Entry   Notes XO Integration Meeting 29.01.2025, posted by Frederik Wolff-Fabris on 29 Jan 2025, 09:50 
General Announcement:
- Steffen Hauf comments that DOC is active from today and also requests SXP and SCS to get in touch with DRC on needed nodes.
- UOM will restart next Friday at 9AM.
Entry   Notes XO Integration Meeting 27.01.2025, posted by Frederik Wolff-Fabris on 27 Jan 2025, 09:59 
General Announcement:
- Maurizio Vannoni reports on behalf of XRO on the ramp-up activities over the weekend: 
SA1 - positions of mirrors were found (post in Zulip) No major problems were found; Attenuators look fine; 
Entry   Notes XO Integration Meeting 22.01.2025, posted by Frederik Wolff-Fabris on 22 Jan 2025, 09:47 
General Announcement:
- Please call DOC number and get in touch with DRC is one needs to save data for any activity or face issues with CTRL and DAQ.
- User and Operation Meeting will start only next week 31.01.
Entry   Notes XO Integration Meeting 20.01.2025, posted by Frederik Wolff-Fabris on 20 Jan 2025, 09:50 
General Announcement:
- E. Boyd reminds on the return of the beam shutter keys: actual plan is to return keys no later than Friday. The SA3 hutches are to be closed on the weekend.
- The User & Operation meeting will start from next week, Friday 31.01.
Entry   Notes XO Integration Meeting 15.01.2025, posted by Frederik Wolff-Fabris on 15 Jan 2025, 09:40 
General Announcement:
- A. Galler announces that yesterday the cooling water of 20C was leaking. The reason is still to be found, as per e-mail from TS sent to the xo-info.
Entry   Notes XO Integration Meeting 13.01.2025, posted by Andreas Galler on 13 Jan 2025, 09:29 
General Announcement:


 
Entry   Notes XO Integration Meeting 08.01.2025, posted by Frederik Wolff-Fabris on 08 Jan 2025, 08:36 
General Announcement:
- Interlock tests are ongoing in tunnels and good progress has been made.
- Planning for the LIMP-2025: it has been worked on; currently there is not a detailed plan available as discussion for tasks is ongoing. 
Entry   Notes XO Integration Meeting 06.01.2025, posted by Frederik Wolff-Fabris on 06 Jan 2025, 09:42 
General Announcement:
- Interlock tests shall start tomorrow 07.01. In case of questions please do not hesitate in contacting XO.
- Eric Boyd says on Wednesday 10AM two hutches shall be interlocked for the tests (FXE exp. Hutch and MID optical hutch) for ~15 minutes. It shall work
Entry   Notes XO Integration Meeting 18.12.2024, posted by Frederik Wolff-Fabris on 18 Dec 2024, 09:55 
General Announcement:
- This is the last XO Integration meeting this year.
- Wajid E. reminds attendance to write a ticket to CTRL when needed 
Entry   Notes XO Integration Meeting 16.12.2024, posted by Frederik Wolff-Fabris on 16 Dec 2024, 09:44 
General Announcement:
- Next Wednesday it is the last XO Integration Meeting.
Entry   Notes XO Integration Meeting 11.12.2024, posted by Frederik Wolff-Fabris on 11 Dec 2024, 09:43 
General Announcement:
- A. Galler comments the maintenance period started; already yesterday tunnels were opened due to the stop in operation from caused by the power glitch
at Desy.
Entry   Notes XO Integration Meeting 09.12.2024, posted by Frederik Wolff-Fabris on 09 Dec 2024, 09:56 
General Announcement:
- A. Galler informs two downtimes happened last two nights totalizing 10-12hs due to communication issues (between terminals) at the accelerator. 
Entry   Notes XO Integration Meeting 04.12.2024, posted by Frederik Wolff-Fabris on 04 Dec 2024, 09:41 
General Announcement:
- A. Galler informs X-rays for cw49 are currently been tuned today due to the issues with the cryo plant last week. Schedule for delivering the beam to
instruments is to start by 15:00 today.
Entry   Notes XO Integration Meeting 02.12.2024, posted by Frederik Wolff-Fabris on 02 Dec 2024, 09:56 
General Announcement:
- A. Galler informs on the changed schedule for Operation due to the difficulties with the cry plant last week: the current beamtimes are extended until
Wed 07:00 and then tuning for cw49 will take place. 
Entry   Notes XO Integration Meeting 27.11.2024, posted by Frederik Wolff-Fabris on 27 Nov 2024, 09:44 
General Announcement:
- Issues with machine at the cold compressor happened and the restart is delayed. Expectation for the cryo stable is around 15:00 today. 
Tuning will start from this point and non-standard modes probably be tuned tomorrow. Further info will be distributed during the day.
Entry   Notes XO Integration Meeting 25.11.2024, posted by Frederik Wolff-Fabris on 25 Nov 2024, 10:02 
General Announcement:
- Martin Doering announces on the upcoming Winter Maintenance period: 
1. Summary Task list was released last Friday 22.11; 
Entry   Notes XO Integration Meeting 20.11.2024, posted by Frederik Wolff-Fabris on 20 Nov 2024, 09:47 
General Announcement:
-  
Entry   Notes XO Integration Meeting 18.11.2024, posted by Frederik Wolff-Fabris on 18 Nov 2024, 09:41 
General Announcement:
-  
Entry   Notes XO Integration Meeting 13.11.2024, posted by Frederik Wolff-Fabris on 13 Nov 2024, 09:47 
General Announcement:
-  
Entry   Notes XO Integration Meeting 11.11.2024, posted by Frederik Wolff-Fabris on 11 Nov 2024, 09:46 
General Announcement:
- Last day of the FD taking place and switching back to 16.3GeV today.