Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther, Page 2 of 29  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authordown Location Severity Subject Text Attachments
  115   29 Apr 2020, 17:28 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 29.04.2020General Announcement:
- The Work on the Controls Network are progressing
very nicely;
  
  116   04 May 2020, 14:20 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 04.05.2020General Announcement:
- From today on there is no general restrictions
in accessing the EuXFEL site: only consent
  
  117   06 May 2020, 14:45 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 06.05.2020General Announcement:
- SRP is invited and urged to participate
in this series of meetings.
  
  118   08 May 2020, 16:44 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 08.05.2020General Announcement:

- Q&A session with SRP/Tobias Haas:
  
  119   11 May 2020, 14:53 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 11.05.2020General Announcement:
- The proposed works on the Control network
are fully organized for this week;
  
  120   13 May 2020, 13:51 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 13.05.2020General Announcement:
- SRP will join this meeting series. If you
have questions please raise the points.
  
  121   15 May 2020, 14:35 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 15.05.2020General Announcement:
- Judging by feedback and communication to
XO both Tunnel and control network works
  
  122   18 May 2020, 14:53 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 18.05.2020General Announcement:
- Starting today 18.05 the XTD1 tunnel will
be closed. It is not accessible until the
  
  123   22 May 2020, 08:57 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 20.05.2020General Announcement:
- XO Integration Meeting will not take place
next Friday 22.05 due to the bridge holiday.
  
  124   25 May 2020, 15:29 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 25.05.2020General Announcement:
- Machine started SA2 lasing last weekend.
Currently photon energy is 0.5mJ at 9keV.
  
  125   28 May 2020, 13:58 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 27.05.2020General Announcement:
- It seems EuXFEL was not affected due to
the power glitch at the Desy site last Tuesday
  
  126   29 May 2020, 14:22 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 29.05.2020General Announcement:
- Due to the public holiday this meeting
do not take place on Monday.
  
  127   04 Jun 2020, 13:31 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 03.06.2020General Announcement:
- Summer shutdown is nearing. Few dates on
crane maintenance at XHEXP1 were sent to
  
  128   05 Jun 2020, 13:44 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 05.06.2020General Announcement:
- Many summer shutdown tasks have been scheduled
already and information has been sent to
  
  129   09 Jun 2020, 15:47 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 08.06.2020General Announcement:
- SA2 lasing: up to 2mJ@9keV was achieved
with strong linear and quadratic tapering
  
  130   10 Jun 2020, 11:12 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 10.06.2020General Announcement:
- Maintenance in the Tunnel Air Conditioning
is completed. No more work restrictions are
  
  131   12 Jun 2020, 13:48 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 12.06.2020General Announcement:
- There will be tunnel ventilation additional
maintenance on two mornings next week from
  
  132   16 Jun 2020, 13:32 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 15.06.2020General Announcement:
- There will be additional ventilation maintenance
on all tunnels, scheduled for next WED/17th
  
  133   18 Jun 2020, 13:40 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 17.06.2020General Announcement:
- Today and tomorrow it takes place the tunnel
ventilation maintenance between 6:30 and
  
  134   19 Jun 2020, 14:28 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 19.06.2020General Announcement:
- Next Monday it is planned the NOT-AUS experiment
in the frame of Interlock tests and the emergency
  
ELOG V3.1.4-7c3fd00