Minutes of the Technical integration meeting 26.06.19 , posted by Adriano Violante on 26 Jun 2019, 10:22
|
XO
From now on A. Galler will join the technical integration meeting. Therefore the XO field has been added.
FXE |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 24 Jun 2019, 09:53
|
FXE
CRLs mainteinance has been completed.
SPB/SFX
Some power sockets are not active. NReimers will contact TS.
Detectors has been moved in the new position. MOV tests have |
Status report after dispatch meeting 09.00, posted by Adriano Violante on 21 Jun 2019, 10:13
|
FXE
SPB/SFX
An AC device in the control room leaks. TBartsch has been informed.
Some issues with pumps going off during the power glitch |
running jdd panels in control rooms, posted by ITDM Admin on 01 Apr 2019, 10:29
|
On all PCs in the control rooms including BKR and also on the exflgateway there is a new version of jddd installed
which is working with openjdk-11.
It is worth to mention that the old javaws from old oracle java 8 is deprecated and it is not recommended running jddd panels using old way, like |
Re: running jdd panels in control rooms, posted by ITDM Admin on 19 Jun 2019, 16:33
|
Regarding the recent announcements from doocs/jddd people about running jddd application I post here a short summary:
- running jddd with oracle java 8 via java webstart will be no longer possible as of 10.07.19
- on all control PCs in the instruments control rooms, BKR and exflgateway the new jddd was already in use since March, as described in the previous |
Minutes of the Technical integration meeting 19.06.19 , posted by Adriano Violante on 19 Jun 2019, 10:55
|
FXE
SPB/SFX
No major issues
Starting from the end of this week to the beginning of next week the hutch will not be accessible because |
Report after dispatch meeting 09.30, posted by Adriano Violante on 17 Jun 2019, 10:43
|
FXE
Floor is being re-worked. Experiment hutch is not accessible until Wednesday. After that only accessible for walk until next Monday.
SPB/SFX
SCS |
Status report after dispatch meeting 09.00, posted by Adriano Violante on 14 Jun 2019, 10:47
|
FXE
SPB/SFX
Getting ready for the shutdown. No relevant issues.
SCS |
Minutes of the Technical integration meeting 12.06.19 , posted by Adriano Violante on 12 Jun 2019, 12:40
|
FXE
SPB/SFX
SCS |
Report after dispatch meeting 09.00, posted by Adriano Violante on 07 Jun 2019, 11:53
|
FXE
SPB/SFX
few days of beamtime remaining, no particular issues
preparing for emergency power off
preparing shutdown activities |
Minutes of the Technical integration meeting 05.06.2019, posted by Gerd Wellenreuther on 05 Jun 2019, 09:59
|
FXE
SPB/SFX
few days of beamtime remaining, no particular issues
preparing for emergency power off
preparing |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 03 Jun 2019, 12:57
|
SPB/SFX
No major issues.
FXE
Tool to save motor positions is not working reliably. ==> CAS + AE have different tools on different levels. There is not automatic |
Minutes of the Technical integration meeting 29.05.19 , posted by Gerd Wellenreuther on 29 May 2019, 10:30
|
FXE
SPB/SFX
XTD2 attenuator appears to be damaged. ==> Request to VAC: is it possible to exchange the attenuators in the summer shutdown? |
Status report after dispatch meeting Monday 27.5. 09.30 , posted by Gerd Wellenreuther on 27 May 2019, 10:35
|
SPB/SFX
Digitizers are ready, have been tested by CAS ==> to be be installed / integrated probably next week ==> according to Adrian probably
Monday, to be confirmed with AE (Bruno + Hamed) ==> is confirmed to be today
Different GUIs were reporting varying values |
Status report after dispatch meeting Friday 24.5. 09.00, posted by Gerd Wellenreuther on 24 May 2019, 11:01
|
SPB/SFX
are working on achieving a good focus @ 6 keV, which currently is not as good as expected. ==> This is understood now, those
were higher harmonics, too many absorbers in the beam. Absorber still shows some structure, though
Digitizers are ready, have been |
Minutes of the Technical integration meeting 22.05.19, posted by Gerd Wellenreuther on 22 May 2019, 09:58
|
FXE
SPB/SFX
XTD2 attenuator appears to be damaged.
Beam at lower energies look disturbed, SPB/SFX will contact |
Status report after dispatch meeting Monday 20.5. 09.30, posted by Gerd Wellenreuther on 20 May 2019, 10:02
|
SPB/SFX
are working on achieving a good focus @ 6 keV, which currently is not as good as expected.
Digitizers are ready, have been
tested by CAS ==> to be be installed / integrated probably next week
Different GUIs were reporting varying values for STATUS on different |
Status report after dispatch meeting 09.00, posted by Adriano Violante on 17 May 2019, 10:47
|
SPB/SFX
ADC have been requested. HW should be already installed (SPB to check). BF will discuss with SPB how to proceed.
FXE
LPD is running.
SQS |
Minutes of the Technical integration meeting 15.05.19 , posted by Adriano Violante on 15 May 2019, 12:53
|
SPB/SFX
Nano KB mirrors and CSS controls are OK
Digitizers have been requested. HW needs to be installed and set up and the timeline
has to be clarified betweek BF and SPB. Not possible to have them running on short notice.
Comment from AS: Trigger Test with pulse on |
Report after dispatch meeting 09.30, posted by Adriano Violante on 13 May 2019, 11:24
|
SPB/SFX
The gear ratio of the CSS is unclear but this was already known and discussed with SPB/SFX ==> AL is working on it toghter with AE.
FXE
Karabo for Jungfrau detector has been udpated and works fine. For the LPD some issues were reported but SH commented that the problems |
Report after dispatch meeting 09.00, posted by Adriano Violante on 10 May 2019, 10:52
|
SPB/SFX
IRDa commissioning successful. A. Mancuso thanked all the people involved in the project.
The gear ratio of the
CSS is unclear but this was already known and discussed with SPB/SFX
Mirrors motors had some issues (ELMO motors), they are already been fixed.
Adam |