490
|
14 Feb 2024, 12:21 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 14.02.2024 |
General Announcement:
- As PRC, Maurizio Vannoni says so far everything is going well this week.
CTRL:
- Nothing to report.
DA:
- Nothing to report.
EEE:
- Nothing to report.
VAC:
- Not present.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- Not present.
UNSYS:
- Problem with SA3 cell 12: seems that electronic is damaged (worked yesterday after power cycling but after few hours of operation it stopped again).
Needs to replace electronics and motor in a next ZZ. Also error message is not given but motor simply does not work.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- Damage of ATT 1.2mm diamond: will investigate new position with beam today.
HED:
- Successful user experiment until yesterday morning; machine performance with HXRSS was very good!
SCS:
- Good experiment last week and preparing for the next beamtime.
SQS:
- Preparing to use beam over the weekend.
SXP:
- Not present. |
|
300
|
14 Feb 2022, 10:02 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 14.02.2022 |
General Announcement:
- Thanks to instruments that posted at the Operations-2022 e-log. Please make regular entries that allow PRCs to recognize eventual issues that have to be tracked down.
CTRL:
- Nothing to report.
DA:
- Friday there was issues with Data Aggregators processing in several detectors. DOC found it was an issue with the new version. It was fixed by Saturday by working with a separate routing.
This was a bug in the new version (time of template creation). A final fix will be installed in a suitable date.
EEE:
- Nothing to report.
VAC:
- Intervention to solve issue GATT issues is postponed by CTRL (patch work is almost ready). To be discussed between Raul V., CTRL once deployment can be done only on Mondays.
XPD:
- Issue noticed that XGM data were showing missing trains at the start of last week. Tickets were issues and it was cured by end of the week – it affected only one XGM. Reason for missing trains must be
asked to Theo M.
- SA1 pulse energy was around 4.5mJ; a really good performance.
- Preparing calorimeter in SA1 hutch for experiment.
DET:
- Two OCD calls (one from HED) and one from SPB on a detector. Both fixed by DOC / OCDs.
ITDM:
- Incident on Saturday with influx DB cluster: happened by 3:00AM; started investigating during the morning. By 14:00-15:00 the cluster came back. Data synchronization is ongoing. Not sure yet if there is
lost data, under investigation.
XRO:
- Main BKR scene will contain a button to Graphana page.
LAS:
- Working with CTRL on Nagios issues.
UNSYS:
- Nothing to report.
SPB:
- Saturday problem with history of motor position at Karabo: solved by DOC.
- Broken cable for encoder of focusing mirror still has to be fixed (MKB focusing mirror in hutch).
FXE:
- Preparing for the week.
MID:
- All fine at MID.
HED:
- Week went good: successful user experiment.
- Beam was drifting quickly between left/right. Not sure if this is related to the new HED feedback loops. Under investigation.
SCS:
- Nothing to report.
SQS:
- Nothing to report. |
|
477
|
13 Dec 2023, 10:04 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 13.12.2023 |
General Announcement:
-
CTRL:
- Few hiccups happened last days:
1. SA3 Karabo topics required full restart of the topic due to hardware failure of the new broker;
2. Network failure affecting communication between SA3 topic and broker. After a restart of topic, it runs well;
3. Issue with communication between Karabo and PLC loops in SA2. It is solved but not fully understood yet.
DA:
- Nothing to report.
EEE:
- Fast electronics team finished the uTCA updates; from PLC side the mentioned problem by CTRL is solved and PLC system is stable; regular updates are continued.
VAC:
- Nothing to report.
XPD:
- Works are ongoing: SA1 PES detectors were tested and seem fine; work in HIREX is ongoing.
DET:
- Nothing to report.
ITDM:
- Fast switch for SA2 was delivered yesterday and today ITDM will mount and configured it to be installed.
XRO:
- Not present.
LAS:
- Nothing to report.
UNSYS:
- Installation of Apple-X: all 4 devices are in place and cabling is ongoing. The first segment shall be controllable this afternoon.
- Update on problems with SA2/cell37: yesterday it was figured out that an encoder is damaged, which sits near from the new absorber.
Encoder needs to be replaced but one does not have time and human power to do it during the WMP. Exchange will be done during the next Summer maintenance. Also Desy-VAC does not have Pb material to shield
the absorber in the next 6 months.
An alternative for this undulator is to control it with the rotary encoders in the meantime.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- All fine at MID.
HED:
- Not present.
SCS:
- Working with planned activities.
SQS:
- Nothing to report.
SXP:
- Not present. |
|
286
|
13 Dec 2021, 10:51 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 13.12.2021 |
General Announcement:
- The cooling water various types shall be working/restored and it seems that temperatures are back to normal. In case of finding deviations in temperatures let TS or XO know. Racks and racks rooms can in
principle be closed.
- Tobias H. comments on the open rack doors: in general if racks have to be opened, please keep in mind the corridors in between the labs are fire safety doors and this has to be discussed with SRP or
Michael Prollius prior taking place.
The comment serves as a precaution for the future.
- An e-mail from SRP will be sent concerning disclosing the vaccination status and registration at the entrance gate.
CTRL:
- Upgrade/migration of all tunnel cameras to Aravis was concluded in tunnels.
DA:
- Nothing to report.
EEE:
- All runs smoothly at the moment.
VAC:
- Maintenance activities going accordingly with the plan.
XPD:
- Proceeding with shutdown tasks. Today alignment activities and vacuum activities at XTD2.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- This week resume the work in lab after restoring cooling water.
- XRO reminds the need to resume discussion with the ramp-up activities to divide commissioning days - a plan has to be done due to the high number of updated devices.
A date for recommissioning of these devices shall be fixed. XO will discuss with XRO.
LAS:
- Restarting the lasers and proceeding maintenance.
UNSYS:
- Plan to install Apple-X from today on.
SPB:
- Installing granites in experimental hutch.
- Intervention in optics hutch today: please refrain to access it for staff other than the ones performing task.
FXE:
- Access XTD2 to check CRL; commissioning motors in hutch.
MID:
- All fine at MID.
HED:
- Laser interlock upgrade last week was successful with Klaus Witt.
SCS:
- Activities are going accordingly to the plan.
SQS:
- Nothing to report. |
|
565
|
13 Nov 2024, 09:47 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 13.11.2024 |
General Announcement:
-
CTRL:
- Nothing to report.
DA:
- Not present.
EEE:
- PLC team: AIBS triggered at SQS; reset alarm (see below).
- Eric Boyd informs the problem with one of the two sensors at the SQS AIBS. One is defective and needs to be reset (2x in last two days) so the entire AIBS has to be exchanged.
This week we can run in this condition and at the end of beamtime it can be exchanged.
VAC:
- Nothing to report.
XPD:
- A. Koch informs on EPS condition #3 for SA1 Mode-S which was disabled and with that the YAG screen of FEL IMG received up to 30 bunches (limit shall be 2). Enabled by PRC.
- XO found that it seems to have being disabled on 18.10.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- Nothin to report.
LAS:
- SCS laser: tried to replaced trace compressor; new installation did not work; old one was re-installed. Compression is in the same position.
- LAS investigates issue at FXE laser.
UNSYS:
- Nothing to report.
SPB:
- DAQ update this morning for Shimadzu: Jola S.-D. says it shall be working again.
FXE:
- Nothing to report.
MID:
- Nothing to report.
HED:
- Nothing to report.
SCS:
- Nothing to report.
SQS:
- Busy downstairs.
SXP:
- Not present. |
|
468
|
13 Nov 2023, 10:16 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 13.11.2023 |
General Announcement:
- This and next week of operation are the last 2 delivery weeks, which are done with 4.5MHz base rep rate.
CTRL:
- Announcement: today IT will make an intervention in one of the hosts (204) for the DOOCS topic; downtime is expected and colleagues using cloning devices in this host (DOOCS requester to clone DOOCS)
have to be refreshed and restarted.
DA:
- Nothing to report.
EEE:
- Incident that SCS motor not correctly moving during the weekend. PLC-OCD could not be reach due to phone issues; issue with motor was solved
VAC:
- ZZ on Thursday in XTD2 to exchange turbo pump was successful.
XPD:
- SA1 studies with 1nC was done in SA3 and not in SA1;
- 30keV went well on Wednesday but with Nepal-X no lasing was found on Friday.
DET:
- Nothing to report.
ITDM:
- Nothing to add apart of CTRL report. An e-mail will be sent when it is done.
XRO:
- A. Trapp says the issue with SA2 motors moving slowly was fixed now after a patch was deployed.
LAS:
- Nothing to report.
UNSYS:
- ZZ last week for SA1 cell20 PS motor being replaced (damaged encoder). Many spare encoders are in house.
SPB:
- Nothing to report.
FXE:
- Preparing for in-house experiment.
MID:
- All fine at MID.
HED:
- 2 experiments this week at 18 and 24keV.
SCS:
- Not present.
SQS:
- Nothing to report.
SXP:
- Preparing experiments at 4.5MHz. |
|
656
|
13 Oct 2025, 09:39 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 13.10.2025 |
General Announcement:
- Tobias Clever informs on the gas maintenance system: the central gas supply is currently disconnected;
One shall not bypass it by installing other gas bottles as the gas monitoring alarm is not working and thus pose a safety threat if leakage happens.
By the end of this week the activity is completed and possibly by mid of the week gas may be available again.
CTRL:
- Proceeding with tests of Karabo3; some instruments will be contacted this week for tests.
DA:
- All fine.
EEE:
- Nothing to report.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Question on gases activity: XHQ lab areas are also affected, including clean rooms.
ITDM:
- E-mail will be sent later informing on next week's (Tuesday) interruption of DAQ storage due to a maintenance.
XRO:
- Not present.
LAS:
- Timing issues were happening but solved with help from EEE.
UNSYS:
- Nothing to report.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- All fine; no issues.
HED:
- Nothing to report.
SCS:
- Nothing to report.
SQS:
- Nothing to report.
SXP:
- Nothing to report. |
|
268
|
13 Oct 2021, 09:26 |
Andreas Galler | General | Information | Notes XO Integration Meeting 13.10.2021 |
|
General Announcement:
- This meeting is a tool to share information/experiences across scientific and technical groups
CTRL:
DA:
EEE:
- next week
- update on GATT and EPS loop in SA3 in roder to allow for new protection of GATT for the whole beaemtime
- SA2 on Thursday (maybe Friday), try to correct backlash issue --> loop update
VAC:
- all is running
- HED VAC event
- miscommunication between operators led to this issue
XPD:
- no issue to report
- next week, during the whole week there'll be a high photon energy test at SA1 and SA2 see a big involvement of XPD
- 24 keV @SA1 (Tue)
- ~30 keVC @ SA2 (Wed/Thu)
- PI/Planner is Frank Brinker
DET:
- investigating JF1M issue of 4-6Hz instead of 10 Hz operation
ITDM:
XRO:
- SA1 M1/M2 drifts under investigation
- XRO is involved as well with next weeks high photon energy effort as well as EEE loop updates
LAS:
UNSYS:
SPB/SFX:
- user exp this week, 24 keV next week
FXE:
MID:
HED:
- next week high photon energy
SCS:
SQS:
- next week material tests, maybe also detector group.
AOB:
|
|
451
|
13 Sep 2023, 09:49 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 13.09.2023 |
General Announcement:
- The current week is the long delivery beam week for instruments. Operation continues up to next Wednesday 20.09 at 7AM. The DRC, PRC and RC will change as usual on Monday 18.09.
CTRL:
- Nothing to report.
DA:
- Not present.
EEE:
- Different problems with digitizers being addressed: 1. At XPD/ PES (card not working, it is then disabled); 2. FXE with jitter scene; 3. SQS is solved (undulator panel).
VAC:
- Everything good.
XPD:
- Apart of issues with PES nothing to report.
DET:
- Nothing to report.
ITDM:
- At a retreat.
XRO:
- Nothing major to report.
LAS:
- Not present.
UNSYS:
- Not present.
SPB:
- Everything fine.
FXE:
- Not present.
MID:
- Nothing to report.
HED:
- Nothing to report.
SCS:
- Nothing to report.
SQS:
- Not present.
SXP:
- Not present. |
|
259
|
13 Sep 2021, 10:04 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 13.09.2021 |
General Announcement:
-
CTRL:
- Next week CTRL will upgrade Beckhoff devices containing MC2 loops. This is done to avoid the PLC to crash. This is only Beckhoff devices and is for all tunnels and loops. This is a Karabo devices upgrade
and not the PLCs.
Naresh K. says systems are still needed on Monday morning. A. Galler tells that a ZZ will take place on Wednesday and this may be a better time for the update. XO and Valerii B. will discuss offline.
DA:
- Nothing particular; DOC and OCDs were quiet.
EEE:
- Nothing to report.
VAC:
- Yesterday effect of the power glitch at 15:03. VAC-OCD checked with SCS - the interlock reacted and GATT stopped for a while.
- SCS comments that the problem with GATT gave 300x more photons than expected to the sample and detector. A better safety / interlock is to be prepared.
Raul V. says that topic was first discussed in 2019 with SQS (using the B4C block in the interlock loop for the GATT). It may require interaction from SA3 instruments, VAC, XRO, CTRL.
XPD:
- Small confusion on the SA3 XGMs during the weekend: BKR mixed the SCS and SQS XGM's not working and this triggered a few reactions on the weekend. A better way to do not mix up XGMs will be made.
Please look to the right device before informing experts on possible errors.
DET:
- PnCCD detector is brought back to operation.
ITDM:
- Next week (not yet date) a follow up of the Gitlab update will take place. Mostly likely on Wednesday; details will come by e-mail.
- Update of the GPFS metadata: to be replaced on a time without activity. Shall be transparent.
XRO:
- Nothing to report.
LAS:
- Lost SA1 PP-laser due to change of temperature and humidity at midnight this morning. No information when it will be made available for use.
UNSYS:
- Nothing to report.
SPB:
- Looks fine apart the fact it did get only 188 and not 202 bunches.
FXE:
- Nothing to report.
MID:
- All fine at MID - experiment running smooth; seeded beam running well. Only issue that Gotthard in tunnel has triggered Big Brother a couple of times. It was not a real signal. Naresh K. will talk to
Ulrike B.
HED:
- All fine at HED.
SCS:
- Nothing else to add.
SQS:
- Successfully brought up pnCCD. It replaced physically one sensor. Reasons for the crash is understood at SQS (bad communication among the involved people). |
|
637
|
13 Aug 2025, 09:50 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 13.08.2025 |
General Announcement:
- A. Galler informs on the LIMP-25 plans for next week:
1. TS tasks: last week with water, dehumidification activities;
2. Karabo PLC updates in tunnels ending next week;
3. Ramp up activities apart of FXE will be ending.
- Issue with SA1 PP-laser air conditioning on Tuesday 12.08: T. Clever says an incident in preparation works at D.14 SPB hutch result in valves not been properly closing so that water leaked.
Emergency solution was to shut down the 8C cooling water. Increased temperature in hutches of about 1-2C was measure. After fixing the system the temperatures were back to normal operation.
- A. Galler reminds that this XO integration meeting is the main platform to exchange and receive information between groups.
Please use this platform to share and have discussions between support groups and scientific instruments.
- M. Prollius says a team from NDR may visit tunnels next week for footage. A timetable will be communicated in coming days (likely on Wednesday afternoon). XO will discuss with Communications group.
CTRL:
- Nothing major to report.
DA:
- Nothing to report.
EEE:
- Working with VAC in tunnel deployments.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM:
- Not present.
XRO:
- Not present.
LAS:
- Not present.
UNSYS:
- Nothing to report; no news on the work of Desy alignment group - seems that today they may start working in SASE1 with drilling activities.
SPB:
- Nothing to report.
FXE:
- Not present.
MID:
- Not present.
HED:
- Not present.
SCS:
- Nothing to report.
SQS:
- Nothing to report.
SXP:
- Nothing to report. |
|
341
|
13 Jul 2022, 09:59 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 13.07.2022 |
General Announcement:
- Today and tomorrow the TUV / Interlock tests are taking place. Emergency OFF are bridged and work in the area is possible only with an EQP present.
CTRL:
- Nothing to report.
DA:
- Nothing to report.
EEE:
- Planned the Run over of the shutdown with instruments: starting with SPB today but an issue with SPB Elmo controller has to be fixed first. Handover tests will start today or tomorrow.
- EEE was informed by M. Petrich that an ion pump in tunnel shows problems and is under investigation.
- A PLC update for the gas attenuator will take place today.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Progressing with tests for the cooling pipes at DSSC detector.
ITDM:
- Nothing to report.
XRO:
- Not present.
LAS:
- Timing system issues: ongoing with uTCA investigation; Lars F. from Desy is a contact point.
UNSYS:
- Issues with feedback of ambient field correction SA1/cell14: ZZ is scheduled for today.
SPB:
- Test of CTRL and EEE - some small issues to solve.
FXE:
- Nothing to report.
MID:
- Not present.
HED:
- Not present.
SCS:
- Testing devices: some devices issues in tunnels updates are solved.
SQS:
- Not present. |
|
142
|
14 Jul 2020, 13:45 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 13.07.2020 |
General Announcement:
- XO will reset the calendar invites for the XO Integration Meetings of Mondays and Wednesdays as well as for the User&Operation Meetings on Fridays. Usual times will be
kept.
- Machine is on startup and the RF window will be 400us instead of 600us in the first 2-3 weeks. Instruments can expect about 160 bunches in this time.
- Instruments must take tunnel components out of beam path, especially in case they are connected to the EPS which could potentially block beam operation.
- XPD and HED report on turbo pumps that failed last week. One has to investigate of it is linked to the Karabo re-start due to the DESY-NOC activities last Tuesday.
FXE also reports motors in tunnel components were OFF.
CTRL:
- Further investigations are ongoing with Basler cameras that did not start after Karabo reboot.
DA:
- Not present.
EEE:
- Waits for feedback on the FXE XGM commissioning.
VAC:
- Nothing to report.
XPD:
- SASE XGMs are started and being operated.
- Lasing in SASE2 was confirmed in the FEL-IMG; SA1 was lasing @2mJ last night.
- Re-alignment of SASE3 was not yet confirmed - no beam visible on the XGM or FEL IMG, only spontaneous radiation.
- XPD did a successful DAQ test.
- ZZ in XTD10 will be required to investigate failed PES pump. This will take place on Tuesday.
DET:
- Poor vacuum SPB/AGIPB last Friday: under investigation (may be a 40 gauge) and will be followed up next days.
ITDM:
- New DAQ version was released to fix detectors and slow data acquisition: tested in SPB and FXE (Agipd and LPD).
- This week ITDM makes upgrades in all instruments but MID takes place next week; SCS still needs to agree on the date for this week.
XRO:
- Plan for the week is the recommissioning of the beam transport. XRO has shift plans for the weekend.
LAS:
- All lasers are running.
UNSYS:
- Nothing to report.
SPB:
- Vacuum issue with the 40 gauge under investigation by DET.
- No big problems for the start of next week.
FXE:
- DAQ test taking place today.
- XGM is going with the plan but for a cable that may need to be exchanged.
- Upgrade of Beckhoff system: motors were not moving. There is a lack of communication between the Beckhoff upgrade, control support and instrument scientists.
MID:
- Not present.
HED:
- HED had to check and/or entry the motor parameters after the reboot of the control systems that place motors in OFF state.
CTRL informs the information must be stored in the PLCs / Karabo. It is solved but it demanded a lot of work during last week.
SCS:
- Not present.
SQS:
- Problems occurring with turbo pumps. There is a particular controller in one rack that had to be replaced 7 times in 2 years.
EEE and SQS will investigate and do inspections on this rack. |
|
332
|
13 Jun 2022, 09:48 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 13.06.2022 |
General Announcement:
- The cold compressor (stage 2) failed yesterday shortly after lunch time and beam delivery had been cancelled on the remaining of Sunday 12.06.
For this week, the delivery is not expected to start prior Tuesday 15:00. Later today PRC or XO will know more on the machine status and will inform instruments.
CTRL:
- Nothing to report.
DA:
- Nothing to report.
EEE:
- Nothing to report.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
- The issue with SA1 XGM last week was due to a short communication interruption. No need for further action.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- Agreed with MID to recheck beamline alignment (change stripe from Platinum to B4C): has to be communicated when beam is available.
LAS:
- Nothing to report.
UNSYS:
- All fine with undulators.
SPB:
- Nothing to report.
- Second user still managed to achieve the goal of the experiment apart of the beamtime lost.
FXE:
- Nothing to report.
MID:
- All fine at MID.
HED:
- Nothing to report; Second user schedule for the weekend was affected.
SCS:
- Users were struggling with samples at different temperatures. A second sample not achieve much as it was exchanged for Sunday.
SQS:
- Nothing to report. |
|
513
|
13 May 2024, 09:43 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 13.05.2024 |
General Announcement:
- A. Galler reminds that entries from the instruments taking beam at the Operation-2024 e-log is highly appreciated.
CTRL:
- Nothing to report.
DA:
- Nothing to report.
EEE:
- Nothing to report.
VAC:
- Nothing to report.
XPD:
- Issue Friday night at 02:28AM: the SA2/XTD1 XGM stopped delivering single shot data. There was an interlock of high voltage HAMP (over current happened).
It was repaired earlier in the morning around 08:30AM but further investigation is ongoing.
MID did not take beam during that time due to another issue happening in parallel, so no data needed from XGM were lost.
DET:
- Nothing to be reported.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- Not present.
UNSYS:
- Everything is fine.
SPB:
- Piezo motors for the PP-laser had issue but now it's solved.
FXE:
- Problem with PP-laser (fundamental spectrum) was fixed by OCD.
- PP-laser timing jump after shift changes from SPB/SFX.
- Problems with dark taking for the Jungfrau which was reported to DOC - as DRC, Phillip Schmidt reports that refreshing the myMDC page permits to make data visible.
MID:
- Nothing to report.
HED:
- Nothing to report.
SCS:
- Not present.
SQS:
- Users are taking beam.
SXP:
- Not present. |
|
120
|
13 May 2020, 13:51 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 13.05.2020 |
General Announcement:
- SRP will join this meeting series. If you have questions please raise the points.
- DET has questions on the policy in how to proceed with team work (how close and what is the interaction that different teams can have, e.g. when working in the same
room?). The subject has been reviewed by the Covid-19 task force and a guideline will be announced soon.
- There is a smooth re-start of activities regarding the Control Network tasks.
Groups are encouraged to use this meeting to present questions and discuss open points in this matter.
- General: the group of janitors was spotted smoking together in close distance in the designated smoking area.
It is remarked that the 1.5m distance between persons has to be respected. Information will be send to TS.
CTRL:
- Planned work is going smoothly.
- Group's OCD phones are working. Please do not hesitate in making use of it.
DA:
- Not present.
EEE:
- Ongoing with regular tasks.
- The cabling company is onsite but stopped at the gate house due to missing training.
After access is granted, work will start at the SQS. Joern will inform XO on further details.
VAC:
- Planned work is ongoing.
- Preparing for the alignment task in XTD10.
XPD:
- Nothing special to report.
- Housing of XGM distributor boxes and Femto amplifiers in XTD1 is ongoing this week.
DET:
- Work runs smoothly.
ITDM:
- Nothing to report.
XRO:
- Installation of magnetic switch in XTD6 is done; cooling installation is on progress.
LAS:
- Proceeding accordingly to the plans: FXE and SPB lasers were handed to the instruments;
- Currently working in SASE3 laser.
SPB:
- Plans are in place for activating the detectors.
FXE:
- Ongoing as planned; Waiting for cabling installation after SQS is done.
MID:
- It has placed a task request to be done in XTD1 (to inspect CRL-1 device of SASE2) - XO is trying to schedule it this week, most likely for Friday.
- Majority of tasks at the instrument goes well; there were pico motor issues with monochromator.
HED:
- All activities are going well.
SCS:
- Not present.
SQS:
- Nothing special apart from the cabling company stuck in the gate. |
|
317
|
13 Apr 2022, 09:28 |
Andreas Galler | General | Information | Notes XO Integration Meeting 13.04.2022 |
|
General Announcement:
- No User operation meeting this Friday, instead cw 16 / cw 17 check will happen in Daily Operations Meeting at 15:30 on Thu Apr 14. Link available on ttfinfo in XFELelog
CTRL:
DA:
EEE:
VAC:
XPD:
DET:
- offline calib with JUNGFRAU --> tickets closed already
ITDM:
XRO:
- request to SA1 instruments
- please check the repaired XTD2 solid attenuators
- attenuators cannot sustain too much power, offline discussion follows
- SA2 mirror recalib
- roll of M1 and M2 was completely misaligned, recalibration successful
- geometrical center of the kinematic system roughly identified
LAS:
UNSYS:
SPB/SFX:
FXE:
MID:
- pump probe looks stable and getting ready for the user
- BAM doocsbridge stopped --> manual restart necessary
HED:
SCS:
SQS:
DRC
- one hour data lost in influxDB in SA2
PRC
|
|
498
|
13 Mar 2024, 11:30 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 13.03.2024 |
General Announcement:
-
CTRL:
- Nothing to report.
DA:
- Not present.
EEE:
- Nothing to report.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- Nothing to report.
UNSYS:
- Everything is fine. ZZ on Monday was successful.
SPB:
- Nothing to report;
- Problem with AGIPD chiller: seems solved for the moment - see how it goes next days.
FXE:
- Nothing to report.
MID:
- All fine at MID.
HED:
- Starting with the beam.
- SCS:
- Prepared equipment; maybe electronics will be contacted later.
SQS:
- All good.
SXP:
- All not present. |
|
402
|
13 Mar 2023, 09:49 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 13.03.2023 |
General Announcement:
-
CTRL:
- On Friday a minor issue with Karabo dataloggers while connecting to Influx DB happened. Investigation to be concluded today and possibly apply the fix today.
DA:
- Deployment of offline calibration went well and smooth. In case of question please contact DA.
EEE:
- Nothing to report.
VAC:
- Nothing to report.
XPD:
- Issue with SA2 XTD6 XGM on Friday and Saturday: finally, it was found the Hard drive was damaged and had to be exchanged by a ZZ on Saturday 13:00.
Thanks to Theo M., Fini J. for the ZZ and Soeren G. for software re-installation - all under voluntary basis.
DET:
- Problem with Julabo chiller at SPB/SFX: Julabo to be dismounted today and to be sent to Julabo. The repaired one will arrive Wednesday or Thursday and installed at SPB asap.
ITDM:
- Nothing to report.
XRO:
- For SA1 and SA2 all mirrors cooling are OFF.
LAS:
- Nothing to report.
UNSYS:
- Did studies on radiation of Apple-X.
- Problem with roll angle motor at 2nd Mono for HXRSS at cell#18. It can not be controlled and it seems it needs to be replaced.
Understanding together with RCs is that is possible to run HXRSS this week with current roll position.
- Pb-shield for phase shifter motors are received and will be placed during ZZ accesses.
SPB:
- Julabo chiller exchange is planned for this week.
FXE:
- Nothing to report.
MID:
- Nothing to report.
HED:
- Nothing to report.
SCS:
- Nothing to report.
SQS:
- Nothing to report.
SXP:
- Nothing to report. |
|
394
|
13 Feb 2023, 10:05 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 13.02.2023 |
General Announcement:
- Accelerator downtime on Saturday of 5-6 hours due to a matching capacitor located at the GUN. Work to find the problem and exchange cause this delay and it was the first of this kind since 2016.
CTRL:
- A fix for the device clone is prepared and will deployed today.
- Two issues from weekend being investigated (camera SPB/SFX and PLC) with EEE and CTRL.
DA:
- Data generation for MID: high load during the weekend. Now it was drained.
- Data delay during the weekend was recovered: migration queues were very long and calibration was delayed. Denial of services happened as many works were in the queue.
This was changed and shall not happen anymore. All data taken during the time was processed.
EEE:
- Working on the timeout issue.
- OCD calls for AGIPD motor positions: configs were recovered.
- Scanner issue is not yet clear if mechanical or software related.
VAC:
- Nothing to report.
XPD:
- Preparing for calorimeter measurements at SPB.
- Today supporting BKR to record images.
DET:
- Nothing to report.
ITDM:
- Be aware that last week was not a standard week in Data recording, being a run at the edge of capabilities. Experts are looking to explore other possibilities.
- ITDM expected MID to take a bit higher data but it was really at the edge. Much less calibrated data was generated – efforts by data reduction helped to keep into the edge.
XRO:
- Nothing to report.
LAS:
- Unexplained behavior of ADC in SA2 laser being investigated.
UNSYS:
- Nothing to report.
SPB:
- Did not get the RF window at the beginning. It was enough to get some data by end of the week.
FXE:
- Users were happy last week.
MID:
- Good week and very successful week with user group.
- High duty cycle could be achieved - thanks to DA; reduced due to the high load.
HED:
- Nothing to report; finishing to prepare for this week beam.
SCS:
- Nothing to report; waiting for XTD10 tunnel investigation of the motor.
SQS:
- Nothing to report.
SXP:
- Nothing to report. |