Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 67     Entry time: 15 Jul 2019, 10:01
Author: Adriano Violante 
Location: General 
Severity: Information 
Subject: Status report after dispatch meeting 09.30 

XO

FXE

SPB/SFX

  • After the loops update the MPS signals have to be tested. The plan is to start today. (AS+EEE support is required)

SCS

SQS

​​MID

  • The VAC interlock tests performed on Friday showed some unexpected behavior of the system. ==> have been almost 100% fixed.
  • hexapods can be controlled by Karabo now.
  • Servo motor drivers are now in the EEE lab and would be needed asap in MID to start commissioning. Could happen this week already.

HED

  • High power laser being aligned to bring beam into the HED experiment enclosure. ==> It was not possible to bring the laser into the hutch apparently because of some communication problems with safety. 
  • Mirror s could not be aligned for HED during the WE because of a crash of the MOV loop. This was due to a NaN delivered to the plc instead of a motor position. This problem has been fixed with the last loop update, which was not implemented in the XTD6 MOV loop yet. It will be discussed with EEE, MDommach and L.Samoylova whether to perform the update now.
  • EEE should return the nanocube controllers as soon as possible for commissioning.
  • Hexapods remote controls needed.

 

Optical lasers

  • the status of the SASE1 PP laser is not yet clear.

VAC

XRO

XPD

DET

  • Karabo 2.5.0 update OK. 
  • Online calibration tools will be available for MID and SPB/SFX starting from tomorrow.

EEE

CAS

  • Not a number values  can be filtered by karabo. AS will have a look at that. 

ITDM

SRP

TS

AoB

  • Mail has been sento to the STGL and readiness mailing list. Deadline is the 2.08. for the delivery of the info to XO/PM
ELOG V3.1.4-7c3fd00