SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
|
|
Message ID: 83
Entry time: 28 Aug 2019, 10:33
|
Author: |
Adriano Violante |
Location: |
General |
Severity: |
Information |
Subject: |
Minutes of the Technical integration meeting 28.08.2019 |
|
|
XO
FXE
- Leak in the LPD cooling system has been found. DET on it. Ongoing
- Laser went out of synch several time during the last weeks. Being addressed with the synch. group.
- Mono middle layer is not working properly. Calibration parameters are not reloaded correctly after restart. CAS on it. Ongoing.
- SA1 MOV loop has been updated. Minor issues with the CRL encoders are being addressed.
SPB/SFX
- CSLITS - discrepancies between the behavior of normal motors vs MC2 motors. CAS on it. ==> will be fixed once Karabo 2.6.1. has been deployed.
SCS
SQS
MID
- During last WE big issues with the AGIPD were experienced. Probably calibration pipeline related. DET on it.
- Laser hutch A.07 is not supposed to be accessible in the next weeks because of the laser operation. SRP points out that they are not sure whether the interlocks are properly working and active. To be clarified offline between MID, HED and SRP.
HED
- Access to the experiment hutch, Optics and Rackroom will be restricted this week due to laser shots tests.
Optical lasers
VAC
XRO
- Change of middle layer devices for the attenuator in SASE2 will be discussed offline with CAS
XPD
DET
EEE
- Loops are being updated in coordination with the instruments.
CAS
- 2.6.1. ready to be deployed. Deployment schedule has been agreed with individual groups.
ITDM
- Maxwell cluster maintenance on 2-3. 09.
- Control PCs wil be deployed during the shutdown week
- Claoud service (DESY platform) will be put into operation. An official announcement will details will follow.
SRP
TS
AoB |