Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 72     Entry time: 26 Jul 2019, 14:07
Author: Adriano Violante 
Location: General 
Severity: Information 
Subject: Status report after dispatch meeting 09.00 

XO

FXE

SPB/SFX

SCS

SQS

MID

  • Nanocube being used with the scan tool. Seems fine. Some test of the velocity scan has to be done (CY will coordinated with MID)
  • Exapods have been integrated. Some feedback from TF is needed for EEE to complete the hand over.

HED

  • Loop 6 will be updated next week. KS will talk to HED and EEE to make sure vacuum systems are safe during the update.

Optical lasers

VAC

XRO

XPD

DET

EEE

  • Crash of PLCs because of not a number values. The fix on the PLC side requires the update of the loops framework and can be done only in the August shutdown. By the end of the week a filtering tool will be availbale in Karabo. ==> Filter is ready and can be deployed on Monday.

CAS

ITDM

  • Some issues with the GPFS will results in slowness of the system. This is being investigated and probably already fixed today.

SRP

TS

AoB