Minutes of the Technical integration meeting 28.08.2019, posted by Adriano Violante on 28 Aug 2019, 10:33
|
XO
FXE
Leak in the LPD cooling system has been found. DET on it. Ongoing
Laser went out of synch several time during the last weeks. |
Report after dispatch meeting 09.30, posted by Adriano Violante on 26 Aug 2019, 09:52
|
XO
Today a test of the fire alarm system will take place. Mail has been circulated by SRP.
From next monday the dispatch meeting
time slot will change to 8.30. Chair will be with XO.
FXE |
Minutes of the Technical integration meeting 21.08.19 , posted by Adriano Violante on 21 Aug 2019, 11:15
|
XO
A review of the procedures in case of power failure is in progress. Thanks to everybody for the efforts during the last days.
FXE
Remote control of the radiation shutter dows not work. IP of the new computer is needed. Will be solved offline between FXE, CAS and |
Report after dispatch meeting 09.30, posted by Adriano Violante on 19 Aug 2019, 11:11
|
General
Still recovering from the power loss occured on Saturday (The primary line was affected). In the hall the power was down for about 30
minutes, while in the tunnels it seems it was only a glitch.
It is clear that it was a major system failure. Optimization of procedures and |
Minutes of the Technical integration meeting 14.08.2019, posted by Gerd Wellenreuther on 14 Aug 2019, 10:01
|
XO
On Monday at around 12:20 there was a power glitch at least in Hamburg, affecting the machine.
In this cause, the startup
was delayed due to a missing signal from the Vacuum EPS-MPS-interface. The signal had to be manually enabled again.
Tuning is estimated to take |
Status report after dispatch meeting 12.8., posted by Gerd Wellenreuther on 12 Aug 2019, 09:50
|
XO
FXE
XTD1 CRLs: There is an issue regarding a limit switch, to be repaired in the shutdown by MKnoll + EEE.
SPB/SFX |
Minutes of the Technical integration meeting 07.08.2019, posted by Adriano Violante on 07 Aug 2019, 11:55
|
XO
The accelerator is now working at 2.25 MHz. Kicker can be used. DET informs that for repetition rates different to the ones been used so
far the calibration can be significatively different. |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 05 Aug 2019, 10:19
|
XO
FXE
Photon3 detector has been fully implemented.
SPB/SFX |
Info on dispatch meeting 09.00, posted by Adriano Violante on 02 Aug 2019, 09:10
|
The meeting did not take place since only EEE was attending. |
Minutes of the Technical integration meeting 31.07.19 , posted by Adriano Violante on 31 Jul 2019, 10:46
|
XO
FXE
SPB/SFX |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 29 Jul 2019, 10:16
|
XO
FXE
SPB/SFX |
Status report after dispatch meeting 09.00, posted by Adriano Violante on 26 Jul 2019, 14:07
|
XO
FXE
SPB/SFX |
Minutes of the Technical integration meeting 24.07.19 , posted by Adriano Violante on 24 Jul 2019, 10:54
|
XO
FXE
DAQ issue reported (data not being recorded). Comment from ITDM is that this was a miro issue solved with the re initialization of the |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 22 Jul 2019, 12:42
|
XO
FXE
DAQ issue reported (data not being recorded). Comment from ITDM is that this was a miro issue solved with the re initialization of the |
Status report after dispatch meeting 09.00, posted by Adriano Violante on 19 Jul 2019, 10:48
|
XO
FXE
SPB/SFX |
Minutes of the Technical integration meeting 17.07.19 , posted by Adriano Violante on 17 Jul 2019, 10:05
|
XO
FXE
SPB/SFX |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 15 Jul 2019, 10:01
|
XO
FXE
SPB/SFX |
Minutes of the Technical integration meeting 10.07.19 , posted by Adriano Violante on 10 Jul 2019, 16:16
|
XO
In SASE3 the apertures of the GATT have to be realigned. The upstream apertures have been alreadz realigned. The downstream ones will
be probablz realigned tomorrow. If not succesfull some restrictions of the operation have to be evaluated. ==> Done.
Turnstile issue: 2 days |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 08 Jul 2019, 10:25
|
XO
FXE
Loops update has to be coordinated between EEE and FXE. No feedback received from EEE. AG will remind TKorsh. ==> TK will discuss |
Status report after dispatch meeting 09.00, posted by Adriano Violante on 05 Jul 2019, 09:54
|
XO
FXE
Loops update has to be coordinated between EEE and FXE. No feedback received from EEE. AG will remind TKorsh. ==> Nothing was |