Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther, Page 2 of 29  Not logged in ELOG logo
Entry   Notes XO Integration Meeting 25.09.2024, posted by Frederik Wolff-Fabris on 25 Sep 2024, 09:57 
General Announcement:
- Machine had a rough day yesterday and last night with downtimes due to problems with L-IBFB, dump communication, vacuum in A14. 
Files for beam delivery were prepared and small pointing corrections had to be done this early morning. Beam is currently in delivery mode.
Entry   Notes XO Integration Meeting 23.09.2024, posted by Frederik Wolff-Fabris on 23 Sep 2024, 10:01 
General Announcement:
-  As DRC, Krzysztof Wrona and Monica Turcato report all is fine at DOC, no major issues and no DRC calls overnight.
Entry   Notes XO Integration Meeting 18.09.2024, posted by Frederik Wolff-Fabris on 18 Sep 2024, 09:51 
General Announcement:
-  
Entry   Notes XO Integration Meeting 16.09.2024, posted by Frederik Wolff-Fabris on 16 Sep 2024, 10:03 
General Announcement:
- As PRC, Maurizio V. reports some calls over the weekend mostly for exchange of info on minor issues that were addressed
Entry   Notes XO Integration Meeting 11.09.2024, posted by Frederik Wolff-Fabris on 11 Sep 2024, 09:50 
General Announcement:
-  Todays the machine setup is ongoing and from tomorrow it starts the beam delivery, as planned.
Entry   Notes XO Integration Meeting 09.09.2024, posted by Frederik Wolff-Fabris on 09 Sep 2024, 09:38 
General Announcement:
- A. Galler informs a downtime of about 30min happened this morning in the North Branch due to a faulty vacuum controller.
- H. Sinn mentions on the beam drift in SA1: it was seen in both instruments over the weekend and is likely the comes from M1 but can be corrected by feedbacks
Entry   Notes XO Integration Meeting 04.09.2024, posted by Frederik Wolff-Fabris on 04 Sep 2024, 09:40 
General Announcement:
- Machine tuning last two days was hindered as a power supply for a camera in injector laser had to be exchanged. As consequence, the camera moved and
had to be re-aligned costing time. 
Entry   Notes XO Integration Meeting 02.09.2024, posted by Frederik Wolff-Fabris on 02 Sep 2024, 09:53 
General Announcement:
-  
Entry   Notes XO Integration Meeting 28.08.2024, posted by Frederik Wolff-Fabris on 28 Aug 2024, 09:52 
General Announcement:
- Communications Group thanks all people involved on the SRI visit. The extension of the beam delivery also worked nicely to instruments.
- As PRC, A. Galler says so far there is nothing to report or discuss for the current week.
Entry   Notes XO Integration Meeting 26.08.2024, posted by Andreas Galler on 26 Aug 2024, 09:28 
General Announcement:
- Today Monday 26.08 the beam delivery will be interrupted from 13:30 to 18:30 due to the SRI visit at EuXFEL. These hours are compensated by extending
the beam delivery on Tuesday from 7:00AM up to 12:00.
Entry   Notes XO Integration Meeting 21.08.2024, posted by Frederik Wolff-Fabris on 21 Aug 2024, 09:46 
General Announcement:
- Next Monday 26.08 the beam delivery will be interrupted from 13:30 to 18:30 due to the SRI visit at EuXFEL. These hours are compensated by extending
the beam delivery on Tuesday from 7:00AM up to 12:00.
Entry   Notes XO Integration Meeting 19.08.2024, posted by Frederik Wolff-Fabris on 19 Aug 2024, 09:41 
General Announcement:
- As DRC, Steffen Hauf reminds that if support from DA groups is needed, please request as soon as it is needed; Second: please instruments check if the
Zoom is installed and running in the control rooms.
Entry   Notes XO Integration Meeting 14.08.2024, posted by Frederik Wolff-Fabris on 14 Aug 2024, 09:44 
General Announcement:
- This morning difficulties to switch to SA2 9keV SASE happen but right now it is working for delivery to HED.
- Eric Boyd informs D3 would like to access an optical hutch to test insert for BTM on next Tuesday. An e-mail will be sent to xo-info mailing list asking
Entry   Notes XO Integration Meeting 12.08.2024, posted by Frederik Wolff-Fabris on 12 Aug 2024, 09:44 
General Announcement:
- A power glitch happened on the weekend but had no effects on the machine. So far XO is not made aware of effects at XFEL. Please let XO know if you were
affected.
Entry   Notes XO Integration Meeting 07.08.2024, posted by Frederik Wolff-Fabris on 07 Aug 2024, 09:38 
General Announcement:
- A. Galler informs to SQS that the vertical polarization operation is planned for Thursday starting tuning in the afternoon 15:00. Please SQS inform BKR
if tuning can start earlier.
Entry   Notes XO Integration Meeting 05.08.2024, posted by Frederik Wolff-Fabris on 05 Aug 2024, 09:41 
General Announcement:
-
Entry   Notes XO Integration Meeting 31.07.2024, posted by Andreas Galler on 31 Jul 2024, 09:23 
General Announcement:


CTRL:
Entry   Notes XO Integration Meeting 29.07.2024, posted by Andreas Galler on 29 Jul 2024, 09:27 
General Announcement:


CTRL:
Entry   Notes XO Integration Meeting 24.07.2024, posted by Andreas Galler on 24 Jul 2024, 09:29 
General Announcement:


CTRL:
Entry   Notes XO Integration Meeting 22.07.2024, posted by Andreas Galler on 22 Jul 2024, 09:29 
General Announcement:


CTRL: