Subject: Notes XO Integration Meeting 13.05.2024 
General Announcement:
- A. Galler reminds that entries from the instruments taking beam at the Operation-2024 e-log is highly appreciated.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Issue Friday night at 02:28AM: the SA2/XTD1 XGM stopped delivering single shot data. There was an interlock of high voltage HAMP (over current happened). 
It was repaired earlier in the morning around 08:30AM but further investigation is ongoing. 
MID did not take beam during that time due to another issue happening in parallel, so no data needed from XGM were lost.

DET:
- Nothing to be reported.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- Everything is fine.

SPB:
- Piezo motors for the PP-laser had issue but now it's solved.

FXE:
- Problem with PP-laser (fundamental spectrum) was fixed by OCD.
- PP-laser timing jump after shift changes from SPB/SFX.
- Problems with dark taking for the Jungfrau which was reported to DOC - as DRC, Phillip Schmidt reports that refreshing the myMDC page permits to make data visible.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Users are taking beam.

SXP:
- Not present.