chamber has been prepared. Next week (foreseen in the middle of the next week) XPD will bring it to the big clean room.
- Plans are up for next week.

DET:
- Nothing special.

ITDM: 
- Plan to make intervention with control group/server for short moment in a instrument.

XRO:
- Nothing to report, but please be aware of the particle free masks issue in the clean rooms (pointed above by VAC).

LAS:
- All 3 PP-laser are working. It remains some alignment but it not a showstopper.

SPB:
- Working with DET, EEE and CTRL to bring back systems - all going well so far.

FXE:
- Preparing for the installation of cables.
- Tasks to be done with EEE: new PLCs to be placed in the racks and to be powered on in the hutches.

MID:
- Fully under vacuum again. PLCs and motors are on and tested. Commissioning of experimental hutch ongoing.
- MID was in a full shutdown mode: it takes only about 3-4 days to place the full instrument in operation again.

HED:
- PP-laser and laser back.
- Split delay line is also OK.

SCS:
- Not present.

SQS:
- Progressing with the re-start of the instrument. 
- SQS has used the time to develop and improve the interlock system for the pre-vacuum. 
Entry   Notes XO Integration Meeting 06.05.2020, posted by Frederik Wolff-Fabris on 06 May 2020, 14:45 
General Announcement:
- SRP is invited and urged to participate in this series of meetings.
- Several groups have questions to the SRP regarding: 
1. Rules on access, training and work performed by external companies; 
2. Clarification in how to conduct work in the clean room among several groups; 
3. Distribution of PPE/Masks; 
4. Usage and disposal of masks; 
5. Procedure to work in the rack rooms; 
6. Hygienic rules in experimental hutches: disinfecting tools, computers, disposal of PPE.  
- Friday we will discuss next week plans and also CTRL activities for next week.

CTRL:
- No issues to report;
- Announcement: to reach OCD please use 6541 and 6542.

DA:
- Planning with instruments the support for coming weeks.

EEE:
- Ongoing with planned works;
- Cabling: SQS cabling will start on next Monday (EEE and SQS will organize the task). Afterwards the cabling installation takes place at FXE. 
The installation is done with external contractors - EEE needs clear information from SRP on the Covid-19 trainings and rules for external companies.

VAC:
- Working on the tunnels accordingly to this week's plan: 
1. small issues at XTD10: chamber does not fit and needs some re-work at external company; 
2. Preparations in XTD9 for IMG screen change. 
- No issues with distancing regulations;

XPD:
- No issues to report - working as planned: XTD6 installation of Hirex filter; XTD9 exchange of Imager screen.
- Unpacking and mounting the hard-Xray PES chamber.
- XPD needs clarification from SRP on work procedures in the clean room;
- After exchange of IMG screen, XPD needs to check functionality by moving motors. EEE and CTRL are aware and shall not be a problem.

DET:
- Going back on-site to work in the prep Lab.
- Usage of labs has to be coordinated among the groups.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- SA1 pump-probe laser re-stared; SA2 PP-laser is progressing;
- LAS needs answers from SRP on the regulations for external company which is coming this week.

SPB:
- Nothing to report: working as planned on re-start;

FXE:
- Started working in the control and main hutches. Group has plans for next two weeks and is organizing tasks together with DET and LAS.
- E-mail to health@xfel.eu is not answered. FXE will not allow external companies coming in unless if trained. 
- FXE has set own rules in how to use tools, disinfect tools and computers. FXE waits clarifications from SRP. 

MID:
- General progress accordingly to the plan: updates have been made; tests of motors are ongoing.

HED:
- Nothing to report;

SCS:
- Not present;

SQS:
- Started with checking vacuum systems.
Entry   Notes XO Integration Meeting 04.05.2020, posted by Frederik Wolff-Fabris on 04 May 2020, 14:20 
General Announcement:
- From today on there is no general restrictions in accessing the EuXFEL site: only consent of group leader is needed.
- Control Network activities: there is a sensible approach for this week and currently CTRL and XO do not observe issues needing discussions.
- Activities in tunnels start this week. We encourage the support groups to point any issue during this series of meetings or by sending an e-mail to xo@xfel.eu.

CTRL:
- A third training on the notification service will happen on Wednesday. Proper communication will be send around.

DA:
- Nothing to report.

EEE:
- Bringing up the systems.

VAC:
- Group members are on site to prepare activities. The main one this week is the installation of pre-shutter in XTD10. 
- Protective masks have to be picked up with SRP.

XPD:
- No incidents during last week. Two group members are currently working at EuXFEL site. 
Later additional staff will work on tunnels (e.g. on Hirex; on scintillator screen on IMG) and in the lab. 
- SRP has to provide protective equipment to the staff.

DET:
- Nothing to report.

ITDM: 
- We plan to perform tasks on the rack rooms and we are waiting for the SRP assessment.

XRO:
- Nothing to report.

LAS:
- Group has an on-site team who is switching on all lasers this week. 
An order for the re-start will be communicated after an evaluation of each system's condition.

SPB:
- Group has staff on site to start systems.

FXE:
- One team is onsite. The planned activities shall not involve other groups: re-starting systems and making tests in the control hutch.

MID:
- Plan is to bring the PLCs and electronics up.

HED:
- Starting lasers and split-delay line. Activities do not mix with other groups. 
- Group is coordinating with EEE for checking the rack rooms.

SCS:
- Not present.

SQS:
- Start being on site today and plans to re-start devices together with EEE.
- Also start setting up ion pumps (no need for VAC support).
Entry   Notes XO Integration Meeting 29.04.2020, posted by Frederik Wolff-Fabris on 29 Apr 2020, 17:28 
General Announcement:
- The Work on the Controls Network are progressing very nicely;
- Work in the tunnels: safety practices due to Covid-19 were covered in the staff meeting. 
The policy states that if two or more workers that are closer than 1.5m for longer than 15 min then both shall use FFP2 masks. 
If shorter than 15 min (whole day), workers can use surgical masks. 
- Work in tunnels with clean tents: in case of 2 simultaneous workers, by default they have to use PPE.
- FFP2 masks may not be suitable for clean room. More information will follow.
- For additional questions please contact SRP.
- Next Friday May 1st there will be no meeting. We resume this meeting series on Monday.

CTRL:
- Working on control network activities.
- Two trainings on the notification service were done. Another one will follow soon.

DA:
- Group is focusing in offline data analysis.

EEE:
- Normal OCD service will be open next week. However, there will be no OCD for micro-TCA issues. 
- Up to 4 PLC staff on site to support groups – EEE is asking groups to find out what type of onsite people will be needed.
- EEE colleagues from technical side will also be available on site.
- EEE colleagues from fast electronics in principle will not be on site, unless requested and planned (mostly are doing only home-support).
- We rely on the instruments plans. Please provide such information to EEE.

VAC:
- Preparing for the re-start activities.

XPD:
- Preparing for re-start activities.
- XPD will receive a VAC chamber from Italy today and next week the group will work on it.

DET:
- Preparing a plan for activities together with instruments.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Preparing to switch on the lasers on next week.
- LAS do not need micro TCA support if balcony room works for us. Group just needs to receive the master time from the balcony. 
EEE states that it shall be fine unless if things fails during the night. LAS comment in this case the laser will safely shutdown in the night.

SPB:
- A crashed loop will be taken care next week;

FXE:
- Nothing special to report.

MID:
- Preparing with EEE and CTRL for Monday re-start phase.

HED:
- Same as MID.

SCS:
- Preparing for next week.

SQS:
- Trying to start up and provide info to EEE.
Entry   Notes XO Integration meeting 27.04.2020, posted by Frederik Wolff-Fabris on 28 Apr 2020, 16:19 
General Announcement:
- The CTRL group has received 3 Control Network tasks that can be carried out this week;
- Requests from the groups to Tunnel activities from May 4th are being treated and an answer will come in the next couple of days. 
- With respect to Re-start activities XO/XML has 17 group submissions. We thank the groups to submit them. We have not spotted conflicts so far.
- In case of need to contact staff, please use the working mobiles, emergency phone list or group's mailing lists to address any issue.

CTRL:
- First training on the notification service with 5-6 people. Next training is scheduled for today.

DA:
- All good, doing progress without conflicts.

EEE:
- Nothing special; Group is working on the submission of tasks, to prioritize and make schedule for next week. 
- The group is requested to inform XO in case you have re-start tasks needed to be performed in tunnel.
- An electrical safety person will be provided on site by EEE to serve the instruments from next week. EEE is clarifying and shall respect the safety rules. 

VAC:
- Nothing special. Assembling for the tasks that can be done in tunnel. Also CTRL is involved. Progressing normally.

XPD:
- We have submitted the tasks and looking forward to coordinate with VAC, XRO, EEE to plan the tunnels tasks. 

DET:
- Same as XPD.

ITDM: 
- Nothing to report.

XRO:
- We sent re-start task list. The main problem is to evaluate what work can be done due to safety regulations in the case of complex installations.

LAS:
- We are preparing to switch SA1 on beginning of next week and other lasers will follow during the next week (PP and lab lasers). 
- SA2 may delay due to the needed presence of external company.

SPB:
- Nothing special to report; The group believes it has no activities in the tunnel;

FXE:
- Similar when compared to SPB;

MID:
- Preparing the start-up;

HED:
- Preparing for the start-up.
- HED will need people to switch on electric components on the racks.

SCS:
- Nothing special to report.

SQS:
- Nothing special to report. We are ramping up the vacuum system.
Entry   Notes XO Integration Meeting 24.04.2020, posted by Frederik Wolff-Fabris on 24 Apr 2020, 13:48 
Relaxation control network: 
- CTRL and XO remind the groups to submit the planned activities on e.g. scenes, projects, until Fridays. 
- For next week case: please limit any hardware change. Reason is the current limitation on the physical presence of staff. 
Groups will support only emergency and priority tasks. From May 4th the situation will be different. 
- However, we do not want to stop any progress on activities. This also includes work on Karabo that affects critical work like VAC in tunnels.

Tunnel access for the coming weeks:
- A scheduling plan will be made due to the restrictions of allowed people working on tunnel at the same time. 
Plan will be made in order to respect safety rules and minimize number of people working in tunnels. 
- Tunnel access will be a first agenda point from next week.

General:
- For next meetings, we will continue with the small report from the support and instrument groups.
- Tasks to happen in the hutches are decided by the groups. XO/PMO plan tasks in tunnels.
- We encourage groups to start as earlier as May 4th the tasks which were originally planned to be conducted during the summer shutdown. 
If it needs tunnel access, then one must respect the coming schedule.
- XO is looking together with Desy on all tunnel activities. A schedule is being prepared and will be communicated to the groups as soon as possible. 
- In case of delay of activities due to e.g. excess of people in tunnel, prioritization will be made together with XO and Desy.
Entry   Notes XO Integration Meeting 22.04.2020, posted by Frederik Wolff-Fabris on 23 Apr 2020, 10:04 
General Announcement:
- An e-mail was sent yesterday about the relaxation of restrictions on the control network.
- From now on, the XO integration meeting series will happen on Monday and Wednesday at 09:30 and Friday at 11:30.
- These meetings serve two purposes: 1.exchange of information for the re-start phase, and 2. Controls issues. 
- This procedure is set to help the re-start of activities coming from the super-restricted operation mode.
- Groups are asked to send by every Friday to controls-integration@xfel.eu a summary of activities to be carried out during the following week regarding the Control 
Network. 
This helps CTRL and XO to prepare and coordinate the full scope of activities while having an overview on actions that require large scale resources.
- For example, groups and staff who move motors have to be cautious, once reduced number of people will have access to debug devices in case they get stuck.
- This process could be reviewed in the course of next weeks. 

CTRL:
- Training for the Notification service: half of the groups have delegate people to attend it. Other groups please do so at the distributed Doodle link.

DA:
- Request that groups should inform DATA if people on site are required from next week.

EEE:
- Nothing major to report on micro-TCA and technical side.
- Cablings are ready to be installed when allowed to.

VAC:
- Preparing for the start-up.

XPD:
- Preparing for start-up.

DET:
- Same as VAC and XPD.

ITDM: 
- Preparing for start-up.

XRO:
- Nothing to report.

LAS:
- Work together with Desy last week.
- It is planned to test the laser pattern synchronization on next week if possible. 
An e-mail has to be send to controls-integration@xfel.eu with this request prior Friday 11:30AM XO Integration meeting.

SPB:
- Nothing to report.

FXE:
- Not present.

MID:
- Planning the re-start steps for May 4th.
- MID reminds that at least one person from the Safety groups shall attend this series of meetings.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Not present.
Entry   Notes Dispatch Meeting 20.04.2020, posted by Frederik Wolff-Fabris on 20 Apr 2020, 10:59 
General:
- Desy informed a power glitch occurred on Thursday 16th at 04:55AM. TS has not seen any traces of it in the EuXFEL internal GLT.
- From next week the Dispatch meeting will start at 09:30AM.
- An additional Friday's Integration Meeting will happen at 11:30AM. Proper information and invitation will be send soon.

CTRL:
- The notification service for the reduced operation mode is ready for start-up and an e-mail will be send around with instructions. 
- Groups/staff will be requested to subscribe to the lists.
- Training will be conducted on next Wednesday at 15:00 and/or next week. One member of each group is required to attend it.

DA:
- Nothing to report. Working busily from home.

EEE:
- No issues to report

VAC:
- Two pumps located in a gas attenuator were OFF due to the power glitch of last Thursday 16/04 at 04:55AM.

XPD
- No issues related to the power glitch were observed.
- XPD has received devices and they were successfully stored in vacuum / clean rooms. Another devices shall arrive this week.

DET:
- Nothing to report.

ITDM:
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Not present.

SPB:
- Nothing to report.

FXE:
- Not present.

MID:
- Everything is fine.

HED:
- All is fine, all is running.

SCS:
- Not present.

SQS:
- Not present.
Entry   Technical Integration Meeting 15.04.2020, posted by Andreas Galler on 15 Apr 2020, 09:03 

CTRL:

  • notificagion service device going to be tested this week
    • ITDM: SMS part is operational but needs to be implemented

EEE:

  • shutdown task list to be submitted today

VAC:

  • no one present

XPD:

  • shutdown task list submitted

DET:

  • nothing to report

ITDM:

  • nothing to report
  •  

XRO:

  • nothin to report

SPB:

  • VAC i

LAS

  • w

FXE:

  • shutdown list

MID:

  • shutdown list
  • Jörg and Jörn (EEE) align for shutdown task list

HED:

  • aligning with Jörn (EEE) on shutdown taks

SCS

  • working on shutdown list

DA:

Entry   Technical Integration Meeting 08.04.2020, posted by Andreas Galler on 08 Apr 2020, 08:45 

CTRL:

  • no bigger issues
  • announcement: inital simulation environment ready which can simulate BECKHOFF devices
    • shall be opened to all groups for karabo development

EEE:

  • continue work
    • shutdown task deadline may be too early
  • if people have CRs CRDs, cable issues please submit

VAC:

  • water pumps

XPD:

  • nothing to report

DET:

  •  

ITDM:

  •  

XRO:

  • nothing

SPB:

  • nothing to report

LAS

  • waiting for karabo policy

FXE:

  • nothing to report

MID:

  • nothing to report
  • two weeks deadline extensions like EEE, DET

HED:

  • nothing to report

SCS

  • shutdown list week extension

DA:

Entry   notes Dipatch Meeting April 6th, 2020, posted by Frederik Wolff-Fabris on 06 Apr 2020, 09:50 
CTRL:
- It was remotely observed that some cameras were consuming too much memory. By remotely re-starting these devices the issue was solved.  
- No calls to the OCD during the weekend.

EEE:
- No issues to report;
- Planning a meeting with Instruments/CTRL/DA to discuss long term tasks that have been working on during this reduced operation period.

VAC:
- Nothing to report; All running in good state.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM:
- Nothing to report.

XRO:
- After the recent power glitch: XRO has checked the basic parameters of special motors which presented problems in the past associated to power glitches;
- At this time, the main basic parameters remain OK (note that only few devices were checked - the ones which presented problems in the past);
- During the EuXFEL restart a deeper look on all devices has to be taken together with the instruments. 

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Nothing to report.

	 
Entry   Technical Integration Meeting 01.04.2020, posted by Andreas Galler on 01 Apr 2020, 09:19 

CTRL:

  • productive meeting with HED
    • CTRL will ask the other instruments if a similar concept could be agreed upon
  • discussion with LAS this afternoon with respect to the current hardware policy

EEE:

  • HED provided tasks that EEE shall do
  • uTCA development ongoing
    • review how digitizers are being used (fastADC, SPdevices, clock & Control)

VAC:

  • power glitch

XPD:

  • nothing to report

DET:

  •  

ITDM:

  • nothing to report, no indication of power glitch

XRO:

  • no indication of power glitch

SPB:

  • nothing to report

FXE:

  • nothing to report, problem to read out pressure values
    • Bernd Baranasic: no ion pressure readings on OGT1
      • in PLC it looks ok, but karabo shows 0
    •  

MID:

  • meeting with DESY safety colleagues wrt PUMA, going to be bundled with LDM safety
  • discussing with Bruno about digitizers
  •  

HED:

  • see CTRL

SCS

  • only valves in loop1 were closed
  • every few days a pump is failing, new behaviour
    • JG: comments it is a known behaviour that one of the gauges showed an erratic behaviour (wrongly set epsilon in karabo)
    • GM: answers, what happened on Saturday was slighty different

DA:

  •  

Entry   , posted by Andreas Galler on 30 Mar 2020, 08:57 

CTRL:

  • Broker Pile Up in 4 topics over the weekend
    • LAS affected in all topics, LA2 even twice
    • SPB affected once
  • mitigation startegy worked

EEE:

  • nothing to report

VAC:

nothing to report

 

XPD

  • vac systems in the lab had been secured --> secuvac valves installed plus webcams

DET:

  • nothing to report

ITDM:

  • exflgateway hardware problem on Saturday --> fixed

XRO:

  • nothing to report

SPB:

  • rough pump turned off, possibly lack of cooling water
    • interlock tripped --> pressures raised
  • were able to set remotely

FXE:

  • nothing to report

MID:

  • everything is fine

HED:

  • VAC is fine, ion pumps are on, no roughing pumps running

DA:

  •  

 

Entry   Technical Integration Meeting 25.03.2020, posted by Andreas Galler on 25 Mar 2020, 09:32 

Currently EuXFEL enforces a hand-off policy for instrument/tunnel hardware. That includes remote control of motors, pumps, etc.. as well as changing config files. If and when this policy is lifted will be communicated during Dispatch and Technical Integration Meetings. Please also don't hesitate and contact XO in case of any questions.

SPB:

  • instrument is fine in safe state.
  • anyone having a VAC monitoring script connected to an SMS service?
    • SH: comments that CTRL is working on that on a more general scope, but that needs a bit more time

FXE:

  • JungFrau checked and powered down.

MID:

  • everything is in a safe state.
    • Martin D. reported a VAC issue --> gonna be clarified
      • MD reports a spike in the VAC which might indicate a leak in a bellow

SCS:

  • VAC interlock closed
  • eplans for hRIXs electronics
  • MT wrote a rudimentary webservice for monitoring karabo stuff via a webbrowser --> not to be used until sanctioned by CTRL

 EEE:

  • general remark: EEE provides two key systems: utca, and PLCs
    • currently only PLCs for critical systems are covered by OCDs
    • however all other PLCs are kept running, but not necessarily fixed on-site
    • utca not critical --> thus no OCD for that

CTRL:

  • all systems running
    • limitations on karabo in the control network as stated in MB message --> finding out what that means for work on CTRL topics

ITDM:

  • everything working, dropbox for urgently needed IT equipment available

HED:

  • working on scenes / projects, recombining and cleaning up.

DA:

  • not present

XRO:

  • tunnel components secured, something on CRLs to be clarified with VAC

XPD:

  • everything is fine

VAC:

  • VAC in tunnel is stable
  • new software for vacuum pump carts developed and being rolled out

Entry   notes Dispatch meeting Mar 23 2020, posted by Andreas Galler on 23 Mar 2020, 08:57 

Currently EuXFEL enforces a hand-off policy for instrument/tunnel hardware. That includes remote control of motors, pumps, etc.. as well as changing config Files. If and when this policy is lifted will be communicated during Dispatch and Technical Integration Meetings. Please also don't hesitate and contact XO in case of any questions.

SPB:

  • reached safe state
  • rougning pumps still runnning and valves open
  • PLCs need to run for monitoring

FXE:

  • n

MID:

  • absolutely safe
  • cooling water connection
  • PLCs switched off

SCS:

  • S

 EEE:

  • MID switched off completely, all other PLCs are running
  • MID utca also shut down
  • Jörn, plenty of time for additional planning

CTRL:

  • broker logs ok from last weekend
  • ICI contacts are in discussion instruments

ITDM:

  • while instrument schutdown, network and servers are still running

HED:

  • safe state, all motors switched off ( parameters saved) all valves close, ion pumps are stil running.

DA:

  • work to do

XRO:

  • M1s parked on Friday, tunnel seems ok, lenses seem to be fine
  • small problems in the GUI,

XPD:

  • x-ray diagnostics had been secured last week, i.e. power ramped down. XGM vaccum needed.

FXE:

  • Jungfrau chiller switched on, AMPHOS shutter chiller
  • OGT3 no pump cart, ion pumps still running, gate valves closed

VAC:

  • V0 closed, OCD looking at vacuum twice a day, PLCs needed and running
Entry   Technical Integration Meeting 18.03.2020, posted by Andreas Galler on 18 Mar 2020, 09:26 

SPB:

  • interument parked
  • power cut --> someon needs to come in
  • NJ: what'S that status of the VAC
  • KC & RB: safe state, roughing system still running, in the event of a power cut this needs to be looked at

FXE:

  • nothing to report
  • NJ: VAC in safe state? --> MK yes everything is switched off

MID:

  • instrument parked, VAC is running but pumps will be stopped today and partially vented
    • gate valves are closed hopefully the VAC stays

SCS:

  • SCS in safe state, all pumps running
  • valves around KB are permenantly closed
  • in the event of a power cut all other gate valves will close
  • loop update done yesterday

 EEE:

  • preparation for safe state ongoing
    • discussed

CTRL:

  • is master timing going away or not?
  • if master timing goes down, some devices
  • ICI contacts identify what can be remotely done and what not
  • u

ITDM:

  • nothing special

HED:

  • HED is going to sleep within the next two days

DA:

  • focus on long standing tasks

XRO:

  • beam transport is going to be parked today
Entry   Notes Dipatch Meeting March 16th, 2020 , posted by Frederik Wolff-Fabris on 16 Mar 2020, 09:36 
FXE:
- Beamline is in safe state;
- Minor Jungfrau calibration issues over last week. In touch with DET and EEE;

SPB:
- Good exercise: experiment run with only 2 users. Successful beamtime with data taken: to be analysed by users;

MID:
- Successful beamtime with good beam conditions and data has been taken;
- Beamline is in safe state and most of staff is in telecommuting;

EEE:
- Start collecting a list of broad activities to take place in case of a long shutdown;
- No major issues to be fixed;

CTRL:
- Few cameras and detectors hiccups – e.g. DAQ re-start bring system back;
- Most of people will run from home office / telecommuting;
- Tests together with EEE/FXE still to be performed this week - to be scheduled;

DET:
- DET is placing a plan to warmed up detectors and be ready for shutdown;
- AGIPD, DSSC are already in safe mode;
Entry   notes Dipatch Meeting March 9th, 2020, posted by Frederik Wolff-Fabris on 10 Mar 2020, 12:44 
* Users are scheduled to be here this week (4 beamlines in user runs). SPB, HED, MID report several users have cancelled the travel. Beamlines are making mitigation plans 
to run experiments.

FXE:
- Setting up and working with detectors; Working with 4-bounds MONO; Von-Amos detector working;
- Jumps of beam position have been observed and have to be evaluated;
- Jungfrau detector crashed and DET was contacted;

SPB:
- Smooth run after new tuned up on Tuesday;
- Jump on beam position comes from mirrors;
- It was observed a change of number of bunches on Tuesday night: from 2 to 30 for example; XO comment: This time should be not considered as regular beam delivery and 
only parasitic use. Nevertheless, better information on what kind of changes the machine may perform during the shift can help for the future use of parasitic beam.
- AGIPB was successful; also preparation for users; Mitigated troubles with missing user;

SCS:
- Not present

SQS:
- Not present

HED:
- Solving issues with motors together with EEE last week;
- Hexapod vacuum feedthrough: missing flange has to be borrowed from another group  - still to be found;

MID:
- The Pump-probe laser test last week was very successful;
- Re-start of some devices was needed;
- For this week: reduction of user group from 11 to only 3 visitors. Beamtime is a continuation from last year's interrupted time due to the power outage. Local staff is 
mitigating missing users;

EEE:
- Nothing to report

CTRL:
- Nothing to report

ITDM: 
- Not present

VAC:
- Gas attenuator in SQS: not above 10.2 mbar - in investigation. A stress test has to be made and shall be agreed with BKR;

DET:
- Not present

LAS:
- Not present

XPD:
- Not present
Entry   notes Dispatch meeting Mar 2 2020, posted by Andreas Galler on 04 Mar 2020, 08:49 

SPB:

  • AGIPD improvement campaign great success
  • EEE --> 2nd C&C worked just fine

FXE:

  • BTM tests successful
  • Johann MDL motors should be in closed loop
  • JF CTRL device crashed

MID:

  • AGIPD Flat Fields done
  • Data Correction pipeline was down --> 1 day lost
  • PPLaser comm this week
  • extrafoam issues

SCS:

  • nothing to report

 EEE:

  • updates for SDL (MID)
  • fastADC issue --> don't take more than 40k samples; bugfix in progress

CTRL:

  • 8 OCD events
    • mostly deployment isues
    • FXE DA3 overload
    • old version of scantool @ SCS

 

 XPD:

  • unusual behaviour of beam pos measured with XGM
    • cross check done yesterday

ITDM:

  • DA crashes --> being investigated

HED:

  • tecnosoft terminal issue
    • motor ran into Ty limit (CCW) and got stuck due to tecnosoft logic

 

Entry   notes Dispatch meeting Feb 24 2020, posted by Andreas Galler on 26 Feb 2020, 09:06 

SPB:

  • nothing to report

FXE:

  • not present due to group retreat

MID:

  • Mono done, no severe issues from commissioning weekend

SCS:

  • not present

 EEE:

  • SQS pnCCD cables have been installed, waiting for crate to connect

CTRL:

  • two minor OCD call and one regarding AGIPD
    • SPB not aware that no support was scheduled for AGIPD

 

 XRO:

  • piezo karabo device and firmware in HED mono need to be checked for compatibility

ITDM:

  • 2 calls
    • derver down and restarted
    • data aggregator down and restarted
  • new RunConfig delpoyed at FXE

DA:

  • jupyterhub @SCS showing performance issues --> investigated by DA

 

Entry   notes Dipatch Meeting Feb. 17th, 2020, posted by Frederik Wolff-Fabris on 17 Feb 2020, 12:02 
FXE:
Nothing to report: no issues;

MID:
Delay line pumping down; Connecting all devices in preparation to be ready for Friday;

EEE:
Finishing SQS interlock scenes and SPB loops;
ELMO parameters lost themselves (in connection to XRO/Maurizio request). Parameters to be checked this week and next shutdown;
XPD ticket to be checked;
Cabling shall be started for SQS/SCS: waiting for open hutch;

CTRL:
Ticket from XPD (shared EEE/CTRL): dry run did not work at BKR: missing pieces. 
Please instruments check the systems during the day prior Friday when the Test Run starts;
Request from CTRL/Chris: Define guidelines for the users/support on the ticketing and e-log (who has responsibilities to check devices?).

ITDM: 
Ticked from XPD/Liuba: it is a ticket with link (?) to E-log.


* Mc2 motors: XRO needs a list of all motors in order to check configurations. Example: SA3 MONO pre-mirrors with torque set to zero; SA3 exit 
slits with wrong settings.

* CTRL reminds the instruments to check devices during working hours prior Friday when the Test Run starts with beam delivery.
Entry   Notes Dispatch meeting Feb 10th, 2020, posted by Frederik Wolff-Fabris on 10 Feb 2020, 10:12 
SPB:	Nothing to report;

FXE: 	Everything ongoing; nothing special to be reported;

MID:    Finalize motors of split and delay line; MID has to test interlock for vacuum loop update.

HED:	Commissioning of laser heat table. It may need assistance from EEE and CTRL during the week.

SCS:	Nothing to report - Last week's mounted setup will be disassembled in order to mount the standard setup for users;

EEE: 	OCD was called from XRO during beamline alignment of SA2: 1 BMPI motor had a problem and is under investigation - EEE reminds on the new homing position for 
negative direction motion.

CTRL: 	Following reset of train-ID and timing system for today.

XPD: 	Shifted Beam Pointing Studies from A. Koch to Tuesday. 

DET: 	Nothing to report

*machine is currently not running due to filter clean in the cold compressor. Shall be re-started this afternoon and by tomorrow must be lasing.
*Master time reset and train-ID reset this morning. Then EEE (check systems), followed by CTRL (karabo servers re-start) and ITDM (check DAQ operation). LAS and DET are 
informed.
*Wednesday: Network stress test with Cameras by CTRL on Wednesday 12:00-14:30.
Entry   notes Dispatch meeting Jan 20 2020, posted by Andreas Galler on 22 Jan 2020, 09:16 

SPB:

  • nothing to report

FXE:

  • MC2 library motor commissioning on-going

MID:

  • SDL motor parameters defined, however one crate is blocked by Wille and 6 motor connectors (Harting material) are still missing
    once fixed, motor paramaters can be uploaded
  • WCB (wall connection boxes) in otics hutch are partially finished

HED:

  • Wille is working on some crates and the respective Beckhoff loops are down for the moment
  • loop updates from Tuesday on

 EEE:

  • additional limit switched for XTD6 CRLs (MID) are being installed
  • HED is asking for limit switches on their XTD6 CRLs as well --> EEE and HED will investigate when and how
  • cable change in FXE starts this week with exchaging wrongly poled SHV cables

CTRL:

  • nothing to report

VAC:

  • nothing to report

XRO:

  • nothing to report

Entry   notes Dispatch meeting Jan 13 2020, posted by Andreas Galler on 15 Jan 2020, 09:09 

SPB:

  • Testing coordinated movement of Mirror motors with the MC2 lib on lemo drives
  • optics hutch vented accidentally vented but root cause is understood and vacuum had been reestablished

FXE:

  • XTD2 CRLs have encoder problems --> cables damaged --> repair strategy is being evaluated with EEE

MID:

  • SDL should enter the hutch by the end of January

SCS:

  • pulse (train) picker to be installed in the tunnel by the end of this week

 EEE:

  • FXE had been migrated to MC2 lib
    • motors need to be recalibrated
  • XTD6 motion part is to be migrated to MC2 lib
  • SQS gets interlock updates

CTRL:

  • busy with tunnel, additional support for XPD (imagers motion components)

Entry   Report of the Technical integration meeting , posted by Adriano Violante on 08 Jan 2020, 12:36 

SPB:

  • Coordinatd motion for MC2 motors is going to be rolled out by EEE soon.

FXE:

  • No issues to report.

MID:

  • SDL tests ongoing. 
  • All SDL cables have been installed and tested apart from 6 cables (still waiting for pins to be delivered). 
  • Various loops update and hexapod integration ongoing.
  • CRLs - EPS loop will be update probably this week. (involves position sensors in the y direction for CRLs in SASE2 and 1. To be done in the framework of the full beam operation project)

 EEE:

  • SA1 VAC loop update. Issues with the eplan export. Discussion ongoing with VAC and XPD.
  • SA2 MOV loop update for imagers MC2 motors. This week a meeting with all the stakeholder will be held (MID, HED, EEE, Controls) and a suitable date (during next week) for the update will be found. PMO will ask MDommach to provide some feedback on the Tunnel closing schedule. As soon as the feedback is available, it will be distrubuted through the readiness mailing list.
Entry   Report after tech. Int. meeting 09.30, posted by Adriano Violante on 18 Dec 2019, 10:06 

MID:

  • SDL tests ongoing. Important motors have been tested. Alignment of the mechanics with the alignment laser ongoing. Will be pumped over Christmas.

 EEE:

  • uTCA puppet migration: Instr. done. Tunnels and balconies probably will be updated at the beginning of next year.
  • SASE2 EPS loop will be updated probably today.
  • SPB/SFX is getting a new CPU.
  • Migration to MC2 motors has been agreed with controls, XRO, XPD. in XTD 6 XPD the upgrade will be done in KW2. For the rest a plan has to be made.

ITDM

  • Meeting this week ITDM/EEE/TS to discuss how to mitigate issues caused by accidents (e.g. cooling water interruption caused by power cut). 

Controls:

  • CY sent a mail several weeks ago to XO and the DH. The topic is emergency procedures during Christmas. No reply. CY announces that in the period 23.12-07.01 the Controls OCDs would not be available.

AoB

  • No dispatch meeting on 06.01. Next meeting will be the Technical Integration one on 08.01.
Entry   Report after dispatch meeting 09.00, posted by Adriano Violante on 16 Dec 2019, 09:28 

FXE:

  • uTCA update has been completed by EEE on Friday evening. Information will be passed to controls for the finalization.

SCS

  • The interlock system for the big sliding door has to be fixed. JTD is following up the issue with TS and SRP.
  • MT will talk to VAC to clarify how to go on with the train picker integration in the tunnel.

SQS

  • uTCA has been updated.
  • A channel in a digitizer is bisbehaving. The issue is being fixed.
  • Steinmeyer stages will be commissioned today with MS.

MID:

  • SDL tests ongoing
  • Hexapod controllers will be moved to the rackroom. Cables have to be pulled and only after the position of the controllers can be chosen.
  • Loop12 will be updated today by EEE

 EEE:

  • uTCA puppet migration: Instr. done. Tunnels and balconies probably will be updated at the beginning of next year.
  • SASE1 and 3 EPS loop will be updated probably today.
  • PLC in SPB with issues is being worked on.
  • Migration to MC2 motors has been agreed with controls, XRO, XPD. in XTD 6 XPD the upgrade will be done in KW2. For the rest a plan has to be made.

 XPD:

  • Some issue with the font size in the new Karabo GUI. Controls will have a look.

 Controls:

  • Karabo updates ongoing. SASE3 today until 13:00. SA1, 2 on Wed.
  • MC2 motors updates has been started also in FXE. 
  • SASE3: meeting with Lasermet for the integration of interlock signals in Karabo. Controls has handed over the scenes to the instruments that will optimize them.
  • firmware of the power supply for the AGIPD has to be updated urgently (by Wed.). CY sent a mail to AM. If no reply the power supplies will be switched off for the update.
Entry   Report after Tech. Int. meeting 09.30 , posted by Adriano Violante on 11 Dec 2019, 09:54 

FXE:

  • New optical table will be installed today. Access to the hutch could be limited.
  • The new Airbox installed by D3 is colliding with the sliding door. It might be problematic to bring the new laser table in. SRP informed. It is being followed up. 
  • uTCA update will be done on Thursday.

SCS

  • The interlock system for the big sliding door has to be fixed. JTD is following up the issue with TS and SRP. It is not so clear who are the main players so far.

MID:

  • SDL will be completed at the beginning of next week (inc. cables measurement).
  • SDL tests ongoing
  • Hexapod controllers will be moved to the rackroom. KS is waiting for the controller allocation in the racks in relation to the cables length from MFobian. 

 EEE:

  • uTCA puppet migration: in MID it has been done yesterday. Today SQS and SCS will undergo the update. Tomorrow HED and FXE. Next week tunnels.
  • 1 day has been requested to ITDM to clean up and re arrange uTCA related cablin in the balconies. ITDM has to come back to BF to define a date.
  • Update of loops in the tunnels are scheduled for next week
Entry   Report after dispatch meeting 09.00, posted by Adriano Violante on 09 Dec 2019, 09:22 

FXE:

  • No major issues.
  • Karabo will be updated to the version 2.7.0. on Friday.
  • uTCA update will be done on Thursday.

SCS:

  • it was forgotten to involve EEE in the PLC update of the train picker in the tunnel. Now the issue is solved.

MID:

  • SDL cabling ongoing.
  • SDL preliminary tests ongoing
  • Hexapod controllers will be moved to the rackroom. KS is waiting for the cables length from MFobian. 

 HED:

  • IC1: cheking of the encoder is going on with the help of EEE (Hazem Ali)
  • New interlock definitions for Loop 6 are giong to be delivered with some delay. NJ is informed.
  • Hexapod controllers will be moved to the rackroom. KS is waiting for the cables length from MFobian. 
  • XPD installed the diamond screens in the pop in monitors in the tunnel.

EEE:

  • uTCA puippet migration  will start today in the optical laser systems. Next weeks it is planned to do it in the tunnel (XPD is informed). Info mail will follow.
  • 1 day has been requested to ITDM to clean up and re arrange uTCA related cablin in the balconies. Info mail will follow.
  • SCS: new set of cables (microscope and others) will be ready for installation tomorrow.

Controls:

  • 13.12. Karabo 2.7.0 deployment will begin.
  • Normal motors will be upgraded to MC2. First tests are foreseen in MID tunnels. XPD and XRO are affected. XPD has been informed in this dispatch meeting. KS will inform MV (XRO). MS (EEE).
Entry   Summary of the technical integration meeting, posted by Adriano Violante on 04 Dec 2019, 14:18 

FXE

  • No major issues - PLCs update has been started by EEE (BB)

SCS

  • Hrixs and related components will be delivered on 13 and 14.01.2020. SCS is coordinating the works with TS in order to crane the chambers into the hall (collision with the scaffolding required for HED dipole laser)
  • Puls picker update in XTD10. Requires update of loops. EEE is not informed. JTD follows the issue up.

EEE

  • General work is ongoing.
  • Next week the EPS loops will be updated in the framework of the full beam operation project.
  • Issue with a PLC in SPB crashing after update to Win10. Beckhoff is working to a solution. If this does no work the PLC will be replaced.

Controls

  • A mail will be sent out early next week to announce th deployment schedule of the new Karabo release.
Entry   affected ITDM Systems after power cut tonight, posted by Andreas Galler on 28 Nov 2019, 15:42 

XHQ.E1.092

SW-HH-AL-271 was available
SW-HH-AL-272 came back after the DL switch was back (see below, ca 09:33)
SW-HH-AL-273 had to be power cycled and rebooted by NOC through console to come back fully (ca. 10:52).

 

SASE1 balcony room 38

restarted at 4am:
DELL servers:
exflprx03n0
exflprx04n0
exflprx112
exflpcl01n0 to 08n0
exflpcl18n0

 

SuperMicro servers:
exflonc09 to 12 (4-in-1 chassis)
exflong06

 

IBM ESS systems stayed off, as well as storage jbods
exfl-ons-​​​​​gs111 and 112
exfl-ons-gl111 and 112
exfl-ons-gl113 and 114

 

IBM server (hosting ems servers for OS installations) was off as well
exflkvm01

 

SuperMicro servers stayed off:
exflong03 to 05

 

juniper (management network) switch stuck at booting, power cycled, after long time finally came back, but we were lacking management network over whole site

 

SW-HH-AL-DL-07 (office network distribution layer) switch was stuck at booting, came back after power cycling. Some (not all) office switches were not available because of this, seemingly the failover between AL and DL didn't work. Both this switch and the (permanently available) ...DL-08 were correctly cabled to separate PDUs.
Second fuse in BR38 rack 7 was out and had to be pushed back in manually (made power redundant again).

 

SA1 tunnel:

exflcon08n0 restarted at 4am, but apparently switch in the tunnel was off till 10:30 and since that time the server was accessible

 

E0.604

All systems were affected. We need the clear statement from YS why the second line did not work.

 

DELL servers rebooted at 4am:
exflprx01n0
exflprx02n0
exflpcl51n0
exflpcl52n0
exflpcl53n0
exflcon03n0
exflcon04n0
exflcon05n0
exflcon150
exflcon153
exflcon156
exflcon157
exflons01 and 02
exfldaq01 and 02 (gitlab CIs)
exflst105 (karabo project db - development and labs)

 

IBM servers stayed off:
exflpcl54n0
exflpcl55n0
exflpcl56n0
exflpcl57n0
exflonc41
exflonc41

 

IBM ESS system stayed off:
exfl-ons-gs901 and 902
There are also several servers (proxmox, serving VM OnlyOffice) all rebooted at 4am

 

List of h/w failures:

exflpcl05 PSU dead

exflong04 and 05 PSU dead (in exflong04 was actually since yesterday after reboot for OS updates)

 

may not be related to power glitch

exflprx106 RAM DIMM error

Intel server:
exflonc21 to 24 (4-in-1 chassis) PSU dead

 

Entry   dispatch meeting Mon Nov 25 2019, posted by Andreas Galler on 27 Nov 2019, 09:25 

FXE: no issues

SPB: no issues

MID: Split & Delay line arriving on Friday, MID aims for a quick integration into instrument / beamline
         EEE informed to switch Hexapod motors from loop3 to loop 7

HED: changing loop1 (JJ X-ray motors) from open to closed loop operation

 

SQS: KB works, see sometimes spontaneous switching of end switch logics

EEE: MID, SPB, VAC loop updates running this week;
         no triggers for experiments available until end of power off work
         Jörn: cabling for MID is in full swing, for future installations first check phase 1 cabling, for non blocking
                                   HED: cabling
                                   SCS company Witte 30 ccables
                                   FXE: two CRDs not approved yet, no cabling during this shutdown

Controls:
 

Entry   Minutes of the Technical integration meeting 20.11.19 , posted by Adriano Violante on 20 Nov 2019, 10:12 

FXE

  • Wille was asked by D3 to pull new cables for the Pandora in FXE on 19.11.. This was not known by FXE. Will be discussed with Safety/DNölle.
  • Mono was fixed and is now ready for commissioning with beam

SPB/SFX

  • uTCA update planned for tomorrow#
  • Chris Blöm will leave the company next week. His tasks need to be re assigned.
  • Order of loops upgrade will be discussed with M.Stupar as soon as he is back.
  • The drag chain will be opened for cables re organization. HV cables will be also replaced by Wille . SPB/SFX will get the new HV cables from Sonay Sayar.

SCS

SQS

MID

  • Loop11 (AGIPD) needed. The task was not envisaged in the shutdown task list and is required by the detector group. Will be discussed with MS.
  • It has to be checked whether the delivery of the SDL is confirmed and the patch panels infrastructure is ready for cables installation.

HED

 

Optical lasers

VAC

XRO

XPD

DET

EEE

  • Power supplies - firmware update will be performed in the next days. Mail will be sent around.
  • Tming system update. No triggers will be available. Will be announced by mail.
  • uTCA CPUs migration. The CPUs stored valued will be lost. Karabo devices will need to be re installed. Karabo stored values will not be lost. Will be announced by mail.

Controls

  • The overnight and weekend OCD service will stop during the shutdown. OCD only available in the time 6:00 - 18:00
  • Karabo 2.7.0 deployment date for the tunnels is the 13.12.- Instruments to follow.

ITDM

SRP

TS

  • The power cut works will start at 6:00 in the morning. The electronics should ne put in a safe state the day before. 
  • TS can provide support for temporary light and powerr during the power cut periods.

AoB

Entry   Status report after tech. Int. Meeting 9.30, posted by Adriano Violante on 13 Nov 2019, 10:12 

FXE

  • Radiation tests ongoing.
  • EEE informs that the PLC drawings will be exchanged in the WS

SPB/SFX

SCS

SQS

MID

HED

  • During the first week of shutdown (KW47) the loop1 devices will be put into closed loop (e.g. for backlash compensation).
  • An electrical shutdown seems to be necessary to upgrade the protection against the power glitches, especially to protect the optical lasers. This is now planned for the 17/18.19 for SASE2 and similar dates for SASE1 and 3. AV will try to collect more information and come back to the instruments ans technical groups.

 

Optical lasers

VAC

XRO

XPD

DET

EEE

  • EEE needs the updated interlock definitions from VAC
  • The list of requested services during the WS is very long. NJ is trying to plan the works inside EEE and will come back to XO/PMO in case priorities have to be assigned. Also, late requests and changes are making things more difficult.

Controls

  • The overnight and weekend OCD service will stop during the shutdown. OCD only available until 18:00
  • Karabo 2.7.0 deployment date (now forseen for KW51) is being verified. More info to come.

ITDM

SRP

TS

AoB

Entry   Status report after dispatch meeting 09.00, posted by Adriano Violante on 12 Nov 2019, 09:49 

FXE

  • FXE – radiation tests and LPD tests planned for this week. Small issues with the scan tools are being addressed.

SPB/SFX

SCS

SQS

MID

  • First measurements with the pulsed magnet have been performed last week with the power supply installed temporarily in the experiment hutch. This week only the cryostat is going to be used. Next step will be to bring the magnet power supply in the rackroom to comply with the electrical safety requirements. MID will follow it up.

 

HED

Pptical lasers

VAC

XRO

XPD

DET

EEE

Controls

  • Many IT/controls services will be down in KW48 (shutdown)

ITDM

  • Server 13 for SCS will be down today.
  • General remark from Controls and ITDM: devices and functionalities (e.g. new devices in the DAQ, data aggregators…) that have not been tested during the normal working ours should not be used during shifts in the weekend or during the night. This creates a huge and evitable overhead for the people in OCD.

SRP

TS

AoB

Entry   Minutes of the Technical integration meeting 28.08.2019, posted by Adriano Violante on 28 Aug 2019, 10:33 

XO

FXE

  • Leak in the LPD cooling system has been found. DET on it. Ongoing
  • Laser went out of synch several time during the last weeks. Being addressed with the synch. group.
  • Mono middle layer is not working properly. Calibration parameters are not reloaded correctly after restart. CAS on it. Ongoing.
  • SA1 MOV loop has been updated. Minor issues with the CRL encoders are being addressed.

SPB/SFX

  • CSLITS - discrepancies between the behavior of normal motors vs MC2 motors. CAS on it. ==> will be fixed once Karabo 2.6.1. has been deployed.

SCS

SQS

MID

  • During last WE big issues with the AGIPD were experienced. Probably calibration pipeline related. DET on it.
  • Laser hutch A.07 is not supposed to be accessible in the next weeks because of the laser operation. SRP points out that they are not sure whether the interlocks are properly working and active. To be clarified offline between MID, HED and SRP.

HED

  • Access to the experiment hutch, Optics and Rackroom will be restricted this week due to laser shots tests.

Optical lasers

VAC

XRO

  • Change of middle layer devices for the attenuator in SASE2 will be discussed offline with CAS

XPD

DET

EEE

  • Loops are being updated in coordination with the instruments.

CAS

  • 2.6.1. ready to be deployed. Deployment schedule has been agreed with individual groups.

ITDM

  • Maxwell cluster maintenance on 2-3. 09.
  • Control PCs wil be deployed during the shutdown week
  • Claoud service (DESY platform) will be put into operation. An official announcement will details will follow.

SRP

TS

AoB

Entry   Report after dispatch meeting 09.30, posted by Adriano Violante on 26 Aug 2019, 09:52 

XO

  • Today a test of the fire alarm system will take place. Mail has been circulated by SRP.
  • From next monday the dispatch meeting time slot will change to 8.30. Chair will be with XO.

FXE

  • Leak in the LPD cooling system has been found. DET on it.
  • Laser went out of synch several time during the last weeks. Being addressed with CAS.
  • Mono middle layer is not working properly. Calibration parameters are not reloaded correctly after restart. CAS on it.

SPB/SFX

  • CSLITS - discrepancies between the behavior of normal motors vs MC2 motors. CAS on it.

SCS

SQS

MID

  • During last WE big issues with the AGIPD were experienced. Probably calibration pipeline related. DET on it.

HED

  • Hirex 2 commissionig ongoing.
  • Mono commissioning - cameras were found not to work. CAS/EEE to check.
  • Access to the experiment hutches will be restricted this week due to laser shots tests.

Optical lasers

VAC

XRO

  • SASE1 FEL imager was damaged following the last power cuts and EPS/MPS issues. Will be replaced by Thursday.

XPD

DET

EEE

CAS

  • 2.6.1. ready to be deployed. Deployment schedule has been agreed with individual groups.

ITDM

SRP

TS

AoB

Entry   Minutes of the Technical integration meeting 21.08.19 , posted by Adriano Violante on 21 Aug 2019, 11:15 

XO

  • A review of the procedures in case of power failure is in progress. Thanks to everybody for the efforts during the last days.

FXE

  • Remote control of the radiation shutter dows not work. IP of the new computer is needed. Will be solved offline between FXE, CAS and ITDM. ==> Done for FXE. Small issues being fixed for MID.

SPB/SFX

SCS

  • Support from EEE is needed to make sure motors needed for the user experiments in 2 weeks are actually working (e.g. Elmo). ==> fine tuning of the support plan will be made between SCS and EEE.

SQS

MID

  • DPS turbo pump issue. A software workaround exists. The problem is that the used controller has not been commissioned firmwarewise before. This is not a showstopper and wil be addressed later. ==> The cabling is done differently. EEE is testing the device + firmware. ==> Ongoing

HED

  • The smaract stages with the current firmware can be either driven fast or precise. EEE will discuss with the isntruments involved how to modify the stages implementation to be able to have both options available.

Optical lasers

VAC

XRO

  • There was an issue with a drift of the HED mirror. As a consequence, VAC and XRO have switched of the mirror cooling. HED and MID should report about the change of the situation. ==> still exchange of information needed. ==> Measurements from MID have been received. HED will do the same. Investigation of the problem will happen next week (shutdown)

XPD

DET

  • Calibration database haes been migrated. If problems are experienced please send a ticket to DET.

EEE

  • Loop updates in the tunnels and instruments being scheduled together with the involved groups.

CAS

  • 2.6.1. being prepared.  Deployment plan is still valid.

ITDM

SRP

TS

AoB

Entry   Report after dispatch meeting 09.30, posted by Adriano Violante on 19 Aug 2019, 11:11 

General

  • Still recovering from the power loss occured on Saturday (The primary line was affected). In the hall the power was down for about 30 minutes, while in the tunnels it seems it was only a glitch.
  • It is clear that it was a major system failure. Optimization of procedures and responsibility will be discussed within the DOD.

FXE

  • Issues with the acquisition of images fromt he Jungfrau detector with the last version of Karabo. DET to follow it up offline.
  • There are concerns about the replacement of the simple motor with the MC2 library, in particular about whether all functionalities will still be available (e.g. step-up/down). According to EEE this should be okay. CAS has already release the new library for testing. ==> will be done in thw WS for FXE, later for th tunnels and the other instruments.
  • Remote control of the radiation shutter dows not work. IP of the new computer is needed. Will be solved offline between FXE, CAS and ITDM.

SPB/SFX

  • Hexapods are being integrated. ==> This was rescheduled due to the issues with hexapods at HED and MID. Currently, there is no dire need to integrate the SPB/SFX hexapod, it can be run from TwinCAT. ==> postponed.

SCS

  • Support from EEE is needed to make sure motors needed for the user experiments in 2 weeks are actually working (e.g. Elmo).
  • If issues with the pulse IDs occur, AS, PG and BF are to be contacted (part of the trigger board)

SQS

MID

  • DPS turbo pump issue. A software workaround exists. The problem is that the used controller has not been commissioned firmwarewise before. This is not a showstopper and wil be addressed later. ==> The cabling is done differently. EEE is testing the device + firmware. ==> Ongoing
  • Vacuum interlock worked fine following the power failure.
  • Recovering from the power failure. Definition of check list in progress.

HED

  • Recovering of Loop 9 is ongoing (motors fpor Mono1 and 2). EEE is supporting.
  • Jungfrau has been fully recovered. Epix in progress.

Optical lasers

VAC

XRO

  • There was an issue with a drift of the HED mirror. As a consequence, VAC and XRO have switched of the mirror cooling. HED and MID should report about the change of the situation. ==> still exchange of information needed.

XPD

DET

  • In general, it seems that no major issues occured after the power loss. 
  • In FXE the power supply and the chiller for the LPD are connected on different power lines and this lead to the fact that, after the power came back, the power supply was back on while the chiller was off. This should be avoided anc hecked by the instruments.

EEE

CAS

  • 2.6.0. being prepared. ==> Sneak peak was deployed in SPB/SFX. Actual deployment datas can be found in the Shutdown planing, will be discussed in the chapters and with the SASE responsibles. ==> tests with ITDM being planned.

ITDM

SRP

TS

AoB

Entry   Minutes of the Technical integration meeting 14.08.2019, posted by Gerd Wellenreuther on 14 Aug 2019, 10:01 

XO

  • On Monday at around 12:20 there was a power glitch at least in Hamburg, affecting the machine.
  • In this cause, the startup was delayed due to a missing signal from the Vacuum EPS-MPS-interface. The signal had to be manually enabled again.
  • Tuning is estimated to take until 14:00 today.
  • In the wake of such events a lot of communication about the machine status is happening. In the future, XO will ensure the readiness mailing list will be updated, too. In this respect, P. Gessler suggested to rethink / rename the multitude of mailing lists inherited from the construction phase.

FXE

  • There are concerns about the replacement of the simple motor with the MC2 library, in particular about whether all functionalities will still be available (e.g. step-up/down). According to EEE this should be okay. CAS has already release the new library for testing.

SPB/SFX

  • Hexapods are being integrated. ==> This was rescheduled due to the issues with hexapods at HED and MID. Currently, there is no dire need to integrate the SPB/SFX hexapod, it can be run from TwinCAT.

SCS

  • There is an issue with the main sample stage. SCS and SEC are working on it, will continue with commissioning the instrument.

SQS

  • Loop 14 will be updated today.

MID

  • DPS turbo pump issue. A software workaround exists. The problem is that the used controller has not been commissioned firmwarewise before. This is not a showstopper and wil be addressed later. ==> The cabling is done differently. EEE is testing the device + firmware.

HED

  • Loop 13 has been commissioned.

Optical lasers

VAC

XRO

  • There was an issue with a drift of the HED mirror. As a consequence, VAC and XRO have switched of the mirror cooling. HED and MID should report about the change of the situation.

XPD

  • During an intervention in XTD1 the LED for the Self-Seeding setup was replaced.

DET

EEE

CAS

  • 2.6.0. being prepared. ==> Sneak peak was deployed in SPB/SFX. Actual deployment datas can be found in the Shutdown planing, will be discussed in the chapters and with the SASE responsibles.

ITDM

SRP

  • The primary door of the HED experiment is currently not guarded with a magnet against incidential opening of the door leading to a trip of the machine. KWitt has to redo some cabling, until then, users can set the laser interlock, which will engage the magnet.

TS

  • Controller for the hexapod is currently in the MID control room. UBrueggmann should check the installation.

AoB

  • Please check the shutdown planning
  • No dispatch meeting on Friday.

Entry   Status report after dispatch meeting 12.8., posted by Gerd Wellenreuther on 12 Aug 2019, 09:50 

XO

FXE

  • XTD1 CRLs: There is an issue regarding a limit switch, to be repaired in the shutdown by MKnoll + EEE.

SPB/SFX

  • Master loop has to be updated. EEE to agree offline with SPB/SFX ==> has been fixed
  • Hexapods are being integrated. ==> was supposed to be tackled today. But since both HED and MID experienced different issues with their hexapods, the commissioning at SPB/SFX has to rescheduled (Tuesday?)
  • Micro KB encoders + beam are drifting away, so closed loop operation would stabilize things... has to be commissioned, foreseen for Wednesday. Users start at Thursday...
  • A microscope got stuck on a limit switch. Probably the limit switches have to be rewired.
  • An encoder in loop 11 seems to be missing. EEE is on it...

SCS

  • Since Sunday there appears to be an issue with the in-vacuum sample stage. Is kind of urgent...

SQS

  • Last week: Commisioned the laser
  • This week: Users & night shift

MID

  • There is an issue with the hexapod, EEE is on it.
  • Chris is testing some cooling / heating using peltier elements.

HED

  • Train IDs are missing in loop 5 and 10. EEE is on it, too.

Optical lasers

VAC

XRO

XPD

  • There is probably an intervention in XTD1 to repair a camera for the self-seeding setup. Others might want to jump on the train. Time is not yet decided.

DET

EEE

CAS

  • Test for 2.6. are ongoing.

ITDM

SRP

TS

AoB

Entry   Minutes of the Technical integration meeting 07.08.2019, posted by Adriano Violante on 07 Aug 2019, 11:55 Technical_Integration_Meeting_07.08.2019_-_Copy_(4).pptx

XO

The accelerator is now working at 2.25 MHz. Kicker can be used. DET informs that for repetition rates different to the ones been used so far the calibration can be significatively different.

FXE

SPB/SFX

  • Hexapods are being integrated. 
  • Master loop has to be updated. EEE to agree offline with SPB/SFX

SCS

SQS

  • Commissioning of smaract stages done. 1 encoder cable is being checked (seems a problem of definition).

MID

  • DPS turbo pump issue. A software workaround exists. The problem is that the used controller has not been commissioned firmwarewise before. This is not a showstopper and wil be addressed later. 

HED

Optical lasers

VAC

XRO

XPD

DET

  • Offline calibration update has been performed in SCS. Tests are foreseen for today.

EEE

  • A new karabo device updating the digitizers with the beam parameters in real time has been successfully tested last week.

CAS

  • 2.6.0. being prepared.

ITDM

SRP

TS

AoB

The dispatch/tech. integration meetings will be re organized in the near future. Slides are attached.

Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 05 Aug 2019, 10:19 

XO

FXE

  • Photon3 detector has been fully implemented.

SPB/SFX

  • Some issues reading the encoders of the JJ XRay CSLIT. EEE checks whether similar issues are also present in other instruments. ==> has been fixed.

SCS

SQS

MID

  • 2 Motors have to be checked: Rotation of the hexapod and the y motion of the AUX3 are needed for next week.
  • DPS turbo pump 3 behaving strangely. EEE to have a look
  • Loop 7 has to be updated. Offline discussion MS/JH

HED

  • Grating holder motion HED OPT. Motors to be commissioned. EEE required
  • Cable needed for the Jungfrau timing signal. KS BF to discuss offline.

Optical lasers

VAC

XRO

XPD

DET

EEE

CAS

ITDM

SRP

TS

AoB

 

Entry   Info on dispatch meeting 09.00, posted by Adriano Violante on 02 Aug 2019, 09:10 

The meeting did not take place since only EEE was attending.

Entry   Minutes of the Technical integration meeting 31.07.19 , posted by Adriano Violante on 31 Jul 2019, 10:46 

XO

FXE

SPB/SFX

  • Loop 12 has to be updated ==> Done.
  • SASE1 M3 issues with the pitch motor lead to FXE losing beamtime. EEE to follow it up. ==> Basically fixed. Some remaining issues will be fixed during the shutdown week in August.
  • Some issues reading the encoders of the JJ XRay CSLIT. EEE checks whether similar issues are also present in other instruments.

SCS

SQS

  • Commissioning of smaract stages ongoing.

MID

  • By the end of the week MID should send the requirements for the vacuum interlock to EEE. ==> tests are ongoing. AS will organize a meeting with CAS, VAC and EEE to define a test procedure to be followed by the instruments when testing the vacuum interlocks. ==> to be done.

HED

  • New update of Loop 6 will be done propably today after new interlock definitions have been delivered.
  • Hexapod: Loop 9 has been updated. Loop 7 to follow.

Optical lasers

VAC

XRO

XPD

DET

EEE

  • Crash of PLCs because of not a number values. The fix on the PLC side requires the update of the loops framework and can be done only in the August shutdown. By the end of the week a filtering tool will be availbale in Karabo.==> Karabo client has been deployed in the tunnels and FXE. The other instruments will get it during the August shutdown.
  • XPD reported some issues with digitizers for MCPs. It should be fixed already by now.

CAS

  • CAS received host alerts regarding sa2-br-sys-con-1, sa2-br-sys-con-2, sa2-br-sys-con-5 resources usage. To avoid the worst issues during experiments, we will do maintenance on these machines today from 12:00 to 14:00.
  • CAS/SQS working on karabo scenes to display the LaserMet laser isnterlock status.

ITDM

SRP

TS

AoB

  • RBean reported that by the end of the week a macro will be run by HSinn to decouple machine interlocks in SASE1 and SASE3. For more details AGaller should be addressed.
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 29 Jul 2019, 10:16 

XO

FXE

SPB/SFX

SCS

SQS

MID

  • Nanocube being used with the scan tool. 
  • Cleanup and preparation for the next experiments ongoing
  • VAC interlock has been tested due to an accidental trigering of a vacuum valve. Some dcetails will need to be fixed.

HED

  • Loop 6 will be updated as soonas the new interlock definitions will be available. KS will talk to HED and EEE to make sure vacuum systems are safe during the update.
  • Loop 7 and 9 will be updated today.

Optical lasers

VAC

XRO

XPD

DET

EEE

 

CAS

  • Crash of PLCs because of not a number values. Karabo client is now available to filer NaN values.
  • 2.5.1. available. FIxes a bug for cameras (restricted ROI), and GUI machines. 

ITDM

  • Some issues with the GPFS will results in slowness of the system. Has been fixed.
  • Cleanup of the GPFS during the weekend. Petabytes of data have been recorded. This may reduce the time in which the data is available on the GPFS for the next user runs. 
  • Xfel gateway will be shut down for a short time today around lunchtime. JS will send a mail to readiness with the precise time.

SRP

TS

AoB

Entry   Status report after dispatch meeting 09.00, posted by Adriano Violante on 26 Jul 2019, 14:07 

XO

FXE

SPB/SFX

SCS

SQS

MID

  • Nanocube being used with the scan tool. Seems fine. Some test of the velocity scan has to be done (CY will coordinated with MID)
  • Exapods have been integrated. Some feedback from TF is needed for EEE to complete the hand over.

HED

  • Loop 6 will be updated next week. KS will talk to HED and EEE to make sure vacuum systems are safe during the update.

Optical lasers

VAC

XRO

XPD

DET

EEE

  • Crash of PLCs because of not a number values. The fix on the PLC side requires the update of the loops framework and can be done only in the August shutdown. By the end of the week a filtering tool will be availbale in Karabo. ==> Filter is ready and can be deployed on Monday.

CAS

ITDM

  • Some issues with the GPFS will results in slowness of the system. This is being investigated and probably already fixed today.

SRP

TS

AoB

Entry   Minutes of the Technical integration meeting 24.07.19 , posted by Adriano Violante on 24 Jul 2019, 10:54 

XO

FXE

  • DAQ issue reported (data not being recorded). Comment from ITDM is that this was a miro issue solved with the re initialization of the proposal. More details will eb discussed offline.==> issue fixed (it was due to a misconfiguration in the DAQ server)

SPB/SFX

  • Loop 12 has to be updated
  • SASE1 M3 issues with the pitch motor lead to FXE losing beamtime. EEE to follow it up.

SCS

SQS

MID

  • By the end of the week MID should send the requirements for the vacuum interlock to EEE. ==> tests are ongoing. AS will organize a meeting with CAS, VAC and EEE to define a test procedure to be followed by the instruments when testing the vacuum interlocks.
  • Calibration server for mid has memory problems and needs to be replaced. Calibration pipeline has to be moved to a different servers. Will be discussed offline with MID.==>

HED

  • Yesterday the loop 6 was updated. There were issue with pumps switching off and causing overhead for HED. PG will investigate why this happened... ==> the procedure was clear to EEE and foresaw the switching off of the pumps at some point. This was supposed to be clear also to the instruments buy clearly it was not the case. 
  • Nanocube PLC has been integrated.

Optical lasers

VAC

XRO

XPD

DET

EEE

  • Crash of PLCs because of not a number values. The fix on the PLC side requires the update of the loops framework and can be done only in the August shutdown. By the end of the week a filtering tool will be availbale in Karabo.

CAS

  • Karabo 2.5.1. hotfix is being prepared (Fixing 2 bugs in the framework and several GUI issues). ==> Done
  • Tomorrow at 14:00 there will be a test of the pulse on demand feature (conditional triggers) in FXE. (AS/BF) ==> Done

ITDM

  • Calibration server for mid has memory problems and needs to be replaced. Calibration pipeline has to be moved to a different servers. Will be discussed offline with MID.==> It is ongoing. In general this issue led to a loss of beamtime for MID. Alessandro suggests that in case of hardware failure there should be a joint ITDM-CAS decision/effort on what to do.
  • Data migration: it was slow in the past days due to some script not being used for safety reasons. This is being fixed. Hovewer, due to the queue of old data to be migrated it will take some more time until full performance will be reached. 

SRP

TS

AoB

Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 22 Jul 2019, 12:42 

XO

FXE

  • DAQ issue reported (data not being recorded). Comment from ITDM is that this was a miro issue solved with the re initialization of the proposal. More details will eb discussed offline.
  • Contact person for EEE is now Timo Korsh (deputy is Paul Frankenberger)

SPB/SFX

SCS

SQS

MID

  • Vacuum interlock tests have been (almost completely) performed
  • ITDM OCD was quite busy last week because of some DAQ instabilities. MID/ITDM to discuss offline.
  • CY and RS are working on the nanocube scan device, BF needed today at 13:00 for futher trigger tests.

HED

  • Commissioning ongoing.
  • Problems with data migration: to be discussed with ITDM
  • Epix DAQ issue: solved restarting the server.

Optical lasers

VAC

XRO

XPD

DET

EEE

  • Some issues were reported from NK about motors in SASE1 M2. EEE will need to have a look.
  • Some OCD calls concerning errors from encoders (due to cabling issues)
  • Conditional trigger test in SASE1 was successful.

CAS

ITDM

  • Calibration server for mid has memory problems and needs to be replaced. Calibration pipeline has to be moved to a different servers. Will be discussed offline with MID.
  • SASE3 data migration issues: has to be checked by ITDM
  •  

AoB

Entry   Status report after dispatch meeting 09.00, posted by Adriano Violante on 19 Jul 2019, 10:48 

XO

FXE

SPB/SFX

SCS

SQS

MID

  • Vacuum interlock tests should be done on Monday.. 
  • CY and RS are working on the nanocube scan device, also operated with an external trigger signal. CAS/MID/EEE technical discussions happen offine.

HED

  • main loop has to be updated on Monday in order to ensure proper implementation of the interlock signals.
  • Hexapod controls are needed: KS wrote an EEE ticket. EEE will coordinate with KS and M.Makita. 

Optical lasers

VAC

XRO

XPD

DET

EEE

  • SQS smaract motors commissioning being supported
  • There is an issue in the PLC firmware for the scroll pumps. Update needed. Will be scheduled and coordinated with the intruments.

CAS

ITDM

AoB

Entry   Minutes of the Technical integration meeting 17.07.19 , posted by Adriano Violante on 17 Jul 2019, 10:05 

XO

FXE

SPB/SFX

  • 2 screens require the intervention of EEE today. Being agreed offline.

SCS

SQS

​​MID

  • XRO will agree with MID which functionalities of the attenuators in XTD1 have to be tested. 'to do list' will be issued. XRO will put the results in the operation logbook. If XRO will not make it to test everything, MID will be informed and will help. ==> Ongoing
  • M2 bender: motor issue. HSinn is following it up.
  • By the end of the week MID should send the requirements for the vacuum interlock to EEE. ==> tests are ongoing. AS will organize a meeting with CAS, VAC and EEE to define a test procedure to be followed by the instruments when testing the vacuum interlocks.

HED

  • Lase is fully integrated in Karabo now.
  • Yesterday the loop 6 was updated. There were issue with pumps switching off and causing overhead for HED. PG will investigate why this happened...

Optical lasers

  • SA1 PP laser: the damage is worst than expected. More info to come.

​VAC

XRO

  • M1 in SASE2 and 1 will be commissioned this week end. New positions will be found and written diwn in the logbook. Difference of some mm with respect to the old positions is expected.

XPD

DET

​EEE

CAS

  • Karabo 2.5.1. hotfix is being prepared (Fixing 2 bugs in the framework and several GUI issues).
  • Tomorrow at 14:00 there will be a test of the pulse on demand feature (conditional triggers) in FXE. (AS/BF)

​ITDM

​SRP

TS

AoB

  • People are reminded to send XO/PM the shutdown activities by the 2.08.
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 15 Jul 2019, 10:01 

XO

FXE

SPB/SFX

  • After the loops update the MPS signals have to be tested. The plan is to start today. (AS+EEE support is required)

SCS

SQS

​​MID

  • The VAC interlock tests performed on Friday showed some unexpected behavior of the system. ==> have been almost 100% fixed.
  • hexapods can be controlled by Karabo now.
  • Servo motor drivers are now in the EEE lab and would be needed asap in MID to start commissioning. Could happen this week already.

HED

  • High power laser being aligned to bring beam into the HED experiment enclosure. ==> It was not possible to bring the laser into the hutch apparently because of some communication problems with safety. 
  • Mirror s could not be aligned for HED during the WE because of a crash of the MOV loop. This was due to a NaN delivered to the plc instead of a motor position. This problem has been fixed with the last loop update, which was not implemented in the XTD6 MOV loop yet. It will be discussed with EEE, MDommach and L.Samoylova whether to perform the update now.
  • EEE should return the nanocube controllers as soon as possible for commissioning.
  • Hexapods remote controls needed.

 

Optical lasers

  • the status of the SASE1 PP laser is not yet clear.

VAC

XRO

XPD

DET

  • Karabo 2.5.0 update OK. 
  • Online calibration tools will be available for MID and SPB/SFX starting from tomorrow.

EEE

CAS

  • Not a number values  can be filtered by karabo. AS will have a look at that. 

ITDM

SRP

TS

AoB

  • Mail has been sento to the STGL and readiness mailing list. Deadline is the 2.08. for the delivery of the info to XO/PM
Entry   Minutes of the Technical integration meeting 10.07.19 , posted by Adriano Violante on 10 Jul 2019, 16:16 

XO

  • In SASE3 the apertures of the GATT have to be realigned. The upstream apertures have been alreadz realigned. The downstream ones will be probablz realigned tomorrow. If not succesfull some restrictions of the operation have to be evaluated. ==> Done.
  • Turnstile issue: 2 days ago the hall was not accessible for some hours because of non functioning turnstiles. The problem was a change in the desy firewall configuration that lead to the transponders system not working. 

FXE

  • Loops update has to be coordinated between EEE and FXE. No feedback received from EEE. AG will remind TKorsh. Still pending.

SPB/SFX

  • No major issues
  • BB is coordinating the loops update with SPB/SFX

SCS

  • No Major issues
  • Loop1 has been updated

SQS

  • Aerosol will be commissioned next week. EEE waiting for the precise dates.==> Still waiting.

​​MID

  • XRO will agree with MID which functionalities of the attenuators in XTD1 have to be tested. 'to do list' will be issued. XRO will put the results in the operation logbook. If XRO will not make it to test everything, MID will be informed and will help.
  • XTD 6 will be closed tomorrow after lunch. CY points out that there is a list of issues to be fixed in XTD6 (e.g. motors not working) and many people in CAS are ill, hence, not available, NJ checks with MS and CY sends the list to EEE.
  • By the end of the week MID should send the requirements for the vacuum interlock to EEE.

HED

  • The monochromator can be cooled down now. The vacuul is still not optimal but the device is operable,.
  • Today loop 3 will be updated.

Optical lasers

VAC

XRO

  • M1 in SASE2 and 1 will be commissioned this week end. New positions will be found and written diwn in the logbook. Difference of some mm with respect to the old positions is expected.

XPD

DET

  • Tests with Karabo 2.5.0 OK.

EEE

  • Electrical safety regulation. From the beginning of July the new electrical safety regulation is supposed to be in place. According to this regulation the work at the back of the racks in the XHEXP1 and in the entire racks in the tunnels can only be done by certified EFK (Elektrofachkraefte) or by EUPs with an additional training. The additional training can only be provided after summer. The nomination of XFEL EFKs is suffering a delay due to the fact that is not clear who should nominate them (TS, UBR, HR?).  PG reported the problem and also the fact that no official statements were made in the past concerning the topic. THaas is trying to clarify the status, and come up with a statement and proposal in the Operations meeting. ==> there was no meeting on Friday. Still pending. ==> implementation of the electrical safety regulation has been postponed to the end of the year (mail from SRP).

CAS

  • Deployment of Karabo 2.5.0 has been completed

ITDM

SRP

TS

AoB

 

 

Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 08 Jul 2019, 10:25 

XO

FXE

  • Loops update has to be coordinated between EEE and FXE. No feedback received from EEE. AG will remind TKorsh. ==> TK will discuss the topic in the FXe group meeting today and contact EEE.

SPB/SFX

SCS

SQS

​​MID

  • The VAC interlock tests performed on Friday showed some unexpected behavior of the system. Change request is being prepared to fix these (minor) issues.
  • Quadrant motion tests foreseen for this week

HED

  • Tunnel installations have been completed
  • VAC final leak tests today
  • High power laser being aligned to bring beam into the HED experiment enclosure
  • In the optics hutch a new grating is being installed.

 

Optical lasers

VAC

  • All tunnel closed apart from XTD9 and 6

XRO

  • An encoder for the mirrors in SASE1 shows an error. This is known. XRO will notify EEE if they want to have special actions taken.

XPD

DET

  • Karabo 2.5.0 update OK. Update of the calibration system still has to happen for all the detectors apart from DSSC

EEE

CAS

  • On Friday many requests were sent to CAS about final checks needed for commissioning of the components. Priorities have to be set since CAS does not have the resources to deal with all of them.
  • Data loggers for HED will be brought online today.
  • In the 2.5.0 the MPODs were moved to the new configuration. MPC and PES have also been updated. XPD knows that in the standard configuration 0V is set as voltage target since the old values probably were not making sense anymore. A summary/update mail will be sent by CY to readiness@xfel.eu today.

ITDM

SRP

TS

AoB

Entry   Status report after dispatch meeting 09.00, posted by Adriano Violante on 05 Jul 2019, 09:54 

XO

FXE

  • Loops update has to be coordinated between EEE and FXE. No feedback received from EEE. AG will remind TKorsh. ==> Nothing was received by EEE.

SPB/SFX

SCS

SQS

​​MID

  • Loops required are all up and running.
  • RSchaffer is working on the SDL coordinated motion simulation.

HED

Optical lasers

VAC

  • SASE1, 3 and MID ready for beam
  • HED mono is leaking. Fix hopefully today.
  • For the monos in SASE2 a loop update is required before switching the power supplies on. EEE will tray to do it today.

XRO

  • An encoder for the mirrors in SASE1 shows an error. This is known. XRO will notify EEE if they want to have special actions taken.

XPD

DET

  • Karabo 2.5.0 update OK.

EEE

CAS

  • Karabo 2.5.0 will be deployed in HED and SASE1. So far no major issues in the other beamlines.

ITDM

SRP

TS

AoB

 

 

Entry   Minutes of the Technical integration meeting 03.07.19 , posted by Adriano Violante on 03 Jul 2019, 10:18 

XO

  • In SASE3 the apertures of the GATT have to be realigned. The upstream apertures have been alreadz realigned. The downstream ones will be probablz realigned tomorrow. If not succesfull some restrictions of the operation have to be evaluated.

FXE

  • Loops update has to be coordinated between EEE and FXE. No feedback received from EEE. AG will remind TKorsh. 

SPB/SFX

  • Loop updates continue.
  • Loop 8 will be commissioned on monday with EEE.

SCS

SQS

  • Aerosol will be commissioned next week. EEE waiting for the precise dates.

​​MID

HED

  • Suffered overhead due to the power cut occured on Monday.

Optical lasers

VAC

  • All XTDs apart from XTD 6 and 9 will be closed on Monday
  • XTD6/9 will be stay opened until Tuesday. Confirmation will be given during the dispatch meeting on Monday.
  • XTD1,2 ready for beam formt he VAC point of view
  • XTD6 -  mono works ongoing.
  • XTD9 -  Maybe worls planned by FXE on the gratings. To be double checked whether it is feasible.

XRO

XPD

DET

EEE

  • Electrical safety regulation. From the beginning of July the new electrical safety regulation is supposed to be in place. According to this regulation the work at the back of the racks in the XHEXP1 and in the entire racks in the tunnels can only be done by certified EFK (Elektrofachkraefte) or by EUPs with an additional training. The additional training can only be provided after summer. The nomination of XFEL EFKs is suffering a delay due to the fact that is not clear who should nominate them (TS, UBR, HR?).  PG reported the problem and also the fact that no official statements were made in the past concerning the topic. THaas is trying to clarify the status, and come up with a statement and proposal in the Operations meeting. ==> there was no meeting on Friday. Still pending.

CAS

ITDM

  • Additional CAT connections planned for SQS, FXE, SCS were installed and approved by ITDM.
  • During the maiinenance of the cooling water system the doors of the balcony rooms and racks were left open to cool down the electronics. Although in the past that worked, it is no longer the case. ITDM will discuss with MKK2 how to make the cooling of the balcony rooms more efficient during planned mainenance of the cooling water system or in case of emergency.

SRP

TS

AoB

On Monday Torsten Schoen informed AV that the power went off in MID and HED experiment hutch because of the radiation interlock test. This was due to the fact that according to the original plan (circulated and approved at the beginning of May), the SASE1 test was supposed to happen on Monday and the SASE2 test the day after. On monday, SASE1 system was accordingly bridged to avoid issues with the power. A last minute change in the plan was agreed between MID and MPS but the info unfortunately did not reach Torsten, hence the issue. Also, nobody from SRP, D3, HED was timely informed. 

There was obviously a lack of communication that has to be improved. AV will write a report and circulate it to the involved people for review and provide it to the MB.

 

Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 01 Jul 2019, 10:07 

XO

FXE

SPB/SFX

  • Detector tests are running this week. Before working on loops or around the detectors the SPB/SFX team should be asked/informed.
  • The SPB/SFX team is on retreat on Thursday and Friday.

SCS

  • Pulse IDs written by detector digitizers are recorded inconsistently by the different instruments. Some discussions have started to improve the situation and work is ongoing, but no target date is known. Right now the people working on this topic are BF, AS, KW, PG. A Karabo data guy should be also involved. The progress should be tracked in the Wednesday meetings.

SQS

MID

  • Loop 7/11 need to be updated. Already coordinated with EEE.
  • Loop8 is needed (remote control of the vac system).

HED

  • Works in the tunnels will resume this week.
  • Commissioning of the Amplitude laser is ongoing. The goal is to bring the optical laser beam into the hutch this week. There might be radiation involved, but HED is working together with SRP to define all the needed steps.
  • This week radiation interlock tests are foreseen with D3. 

Optical lasers

VAC

XRO

XPD

DET

EEE

CAS

  • 2.5.0 will be deployed in SA3 tomorrow and probably in SA2 on Wed (depends on the outcome of the SASE3 deployment). 

ITDM

SRP

TS

AoB

Entry   Status report after dispatch meeting 09.00, posted by Adriano Violante on 28 Jun 2019, 11:25 

XO

FXE

SPB/SFX

  • AGIPD: Modules OK. Additional tests with data acquisition planned for next week
  • AGIPD: Online preview of the modules position will be implemented next week when AS is back.

SCS

SQS

MID

HED

  • Works in the tunnels will resume after the end of the interlock tests. 
  • Commissioning of the Loop 8 is ongoing.
  • It is pointed out that the access to the tunnels is not managed in a transparent way and is difficult to get reliable information. AV will bring the concern to the XO and  DOB.

Optical lasers

VAC

XRO

XPD

DET

EEE

  • The issues with the encorder of the quadrant motion motors are caused by the fact that the encoder cables are too long (30m until the drag chain + 30 m in the drag chain). Right now a workaround exists (cable ground connected to the general ground). Final solution has to be found.
  • MPS Box  for timing. Some Cpus have to be reboot. No timing problems are expected. In case, BF will send an e mail to readiness.

CAS

  • 2.5.0 will be deployed in the tunnels starting from next week

ITDM

SRP

TS

AoB

Entry   Minutes of the Technical integration meeting 26.06.19 , posted by Adriano Violante on 26 Jun 2019, 10:22 

XO

From now on A. Galler will join the technical integration meeting. Therefore the XO field has been added. 

FXE

SPB/SFX

  • Detectors has been moved in the new position. MOV tests have been done. Today the detector modules will be swapped.
  • EEE started the deployment of the updated Loop4 which now supports the MC2 motors. 
  • Loop 5 has been updated yesterday.

SCS

SQS

  • AVC3000 leak controller from Pfeiffer. EEE will release the controls today. ==> Ongoing.

MID

  • Integration of the LDM: next steps of the risk assessment: SRP is reviewing it, AMadsen has to sign it, then JHallman will call for a meeting with tin involved parties (e.g. EEE) for the implementation.
  • Quadrant motion system test revealed some issue with the cables shielding. Issue is being tackled.

HED

  • Loop 11 being set up by EEE. Start Today or tomorrow.
  • Loop8 commissioning ongoing.

Optical lasers

VAC

  • Requested to see the first pump + valve of SPB/SFX ==> definitions still needed by EEE == Ongoing.

XRO

  • M1  in XTD6 is closed and pumped (10^-7 mbar range).  
  • XTD2 SA1 M1n closed and pumping. Leak test next week.
  • Self seeding mono in XTD1 is now closed and pumping but the vacuum level is not yet satisfactory.
  • After the last Karabo restart some devices are not working and this should be fixed before the end of the shutdown. Robert is the contact person in CAS and will follow the issue up.
  • CRL in XTD2 maintenance has been completed.

XPD

DET

EEE

  • The timing uTCA will be switched off on the 24.06 between 9 am and 5 pm. ==> there are some issues with different versions of power supplies. EEE on it.
  • Electrical safety regulation. From the beginning of July the new electrical safety regulation is supposed to be in place. According to this regulation the work at the back of the racks in the XHEXP1 and in the entire racks in the tunnels can only be done by certified EFK (Elektrofachkraefte) or by EUPs with an additional training. The additional training can only be provided after summer. The nomination of XFEL EFKs is suffering a delay due to the fact that is not clear who should nominate them (TS, UBR, HR?).  PG reported the problem and also the fact that no official statements were made in the past concerning the topic. THaas is trying to clarify the status, and come up with a statement and proposal in the Operations meeting.

CAS

  • Release cycle for the next Karabo version in progress.

ITDM

  • At 10 today the doors of the balcony rooms and racks will be opened due to short interruptions (20 minutes per tunnel) of the cooling water from DESY. This should not cause any issues. If the pomps intervention will require more time, the ITDM racks will be switched off. 

SRP

  • From SBP/SFX: Currently, it is not clear what to do if one of the Pandoras goes off. This apparently happened @ FXE on the night from Sat.-Sunday, and it took 12 hours to fix it. Update from SRP: Occasionally Pandoras trigger radiation alarms. It is not clear why. One possibility is that this is caused by electronic noise. Discussions with D3 are ongoing. Right now an expert is needed to reboot the system since it is not a simple off/on procedure, but data has to be analysed. There is a a document in preparation by SRP/D3 that will allow more people to be able to perform this procedure, but it is not ready yet. A side note is that there is no OCD agreement in place for these experts and the reboot is done on the best effort level. ==> Z.Ansari will be also able soon to reboot the system. ==> The issue will eventually be put up for discussion in the operation board. Statement from SRP is that there are nnot enough people to ensure an OCD service.
  • Racks in HED outside the rackroom. They are too high and the top cannot be reached. SRP/JE/SRP will follow the issue up. ==> A solution has been found: TS will modify the existing movable stairs.

TS

AoB

Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 24 Jun 2019, 09:53 

FXE

  • CRLs mainteinance has been completed.

SPB/SFX

  • Some power sockets are not active. NReimers will contact TS.
  • Detectors has been moved in the new position. MOV tests have started. Tomorrow detector modules will be swapped.

SCS

SQS

  • Some Harting connectors have been plugged in the modules. TB will make sure NRennhack informed JEilers. 1 beckhoff module has still to be modified (according to a CR not yet implemented)
  • Some labels are not correct. NR is discussing with EEE
  • AVC3000 leak controller from Pfeiffer. EEE will release the controls today.
  • Vacuum interlocks. BB is working on it this week.

MID

  • Schutdown activities basically on schedule
  • Bias system tests have been done
  • This week R. Schaffer and J.Hallmann will work on the ALAS
  • Quadrant motion system test will start this week. ASilenzi is the product owner.
  • For next week vacuum interlock tests are foreseen

​​HED

  • It is not clear whether the tunnels are accessible or not. They should not be accessible. SK asks SRP and AGaller.
  • This week cooling system works for the M2 are being executed. Hi res mono will follow.

Optical lasers

VAC

XRO

  • M1  in XTD6 is closed and pumped (10^-7 mbar range). How to proceed with the second mirror is being discussed 
  • XTD2 SA1 M1n works have been initiated. Now stopped because of the interlock tests. Will resume next WE.
  • Self seeding mono in XTD1 is now closed and pumping but the vacuum level is not satisfactory.
  • After the last Karabo restart some devices are not working and this should be fixed before the end of the shutdown. Robert is the contact person in CAS and will follow the issue up.

XPD

DET

EEE

  • Timing will not be available due to maintenance until 5pm, as announced last week.

CAS

  • Tests of Karabo 2.5.0. are ongoing (integration PLC/DAQ). 

ITDM

  • AoB
Entry   Status report after dispatch meeting 09.00, posted by Adriano Violante on 21 Jun 2019, 10:13 

FXE

SPB/SFX

  • An AC device in the control room leaks. TBartsch has been informed.
  • Some issues with pumps going off during the power glitch yesterday have occured.
  • Power has come back after the interlock tests.
  • Loops updates are being coordinated with EEE. No major issues.
  • Detectors has been moved in the new position. MOV tests will follow and pumping down the system is foreseen for middle of next week.

SCS

SQS

  • Power back. Testing of equipment ongoing.
  • Loop9. PLCs are reachable but not the temrinals. EEE will check.
  • Interlock communication issue. EEE will reboot the master loop.
  • Some Harting connectors have to be plugged in the modules. NRennhack will discuss the details with EEE.

 MID

​​HED

Optical lasers

VAC

XRO

XPD

DET

EEE

  • Due to the power glitch yesterday some uTCA crates in the rackrooms had problems (despite the redundant power lines). This was caused by the firmware not being able to deal with these type of instabilities of the mail power line. The crates are now working again and a new version of the fw will be updated to avoid these issues in the future. In addition, the uTCA crates in the hutches do not get redundant power lines, this means that they went off  and should be checked to make sure they are working properly.

CAS

  • Tests of Karabo 2.5.0. are ongoing (integration PLC/DAQ). HS will give a report on Monday about the tests and the preliminary deployment schedule.

ITDM

  • Some servers require fw updates. JS will send a mail to readiness@xfel.eu with the details.

AoB

Entry   running jdd panels in control rooms, posted by ITDM Admin on 01 Apr 2019, 10:29 

​​​​​On all PCs in the control rooms including BKR and also on the exflgateway there is a new version of jddd installed which is working with openjdk-11.
It is worth to mention that the old javaws from old oracle java 8 is deprecated and it is not recommended running jddd panels using old way, like
javaws jddd-run.jnlp

The recommended way, is to run it on the control PC (if you are in the control room), you don't need to login to exflgateway and start it there anymore, although this is also possible.

To start a svn repository selection window just run
jddd-run

To start a panel of a given name from http repository just type for instance
jddd-run -http XFELMainTaskbar.xml

To start a panel from svn repository just type for instance
jddd-run -file XFELMainTaskbar.xml
 

In case of question contact it-support@xfel.eu

Best

Janusz

    Reply   Re: running jdd panels in control rooms, posted by ITDM Admin on 19 Jun 2019, 16:33 

Regarding the recent announcements from doocs/jddd people about running jddd application I post here a short summary:
- running jddd with oracle java 8 via java webstart will be no longer possible as of 10.07.19
- on all control PCs in the instruments control rooms, BKR and exflgateway the new jddd was already in use since March, as described in the previous entry
- today the jddd was updated to version 2.12.10-2, which includes openjdk-12 (control PCs will be automatically updated during night)

On Windows 10 you can install Jddd using Software Shop (Netinstall).

Best, 

Janusz
 

ITDM Admin wrote:

​​​​​On all PCs in the control rooms including BKR and also on the exflgateway there is a new version of jddd installed which is working with openjdk-11.
It is worth to mention that the old javaws from old oracle java 8 is deprecated and it is not recommended running jddd panels using old way, like
javaws jddd-run.jnlp

The recommended way, is to run it on the control PC (if you are in the control room), you don't need to login to exflgateway and start it there anymore, although this is also possible.

To start a svn repository selection window just run
jddd-run

To start a panel of a given name from http repository just type for instance
jddd-run -http XFELMainTaskbar.xml

To start a panel from svn repository just type for instance
jddd-run -file XFELMainTaskbar.xml
 

In case of question contact it-support@xfel.eu

Best

Janusz

 

Entry   Minutes of the Technical integration meeting 19.06.19 , posted by Adriano Violante on 19 Jun 2019, 10:55 

FXE

SPB/SFX

  • No major issues
  • Starting from the end of this week to the beginning of next week the hutch will not be accessible because of works on the AGIPD.

SCS

  • No big issues

SQS

MID

  • Integration of the LDM: Risk assessment has been finalized and uploaded in the IPW system. Next steps: SRP will review it and forward it to A.Madsen for the signature. PGessler is in the loop. JHallmann will call for a meeting with all the parties involved (e.g. EEE) in the implementation once the risk assessment has been signed by AM.

HED

  • Due to missing endswitches / interlock conditions, some YAG-screens have been burnt. HED would like to try to get this fixed in the tunnels and the hutches still in this shutdown by installing endswitches etc., to be negotiated with EEE ==> Software limit switches can be implemented already next week if the definitions are delivered to EEE by the end of this week. ==> definitions still missing.
  • Loop 11 being set up by EEE

Optical lasers

  • SASE1 timing system will be updated today.

VAC

  • Requested to see the first pump + valve of SPB/SFX ==> definitions still needed by EEE

XRO

  • Installation of the cooling system for the M1 mirror in SASE2 has been completed.
  • SASE1 XTD2 M1 being addressed now. 

XPD

DET

EEE

  • The timing uTCA will be switched off on the 24.06 between 9 am and 5 pm. No train ID and timing wil be available.

CAS

  • Release cycle for the next Karabo version in progress.

ITDM

  • New version of the Jddd should be used. Details will be forwarded to the readiness mailing list as soon as available.

SRP

  • From SBP/SFX: Currently, it is not clear what to do if one of the Pandoras goes off. This apparently happened @ FXE on the night from Sat.-Sunday, and it took 12 hours to fix it. Update from SRP: Occasionally Pandoras trigger radiation alarms. It is not clear why. One possibility is that this is caused by electronic noise. Discussions with D3 are ongoing. Right now an expert is needed to reboot the system since it is not a simple off/on procedure, but data has to be analysed. There is a a document in preparation by SRP/D3 that will allow more people to be able to perform this procedure, but it is not ready yet. A side note is that there is no OCD agreement in place for these experts and the reboot is done on the best effort level. ==> Z.Ansari will be also able soon to reboot the system. No additioanl news.
  • Test panel to test the different alarms will be mounted in the hall soon.
  • After the safety walk in SPB/SFX some issues have been found (e.g. concerning the Biolab, Rackroom) and forwarded to A. Mancuso. SRP and AMancuso will follow the issues up.
  • Racks in HED outside the rackroom. They are too high and the top cannot be reached. SRP/JE/SRP will follow the issue up.

TS

AoB

Entry   Report after dispatch meeting 09.30, posted by Adriano Violante on 17 Jun 2019, 10:43 

FXE

  • Floor is being re-worked. Experiment hutch is not accessible until Wednesday. After that only accessible for walk until next Monday. 

SPB/SFX

SCS

SQS

  • It was asked by TBaumann when is the power coming back. It should be on Thursday.  The details must be asked to TSchön. AV will ask TS to send a mail to readiness when the power is back in a stable way.

 MID

  • Updates in the tunnel being agreed with EEE. CRLs should be updated today and the MOV loop latest on Wednesday.

​​HED

Optical lasers

VAC

XRO

XPD

DET

EEE

  • During the power down a heating up of the uTCAs was observed, in the XHEXP1 as well as tunnels. The reason is not clear. Now the situation is back to normal. ITDM checks the situation in the servers racks.

CAS

  • Deployment schedule for Karabo 2.5.0. has been discussed in CAS . Deployment is foreseen to start on the 1st week of July.

ITDM

AoB

Entry   Status report after dispatch meeting 09.00, posted by Adriano Violante on 14 Jun 2019, 10:47 

FXE

SPB/SFX

  • Getting ready for the shutdown. No relevant issues.

SCS

SQS

  • PLCs have been switched off. Parameters have been saved.
  • GATT loop update will happen on tuesday. The schedule of the other loop updates are being agreed with EEE.

 MID

​​HED

  • Due to missing endswitches / interlock conditions, some YAG-screens have been burnt. Software limit switches will be implemented probably next week. Definitions have been provided by Karen Appel to EEE.
  • Instrument PLCs also switched off.

Optical lasers

VAC

XRO

  • HED mono has been opened and the crystal analized. The crystal shows radiation damages. XRO is discussing with HED to understand how to proceed. Since it its not yet clear why the damages happened, it would probably make sense to continue using the same cristal sending the beam to a different region.

XPD

DET

EEE

  • PLC Powering down in SPB SFX is being performed today.
  • Several loop updates are being planned and organized.

CAS

  • Gain curve device has been commissioned with and approved by L. Samoylova.
  • New structure for the CAS contacts to the instruments has been prepared by HSantos. He will send a mail around with the details.

ITDM

AoB

Entry   Minutes of the Technical integration meeting 12.06.19 , posted by Adriano Violante on 12 Jun 2019, 12:40 

FXE

SPB/SFX

SCS

SQS

MID

  • Integration of the LDM: Safety document is needed. ==> This is needed ASAP!!! ==> J. Hallmann is now back and he is in contact with SRP ti finalize the documentation. The statement from MID is that until the documents are finalized no automatic movement of the detector is foreseen.

​HED

  • Due to missing endswitches / interlock conditions, some YAG-screens have been burnt. HED would like to try to get this fixed in the tunnels and the hutches still in this shutdown by installing endswitches etc., to be negotiated with EEE ==> Software limit switches can be implemented already next week if the definitions are delivered to EEE by the end of this week.

Optical lasers

​VAC

  • Requested to see the first pump + valve of SPB/SFX ==> definitions still needed by EEE

XRO

XPD

DET

EEE

  • Improvement of the communication concering loop updates with the XRO has to be achieved. Mails have been sent by PGessler to the STGL and by NJardon to the relevant people. Loops updates already planned for next week in SASE2. Coordination with the involved people ongoing.

CAS

ITDM

SRP

  • From SBP/SFX: Currently, it is not clear what to do if one of the Pandoras goes off. This apparently happened @ FXE on the night from Sat.-Sunday, and it took 12 hours to fix it. Update from SRP: Occasionally Pandoras trigger radiation alarms. It is not clear why. One possibility is that this is caused by electronic noise. Discussions with D3 are ongoing. Right now an expert is needed to reboot the system since it is not a simple off/on procedure, but data has to be analysed. There is a a document in preparation by SRP/D3 that will allow more people to be able to perform this procedure, but it is not ready yet. A side note is that there is no OCD agreement in place for these experts and the reboot is done on the best effort level.

TS

​AoB

Entry   Report after dispatch meeting 09.00, posted by Adriano Violante on 07 Jun 2019, 11:53 

FXE

SPB/SFX

  • few days of beamtime remaining, no particular issues
  • preparing for emergency power off
  • preparing shutdown activities with EEE

SCS

  • XGM (VAC part) is supposed to run even despite the emergency power off ==> M. Teichmann is in contact with T. Schoen (TS)

SQS

  • preparing for shutdown, in particular some cabling together with EEE. Ongoing.

 MID

  • Integration of the LDM: Safety document is needed. ==> This is needed ASAP!!! ==> SRP is informed and JH will follow the issue up.

HED

  • Due to missing endswitches / interlock conditions, some YAG-screens have been burnt. HED would like to try to get this fixed in the tunnels and the hutches still in this shutdown by installing endswitches etc., to be negotiated with EEE ==> Only softwere limit switches can be implemented. EEE will follow it up.
  • The bias tee used by HED are not being supplied any more, new ones are not performing ==> to be checked with other instruments / EEE, Sato-san was suggested as another expert to ask.

Optical lasers

VAC

  • Requested to see the first pump + valve of SPB/SFX ==> to be clarified by VAC, SPB/SFX + EEE ==> The VAC OK signal has to be used as interlock signal. EEE on it.

XRO

XPD

DET

EEE

  • Improvement of the communication concering loop updates with the XRO has to be achieved. The idea is to approach the problem in 2 stages. In the first stage a time table with the loops update will be distributed by EEE and agreed with the component responsibles. Due to that, the responsibles have to be clarified. The GLs have been already informed. In the second stage EEE will try to automate the notification system when an update is required.

CAS

  • 2.5.0 being developed. 

ITDM

SRP

  • From SBP/SFX: Currently, it is not clear what to do if one of the Pandoras goes off. This apparently happened @ FXE on the night from Sat.-Sunday, and it took 12 hours to fix it.

TS

  • From CAS: TS should not rely on email alerts to monitor the cooling of the servers running for example the email services...

AoB

Entry   Minutes of the Technical integration meeting 05.06.2019, posted by Gerd Wellenreuther on 05 Jun 2019, 09:59 

FXE

SPB/SFX

  • few days of beamtime remaining, no particular issues
  • preparing for emergency power off
  • preparing shutdown activities with EEE

SCS

  • beamtime, no particular issues.
  • preparing for shutdown
  • XGM is supposed to run even despite the emergency power off ==> M. Teichmann is in contact with T. Schoen (TS)

SQS

  • beamtime, first scattering images taken using the pnCCD!
  • preparing for shutdown, in particular some cabling together with EEE

 MID

  • Integration of the LDM: Safety document is needed. ==> This is needed ASAP!!! ==> THIS IS STILL NEEDED!!!

HED

  • CAS was able to follow up regarding the request for test of triggering / pulse on demand from this Monday. HED was kind of lucky, CAS would appreciate some further notice next time...
  • Due to missing endswitches / interlock conditions, some YAG-screens have been burnt. HED would like to try to get this fixed in the tunnels and the hutches still in this shutdown by installing endswitches etc., to be negotiated with EEE
  • The bias teeth(???) used by HED are not being supplied any more, new ones are not performing ==> to be checked with other instruments / EEE, Sato-san was suggested as another expert to ask.

Optical lasers

  • everything fine, thanks for the support!

VAC

  • Requested to see the first pump + valve of SPB/SFX ==> to be clarified by VAC, SPB/SFX + EEE

XRO

XPD

DET

EEE

CAS

ITDM

SRP

  • From SBP/SFX: Currently, it is not clear what to do if one of the Pandoras goes off. This apparently happened @ FXE on the night from Sat.-Sunday, and it took 12 hours to fix it.

TS

  • From CAS: TS should not rely on email alerts to monitor the cooling of the servers running for example the email services...

AoB

Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 03 Jun 2019, 12:57 

SPB/SFX

  • No major issues.

FXE

  • Tool to save motor positions is not working reliably. ==> CAS + AE have different tools on different levels. There is not automatic / global restoring of for example motor positions from the CAS-side available. BUT in the shutdown motor position should not be lost, unless there is a true power outage also affecting the CPUs. ==> Issues are being addressed.

​​SQS

  • Plan for this week is to combine the use of pnCCD and cluster source and make proper mesurements. The CCD measured already X-Rays in 10 Hz mode.

SCS

  • No Major issues

MID

  • No Major issues

HED

  • Beam drifts on the minute scale. The issue could be minimised with a karabo routine in use at FXE (mirrors feedback).
  • Dark images acquired with the jungfrau were not correct due to overheating. It has to be checked by HED whether the issue was solved.
  • Request to trigger the epix and jungfrau detectors via pulse on demand feature and scan tool. Motoaki will ask Daniel and Bruno and discuss the details.

OPT Lasers

​​XRO

XPD

VAC

DET

  • No major issues.

​​AE

ITDM

  • Issue about cooling failure in the lab floor in XHQ is being discussed between KWrona and LKersting

EET

CAS

 

AoB

Entry   Minutes of the Technical integration meeting 29.05.19 , posted by Gerd Wellenreuther on 29 May 2019, 10:30 

FXE

SPB/SFX

  • XTD2 attenuator appears to be damaged. ==> Request to VAC: is it possible to exchange the attenuators in the summer shutdown? LBatchelor might have spares.
  • Digitizers have been installed
  • Bunch number is reported to have jumped from 1 --> 150, report to be provided by SPB/SFX so CAS can investigate.
  • Top priority: Testing new camera + DAQ interface along with motor positions recording @ 10Hz

SCS

  • Currently running + supporting the user experiment

SQS

 MID

  • Integration of the LDM: Safety document is needed. ==> This is needed ASAP!!!
  • Further commissioning is ongoing

HED

  • Loop 6 being commissioned. ==> done

VAC

  • Preparing for Shutdown

XRO

  • Preparing for Shutdown

XPD

DET

EEE

  • Loop priorities for HED and MID are needed.
  • AE reminds everybody to contact TSchoen if power is required during the middle of June, e.g. in order to keep the vacuum running.

CAS

  • Supported / tested measurements of gain curves in SASE1
  • Next week: Testing of correlator
  • Karabo Hotfix 2.4.2 was released, new week testing of 2.5. commences
  • Progress regarding InfluxDB etc. was achieved and reported, e.g. to readiness mailing list

ITDM

SRP

TS

AoB

  • No Dispatch on Friday due to the bridge day!
Entry   Status report after dispatch meeting Monday 27.5. 09.30 , posted by Gerd Wellenreuther on 27 May 2019, 10:35 

SPB/SFX

  • Digitizers are ready, have been tested by CAS ==> to be be installed / integrated probably next week ==> according to Adrian probably Monday, to be confirmed with AE (Bruno + Hamed) ==> is confirmed to be today
  • Different GUIs were reporting varying values for STATUS on different clients / machines ==> ARound will make sure a proper description of the issue (which machines, which clients, when, ...) will be brought to the attention of the proper people @ CAS. ==> CAS is aware. ==> CAS has a suspect.
  • There appears to be an issue with recorded / stored values vs. values shown in the client of motors moving. CAS shall receive a proper + detailed description of the issue.

FXE

  • Tool to save motor positions is not working reliably. ==> CAS + AE have different tools on different levels. There is not automatic / global restoring of for example motor positions from the CAS-side available. BUT in the shutdown motor position should not be lost, unless there is a true power outage also affecting the CPUs.
  • Problems with the PP-laser have been reported.

SQS

SCS

MID

  • Request to have the same kind of feedback as implemented at FXE ==> will require HW changes, to be done during the summer shutdown, and work by CAS in order to adapt the procedure from FXE.

HED

  • According to KS the Smaract-stages are to be checked with AE
  • Interlock definitions would be needed by Wednesday ==> MS is on it.
  • Last weeks issues regarding the epix were probably caused by the DAQ.

OPT Lasers

​​XRO

XPD

VAC

DET

  • The DSSC underwent successful readout test, more DAQ-test to come.
  • The pnCCD saw first visible light, working now on the delay / timing.

​​AE

ITDM

EET

CAS

  • A Hotfix 2.4.2 is provided by CAS, which should fix some issues related to the XGM.

SRP

TS

AoB

Entry   Status report after dispatch meeting Friday 24.5. 09.00, posted by Gerd Wellenreuther on 24 May 2019, 11:01 

SPB/SFX

  • are working on achieving a good focus @ 6 keV, which currently is not as good as expected. ==> This is understood now, those were higher harmonics, too many absorbers in the beam. Absorber still shows some structure, though
  • Digitizers are ready, have been tested by CAS ==> to be be installed / integrated probably next week ==> according to Adrian probably Monday, to be confirmed with AE (Bruno + Hamed)
  • Different GUIs were reporting varying values for STATUS on different clients / machines ==> ARound will make sure a proper description of the issue (which machines, which clients, when, ...) will be brought to the attention of the proper people @ CAS. ==> CAS is aware.
  • Data from motor + camera was taken to correlate motion data. ==> still has to be understood with help of DET and ITDM.
  • AGIPD quadrant motion is needed in summer in order to align the detector in order to record data at low scattering angles / closely around the beam center. ==> is scheduled for summer shutdown

FXE

SQS

SCS

  • First light was seen on the DSSC!

MID

  • AGIPD control server is dead ==> to be replaced by a spare by ITDM / Janusz

HED

OPT Lasers

​​XRO

XPD

VAC

DET

  • pnCCD integration is progressing at SQS, testing taking data with the DAQ.
  • MID-chiller issue: chiller will return in next week.
  • Increasing amount of problems and sufferings due to unreliability of gitlab

​​AE

ITDM

EET

CAS

  • OCD-call regarding device communication: The polling-intervall epsilon was set too small, such that the client became flooded and turned unresponsive.

SRP

TS

AoB

  • Shutdown planning now includes MKK, which includes some activities concerning cooling water. Please check, email was sent to readiness.

Entry   Minutes of the Technical integration meeting 22.05.19, posted by Gerd Wellenreuther on 22 May 2019, 09:58 

FXE

SPB/SFX

  • XTD2 attenuator appears to be damaged.
  • Beam at lower energies look disturbed, SPB/SFX will contact XRO.
  • Digitizers have been requested. HW needs to be installed and set up and the timeline has to be clarified betweek BF and SPB. ==> next week

SQS

  • pnCCD: testing the 5 axis of motion. 3 are working, but there are problems, the wiring of the cables is now being checked.

SCS

  • Some issues are noticed regarding the triggering of the detector, but BF is on it

 MID

  • Due to the failed chiller, the user experiment had to be cancelled.
  • As a consequence, time is available to commision other hardware. ==> to be clarified with AE which activities can be supported.
  • Integration of the LDM: Safety document is needed.

HED

  • Loop 6 being commissioned.
  • Loop 1 was updated, parameters got lost. :-(
  • Detector issues regarding Epix 100: First some HW + assistance from MID was provided to get the detector running. By now, the HED-owned HW for the Epix 10K is being used.

XRO

XPD

VAC

DET

AE

  • Loop priorities for HED and MID are needed.
  • AE reminds everybody to contact TSchoen if power is required during the middle of June, e.g. in order to keep the vacuum running.

ITDM

EET

CAS

SRP

  • A safety walkthrough for SASE2 was done. Several installations are in conflict with the safety regulations regarding e.g. electrical installations. Detailed minutes will be provided. SRP will also involve TS / Süleyman Arslan.

TS

AoB

Entry   Status report after dispatch meeting Monday 20.5. 09.30, posted by Gerd Wellenreuther on 20 May 2019, 10:02 

SPB/SFX

  • are working on achieving a good focus @ 6 keV, which currently is not as good as expected.
  • Digitizers are ready, have been tested by CAS ==> to be be installed / integrated probably next week
  • Different GUIs were reporting varying values for STATUS on different clients / machines ==> ARound will make sure a proper description of the issue (which machines, which clients, when, ...) will be brought to the attention of the proper people @ CAS.

FXE

  • The Karabo FAI went well, FXE thanks explicitly for the support received.

SQS

  • The pnCCD is being set up. AE will be required to help for axes commisisoning next week. ==> this should happen today.

SCS

  • MTeichmann attended, fresh from vacation, nothing to report, everything is "awesome".

 MID

  • Commissioning the cryomanipulator. Had to use a couple of work arounds in order to align it with the beam (travel range issues it appears).
  • The AGIPD Julabo chiller failed on Saturday, it has to be sent in. Meetings this mornings should clarify what other options remain to support the user experiments as planned.

HED

  • User experiment went very well.
  • Currently commissioning ion pumps in the optics hutch
  • Starting on Wednesday loop 6 is to be commisioned (exp. hutch components) together with AE

OPT Lasers

​​XRO

XPD

VAC

DET

  • Question to ITDM: Did the crash of git on Saturday affect the calibration database (there were apparently issues @ FXE for 2 hours) ==> No. If there would have been problems, they would not have resolved with nobody doing anything, the system requires manual intervention. So most probably the problem was somewhere else...

​​AE

  • SCS had a problem with the fast ADC, was fixed Friday. Did this gave further problems during the weekend ==> MTeichmann to check.

ITDM

EET

CAS

SRP

TS

AoB

Entry   Status report after dispatch meeting 09.00, posted by Adriano Violante on 17 May 2019, 10:47 

SPB/SFX

  • ADC have been requested. HW should be already installed (SPB to check). BF will discuss with SPB how to proceed.

FXE

  • LPD is running.

SQS

  • MPODS power supplies are behaving strangely (1 channel trips, but the power supply does not send any error message). CY following it up but the priority is now with the DSSC (working on powering sequence. To be then adopted later also for other detectors.
  • The pnCCD is being set up. AE will be required to help for axes commisisoning next week.Some issues with electronics to read data have been solved. Tests to understand the reasons of the issues are being performed by AE.

SCS

 MID

  • Setting up next weeks experiments. Some equipment that the users are bringing have to be integrated. This may couse some delays.
  • 2 crates for the remote contro of vacuum compoennts are required to run in the intrument. CY wants to be present. There are difficulties finding a suitable time slot both for MS and CY. To be addressed offline.==> done, interlock tests have to be scheduled by MID.

HED

  • Epix card died. Workaround using some MID infrastructure has been proposed. Risks will be presented by HED ( Sebastian Goede) to MID and a decision has to be taken by the group leaders.

OPT Lasers

​​XRO

 

XPD

VAC

DET

  • Updated pipeline in SPB has been updated yesterday. Seems to work. MID probably will be updated today. Has to be discussed offline with ITDM.

​​AE

ITDM

  • DSSC DAQ was basically not commissioned due to lack of time (although scheduled). Now the detector cannot be oprated. More time has to be scheduled for DAQ commissioning. Meanwhile test on the VETO system are being performed. This would help to save much less data (200 images/train with VETO instead of 800 images/train).

EET

CAS

SRP

TS

AoB

Entry   Minutes of the Technical integration meeting 15.05.19 , posted by Adriano Violante on 15 May 2019, 12:53 

SPB/SFX

  • Nano KB mirrors and CSS controls are OK
  • Digitizers have been requested. HW needs to be installed and set up and the timeline has to be clarified betweek BF and SPB. Not possible to have them running on short notice.
  • Comment from AS: Trigger Test with pulse on demand to test the conditional trigger (5Hz like operation) is done, but failed to deliver a real conditional trigger. The Karabo device is adapted to switch between the present mode and conditional trigger from Karabo (although some issue were identified). The X2Timer configuration still need adjustment, BF is on it.

FXE

  • Re shuffling of PLC CPUs drawers will occur during the next winter shutdown.

SQS

  • MPODS power supplies are behaving strangely. CY will have a look.
  • pnCCD: Commissioning should start today. Maxi cage for interlocks will be installed today by SQS.

SCS

  • Det. DAQ test ongoing.

 MID

  • Axes for users operation being commissed
  • Communication between VAC and AE concerning the electronics for the cryo coolers - heaters has to be improved since AE was not involved during the last ZZ intervention on monday. MD will discuss later today with NJ.

HED

  • Loop 6 can be operated in its completeness by middle of next week.
  • Laser beam has to be deivered to SCS in 2 weeks. Fw has to be uploaded in the PLCs. HW is ready, commissioning has to start.
  • There is the request to make the timing signal independent between the SASEs. Will be discussed offline with AE. It should be possible in the winter shutdown. ==> BF is talking to the involved people.

XRO

XPD

VAC

DET

  • Karabo 2.4.1. improves the pipieline stability. The deployment is strongly suggested to MID and SPB. ==> Pipeline for SPB has been deployed. Minor issues being addressed. MID has to folllow.

AE

ITDM

EET

  • Schedule for the Loop 10 and 11 of HED cables installation is confirmed. IN KW25 would be possible to bring the loop up.

CAS

SRP

TS

AoB

Entry   Report after dispatch meeting 09.30, posted by Adriano Violante on 13 May 2019, 11:24 

SPB/SFX

  • The gear ratio of the CSS is unclear but this was already known and discussed with SPB/SFX ==> AL is working on it toghter with AE.

FXE

  • Karabo for Jungfrau detector has been udpated and works fine. For the LPD some issues were reported but SH commented that the problems arise from the fact that the signal FXE was trying to detect is very low, potentially close to the HW limit od the detector

SQS

  • MPODS power supplies are behaving strangely (1 channel trips, but the power supply does not send any error message). TB and CY to have a look.
  • The pnCCD is supposed to be used next week. Meeting after the dispatch meeting with AE, CAS, ITDM(!) to coordinate the efforts.

SCS

 MID

  • Mono needs cooling. Issue will be attacked today/tomorrow.
  • 2 crates for the remote contro of vacuum compoennts are required to run in the intrument. CY wants to be present. There are difficulties finding a suitable time slot both for MS and CY. To be addressed offline.

HED

  • Smaract stages behave strangely. AE support required.

OPT Lasers

  • Crates will be switched on today. Meeting JE/OPT lasers today at 11 to coordinate the efforts.

XRO

 

XPD

VAC

DET

  • Updated pipeline in SPB has been installed today.
  • SCS DSSC took the first images (without beam)

AE

ITDM

EET

CAS

SRP

TS

AoB

Entry   Report after dispatch meeting 09.00, posted by Adriano Violante on 10 May 2019, 10:52 

SPB/SFX

  • IRDa commissioning successful. A. Mancuso thanked all the people involved in the project. 
  • The gear ratio of the CSS is unclear but this was already known and discussed with SPB/SFX
  • Mirrors motors had some issues (ELMO motors), they are already been fixed.
  • Adam and Alexis are discussing internally when the next loops will be needed. The info goes then to AE.
  • NReimers will take care of asking TSchön for temporary power lines for the vaccum pumps during the MPS tests in the summer shutdown.

FXE

SQS

  • MPODS power supplies are behaving strangely. Almost fixed by CY.
  • The pnCCD is supposed to be used next week. SQS want to use channels dedicate to other components and work out a temporary solution. AE requested the list of channels to be used but no answer has been received so far. Also, proper CRDs to start preparing the propoer implementation of the controls is still missing.==> info still missing. AV will ask TBaumann again. Also the DAQ for the pnCCD is not prepared at all.

SCS

  • Part of the uTCA system will need to be installed in the hutch (it was planned for the rackroom). Discussion channel is open with AE.

 MID

  • Nano motors require fw updates. Being agreed with AE, but with low priority.
  • Today there will be a meeting for the implementation of the AGIPD quadrant motion
  • Karabo integration of the SDL: kick off meeting took place yesterday between CAS and MID. - The migration of equipment listed in point 5 to Karabo 2.4.x should be completed by end of first week of summer shutdown (KW24) by CAS. MID should then validate the resulting system performance. Prototypes of the middle layer devices will be prepared by CAS while the component is not here. SDL is expected to be delivered in November. Cables and electronics should also be installed in November (WS)

HED

  • Smaract stages will be commisisoned today. MS support needed.
  • Loop 6 VAC modules will be connected to the loops in 2 weeks. For now the controls remain local.

OPT Lasers

  • Laser beam has to be deivered to SCS in 2 weeks. Fw has to be uploaded in the PLCs. AE got the fw export and should upload it by friday this week. ==> Loops should be started on monday.

XRO

  •  HED had radiation damages on the Mono1 cristals.  REasons are being investigated. One possibility is the accidental focus of the beam on the cristal. There is usually a macro to avoid that but it was foung not working by MV. To be checked.
  • Guesthouse civil contruction is starting soon and MV is in contact with TS concerning vibrations in the tunnels. 

XPD

VAC

DET

AE

ITDM

  • Test for DSSC DAQ started yesterday.

EET

CAS

  • Karabo 2.4.1. improves the pipieline stability. The deployment is strongly suggested to MID and SPB. ==> Deployment schedule for next week monday.
  • Krzysztof, Steffen and Hugo aligned and  concluded that 2.4.1 is backwards compatible with 2.4.0 deployed already on the PCL (DAQ) machines. This setup is, indeed, already running on FXE since 29.04 (Monday).

SRP

TS

AoB

Entry   Minutes of the Technical integration meeting 08.05.19 , posted by Adriano Violante on 08 May 2019, 10:10 Technical_Integration_Meeting_07.05.2019_-_Copy.pptx

SPB/SFX

  • IRDa commissioning ongoing. 
  • CSS. Limit switches re cabling is ongoing. For the next run the old configuration will still be used. RB and MS will meet to make sure the system can be safely (from the component point of view) operated. ==> Solved.
  • Comment from AS: Trigger test with pulse on demand was not succesfull due to missing karabo devices and issues with configuration. For the final fix 10 minutes of beamtine has to be taken from SPB/SFX. This will be agreed with the intrument.

FXE

  • Delay servo stages have been commissioned. Right now only one stage is being used.  

SQS

  • Integration of the photonic science camera is progressing. Status not clear.
  • MPODS power supplies are behaving strangely. CY will ahve a look.
  • The pnCCD is supposed to be used next week. SQS want to use channels dedicate to other components and work out a temporary solution. AE requested the list of channels to be used but no answer has been received so far. Also, proper CRDs to start preparing the propoer implementation of the controls is still missing.

SCS

  • Part of the uTCA system will need to be installed in the hutch (it was planned for the rackroom). Discussion channel is open with AE.

 MID

  • Servo motors require fw updates. Being agreed with AE.
  • Loop 7 update is being coordinated for this week between MS and UBoesemberg.

HED

  • For Loop 6 and 8, as well as smaract stages AE is waiting the go ahead from HED to switch on the Beckhoff modules. 

OPT Lasers

  • Laser beam has to be deivered to SCS in 2 weeks. Fw has to be uploaded in the PLCs. AE got the fw export and should upload it by friday this week.
  • There is the request to make the timing signal independent between the SASEs. Will be discussed offline with AE. It should be possible in the winter shutdown.

XRO

XPD

VAC

DET

  • Karabo 2.4.1. improves the pipieline stability. The deployment is strongly suggested to MID and SPB. ==> Deployment schedule for next week monday.

AE

ITDM

EET

  • GDB cables have been completely produced and are bein installed this week. 
  • Schedule for the Loop 10 and 11 cables installation is confirmed. IN KW25 would be possible to bring the loop up.

CAS

SRP

TS

AoB

  • Presentation showing the MPS schedule  is attached and is showing when the emergency power off system will be triggered. The Beckhoff modules shut down is being organized by AE. It is noted that the instruments should organize the temporary power supply for the vacuum system.
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 06 May 2019, 10:20 

SPB/SFX

  • IRDa commissioning ongoing. 
  • For this week AGIPD works and re commissioning of the nanometer mirrors will be perfermed. It is possible that support from AE will be required.
  • CSS. Limit switches re cabling is ongoing. For the next run the old configuration will still be used. RB and MS will meet to make sure the system can be safely (from the component point of view) operated. 

​FXE

  • Karabo online data analyzer is being used and is stable.
  • LPD no longer overheats but there is still a small leak.
  • Delay stage will be comissioned with the support of AE today.

​SQS

  • This week SQS will have night shifts. BB will be needed today for motors configuration.
  • Integration of the photonic science camera is progressing (should be with ITDM now)
  • MPODS power supplies are behaving strangely. TB will summarize the issue and send an email to CY

SCS

  • The gender of a scroll pump and 4 detectors cables were found to be wrong. According to MT it is not high priority. Nevertheless, EET did not receive any information about whoch cables need to be checked and repaired.
  • List of nice to have electronics fixes has been sent to NJ and AE requested additional feedback. Fedback from MT needed to proceed.

 MID

  • The pico motors for the  monos in XTD6 and optics hutch are dead and need to be replaced\fixed. ==> the XTD6 mono was fixed but has problems again. The opt hutch mono works but is still not aligned. Now OK.
  • AE is supporting MID for the integration of 3 user motors. Done.
  • ZZ access today for an intervention on CRL1.
  • Loop 7 update is being coordinated for this week between MS and UBoesemberg.

​HED

  • Users assisted commissioning. PVagovic attended. Online processing of data was possible. Characterization ofbeam focus has been done. Data being analyzed.
  • Additional moros will need to be implemented for next run.MS supporting.
  • Mono in XTD 6 requires ZZ access today for fixing.
  • If pulse on demand capability is needed to be used by HED the other instruments need to be informed (especially SQS this week - night shifts) since this mode reduces the beam staibility! This issue should be addressed in general in the operation meetings.

​OPT Lasers

XRO

XPD

VAC

DET

  • Karabo 2.4.1. improves the pipieline stability. The deployment is strongly suggested to MID and SPB.
  • DSSC DAQ was supposed to be tested but more fundamental tests are still being performed. Meeting today at 10 to address the issues.
  • Fast CCD low energy calibration improvement is being discussed.

AE

  • During the WE an issue concerning digitizers and fast ADC was reported. Train ID was not correct. This has not happened before. A fw update solved the issue and is being deployed for all the intruments. A detailed investigation of the reasons is being done. No issue for SQS to have reliable digitizers for the next users run.
  • Servos for FXE implementation ongoing.

ITDM

EET

CAS

SRP

TS

AoB

  • Mail to STGL for the collection of the next summer shutdown activities has been sent. Deadline is the end of next week.
Entry   Report after dispatch meeting 9:00, posted by Adriano Violante on 03 May 2019, 14:07 

SPB/SFX

  • IRDa commissioning ongoing. First images have been taken with the Jungfrau detector. Possible to record using 7 to 8 memory cells, after that there are issues. CAS is having a look. 
  • CRL motors being tested. --> issue with a CRL motor is being addressed (connector issue).  The moto failed mechanically flipping the CRL vessel. It seems to be a common issue with JJXRay CRLs. Issue will be reported to the DH. 
  • AE needs to know when Loop 9 and 10 are expected to run in Summer. KW not yet clear.

FXE

SQS

  • Cameras and DAQ minor issues have been fixed. The problem was that a karabo device was moved without updating the network configuration. AS is informing people with the right procedure to follow. 
  • SQS will need to be able to switch the trigger off and connect this to the interlock system. This can be done but requires the addidtion of physical connections by AE and needs to be planned. A faster workaround will be discussed offline with PG.

SCS

  • The gender of a scroll pump and 4 detectors cables were found to be wrong. MT will ask EET for fixing. ==> MFl will coordinate with SCS for the fix.

 MID

  • The pico motors for the  monos in XTD6 and optics hutch are dead and need to be replaced\fixed. ==> the XTD6 mono was fixed but has problems again. The opt hutch mono works but is still not aligned. Ongoing.
  • AE is supporting MID for the integration of 3 user motors. Ongoing.
  • Train ID for AGIPD had issues and the train ID uTCA had to be replaced.

HED

  • Loop8 being commissioned.Works will continue next week (HED has night shifs). 

OPT Lasers

XRO

​​XPD

VAC

​​DET

AE

  • During the WE an issue concerning digitizers and fast ADC was reported. Train ID was not correct. This has not happened before. A fw update solved the issue and is being deployed for all the intruments. A detailed investigation of the reasons is being done. No issue for SQS to have reliable digitizers for the next users run.
  • Servos for FXE implementation ongoing.

​​ITDM

​​EET

​​CAS

SRP

TS

AoB

Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 29 Apr 2019, 10:04 

SPB/SFX

  • IRDa commissioning ongoing. Focus (<5um) in the second interaction region has been achieved.
  • CRL motors being tested. --> issue with a CRL motor is being addressed (connector issue). 
  • AE needs to know when Loop 9 and 10 are expected to run. SPB to check.
  • Jungfrau detector: first beam on the detector. Some issues (receiver had to be restarted, gain constants needed to be properly set) fixed by DET and ITDM OCDs.

FXE

SQS

  • Cameras and DAQ minor issues being fixed.
  • SQS will need to be able to switch the trigger off and connect this to the interlock system. This can be done but requires the addidtion of physical connections by AE and needs to be planned. A faster workaround will be discussed offline with PG.

SCS

  • The gender of a scroll pump and 4 detectors cables were found to be wrong. MT will ask EET for fixing.

 MID

  • The pico motors for the  monos in XTD6 are dead and need to be replaced. This is urgent and will be done this week.
  • AE is supporting MID for the integration of 3 user motors.

HED

  • Loop8 being commissioned. No big issues.

OPT Lasers

XRO

​​XPD

VAC

​​DET

  • LPD first charge injection test with emergency DAQ succesfull. Activities will be continued with the agreed LPD prio list. 
  • FXE. Karabo will be updated for the online calibration.

AE

  • During the WE an issue concerning digitizers and fast ADC was reported. Train ID was not correct. This has not happened before. A fw update solved the issue and is being deployed for all the intruments. A detailed investigation of the reasons is being done. No issue for SQS to have reliable digitizers for the next users run.

​​ITDM

​​EET

​​CAS

SRP

TS

AoB

Entry   Report after dispatch meeting 09.00, posted by Adriano Violante on 26 Apr 2019, 12:28 

SPB/SFX

  • IRD commissioning ongoing.
  • CRL motors being tested. --> Mechanical issue with a CRL motor is being addressed.
  • CSS interlock tests with AE still ongoing.
  • AE needs to know when Loop 9 and 10 are expected to run. SPB to check.
  • Jungfrau detector: calibration being finalized.

FXE

  • Loop 6 is required to drive 2 servo motors. BB will try to bring this into operation this week. NC checked the setup. ==> The loop 9 will be temporarily used. This will be updated either on Monday/Tuesday, or during beamtime. Agreed with FXE.
  • Drawers 2 and 3 have to be rebuilt by AE in order to host new ATCA crates. JE needs time plan info from FXE. 

SQS

  • AE still needs priorities for the next loops. Only Loops 15 and 16 left to be brought up. No plans yet. 
  • Export of motors config. parameters needed by AE. SQS asks CAS
  • Interlocks minor issues being fixed with AE

SCS

  • Discussion with EET ongoing concerning the installation of cables for end stations. Space problem. --> This is a long term issue, to be discussed in the other meetings, ongoing.
  • Commissioning of the quadrant motion has been completed.
  • Loop 12 (chiller) issues with some cables miswiring has been found. AE and EET to check.
  • Motors / encoder of the inlinemic component being commissioned. 

 MID

  • For Loop 9 CY is preparing a change request (naming convention for interlocks). AE involved. --> still pending
  • Loop 12 will be operable this week --> an 100V input is needed, but not readily available. --> the 100 V were needed to increase the speed of a motor. The alternative solution of using a 48V teminal and a gear box was proposed by AE and accepted by MID. 
  • Priorities for next loops needed by AE to plan the work. --> Still required.
  • Peltier being debugged by MS
  • monochromators pico motor in the tunnel is stuck and needs to be fixed. Will be done on Monday.

HED

  • Loop9 (Smaract stages) has to be brough up.  --> being done. Smaract stages being also tested
  • Next loops are 8 followed by the priority-items from loop 6. Loop8 has been started yesterday
  • Loop10 and 11 regarding PPL will be needed in June. HED to confirm. --> Feedback from MN required.
  • Limit switches (loop8?) are not operable right now due to a 24V terminal missing.

OPT Lasers

  • AE support is needed in order to bring the SCS laser up by the end of may. Mail has been sent. NJardon checks. --> Loop extended and running by the end of next week. --> will be done on 06.05.Eplan export will be ready next monday the latest.

XRO

  • Motion loop for Hirex 2 has been delayed until June -> update will be done on 11.06.

XPD

  • Issue repoeted from CAS: Fast ADC for MCP in SASE3 duplicates data in the 3 % of cases. DAQ is not responsible. Tests have to be made and for that the ADC servers have to undergo to short interruptions. Will be coordinated with XPD. Should not be e problem. CAS to follow the issue up. --> Unclear, CAS not attending.

VAC

​​DET

AE

​​ITDM

​​EET

​​CAS

SRP

  • Schedule changes for the Summer shutdown due to modification of the interlock systems. Additional meetings needed. No info is expected before the beginning of May. --> an uncoordinated email was sent around by MDressel (MPS). SRP will take care of clarifying with MPS what has to be done, when, and will communicate this.

TS

AoB

Entry   Minutes of the Technical integration meeting 24.04.19 , posted by Gerd Wellenreuther on 24 Apr 2019, 10:05 

SPB/SFX

  • SPB/SFX is preparing for the upcoming beamtime.
  • CRL motors being tested. --> Still ongoing.
  • CSS interlock tests being planned for tomorrow. --> Still ongoing.
  • AE needs to know when Loop 9 and 10 are expected to run. SPB to check.

FXE

  • AE needs to get information on PLCs loop splitting. FXE to comment. 
  • Loop 6 is required to drive 2 servo motors. BB will try to bring this into operation this week. NC checked the setup.

SQS

  • AE still needs priorities for the next loops. SQS to comment.

SCS

  • Discussion with EET ongoing concerning the installation of cables for end stations. Space problem. --> This is a long term issue, to be discussed in the other meetings, ongoing.
  • Commissioning of the motion is ongoing. JT is fixing particular motors / issues.
  • Further testing is including interlocks, vacuum and chiller.
  • Loop 12 is supposed to be up & running by the end of next week

 MID

  • For Loop 9 CY is preparing a change request. AE involved. --> still pending
  • Loop 12 will be operable this week --> an 100V input is needed, but not readily available. To be checked by AE.
  • Priorities for next loops needed by AE to plan the work. --> Still required.

HED

  • Loop 7 being commissioned --> still being commissioned, encoders are misbehaving / behaving strange.
  • Loop9 (Smaract stages) has to be brough up.  --> will be done this week
  • Next loops are 8 followed by the priority-items from loop 6.
  • Loop10 and 11 regarding PPL will be needed in June. HED to confirm. --> Feedback from MN required.

OPT Lasers

  • AE support is needed in order to bring the SCS laser up by the end of may. Mail has been sent. NJardon checks. --> Loop extended and running by the end of next week.

XRO

  • Motion loop for Hirex 2 has been delayed until June

XPD

  • Issue repoeted from CAS: Fast ADC for MCP in SASE3 duplicates data in the 3 % of cases. DAQ is not responsible. Tests have to be made and for that the ADC servers have to undergo to short interruptions. Will be coordinated with XPD. Should not be e problem. CAS to follow the issue up. --> Unclear, CAS not attending.

VAC

​​DET

AE

​​ITDM

  • New DACHS-area "Balcony rooms" will be setup. Requires local training by ITDM, which is currently being organized.

EET

  • Working on MID SDL and SCS day 2 components.

CAS

SRP

  • Schedule changes for the Summer shutdown due to modification of the interlock systems. Additional meetings needed. No info is expected before the beginning of May. --> an uncoordinated email was sent around by MDressel (MPS). SRP will take care of clarifying with MPS what has to be done, when, and will communicate this.

TS

AoB

Entry   Minutes of the Technical integration meeting 17.04.19 , posted by Adriano Violante on 17 Apr 2019, 11:34 

SPB/SFX

  • CRL motors being tested. Today BB (AE) will check the status.
  • CSS interlock tests being planned for tomorrow.
  • Jungfrau motors -  SS (EET) fixed some cable issues. Now ok.
  • Julabo chiller: loop 5 has been updated (interlocks definition, setpoints...) AE+DET working on it. 
  • AE needs to know when Loop 9 is expected to run. SPB to check.

FXE

  • AE needs to get information on PLCs loop splitting. FXE to comment. 

SQS

  • Loop 9 will be updated.
  • AE helping for commissioning
  • AE needs priorities for the next loops. SQS to comment.

SCS

  • DSSC installation progressing. Loop 5 motion loops should run
  • In general loops have been updated. Loop 13 (part of it) being commissioned. AE needs to know then the entire loop commissionig will start.
  • Discussion with EET ongoing concerning the installation of cables for end stations. Space problem.
  • Loop 4. BKF536 and 531 being modified. Clarification with AE/EET needed.

 MID

  • Epix voltage interlocks definition and implementation. AE (MS) and CAS (CY) working on it.
  • For Loop 9 CY is preparing a change request. AE involved.
  • Loop 12 will be operable this week
  • Priorities for next loops needed by AE to plan the work.

HED

  • Mono in XTD6 has been fixed.
  • Jungfrau and epix commissioned
  • Loop 7 being commissioned
  • Loops 1, 2 , 5, 7 could be done
  • Loop9 (Smaract stages) has to be brough up. 
  • Loop10 and 11 will be needed in June. HED to confirm.

OPT Lasers

  • SA2 PPL work ongoing this and next week. ready by next week.
  • AE support is needed in order to bring the SCS laser up by the end of may. Mail has been sent. NJardon checks.

XRO

XPD

  • Loop updates procedure being finalized by AE. NK asked for MOV2 loop update during next week. AE will try to follow this up.
  • Issue repoeted from CAS: Fast ADC for MCP in SASE3 duplicates data in the 3 % of cases. DAQ is not responsible. Tests have to be made and for that the ADC servers have to undergo to short interruptions. Will be coordinated with XPD. Should not be e problem. CAS to follow the issue up.

VAC

​​DET

AE

​​ITDM

EET

CAS

  • 5Hz test follow up is being done by CAS. Especially optimization concerning train id and time stamp with DESY with the goal to make the switch between the different operation mode easier. A meeting will be planned.
  • 2,4,1. hotfix (Fast data pipeline) is being prepared

SRP

  • Oil cans in and outside SPB rackroom should be removed. A proper cabinet has been requested to TS but it is not yet ready since exhaust lines are needed.
  • Patch cables in the racks should be limited to the very necessary amount since there the material storage is not allowed . TS can help finding space for this material in the hall..
  • Schedule changes for the Summer shutdown due to modification of the interlock systems. Additional meetings needed. No info is expected before the beginning of May.

TS

  • Support for chillers. Contact people by TS are T. Bartsch and P. Schmidt. They can support concerning issues and problems with chillers for the day to day operation. LKersting supports that. For bigger project, a specific request should be made to LK.

AoB

Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 15 Apr 2019, 09:55 

SPB/SFX

  • Tomorrow set up of the donwstream interaction region will start.
  • Jungfrau calibration pipeline has to be pushed. ITDM and DET involved. Can be done this week.
  • Additional motors control bein implemented by AE.
  • Request presented to CAS to resume a project concerning jetting. Library exists.
  • Issues with Train ID/ cell ID for AGIPD. Fix is ongoing.

​​FXE

SQS

  • Photonic science camera issue: fixed by CAS OCD (SB) but requires a hotfix. Will be provided after Easter
  • VAC interlocks for the NQS chamber will be implemented by AE. Definitions were provided.
  • Turbo only going to 50% when operated by Karabo. Fix ongoing
  • New devices to be implementd in karabo. Contact person informed
  • TB and AE to meet to fix some issues with motors

SCS

  • DSSC is pumping down
  • 6 Elmo motors needed for DSSC needed this week.
  • BKF controls will be tested with the DET group
  • Test of motors with the laser hutch is ongoing. Software installation ongoing.

​​MID

  • Users time ongoing. 2 Epix and Agipd being used without major issues
  • Agipd, 1 useful image every 276. This seems to be the stable configuration. ITDM asks for more optimized usage of the IT hardware next time...
  • ATT arm in the tunnel get stuck from time to time
  • for the 7th of may, 3 users motors have to be imlemented in Karabo. Via UPP, test with CY.

HED

  • Loop 7 commissiong ongoing
  • KS to give green light for next loops
  • Jngfr and epix being commissioned
  • Mono in XTD6 - issue with motor. to be fixed as soon as feasible.

 

OPT Lasers

XRO

XPD

VAC

DET

AE

​​ITDM

EET

CAS

SRP

TS

AoB

Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 12 Apr 2019, 10:41 

SPB/SFX

  • Hercules students period. During the night a pump failed and recovered after a power cycle.
  • 5Hz mode tests were performed and successful
  • CSS being commissioned. X mov elmo stage still has to be configured. Will be done probably today.
  • After some updates, AGIPD run control topology light does not go to green. Start stop buttons do not work properly (cannot be seen when the detector stops aquiring data). CAS to have a look.

​​FXE

  • After some modifications in the chain fast valve-mps-plc a connector was found to be not properly reconnected and triggering the interlock. FXE should involve AE when such activities are performed in order not to cause overhead to the support groups.

SQS

 

SCS

  • Loop 4 updated. Loop 3 motors being commissioned. Loop 5 quadrant motion being finalized. Loop 12 (VAC) being prepared.
  • It is not clear when BKF 536 and 531 have to be installed by AE. SCS should comment.

MID

  • Loop 12 being prepared and should work by the end of next week.

HED

  • Loop 7 commissiong will start today. KS will send a list of crates to be put in the loops to AE (Prio-non prio PLCs)

 

OPT Lasers

  • SA2 PPL project, HW prepared.

​​XRO

XPD

 

VAC

DET

AE

​​ITDM

EET

CAS

SRP

TS

AoB

Entry   Minutes of the Technical integration meeting 10.04.19 , posted by Adriano Violante on 10 Apr 2019, 10:54 

SPB/SFX

  • CRL implementation in the hutch. Tests can start today.
  • CSS Test have been started. One elmo devide has to be implemented today. Interlocks have to be tested (later).
  • AGIPD motion. Middle layer final tests will be done during next reconfiguration od the detector.
  • Julabo chiller: loop 5 has been updated (interlocks definition, setpoints...) AE+DET working on it. seems ok.

FXE

SQS

  • Loop 8 and 11 up and running.

SCS

  • Loop 4 being updated. Loop 5 (DSSC related) will be updated this and next week.
  •  Loop 13 running with 1 crate. Part of cables will be delivered by EETf this week. 

MID

  • Smaract stages do not work propery and reliably. High priority. Has to be clarified with AE since it is not clear whether this is the same issue that SCS had and for whoch they developed a workaround. ==> BB will contact the Smaract company to address the issue.
  • Epix power issue has been fixed. The problem was a parameter not properly set in the power supply. No interlocks are being used. MID is aware of that.
  • Loop 9, 4 and 12 will be updated with interlocks next week.
  • Exapod control vs data policy issue (also affecting HED and SPB, as well as other components). The exapod control implementation via Beckhoff requires time and is planned for the end of April. For the time being SPB and MID control the exapods via software. This make somewhat difficult to store all the data in the correct way and is not fullfilling the data policy. PSPO will report the issue to TT. At this stage a reshuffling of priorities to speed up the HW implementation seems not to help, since it is anyway planned for end of April.
  • Loop 12 ready next week.

HED

  • Loop 5 being commissioned. Should be completed by today. Loop 7 cables are been reorganized and the commissioning will strat tomorrow. Planned to be completed by the end of the week. Lilla cables between patch panels and components will be asked and discussed with AE. 

 

OPT Lasers

  • SA2 PPL work ongoing. ready by next week.

XRO

  • Commissioning of M1 in SASE3 took place. An intervention concerning a limit switch has to be done (not critical)

XPD

  • Hirex 2 - Commissioning ongoing. Some imporvements, especially concerning DAQ is needed and will be discussed by AK with ITDM.

 

VAC

  • SASE2 beam permission button is hidden in the vacuum expert panel. It is not the case for SASE1 and 3... To be clarified with VAC, XRO and CAS.

DET

AE

  • 5Hz operation (HW trigger dependent on the bunch pattern) mode pre tests OK. New tests planned for tomorrow (SPB and SCS). MCP and hirex will also be included in the test with low priority.

​​ITDM

EET

CAS

SRP

  • A power supply was switched off by AE and found on again the next day despite a sign put on the device. This should not happen. SRP advices, in similar cases, also to add a contact of the person who switched off the device for safety reasons.
  • XS5000 controller in SCS issue. SRP clarifies that everybody must act in case of clear danger (e.g. preventig the access to a particular area). In this case, it was OK that UB and TS prevented the access to the SCS laser hutch to other people before the controller was put in a safe state.  Having said that, the responsibility lies with the scientific group operating the device.

TS

AoB

Entry   Report after dispatch meeting 09.30, posted by Adriano Violante on 08 Apr 2019, 10:48 

SPB/SFX

  • 5Hz mode tests started (SPB/SQS) and partially successful. A detailed report will be sent around. 2 cameras in SPB and digitizers in SQS were tested. Cameras OK. Digitizers data recordin has some issues being fixed (train id related). Next week on Thursday a test with beam is foreseen. ==> Update from AS:The whole chain, Digitizer, Karabo, DAQ worked as expected.
  • CSS being commissioned
  • AGIPD chiller: Julabo is back. Loop is being updated. Detector interlocks also being updated.

FXE

SQS

  • Loop 8 and 11 deployed
  • Triggers to be re-checked (BF+TB)
  • Configuration of motors is being finalized. 
  • Network drive in the control network. Solution will be discussed with ITDM (group access to the DESY cloud?)

SCS

  • XS5000 controllers in the laser room were not safe and need to be reworked. Technically the issue has been solved. SCS reported some unhappiness because of unclear procedures (responsibility, Elektrofachkraefte...). AV will discuss with SRP and UBr, TS and ask SRP to make a statement.
  • Shutter in the experimant hutch will stay open the entire day to allow XRO to continue the commisisoning of the mirror and mono in the tunnels.

MID

  • Epix - essentially ready for experiments this week.
  • 2nd epix module being tested.
  • Epix channel power issue (digital/analog voltage issue). Being investigated. It is not a showstopper

HED

  • Loop 5 will be commisisoned today. Loop 7 will follow (much bigger, in-vacuum components). The goal is to finish the commissioning of these 2 loops by the end of the week. 

 

OPT Lasers

​​XRO

  • SA3 commissioning during the week end (Mirror+mono). Will continue today.
  • Procedure to re start the loops in the tunnels has been discussed and modified to increase the transparency. PG will write an email summarizing the new procedure to the GLs

XPD

 

VAC

DET

  • HED epix and jungfrau calibration routines will be installed tomorrow.
  • FXE: LPD charge injection scan has to be re-scheduled.

AE

​​ITDM

EET

CAS

SRP

TS

AoB

Entry   Report after dispatch meeting 09.00, posted by Adriano Violante on 05 Apr 2019, 10:07 

SPB/SFX

  • 5Hz mode tests started (SPB/SQS) and partially successful. A detailed report will be sent around. 2 cameras in SPB and digitizers in SQS were tested. Cameras OK. Digitizers data recordin has some issues being fixed (train id related). Next week on Thursday a test with beam is foreseen. ==> Update from AS:The whole chain, Digitizer, Karabo, DAQ worked as expected.
  • Loops updates being finalized. 
  • AGIPD chiller: Spare chiller from CFEL has been placed in the hutch. Julabo chiller is being shipped back. The julabo chiller is the first option, if it is not possible to put it in operation in time, the CFEL chiller will be used. 

FXE

SQS

  • Loop 8 and 11 being put into operation. Ongoing.
  • New motors in loop1. Being configured.

SCS

  • XS5000 controllers in the laser room were not safe and need to be reworked. Loop13 crates have been switched back off.
  • First cables (WCB/laser table) will be delivered by EETf be the end of next week.

MID

  • Test with train id startin today at 10:00
  • Loop 9 - interlock definitions being implemented. Test using interlocks foreseen for next Tuesday.
  • Epix chiller has issues. Julabo chiller being used.
  • Epix channel power issue. Being investigated by CY/UB

HED

  • Cables and loops for HED instrumentation. All the phase II cables needed for operation have been installed. KS/EETf to send a Fertigmeldung to AE.  Loop 5 and 7 will be brought into operation on Monday. Other Loop priorities remain the same.

 

OPT Lasers

​​XRO

  • SA3 commissioning during the week end. DAQ and timing needed.
  • Procedure for loops restarting in the tunnels is being discussed with AE in a meeting today.

XPD

  • Hirex 2 work ongoing with the support from AE.

 

VAC

DET

  • FXE: Jungfrau modules swapped from 500 to 1Mpixel. 
  • FXE: LPD charge injection scan planned for the week end. Timing and DAQ required!

AE

  • SASE3 timing system failure - problem understood and solved.
  • MPS modules failing. It seems to be an IT problem. DESY IT and ITDM are looking into that.

​​ITDM

EET

CAS

Karabo version 2.4.0 requires update of the GIU client. Apart form special cases (MID, SPB for the AGIPD...) deployment is ongoing in the instruments.

SRP

TS

AoB

Entry   Minutes of the Technical integration meeting 03.04.19 , posted by Adriano Violante on 03 Apr 2019, 10:44 

SPB/SFX

  • CRL implementation in the hutch. Cables at the back of the crate have been re-shuffled by EETf. VAC vessel had a leak and is being re-sealed and pumped. If everything is fine and the vessel can be brought to the hutch the motors test can in principle start already this week.  Interaction SPB/SRP ongoing to define operations parameters.
  • CSS Test have been started. 3 encoder connectors need to be fixed by EETf (not sure can be done by the end of this week).
  • AGIPD motion. Test ok.
  • Julabo chiller: waiting for feedback from Julabo to know whether the chiller is going to be repaired on time for next users. If not, SPB/SFX are trying to borrow one from CFEL. VAC interlocks would not be operational due to the different type of chiller. Needs to be evaluated and eventually take the risk (DET, SPB).

FXE

SQS

  • Loop 8 and 11 HW will be prepared by AE. Ongoing (AE/SQS coordination ongoing)
  • Meeting organized by PGessler to review the recurring issues with the digitizers. The outcome is that for the next users run the zero suppression mode will not be used (only raw data - confermed by SQS). In this case, no issues are expected. In the meanwhile a general solution will be worked out.

SCS

  • DSSC undergoing tests in Hera south. If OK, next week will be brought to the hall.
  • Loop 13 running but incomplete. Loop 11 being prepared. Nano motion controls now in this loop. 

MID

  • Smaract stages do not work propery and reliably. High priority. Has to be clarified with AE since it is not clear whether this is the same issue that SCS had and for whoch they developed a workaround. ==> BB will contact the Smaract company to address the issue.
  • Loop 9 has been updated and the flow meters can now be read.
  • Epix chiller has issues. Being investigated by MID and eventually replaced.

HED

  • Cables and loops for HED instrumentation. All the phase II cables needed for operation have been promised to be installed by the end of this week. Loop 5 cannot be available before.
  • 2 weeks ago the HR mono loop was mistakenly updated twice and the second time parameters were not saved (Fri evening). Sat morning was fixed again. AE confirmed it was a misunderstanding because of paralle pulse picker tests. HR mono conversion factors commissioning ongoing.  

 

OPT Lasers

  • SA3 trigger stopped working today. PP laser is down. The timing server in the balcony rooms was found to be down. BF is investigating what happened.

XRO

XPD

  • Hirex 2 - Crates being included in the loops by AE.

 

VAC

DET

AE

  • Waiting for the finalization of the MID LDM risk assessment from SRP to allow the usage of the remote control of the device.==> SRP is working on that. 75% done.
  • 5Hz operation mode tests planned for this thursday. It has already been communicated to the instruments.

​​ITDM

EET

CAS

SRP

TS

AoB

  • Next week XTOB 1.01 will not be available. Most probably the meeting will be held at the mockup control room. AV will anyway send a reminder.
Entry   Report after dispatch meeting 09.30, posted by Adriano Violante on 01 Apr 2019, 10:21 

SPB/SFX

  • The quadrant motion system test for the AGIPD presented some issues with the limit switches. Being fixed.
  • Julabo chiller: waiting for feedback from Julabo to know whether the chiller is going to be repaired on time for next users. If not, SPB/SFX are trying to borrow one from CFEL (necessary parts availability to be checked.)
  • CSS loop restarted
  • CRL chamber will be brought down tomorrow. Cables in the rackroom will be re-shuffled by tomorrow evening.

FXE

  • No issues to report

SQS

  • NQS chamber is being cabled up
  • Crates for Loop 8 and 11 being installed by AE
  • VAC interlock definitions are being updated.
  • Solution for pnCCD has been found. To control it an existing PLC and cables will be used. Draft of the proposed solution will be sento to AE by TB.

SCS

  • Loop 13 firmware export will be provided to AE by EET on friday.

MID

  • Preparation of proposal for next users is ongoing (including AGIPD and EPIX).
  • Cabling issues for EPIX are being solved. Calibration of the detector will follow
  • One crate for epix has been changed and is being mounted back today
  • OPT VAC is now remote and being tested
  • Tomorrow CY will organize a review meeting for the epix where also needed people for the tests foreseen for 4-5.04 will be addressed.
  • Tech. commissioning of the CHILLER2 (AGIPD) will be done tomorrow

HED

  • Cabling phase II vs  loop operation: All the PRIO cables have been promised by the compoany to be installed by next friday.
  • Early next week LW will make a statement whether Loop 5 can be put in operation already during the week.
  • Installation of imagers behind the mono - Karen is organizing it. VAC supports.

OPT Lasers

XRO

  • Cooling installation in the SA1/3 mirrors ig going well. Commissioning foreseen for next WE. SQS and SCS shutters would need to be opened. Will be discussed offline with the instruments.
  • Minor works ongoing.

​​XPD

​​VAC

  • Hirex 2 has been installed
  • Support ongoing
  • Today MID mono will be opened.

AE

  • SASE3 and 1 tunnel MOV loops have been updated. Feedback to AE is needed!
  • Issue with dymaic triggers has been fixed.

ITDM

  • XFEL gateway will be updated in 15 minutes
  • Jddd usage examples will be posted by ITDM

DET

EET

CAS

  • Tunnels updated to Karabo 2.4.0. For the instruments coordination with scientist is ongoing (SCS already done)

 

AoB

  • Mail sent to the GLs asking for feedback concerning shutdown activities by GW.
Entry   Report after dispatch meeting 09.30, posted by Adriano Violante on 29 Mar 2019, 11:02 

SPB/SFX

FXE

SQS

  • Meeting to discuss the recent issues with the digitizers was organized by PGessler and took place yesterday. The outcome is that for the next users run the zero suppression mode will not be used (only raw data). In this case, no issues are expected. In the meanwhile a general solution will be worked out.

SCS

MID

  • Activities for next week include the interlock for the epix power system as well as the AGIPD chiller commissioning. BB has to be passed all the relevant issue since he is supporting CY during MS's holidays

HED

  • Cabling phase II vs  loop operation: All the PRIO cables have been promised by the compoany to be installed by next friday. Early next week LW will make a statement whether Loop 5 can be put in operation already during the week. With these milestoned in mind, AE will be able, if no major issues pop up, to bring up loops 5 and 7 in KW15, Loops 8-9 in KW 16 and Loop 6 by the end of April. HED has to say whether to continue with the users program under this conditions. 
  •  

OPT Lasers

XRO

​​XPD

​​VAC

AE

  • Issue with dymaic triggers is being fixed by DESY. This affects triggers 180, 181 and 182 thate are being patched.
  • Humidifiers failure in SPB rackroom reported by AE vs TS and TN. Now the humidifier has been switched off.  AV clarifies with TS. 

ITDM

DET

EET

CAS

  • SASE3 has been updated yesterday
  • For the karabo server 2.4.0 to work, also the GUI has to be updated to the 2.4.0.

AoB

Entry   Minutes of the Technical integration meeting 27.03.19 , posted by Adriano Violante on 27 Mar 2019, 10:48 

SPB/SFX

  • CRL implementation in the hutch will happen in April. AE and EET involved. ==> Connectors on the beckhoff frames need to be re-shuffled according to the newest version of the EPLAN documentation. EET will take care of that, so that the loop can be started as soon as possible.
  • CSS crate is ready. Loop 7 bridged (same loop as CRL). Test can start tomorrow.
  • AGIPD motion. Prelminary tests are being performed to be ready for the final tests in the march shutdown. ==> Some issues with cabling of limit switches were found. SPB will fix it today/tomorrow. ==> Test starting today. From the Karabo side seems ok.
  • AGIPD chiller has been shipper for repair. SPB/SFX are trying to find alternative solutions for the next users run.

FXE

  • 4 cables are needed to control some stages and were requested to AE/EET. After checking  by NC some rewiring from FXE side on the module side is needed to make the electronic solution proposed usable. NC is in contact wit TKorsh.

SQS

  • Loop 8 and 11 HW will be prepared by AE this week and can run by next week.
  • Interlock updates ongoing
  • Meeting organized by PGessler to review the recurring issues with the digitizers

SCS

  • When operating the machine in the train pattern (not  10 Hz) mode and pulse on demand mode the data from the XGMs in XTD10 and SCS is not recorded. ==> That's still the case and it is caused by a Doocs update not agreed with CAS. ==> Ongoing. ==> Meeting took place yesterday. Issue seeems to be closed.
  • The dangling cable of the sliding door has to be fixed. This is supposed to be done by ARathjen during the March shutdown.
  • A Change in the storage of raw data of the XGM is required. SCS is discussing with XPD (Theo). Later ITDM and CAS will be also involved.
  • Loop 13 being prepared. As well as 11. Interlock updates ongoing.

MID

  • Smaract stages do not work propery and reliably. High priority. Has to be clarified with AE since it is not clear whether this is the same issue that SCS had and for whoch they developed a workaround. ==> BB will contact the Smaract company to address the issue.
  • Loop 9 has been updated and the broncos can now be controlled.

HED

  • Cables and loops for HED instrumentation. LW is monitoring closely the installation of cables to give the go ahead to AE for the starting of tyhe loops. Loop 5 is still the priority. High priority cables for Loops 5, 7,8 should be all installed by the end of this week.

 

OPT Lasers

  • Modules for the time stamp have to be installed by AE. How long does it take? Will be discussed offiline with PG. ==> Installation dates: SASE1 in summer shutdown,  SASE3 being worked out, SASE2 will follow. Workaround with time stamp is being investigated. ==> PLCs have to be updated. HW ready.==> SASE3 OK. SASE2 crates being changed now.

XRO

XPD

  • Hirex 2 will be shipped from Cologne tomorrow and will be brought into the VAC lab. Crates ready, cables ready. AE can support local tests outside the shutdown week.==> Hirex will be installed in the shutdown and probably a couple of testt will need support from AE. These can be scheduled for the 01/02.04. Vac loop is affected.==> AE only supporting crates installation and powering.

 

VAC

DET

  • 3rd branch SA3 - one ion pump has to be included in the VAC loop (update tomorrow)

AE

  • Timing update foressen for today will rpobably happen a little bit later than expected in SASE2.
  • Waiting for the finalization of the MID LDM risk assessment from SRP to allow the usage of the remote control of the device.

​​ITDM

EET

CAS

SRP

TS

AoB

Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 25 Mar 2019, 11:38 

SPB/SFX

  • The Julabo chiller for the AGIPD detector broke. After intervention from TS was clear that it was not possible to fix on the fly. Users time had to be cancelled. In generalr there are 3 solution being pushed simultaneously by SPB: Fix the existing one, buy a new one, integrate a new type of chiller. AMancuso is also preparing a document for the MB with the details of the failure.

FXE

SQS

  • REMI being removed. NQS being brought in on wednesday. Support form AE for testing and configuration will be needed.
  • Vac interlock loop updates are being coordinated with AE
  • Laser being set up. Support from AE maybe needed.

SCS

MID

  • DET and ITDM working on the AGIPD this and next week.
  • Loop 9 needs a framework update (flow control with broncos).
  • Patch panel design in eplan for epix ongoing.
  • Opt hutch VAC being implemented in karabo (w/o interlock definitions. interlock tests still outstanding)

HED

  • XGM/Pulse picker alignment has to be checked with beam. AE will come back to HED today. Has been postponed since timing was not properly implemented. 

OPT Lasers

XRO

​​XPD

​​VAC

AE

  • MOV loop in SASE1 and 3 tunnels is going to be updated tomorrow at the latest. Instruments and involved groups are supposed to check if everything is fine after the update
  • SASE2 Vac loop update today
  • ITDM is supposed to work on the redundant switches in the balcony on Wednesday. Karabo is going to be interrupted for about 30 minutes. NJardon will send an email to readiness when the activity is confirmed.
  • Timing card issue issue caused the timing signal to fail in SASE1. Issue was found to be the DESY people rebooting thr PLC without informing the relevant AE people.

ITDM

DET

EET

CAS

  • 2.4.0 released. Waiting for ITDM for DAQ tests. No deployment in the tunnels foreseen for now.

AoB

Entry   Minutes of the Technical integration meeting 20.03.19 , posted by Adriano Violante on 20 Mar 2019, 14:07 

SPB/SFX

  • CRL implementation in the hutch will happen in April. AE and EET involved. ==> ZA needs the documentation of the CRL. The point is SRP to be able to evaluate the focusing properties to give beam permission after installation. TH will ask directly PVagovic. Still pending since PV is not here.==> Still pending.
  • AGIPD motion. Prelminary tests are being performed to be ready for the final tests in the march shutdown. ==> Some issues with cabling of limit switches were found. SPB will fix it today/tomorrow.

FXE

SQS

SCS

  • When operating the machine in the train pattern (not  10 Hz) mode and pulse on demand mode the data from the XGMs in XTD10 and SCS is not recorded. ==> That's still the case and it is caused by a Doocs update not agreed with CAS. ==> Ongoing
  • The dangling cable of the sliding door has to be fixed. This is supposed to be done by ARathjen during the March shutdown.
  • A Change in the storage of raw data of the XGM is required. SCS is discussing with XPD (Theo). Later ITDM and CAS will be also involved.

MID

  • Issue with the remote control of the ion pumps.MID OPT now ok. MID exp being implemented (waiting for some HW + Support from CY). Basically understood. Will be implemented in agreement with the instrument (requires access + fixed cables)==> Loop update slot to be agreed with the instrument.
  • Smaract stages do not work propery and reliably. High priority. Has to be clarified with AE since it is not clear whether this is the same issue that SCS had and for whoch they developed a workaround. ==> no updates.

HED

  • Cables and loops for HED instrumentation. LW is monitoring closely the installation of cables to give the go ahead to AE for the starting of tyhe loops. Loop 5 is still the priority. High priority cables for Loops 5, 7,8 should be all installed by the end of this week.
  • Vacuul logic has to be implemented int he opt hutch. AE ready. Can be done tomorrow (KS, NJ)

 

OPT Lasers

  • Modules for the time stamp have to be installed by AE. How long does it take? Will be discussed offiline with PG. ==> Installation dates: SASE1 in summer shutdown,  SASE3 being worked out, SASE2 will follow. Workaround with time stamp is being investigated. ==> PLCs have to be updated. HW ready.

XRO

XPD

  • Hirex 2 will be shipped from Cologne tomorrow and will be brought into the VAC lab. Crates ready, cables ready. AE can support local tests outside the shutdown week.==> Hirex will be installed in the shutdown and probably a couple of testt will need support from AE. These can be scheduled for the 01/02.04. Vac loop is affected.

 

VAC

DET

  • LPD charge injection data seem ok.
  • MID gpu calibration foreseen for today

AE

  • Data Correlation issue test between MCP detector and XGM - PG: Workplan has been made. Additional tests needed and have to be planned with beam. ==> Beamtime will be requested by JG. ==> No updates

​​ITDM

EET

CAS

  • HED kick off meeting for preparation for users has to happen. ==> Will take place next week.

SRP

 

oB

Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 18 Mar 2019, 10:04 

SPB/SFX

  • No major issues reported
  • Crates for the CRL will be installed today. Test is foreseen for next week.

FXE

  • Issue with the synchronization of the PP laser has been reported. This affects also SPB. The problem was found to be in the subsynch hutch. WP18 has been informed and is working on it.

SQS

  • Again Issue with digitizers not working was found and was  solved with the help of CAS.  For the long run PGessler proposed to have a task force with ITDM and CAS to look for eventual bottlenecks in the configuration of the chain. 
  • First CRD for the pn CCDs has been submitted. The second CRD (interlocks) is still in preparation

SCS

  • Loop 7 need to be updated (old) due to problems with readind encoders.
  • 2 fuses in the PLCs have to be replaced. AE has been informed.

MID

  • It is reported by CY that, in order to advance with the Epix readiness, would be beneficial if AE and EETF could accelerate the power system work BKF 467 crate completion (with Bernard's latest change request) plus patch-panel planning Eplan update this would be much appreciated. ==> Mails between CY and LW have been exchanged. CR implementation and Patch panel design are needed by Wednesday. 
  • Loop 9 needs a framework update today.
  • Preparation for the first users coming on Wednesay is ongoing.

HED

  • Si-Mono in XTD6 has been aligned with the cristals parallel to the beam but two issues were found: 1 - On of the movements is at ist limit and needs to be fixed. ZZ today (VAC+OPT support). 2 - One motor in Mono2 that does not work. Has to be checked (AE).
  • XGM/Pulse picker alignment has to be checked with beam. AE will come back to HED today.

OPT Lasers

XRO

​​XPD

​​VAC

AE

ITDM

  • Info was sent to the GLs concernig the use of the Maxwell cluster for users. These seemed not to be propagatet to the users since support was requested to IDTM concerning this specific issue. This is also the case for the detector calibration pipeline. These info should be proprly distributed in the future.

DET

  • FXE had small issues with LPD. DET on it.

EET

CAS

  • HED reported as an info to CAS that yesterday karabo was very slow for 2 hrs (10 seconds to push a button...) but it recovered by itself. Will be looked into... 

AoB

Entry   Minutes after dispatch meeting 09.00, posted by Adriano Violante on 15 Mar 2019, 11:27 

SPB/SFX

  • No major issues reported
  • Motors in Loop 14 have been tested and problems with the motion sign and encoder were found. AE/EET on it.

FXE

SQS

  • Issue with digitizers not working was found this morning and was reported solved during the meeting by CAS.
  • 2 CRDs for the pn CCDs are coming. Once they are there it has to be seen how to schedule the design, production of PLCs, as well as of cables.

SCS

MID

  • It is reported by CY that, in order to advance with the Epix readiness, would be beneficial if AE and EETF could accelerate the power system work BKF 467 crate completion (with Bernard's latest change request) plus patch-panel planning Eplan update this would be much appreciated. MFlade reports the request to his group.
  • Issues with Smaract stages cables. Fixed.

HED

  • Si mono in XTD6 had problems with the pitch motor whoch does not work anymore. XTD6 was opened yesterday for intervention and the system was pumping overninght. Interlock modified not to stop operation during the night for MID. This morning ZZ foreseen to complete the intervention.
  • Firmware for Loops 5 and 7 ready. KS/EET are checking whether all the cables for loop 5 have been installed. When they are, AE will be notified to switch on the loop. Same for loop 7. After the meetgin with compkany Schulz it was said that all the priority 1 cables (set by HED) will be installed by 05.04.
  • XGM/Pulse picker alignment has to be checked. On monday AE will have a look.

OPT Lasers

XRO

​​XPD

​​VAC

AE

ITDM

DET

  • Delay scan in MID was successful

EET

CAS

  • Control of personal interlock shutters will be possible through one computer for each instruments control room. PCs have been defined. Implementation can be ready by next week.

AoB

  • GW asks the intruments to check the shutdown planning, especially for the cases in which the instruments are requested as support groups (MPS?). If there a re problems or something does not make sense, please notify PSPO.
Entry   Minutes of the Technical integration meeting 13.03.19 , posted by Adriano Violante on 13 Mar 2019, 11:11 ElectricalSafety.pdf

SPB/SFX

  • CRL implementation in the hutch will happen in April. AE and EET involved. ==> ZA needs the documentation of the CRL. The point is SRP to be able to evaluate the focusing properties to give beam permission after installation. TH will ask directly PVagovic. Still pending since PV is not here.
  • AGIPD motion. Prelminary tests are being performed to be ready for the final tests in the march shutdown. Still planned.

FXE

SQS

SCS

  • When operating the machine in the train pattern (not  10 Hz) mode and pulse on demand mode the data from the XGMs in XTD10 and SCS is not recorded. ==> That's still the case and it is caused by a Doocs update not agreed with CAS.

MID

  • Issue with the remote control of the ion pumps.MID OPT now ok. MID exp being implemented (waiting for some HW + Support from CY). Basically understood. Will be implemented in agreement with the instrument (requires access + fixed cables)
  • Smaract stages do not work propery and reliably. High priority. Has to be clarified with AE since it is not clear whether this is the same issue that SCS had and for whoch they developed a workaround.

HED

  • Cables for the experiment hutch are being installed but some quality issues occured. Last pallets of cables have been sent back for proper confectioning. It is possible that there will be some delays. KA will discuss with LW how to prioritize cables to eventually minimize the impact on the commissioning. ==> Quality issues are being addressed. The company increased the manpower for cable confectioning and installation. KS prepared a list of priorities. AE informs that they will be probably able only to provide fw for loops 5 and 7 by the end of March (collision with many shutdown activities). PG will send details to KA. This will eventually require a decision concerning priorities.  Ongoing. ==> There will be a dedicated meeting after this one to discuss the details, coordinate the process (Cables/fw export/ Loops start).
  • CRL2 in XTD6 - issue with motors losing steps. Will be fixed in the March shutdown. ==> L. Batchelor
  • DAQ is ready. Data sources list has been sent to CAS. Will be also sent to ITDM for implementation.==> Status not clear
  • For the fixing of the mono's Picomotor, XTD6 will be opened tomorrow and on friday during the day. On the evenings the tunnel will be searched and closed again to allow beam in MID.

 

OPT Lasers

  • Modules for the time stamp have to be installed by AE. How long does it take? Will be discussed offiline with PG. ==> Installation dates: SASE1 in summer shutdown,  SASE3 being worked out, SASE2 will follow. Workaround with time stamp is being investigated.

XRO

XPD

  • Hirex 2 will be shipped from Cologne tomorrow and will be brought into the VAC lab. Cretes ready, cables ready. AE can support local tests outside the shutdown week.

 

VAC

  • Charge injection test (LPD, FXE) have been perfomed successfully.

DET

AE

  • Data Correlation issue test between MCP detector and XGM - PG: Workplan has been made. Additional tests needed and have to be planned with beam. ==> Beamtime will be requested by JG.
  • Hirex and DSSC integration and commissioning will most probably not be supported in the shutdown week. AE will try to support them outside that period.

​​ITDM

EET

CAS

  • Who is responsible for the bunch pattern recording for the different instruments? CAS will clarify with ITDM and AE. ==> Ongoing.
  • Karabo 2.4.0 test ongoing
  • 2.3.7. Hotfix available today (pipieline in middle layer devices has been optimized). To be decided by the instr. whether to install it or not. Recommended.
  • HED kick off meeting for preparation for users has to happen.
  • XGMs: DOOCS was updated without agreement with CAS and this lead to problems with the controls. In this condition CAS can give only limited support , because they do not know excactly what was deployed and whoch tests were done. In general, this goes against the good practice rule of not updating stuff during the beamtime.

SRP

  • The self rescue training is supposed to become part of the access requirement in the DACHS system for the tunnel. This caused a lot of concerns during the meeting (visitors? Access to components only in the very firrt part of the tunnel ). PSPO will discuss with SRP .==> SRP is trying to find a way to minimize the impact of this training on the XFEL employees. Discussion with DESY needed. ==> The implementation date is the 01.05. The legal requirements are quite strict. SRP is trying to find a solution with DESY (proper training every 3 yrs + yearly updates? to be seen). Advice from SRP is to get the training. SScherz can support booking the trainings.
  • HED Radiation interlock issues: no agreement yet to get beam permission. Another meeting is planned for tomorrow (SRP chairs).==> Solved
  • EUPs: Procedures for the electrical safety trainings and appointments are being clarified (UB, TH, WUS) ==> 2 training per week (in german) are planned for KW 13,14,15. SRP and TS will approach the GLeaders to decide who has to take the trainig first in the different groups. PGessler and SHauff point out that it is not clear whether the policy is olready in place or not. THaas mentioned that we are still in the transition phase and a presentation was given in thre STGL meeting and it was responsibility of the GLs to inform the group members. TH will send AV the material that will be circulated to the readiness mailing list and  in this elog ElectricalSafety.pdf.
  • SArslan has been appointed Safety responsible for the Exp. Hall. Access for XFEL employees will be granted by him from now on and not anymore by AViolante and GWellenreuther

AoB

Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 11 Mar 2019, 11:58 

SPB/SFX

  • Experiments were succesfull
  • Calibration pipeline has issues - being fixed
  • Detailed planning of the shutdown works is being done with AE to see whether some activities can be done before or after the critical week
  • JGFR calibration pipeline needed. SH will support SPB/SFX today
  • Motors in Loop 14 should be tested. ASilenzi can help. Then info to AE.

FXE

SQS

SCS

MID

  • Epix planning is advancing. List of activity being maintained and followed up by CY. Interface box for cables being modified by KS, CRs being implemented by AE. Ongoing. Goal date is 10.04.2019 to have the detector completely commissioned ==> Ongoing.
  • Issues with Smaract stages cables. Being fixed. (MS will help)
  • Loop 4 would need to be resterted next week.

HED

  • Si mono in XTD6 had problems with the pitch motor whoch does not work anymore. Same problems happened in other mono motors in MID and FXE in the past. MS will have a look. It has be decided how to proceed with the fixing. The mono is required for users operation in HED.
  • Loops readiness and cables readiness have to be aligned and priorities have to be set. It is not clear what can be provided by the end of March in terms of loops and cables. AV calls for  a meeting to clarify and set priorities...

OPT Lasers

XRO

​​XPD

​​VAC

AE

ITDM

DET

  • FXE JGRF was requested to be ready for last week end (done and working), but it was planned for April! In general better planning!
  • SPB calibration pipeline tests ongoing.

EET

CAS

AoB

Entry   Minutes of the dispatch meeting 09.00, posted by Adriano Violante on 08 Mar 2019, 13:01 

SPB/SFX

  • Only minor issues being addressed with the support groups.

FXE

SQS

SCS

MID

  • Epix planning is advancing. List of activity being maintained and followed up by CY. Interface box for cables being modified by KS, CRs being implemented by AE. Ongoing. Goal date is 10.04.2019 to have the detector completely commissioned

HED

OPT Lasers

XRO

​​XPD

​​VAC

AE

  • for SQS there are issue with the Karabo/digitizers communication. Workaround exists, being fixed for good (AE + CAS).
  • Given the preliminary shutdown task list sent to readiness this week, it is clear that AE does not have the resources to cope witl all the requests. The tasks do not have priorities right now and this is a problem. In general, priorities and tasks that could be dropped are needed. Instruments, Support groups and PSPO cannot decide. PSPO will address the issue to HS/TT. 

ITDM

DET

  • Calibration pipeline stability test will be performed with SPB (during shifts). CAS/DET/SPB on it.

EET

CAS

  • Hotfix 2.3.6 (GUI server, data loggers bugs fixed) deployed in SA1,2, in SA3 not yet.

AoB

 

Entry   Minutes of the Technical integration meeting 06.03.19 , posted by Adriano Violante on 06 Mar 2019, 10:31 

SPB/SFX

  • CSS component commissioning. Concept and implementation finalized. EPLAN has been modified. PLC modification has to follow.
  • Issues concerning the simultaneous operation of more Jungfrau detector modules has been solved.  Additional tests ongoing. 
  • CRL implementation in the hutch will happen in April. AE and EET involved. ==> ZA needs the documentation of the CRL. The point is SRP to be able to evaluate the focusing properties to give beam permission after installation. TH will ask directly PVagovic.
  • AGIPD motion. Prelminary tests are being performed to be ready for the final tests in the march shutdown.
  • It is possible to operate simultaneously the Agipd and Jungfrau detector. One issue is the restarting the Agipd afterwards. The issue is non critical and is being solved by DET/CAS.

FXE

SQS

  • exhaust line for explosive gases has not been tested so far and no information is available to SQS. Urgent. SRP should comment.==> MMeyer is following up the issue. ==> MM has got all the documentation and approval needed. The line can be used. XPD and CAS on it.

SCS

  • When operating the machine in the train pattern (not  10 Hz) mode and pulse on demand mode the data from the XGMs in XTD10 and SCS is not recorded.

MID

  • Issue with the remote control of the ion pumps.MID OPT now ok. MID exp being implemented (waiting for some HW + Support from CY)
  • AGIPD, Diamond and Epix detector tests succesful. AM thanks the technical groups for the support.

HED

  • Si bounce monochromators - Chiller leaks. Will be repaired in the next shutdown. ==> Waiting for delivery of parts. Not clear whether can be fixed in the next shutdown.==> Ongoing.
  • Cables for the experiment hutch are being installed but some quality issues occured. Last pallets of cables have been sent back for proper confectioning. It is possible that there will be some delays. KA will discuss with LW how to prioritize cables to eventually minimize the impact on the commissioning. ==> Quality issues are being addressed. The company increased the manpower for cable confectioning and installation. KS prepared a list of priorities. Ongoing.
  • Si- mono commissioning ongoing. Cameras for pico motors have been installed.
  • CRL2 in XTD6 - issue wit motors losing steps. Will be fixed in the March shutdown.
  • DAQ is ready. Data sources list has been sent to CAS. Will be also sent to ITDM for implementation.
  • Commissioning run proposal. Elogs to be used will be discussed with ITDM offline.
  • AE informs that they will be probably able only to provide fw for loops 5 and 7 by the end of March (collision with many shutdown activities). PG will send details to KA. This will eventually require a decision concerning priorities. 

 

OPT Lasers

  • Modules for the time stamp have to be installed by AE. How long does it take? Will be discussed offiline with PG. ==> Installation dates: SASE1 in summer shutdown,  SASE3 being worked out, SASE2 will follow. Workaround with time stamp is being investigated.

XRO

  • In SASE3 additional safety shutters issue: Hardware will be ready by middle of Feb. On the 24 and 25. the installation and the modification of the EPS loop should take place if D3, SRP agree on the change request proposed by HS and MD. ==> Still no official decision from D3 and SRP. AE would like to get as many info as possible in advance to start preparing the loop update. According to MDommach NJardon is supposed to be already in the loop. ==> Concept in written has not yet been communicated to SRP and AE. ZA will talk to HS. ==> HW is installed. Loop update can happen monday or tuesday. The proposed additional radiation safety measures for SASE3 were discussed with Zunaira Ansari. A test is foreseen for 5 March. Implementation in the SEPS system will be directly coordinated between Zunaira and Nerea. ==> Test successful. Limit for SASE3 has been nor raised to 1.3 keV.

XPD

VAC

DET

AE

  • Data Correlation issue test between MCP detector and XGM - PG: Workplan has been made. Additional tests needed and have to be planned with beam.

​​ITDM

  • Commissioning proposals form last year: The data will be moved physically to desy soon. ITDM will send an e mail aroung to inform the relevant people.

EET

CAS

  • Who is responsible for the bunch pattern recording for the different instruments? CAS will clarify with ITDM and AE. ==> Ongoing.

SRP

  • The self rescue training is supposed to become part of the access requirement in the DACHS system for the tunnel. This caused a lot of concerns during the meeting (visitors? Access to components only in the very firrt part of the tunnel ). PSPO will discuss with SRP .==> SRP is trying to find a way to minimize the impact of this training on the XFEL employees. Discussion with DESY needed. ==> The implementation date is the 01.05. The legal requirements are quite strict. SRP is trying to find a solution with DESY (proper training every 3 yrs + yearly updates? to be seen). Advice from SRP is to get the training. SScherz can support booking the trainings.
  • HED Radiation interlock issues: no agreement yet to get beam permission. Another meeting is planned for tomorrow (SRP chairs).
  • Procedures for the electrical safety trainings and appointments are being clarified (UB, TH, WUS)

AoB

Entry   Minutes of the dispatch meeting 09.30, posted by Adriano Violante on 04 Mar 2019, 10:38 

SPB/SFX

  • Ongoing discussions with the support groups to organize the shutdown activities.Update of the shutdown task list could eventually be provided.
  • X-Ray interlock system had issues in the WE and needed to be re set. Not clear why this happened.
  • Problem with Karabo freezing. CAS contact person ihas been involved and is working on the issue. This is related to the calibration running.

FXE

SQS

SCS

MID

  • Fast diodes needed on the WE. HW and Software support required and ongoing. ==> Successful
  • CY called for a  meeting on monday to collect all the requirements for the epix det to work. The det will be then tested in the common lase room. Karabo interface change is required. It will take 3 weeks.==> Epix has been moved back to the common laser room for proper testing and commisisoning. Several tasks have to be accomplished to try to make the detector work for the April's run. CY is basically organizing the technical commissioning.

HED

OPT Lasers

XRO

​​XPD

​​VAC

  • A pump for the GATT in SASE 3 had to be treplaced (borrowed from SPB).
  • Solid ATT in XTD 1 has issues with control valves. Being fixed now with a ZZ access.

AE

  • Probably the timing update planned for this morning will not be needed anymore. BF will send a notification mail.
  • there are many activities planned for the next shutdown and priorities will need to be set . PSPO agreed on sending the preliminary task list to the support groups so that they can start having an overview.

ITDM

  • Failure of the logbook during the night: Also one partition failed. Not clear why. Everything has been fixed and is back to normal.
  • Simultaneous operation of all the instruments generates competition of the resources. Priorities to be set.
  • Calibration pipeline: Only 1 server in place. POssible issues when operationg MID and SPB agipd at the same time... DET should look into that.
  • SPB requested to restart the DAQ before every shift. This can be done but it requires experts from DET and SPB to be present and to perfome some checks. This is now not always the case. To be discussed ho to find a short term solution.

 

DET

EET

CAS

  • Test Karabo 2.4.0. ongoing. Ongoing
  • List of loop updates for PLCs has to be issues by AE to CAS as soon as the activities are known.

AoB

 

Entry   Report after dispatch meeting 09.00, posted by Adriano Violante on 01 Mar 2019, 14:18 

SPB/SFX

  • Today Loop 8 could be ready (AE)
  • Agipd - visualization of data shows variable rep rate... correlations to be investigated.

FXE

SQS

SCS

MID

  • Fast diodes needed on the WE. HW and Software support required and ongoing.
  • CY called for a  meeting on monday to collect all the requirements for the epix det to work. The det will be then tested in the common lase room. Karabo interface change is required. It will take 3 weeks.
  • VAC interlock test in MID OPT to be performed. Marjian can support.

HED

  • Si(111) mono commissionig ongoing
  • VAC componennt in HED OPT being setup by KS
  • Digitizers for diodes being used.

OPT Lasers

XRO

​​XPD

​​VAC

AE

  • Timing update on monday in SASE2. BF sent an email to readiness with the details.

ITDM

DET

EET

CAS

  • Test Karabo 2.4.0. ongoing. List of PLCs AE==>CAS.
  • Problem with a solid attenuator valve in XTD1. Not enough air pressure to operate the valve properly. DFM(CAS) will contact XRO.

AoB

CAS and AE point out that there are many activities planned for the next shutdown and as soon as PSPO will issue the shutdown tasklist planning most probably priorities will need to be set by TT/ MGMT

Entry   Minutes of the Technical integration meeting 27.02.19 , posted by Adriano Violante on 27 Feb 2019, 11:27 

SPB/SFX

  • CSS component commissioning. Concept and implementation finalized. EPLAN is being modified. PLC modification will follow.
  • Loop 14 (Jungfrau) commissionig is ongoing. Issues concerning the simultaneous operation of more modules. SPB and DET on it. The detector is needed functional within 3 weeks.
  • CRL implementation in the hutch will happen in April. AE and EET involved. ==> ZA needs the documentation of the CRL. before April. MS will ask the responsbile person in SPB.Ongoing.
  • Changes concerning modules for the AGIPD motion are being discussed. Intervention on the modules planned for the next shutdown. AE, DET, CAS, SPB involved.
  • Issue Basler camera <==> Loop. Will be solved offline with AE.
  • Refurbished beamstop is needed by Mid. April. XRO has been informed.

FXE

SQS

  • exhaust line for explosive gases has not been tested so far and no information is available to SQS. Urgent. SRP should comment.==> MMeyer is following up the issue. - NO update.

SCS

MID

  • Issue with the remote control of the ion pumps. It is not possible to switch on and off the pumps remotely due to the fact that a wrong terminal was used . It seems this was also the same issue in SASE1 and 3. AE and EET are on it to fix it and update the doucumentation. ==> AE needs to perform a test at MID before deploying the solution. Since there are other priorities now the test has not happened yet. ==> Test has been shifted to HED. ==> Test will be synchronized with planned loop updates in MID. Will be coordinated between AE and MID.
  • An automatic chain of communicaton is needed (TS?) to notify relevant peopole when the power is down. ==> UBr will follow up the automatic notification setup.==> Ongoing.  

HED

  • Si bounce monochromators - Chiller leaks. Will be repaired in the next shutdown. ==> Waiting for delivery of parts. Not clear whether can be fixed in the next shutdown.
  • hirex mono water connections will be reworked in March.
  • Cables for the experiment hutch are being installed but some quality issues occured. Last pallets of cables have been sent back for proper confectioning. It is possible that there will be some delays. KA will discuss with LW how to prioritize cables to eventually minimize the impact on the commissioning.
  • Si- mono commissioning ongoing
  • CRL2 in XTD6 - issue wit motors losing steps. Being fixed
  • DAQ and signal processing is neede int he OPT hutch. Ongoing with ITDM and CAS.

 

OPT Lasers

  • Modules for the time stamp have to be installed by AE. How long does it take? Will be discussed offiline with PG. ==> Installation dates: SASE1 in summer shutdown, SASE3 in the next 2 weeks, SASE3 being worked out.

XRO

  • In SASE3 additional safety shutters issue: Hardware will be ready by middle of Feb. On the 24 and 25. the installation and the modification of the EPS loop should take place if D3, SRP agree on the change request proposed by HS and MD. ==> Still no official decision from D3 and SRP. AE would like to get as many info as possible in advance to start preparing the loop update. According to MDommach NJardon is supposed to be already in the loop. ==> Concept in written has not yet been communicated to SRP and AE. ZA will talk to HS. ==> HW is installed. Loop update can happen monday or tuesday. The proposed additional radiation safety measures for SASE3 were discussed with Zunaira Ansari. A test is foreseen for 5 March. Implementation in the SEPS system will be directly coordinated between Zunaira and Nerea.

XPD

VAC

DET

AE

  • Correlation test between MCP detector and XGM last friday highlighted issues at the Karabo doocs interface concerning train id. Meeting AE, CAS, ITDM, XPD to follow up the issue.

​​ITDM

EET

CAS

  • Who is responsible for the bunch pattern recording for the different instruments? CAS will clarify with ITDM and AE.

SRP

  • The self rescue training is supposed to become part of the access requirement in the DACHS system for the tunnel. This caused a lot of concerns during the meeting (visitors? Access to components only in the very firrt part of the tunnel ). PSPO will discuss with SRP .==> SRP is trying to find a way to minimize the impact of this training on the XFEL employees. Discussion with DESY needed. 

AoB

 

Entry   Minutes of the dispatch meeting 09.30, posted by Adriano Violante on 25 Feb 2019, 09:52 

SPB/SFX

  • Change to the triggers for  cameras is being discussed/implemented with BF.
  • Preparation for the AGIPD intervention planned in the next mini shutdown is being discussed with AE.
  • On Wednesday the user period start. No more commissioning possible. 

FXE

  • Issues with digitizers for the OGT1. AE will investigate.

SQS

  • Issues with digitizers that crash regularly (issue concerning data aggregators may also depend on it) - Cyril on it.
  • Mpods commissioning - Also here CAS (Cyril and CY providing support)

SCS

  • No special issues

MID

  • Commissioning ongoing. (Agipd "saw" beam last WE)
  • This week the interlock definition in Loop4 (VAC) should be updated. Before performing the update MID needs to be informed

HED

OPT Lasers

XRO

​​XPD

​​VAC

AE

  • When HS and ZA the requirements for the SEPS updates have to be discussed and put in written before the loop update. Could happen on Thursday.
  • On Friday Loop 13  in SCS was updated (Train id) and after that MS noted some strange behavior. To be checked with MTeichmann.

ITDM

DET

  • SPB test ok
  • Today: work on LPD and Jungfrau SPB.

EET

CAS

  • Kickoff meeting with ITDM to start to evaluate InfluxDB, Grafana and Elastic Search as an alternative to the current Karabo DataLogger implementation (LA and VAC represents use cases to be addressed/solved). However, "nothing" will impact operation in the next months. ==> Hotfix 2.3.5. has been released. Mandatory to solve a GUI issue currently present.
  • SPB Loop 14 needs to be deployed (Karabo) ==> Today

AoB

 

Entry   MInutes of the dispatch meeting 09.00, posted by Adriano Violante on 22 Feb 2019, 12:36 

SPB/SFX

  • Pulse picker commissiong - Issues concerning motors position and triggers ==> To be worked out with AE, but beam is needed. Has to be done.
  • DET group is helping setting up the Jungfrau detector (w/o PLC).
  • DAQ performance test performed yesterday.
  • Trigger for ns laser is needed next week. Everything should be already prepared but BF checks.

FXE

SQS

SCS

MID

HED

  • Commissioning of components ongoing. There is a learinig curve concerning Karabo.
  • Cabling issues and CR are being followed up with high priority by EET
  • A camera is needed in the tunnel to align the spectrometer. Either a webcam or the camera dedicated to the second spectroemeter has to be moved (only temporary - no definitive changes needed). This can be done with a ZZ access on monday. KA is organizing the hardware, CAS and AE will take care of software and evetaually trigger.

OPT Lasers

XRO

​​XPD

​​VAC

  • On monday the HW for the B4C in SA3 will be mounted. and tested. No loop updates concerning the interlock. This will happen in march.
  • GATT loop update for SASE3 planned for Monday

AE

  • A PLC in HED has to be replaced because of some beckhoff license that expired ==> Problem solved replacing the PLC. Whys did this happen is still not clear.

ITDM

DET

  • SCS took data with the fast CCD. Data has to be analyzed but seems ok. ==> Ongoing
  • SPB agipd OK==> Calibration is now running.
  • FXE LPD had issues being followed up

EET

CAS

  • Kickoff meeting with ITDM to start to evaluate InfluxDB, Grafana and Elastic Search as an alternative to the current Karabo DataLogger implementation (LA and VAC represents use cases to be addressed/solved). However, "nothing" will impact operation in the next months.
  • SPB Loop 14 needs to be deployed (Karabo)

AoB

 

Entry   Minutes of the Technical integration meeting 20.02.19 , posted by Adriano Violante on 20 Feb 2019, 11:16 

SPB/SFX

  • CSS component commissioning. Concept and implementation being finalized.==> Final tests have to be performed at SPB, if OK, the CR will be finalized.
  • Loop 14 (Jungfrau) commissionig has started. 3 modules are being controlled. The movable stage should have been shipped from japan today. Then will be mounted and controlled via PLC.
  • CRL implementation in the hutch will happen in April. AE and EET involved. ==> ZA needs the documentation of the CRL. before April. MS will ask the responsbile person in SPB.

FXE

SQS

  • exhaust line for explosive gases has not been tested so far and no information is available to SQS. Urgent. SRP should comment.==> MMeyer is following up the issue. - NO update.

SCS

  • Ready to take beam

MID

  • Issue with the remote control of the ion pumps. It is not possible to switch on and off the pumps remotely due to the fact that a wrong terminal was used . It seems this was also the same issue in SASE1 and 3. AE and EET are on it to fix it and update the doucumentation. ==> AE needs to perform a test at MID before deploying the solution. Since there are other priorities now the test has not happened yet. ==> Test has been shifted to HED.
  • An automatic chain of communicaton is needed (TS?) to notify relevant peopole when the power is down. ==> UBr will follow up the automatic notification setup. 
  • Loop update caused some issues with the motor directions.
  • Components in the tunnel hava to be included in the DAQ during the internal commisisoning time. Name of the relevan tunnel components should be comminicated to the CAS contact person.

HED

  • Si bounce monochromators - Chiller leaks. Will be repaired in the next shutdown.
  • hirex mono water connections will be reworked in March.

 

OPT Lasers

  • SASE1 PP laser available
  • SASE2 and 3 in progress.
  • Modules for the time stamp have to be installed by AE. How long does it take? Will be discussed offiline with PG.

XRO

  • In SASE3 additional safety shutters issue: Hardware will be ready by middle of Feb. On the 24 and 25. the installation and the modification of the EPS loop should take place if D3, SRP agree on the change request proposed by HS and MD. ==> Still no official decision from D3 and SRP. AE would like to get as many info as possible in advance to start preparing the loop update. According to MDommach NJardon is supposed to be already in the loop. ==> Concept in written has not yet been communicated to SRP and AE. ZA will talk to HS.

XPD

VAC

DET

AE

​​ITDM

EET

CAS

  • Hotfix is being tested and probably relesed tomorrow. It is not mandatory. Minor improvements only.

SRP

  • FXE beam permission issue form last week: Due to the fact that the CRL can focus the beam on the beamstop and the operation betweek 7 and 14 keV was required, a proper analisys of the radiation safety had to be carried out. Between 7 and 9 keV the air is absorbing mostly of the light and there are no concerns. For energies above 7 keV the transmission increases. In order to allow operation the following requirements were set: 4W max power. B4C in front of the beamstop (efficiency grows with energy in this range)
  • The self rescue training is supposed to become part of the access requirement in the DACHS system for the tunnel. This caused a lot of concerns during the meeting (visitors? Access to components only in the very firrt part of the tunnel ). PSPO will discuss with SRP .

AoB

 

Entry   Minutes of the dispatch meeting 09.30, posted by Adriano Violante on 18 Feb 2019, 10:09 

SPB/SFX

  • Data aggregators were often crashing during the WE and needed to be re initialized.
  • Puls picker commissiong - Scan tool was used and worked. Issues concerning motors position and triggers ==> To be worked out with AE.
  • DET group is helping setting up the Jungfrau detector.

FXE

  • Mono commisisong ongoing. Beam was passing through both monos at the end of last shift.
  • New beamstop mounted and being used.

SQS

SCS

  • Parallel operation with SA1 did not generate major issues
  • Karabo did not store the bunch pattern info
  • Leds on the beamline are needed. Loop4 is the most important and will be updated today.

 

MID

  • Water connections for the mono chiller will probably be reworked with the vac group.
  • MIddle layer tests will be performed by CAS (CY)
  • Aligment of the optics in XTD6.
  • Tomorrow: exapod commissiong. PC with windows needed. ITDM+CAS
  • Issues with scenes being stuck, probabl;y due to a HW error to be fixed with manual on-off operation ot the component switch.  Being checked with CAS. 

HED

OPT Lasers

XRO

​​XPD

  • New trigger system needed for a gated camera in SASE3 - BF on it.

VAC

AE

  • Timing server has been updated 
  • A PLC in HED has to be replaced because of some beckhoff license that expired (?)

ITDM

DET

  • SCS took data with the fast CCD. Data has to be analyzed but seems ok.
  • SPB agipd OK
  • FXE LPD had issues being followed up

EET

CAS

AoB

A questionnaire to gather the activity of the next shutdown was sento to the XFEL and DESY group and operation leaders. The planning is going to be done together with DESY using the same templates and planning tools. 

Entry   Report after dispatch meeting 09.00, posted by Adriano Violante on 15 Feb 2019, 12:14 

SPB/SFX

  • SPB requires the new trigger solution to be implemented for AGIPD. This is urgent and should be done before the next run. SHauf has to check in the DET group whether this can be pushed also wil Jola coming back only next week. ==> done and seems to work
  • Commissioning with beam (e.g. focus characterization) planned for the next days.

FXE

  • Issue with the one picomotor of the monochromator which does not move as far ae expected. (Similar issue we had in MID? To be checked). Benoit Rio is following the issue up.

SQS

SCS

 

MID

  • Technical commissioning of CRL and imagers ongoing - no specific issues.
  • MIddle layer tests will be performed by CAS (CY)
  • Agipd cannot be used still due to cooling system problems.
  • MIL Loop9 is running 

HED

OPT Lasers

XRO

​​XPD

VAC

AE

  • Timing server has to be updated again on MOnday 18.02. at 9:00. Mail has been sent already to readiness@xfel.eu with the details
  • No feedback concerning the additional B4C controls in SASE3. HS ans MD have to come back to PG

ITDM

  • Issue with the DAQ was discovered (cameras/digitizers): problems occur when more than 1 camera is using the same data aggregator. Investigation and fix is ongoing. DAQ will need to be re deployed only for these aggregators between today and tomorrow. Tunnels and instruments affected. AGIPD is not affected.  ==> solved

DET

EET

CAS

  • CAS will not deploy devices during the WE on OCD that have not been tested and technically commissioned before.
  • ISAC power supplies: to switch them on and off, an additional piece of circuitry is needed to generate a specifi signal. 2 solution actually esist and it it the wish from CY to avoid using multiple solutions. PG agrees and will look into that. The understanding of CAS and AE will be aligned. 

AoB

Entry   Minutes of the Technical integration meeting 13.02.19 , posted by Adriano Violante on 13 Feb 2019, 10:59 

SPB/SFX

  • CSS component commissioning. RBean is discussing with AE. Concept and implementation being finalized.
  • Loop 14 (Jungfrau) is needed for next week to start the commissioning. IT Cables have been accepted after new measurements. Loop can be switched on.
  • Issue about parallel operation of the 3 Jungfrau modules. Being addressed (DET)
  • CRL implementation in the hutch will happen in April. AE and EET involved. Safety concept for the handling of Berlillium lenses has been finalized.

FXE

  • FXE is working with the SPB spare beam stop (new concept). XRO is in parallel preparing another beamstop for FXE to comply with the new safety standards. SPB needs to get the beamstop back in April.

SQS

  • The chain digitizers-triggers-software is being commissioned to allow online analysis. AE, CAS required and involved.==> Specific issues being addressed.
  • exhaust line for explosive gases has not been tested so far and no information is available to SQS. Urgent. SRP should comment.==> MMeyer is following up the issue. - NO update.

SCS

  • PLCs have been all installed. Firmware deployment has to be pushed. AE is on it.==> Ongoing and high priority. 
  • Commissioning (Smaract/microscope chamber) ongoing.
  • Detector group is working on the fastCCD. Cooling rod has been installed. Cooling is stable. According to DET should be OK.
  • Pulses for SASE3 has been delayed, but it will be no issue for the FastCCD.

MID

  • Issue with the remote control of the ion pumps. It is not possible to switch on and off the pumps remotely due to the fact that a wrong terminal was used . It seems this was also the same issue in SASE1 and 3. AE and EET are on it to fix it and update the doucumentation. ==> AE needs to perform a test at MID before deploying the solution. Since there are other priorities now the test has not happened yet.
  • An automatic chain of communicaton is needed (TS?) to notify relevant peopole when the power is down. ==> UBr will follow up the automatic notification setup.
  • Issue with the silicon oil leaks. Even though the system was testes with LN2 up to 5 bar. For now it is not  a showstopper but it needs to be addressed.

HED

  • Si bounce monochromators - Chiller leaks. Will be repaired in the next shutdown.
  • hirex mono water connections will be reworked in March.
  • Leak in the cooling unit of the racks in A.27 was repaired on site. (TS+External company)

 

OPT Lasers

XRO

  • In SASE3 additional safety shutters issue: Hardware will be ready by middle of Feb. On the 24 and 25. the installation and the modification of the EPS loop should take place if D3, SRP agree on the change request proposed by HS and MD. ==> Still no official decision from D3 and SRP. AE would like to get as many info as possible in advance to start preparing the loop update. According to MDommach NJardon is supposed to be already in the loop.
  • M2 in SASE3 is commissioned and being fine tuned by the instruments.
  • There was a DAQ issue concerning the reading of imagers. Should be solved accordina to ITDM, has to be checked and confirmed by XRO.
  • CAS is fixing some issue on the middle layer for the slit gap controls.

XPD

VAC

DET

  • Jungrfau control issues being addressed
  • SPB requires the new trigger solution to be implemented for AGIPD. This is urgent and should be done before the next run. SHauf has to check in the DET group whether this can be pushed also wil Jola coming back only next week.

AE

  • DESY reboot  of the timing system: small issue with SPB and XRD. Solved.

​​ITDM

  • Storage and logbooks are planned to be divided per week (different buckets for different weeks). It has to be discussed whether it makes sense to try to mergen some of them (e.g. instrument commisioning?). Has to be discussed with the instruments.

EET

CAS

AoB

 

Entry   MInutes of the dispatch meeting 09.30, posted by Adriano Violante on 11 Feb 2019, 09:59 

SPB/SFX

  • Beam is back on Wed. night.
  • IT cables in D.23 were re-measured on friday. Probemessung was OK. Waiting for the complete set of measurements. PSPO pushes the company.
  • Updates+testing of the AGIPD with the CFEL experts is ongoing.
  • interlock definitions were updated.

FXE

  • Last Thursday an alarm signal was heard from the control room and only entering the hutch it was realized that an additional radiation sensor was triggered, maybe due to a spike. The procedure and actual usefulness of the device should be commented on by SRP.
  • An additional beamstop will be installed otday in the hutch. This requires to OGT3 to be moved.
  • Performance issue with the digitizers when all 3 of them are used in parallel. AE on it.

SQS

SCS

  • Beam is back on Wed. night.
  • Today Loop 7 and 9 will be updated. Loop 7 includes the fast ccd motors and will be tested after update.
  • Smaract stages have to be tested with AE (today/tomorrow)

MID

  • Marjan is supporting the commissioning of components in the hutch.
  • Loop11 is probably already containing all the required components. JH will send a confirmation email to NJ today.

HED

  • Problems with the HV ion pump cables in the HED optics. Many of the cables failed the final test and showed sparks. KS, EET are in contact with Fa. Schulz to solve that. It is not clear whether this is a showstopper or the pumps could be operated locally.==> Fa Schulz will fix the connectors on site.
  • Loop1 is being commissioned (Gauges and gate vales are included)

OPT Lasers

XRO

​​XPD

VAC

AE

  • DESY is restarting the timing serve today at 11am. This will not affect the train ID. 
  • No feedback concerning the additional B4C controls in SASE3. Waiting...
  • Material for the trigger boxes is available at AE

ITDM

  • Issue with the DAQ was discovered (cameras/digitizers): problems occur when more than 1 camera is using the same data aggregator. Investigation and fix is ongoing. DAQ will need to be re deployed only for these aggregators between today and tomorrow. Tunnels and instruments affected. AGIPD is not affected.  

DET

  • Test of the Jungfrau foressen for tomorrow at SPB, for the end of the week for FXE. SCS fast CCD also needed asap.
  • online preview feature was deploted for SPB. FXE next week.

EET

CAS

  • Yesterday OCD was called by JG because of some problems with the data sources. This was found to be a configuration problem. Going to be fixed today.
  • CRL in XTD1 2 lenses are disconnected. They do not nmeed to be included in the Karabo scene.

AoB

Entry   Report after dispatch meeting 09.00, posted by Adriano Violante on 08 Feb 2019, 10:42 

SPB/SFX

  • IT cables in D.23 were re-measured yesterday. Waiting for the measurements. PSPO pushes the company.

FXE

SQS

  • Mpods handover took place. Need to be cabled up on Monday and then configuration can follow (CY).
  • Trigger issue would require AE. TB will check first whether the HW is ok...
  • New uTCA crate with more digitizers has been installed (ITDM/CAS/AE). Tests are ongoing now. (e.g. how many digizizers can be used in parallel). Ok so far.
  • Interlock acting on the MPS interface have been tested but are inactive. Should be activated. Meeting TB/NJ/HS to clarify that. ==> Meeting took place but the interlock are not yet active. Should happen next week.

SCS

MID

HED

  • Problems with the HV ion pump cables in the HED optics. Many of the cables failed the final test and showed sparks. KS, EET are in contact with Fa. Schulz to solve that. It is not clear whether this is a showstopper or the pumps could be operated locally.

OPT Lasers

XRO

​​XPD

VAC

AE

  • MPS/ trigger box required by hiBEF issue is being clarified by ZA. AE did not get any request in advance.==> There was a meeting to clairy the issue. Many open points have to be clarified by HED/hibef. The box seems anyway not to be useful...
  • MCP motor in SA1 and 3 does not retract when the limit switch is hit. The update can be done during the next short shutdown. For now, the AE OCD knows the issue and knows how to act on the motors if an issue occurs.
  • Ion pumps remote ON/OFF control: AE is performing some test to see whether once could drive the pumps via serial port w/o updating the loops. Interlocks do not switch the pumps off, it is rather the opposite (no problem in using serial communication then). Once AE finalizes the solution, the IP address of the devices and support will be given to CAS to set up the controls.

ITDM

DET

EET

CAS

  • Yesterday OCD was called by JG because of some problems with the data sources. This was found to be a configuration problem. Going to be fixed today.
  • CRL in XTD1 2 lenses are disconnected. They do not nmeed to be included in the Karabo scene.

AoB

 

Entry   Minutes of the Technical integration meeting 06.02.19 , posted by Adriano Violante on 06 Feb 2019, 11:13 

SPB/SFX

  • AGIPD commissioning and tests. ==> intervention on the wings is ongoing.
  • CSS component commissioning. RBean is discussing with AE. By the end of the week the changes could be implemented.
  • Loop 14 (Jungfrau) is needed for next week to start the commissioning. AE infrastructure is ready. The CAT cables measurements not compliant with XFEL standard, have to be re-measured. It was supposed to happen on Monday, but Fa. Bohn had problems with the measuring device. PSPO tries to apply pressure and get it done asap. In parallel AE will communicate to ITDM the number of ports required to prepare a temporary connection between D.22/D.23.
  • CRL implementation in the hutch will happen in April. AE and EET involved.

FXE

SQS

  • REMI chamber was installed. Final modifications to the DPS were done. Now the system is pumping down. Bake will be turned off during the WE.
  • CYoungmann is commissioning the Mpods.==> Working now.
  • The chain digitizers-triggers-software is being commissioned to allow online analysis. AE, CAS required and involved.==> Ongoing
  • New requirement document will be submitted today for a new slit system component (not for this SD). ==> Ongoing.
  • exhaust line for explosive gases has not been tested so far and no information is available to SQS. Urgent. SRP should comment.==> MMeyer is following up the issue.

SCS

  • PLCs have been all installed. Firmware deployment has to be pushed. AE is on it.==> Ongoing and high priority.
  • 1 Terminal needs to be exchanged. It is needed for next week. Eplan has been updated. AE has to implement the change now.
  • Concerning the smaract stages a technician is today here. If anybody is interested, please contact JTDelitz.==> The component has 17 motors but only 15 were included in the CRD and therefore controlled.
  • Detector group is working on the fastCCD. ==> Today the cooling rod will be installed.

MID

  • Issue with the remote control of the ion pumps. It is not possible to switch on and off the pumps remotely due to the fact that a wrong terminal was used . It seems this was also the same issue in SASE1 and 3. AE and EET are on it to fix it and update the doucumentation. ==> MS is doing some test today to see whether the tunnel solution could be implemented in a provisional way.
  • Fa. Schulz did not manage to pull all the MID EXP cables by Tue afternoon as requested. Fine tuning of whoch cables are needed to start the loop commissioning and whoch ones can be postponed has to be done and driven by EET/MID (M. Flade/JHallman) ==> Being finalized.
  • On Monday afternoon (17:00) a power cut caused by works on the SASE emergency power off caused the PLC to be switched off and additioanl efforts to bring them on again. This intervention was not known to MID and not planned in the winter schutdown list of activities. Technical Services is/will be reminded that proper communication is needed.==> Other unexpected power cuts due to MPS works both on Monday and today. The communication has to be improved (via SRP). In addition, also an automatic chain of communicaton has to be set up (TS?) to notify relevant peopole when the power is down.

HED

  • Loop 2 needed for commissioning. ==> Commissioning starts tomorrow.
  • Tomorrow the commisisoning of the monochromator in the tunnel and CRL in the optics hutch will start. ==> Mono 1 and 2 commissiong is ongoing.
  • hires mono water connections will be reworked in March.

 

OPT Lasers

  • In SASE3 commisioning isd ongoing and there are no concerns about having the laser ready in July
  • In SASE2 commissioning of the seeder started.
  • Issue with the door is being discussed with TS. ==> Door being fixed. Then the commissioning can start.

XRO

 

  • In SASE3 additional safety shutters issue: Hardware will be ready by middle of Feb. On the 24 and 25. the installation and the modification of the EPS loop should take place if D3, SRP agree on the change request proposed by HS and MD. AE is involved and has allocated resources. It is not clear to whoch extent CAS is involved. This should be clarified, also for proper CAS resourced allocation. ==> No feedback received but CAS is not involved a lot (mainly AE).
  • For this friday SRP schedule a test of the GATT. SQS/SCS informed and part of the activity. ==> Successful.
  • During the installation of mirrors for SASE3 with InGa an issue occured. While pumping down (slowly) foam was generated and it required baking of the system to be able to pump it and bring it to ion pumps vacuum level. Tests are needed to finalize the proper procedure. In general, all the instruments dealing with mirrors should contact XRO (M.Vannoni) for proper venting and pumping down of the system to avoid surprises.

XPD

VAC

  • Mono in XTD6 commissioning. AE and XRO involved.

DET

  • AGIPD calibration is being prepared

AE

  • DESY will reboot the timing system next monday. BF circulated a mail about that. ==> Has been postponed. No new date yet.
  • Instruments have been already informed about the new timing feature.

ITDM

  • Switch of the storage in SASE1 was succesful. Testing ios ongoing. OK so far. In the next days other tests with detectors will be done. (IBM technician also at XFEL today) ==> Done. Test to check the possibility for the users to read directly the raw data is being done.

EET

CAS

  • Gateway has been updated.
  • Karabo roadmap will be sent by mail in the next hours

AoB

Next technical integration meeting (Wed 13.02) will be anticipated at 9 due to the General assembly called for 10:00.

Entry   Report after dispatch meeting 09.30, posted by Adriano Violante on 04 Feb 2019, 10:17 

SPB/SFX

  • Waiting for the loop 12 to be running to start the commissioning of Jungfrau. Some cables for th fus boxes missing. Also IT cables are being mesaured.
  • CSS motion. Discussions ongoing to fix it.

FXE

SQS

  • Mpods handover postponed to today at 15:30.
  • Interlocks are being tested and some issues found. AE fixing them.
  • uTCA almost readyfrom the HW point of vies. 1 cable is missing, but it is being taken care of. 
  • Interlock acting on the MPS interface have been tested but are inactive. Should be activated. Meeting TB/NJ/HS to clarify that.

SCS

  • Loops update ongoing. Should be completed during this week.
  • Interlock definitions are being discussed with/corrected by AE
  • Waiting for approval by AE for some components to be bought. NC is working on that.
  • For the test planned on 8/9/10 (bender commissioning in SASE3) there is going to be a meeting with SCS/SQS/VAC/OPT for coordination purposes. MTeichmann should be involved.

MID

  • Ph. II cables should be done today (should have been completed already last week). JH is discussing after the meeting with AE to see when Loop 10 can be expected to run and will then inform CAS about updated timeline.
  • Meeting about the status of the SDL project in MID is planned for today at 14:30. All interested groups have been invited.
  • There was a power cut in MID EXP/OPT this morning. Not clear why. Will be investigated.
  • Ion pumps remote ON/OFF control: AE is performing some tests. as soon as thet are over AE will make a  statement and suggest how to proceed.

HED

  • Leak in the chiller of the hirex mono. Cooling system is not needed urgently (it seems). The fix will not happen in this SD.
  • Commissioning of ATT starts tomorrow.
  • Meeting on wednesday to finalize the list of things to be done to the XTD monos before the closing of XTD6 (Thu.)

OPT Lasers

XRO

  • Commissioning of benders in SASE3 planned for 8,9,10. Feb. SQS hutch will be interlocked and shutter opened.

XPD

VAC

AE

  • MPS/ trigger box required by hiBEF issue is being clarified by ZA. AE did not get any request in advance.
  • The timing system update at desy planned for today has been cancelled. More info to come.

ITDM

  • in SA2 and 3 additional servers for online computing clusters are being installed and need to be configured.
  • AGIPD/LPD parallel operation in SASE1 needs to be tested (ITDM/INSTR/DET)

DET

EET

CAS

  • Yesterday there was a problem with the Broker of Karabo in SASE1. SA1 was down for several hours. Cause is being investigated. It was not clear on the CAS side how to communicate the problem properly (Which logbook/mailing list to use). Should be addressed in the operation meetings. ==> No conclusive statement yet.

AoB

The Technical integration meeting (this Wednesday) will be replaced by a dispatch-like meeting in the mockup control room due to proper rooms unavailability.  A reminder to readiness@xfel.eu will follow. 

Entry   Report after dispatch meeting 09.00, posted by Adriano Violante on 01 Feb 2019, 12:49 

SPB/SFX

  • Open AGIPD wing. Next 3 days are needed for fixing purposes.

FXE

SQS

  • Interlocks are being tested and some issues found. Next week AE support planned.
  • In Loop 4 the power supplies for the gauges do not work. Being investigated by Bernard Baranasic
  • Vacuum of the REMI chamber small issues. NRennhack is in contact with AE.
  • Today there will be the handover of the first  Mpod crate to SQS by CY.

SCS

MID

HED

  • Hirex mono needs water connections. Being addressed.
  • CRL commissioning in the OPT hutch has been completed.
  • Next week: commissioning of ATT, Imagers and zoom monitor - Loop 2 is ready.

OPT Lasers

XRO

  • Encoders for the mirrors in XTD6 are being checked.
  • Commissioning of benders in SASE3 planned for 8,9,10. Feb. SQS hutch will be interlocked and shutter opened.

XPD

VAC

AE

  • Update of the EPS in SASE1 and 3 has been done yesterday and some issues on the machine side followed (EPS was triggered)
  • .Today MPS test of the Gatt in sase3. 
  • HED att has some issues. Marjan and Nerea following the issue up.
  • Fuse boxes for D.23 arrived. Power cables are missing. Being taken care of.
  • IT cables in D.23 will be remeasured on Monday. 

ITDM

 

EET

CAS

  • Yesterday there was a problem with the Broker of Karabo in SASE1. SA1 was down for several hours. Cause is being investigated. It was not clear on the CAS side how to communicate the problem properly (Which logbook/mailing list to use). Should be addressed in the operation meetings.

AoB

Entry   Minutes of the Technical integration meeting 30.01.19 , posted by Adriano Violante on 30 Jan 2019, 11:26 

SPB/SFX

  • Planned for the next 2 weeks
    • AGIPD commissioning and tests. DET group heavily involved.
    • Screens are being installed and commisisoned in the hutch.
    • CSS component commissioning. AE involved and informed.
    • Loop 14 (Jungfrau) is needed for next week to start the commissioning. AE and EET main players for now. Issues are now Fuses boxes delivery (AE) and ITDM connections ready (CAT cables measurements not compliant with XFEL standard, AV/ITDM are trying to solve the issue with the companies)
  • CRL implementation in the hutch will happen in April. AE and EET involved.

FXE

SQS

  • REMI chamber was installed. Currently vacuum connections are being done and tests have to be performed (next couple of days)
  • CYoungmann is commissioning the Mpots.
  • The chain digitizers-triggers-software is being commissioned to allow online analysis. AE, CAS required and involved.
  • New requirement document will be submitted today for a new slit system component (not for this SD).
  • exhaust line for explosive gases has not been tested so far and no information is available to SQS. Urgent. SRP should comment.

SCS

  • PLCs have been all installed. Firmware deployment has to be pushed. AE is on it.
  • For the microscope a in-house fast solution has been put in place.
  • Concerning the smaract stages a technician is today here. If anybody is interested, please contact JTDelitz.
  • Detector group is working on the fastCCD.

MID

  • Julabo chiller came back from repair and it is being connected back and tested in this days.
  • Issue with the remote control of the ion pumps. It is not possible to switch on and off the pumps remotely due to the fact that a wrong terminal was used . It seems this was also the same issue in SASE1 and 3. AE and EET are on it to fix it and update the doucumentation. 
  • Fa. Schulz did not manage to pull all the MID EXP cables by Tue afternoon as requested. Fine tuning of whoch cables are needed to start the loop commissioning and whoch ones can be postponed has to be done and driven by EET/MID (M. Flade/JHallman)
  • On Monday afternoon (17:00) a power cut caused by works on the SASE emergency power off caused the PLC to be switched off and additioanl efforts to bring them on again. This intervention was not known to MID and not planned in the winter schutdown list of activities. Technical Services is/will be reminded that proper communication is needed.

HED

  • Loop 2 needed for commissioning. Should be ready this week. Modules for the attenuator are expected to be delivered today/tomorrow. AE required and on it.
  • Tomorrow the commisisoning of the monochromator in the tunnel and CRL in the optics hutch will start.

 

OPT Lasers

  • LOPA is being  commisisoned in SASE1. Test by the end of the week. No special support required.
  • In SASE3 commisioning isd ongoing and there are no concerns about having the laser ready in July
  • In SASE2 commissioning of the seeder started.
  • Issue with the door is being discussed with TS.

XRO

 

  • In SASE3 additional safety shutters issue: Hardware will be ready by middle of Feb. On the 24 and 25. the installation and the modification of the EPS loop should take place if D3, SRP agree on the change request proposed by HS and MD. AE is involved and has allocated resources. It is not clear to whoch extent CAS is involved. This should be clarified, also for proper CAS resourced allocation.
  • For this friday SRP schedule a test of the GATT. SQS/SCS informed and part of the activity.
  • Durng the installation of mirrors for SASE3 with InGa an issue occured. While pumping down (slowly) foam was generated and it required baking of the system to be able to pump it and bring it to ion pumps vacuum level. Tests are needed to finalize the proper procedure. In general, all the instruments dealing with mirrors should contact XRO (M.Vannoni) for proper venting and pumping down of the system to avoid surprises.

XPD

VAC

  • Mono in XTD6 commissioning. AE and XRO involved.

AE

  • DESY will reboot the timing system next monday. BF circulated a mail about that.
  • On 19.02 AE and CAS will present the new timing system for the SASEs and related Karabo functions the PBS meeting 

ITDM

  • Switch of the storage in SASE1 was succesful. Testing ios ongoing. OK so far. In the next days other tests with detectors will be done. (IBM technician also at XFEL today)