Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 468     Entry time: 13 Nov 2023, 10:16
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 13.11.2023 
General Announcement:
- This and next week of operation are the last 2 delivery weeks, which are done with 4.5MHz base rep rate. 

CTRL:
- Announcement: today IT will make an intervention in one of the hosts (204) for the DOOCS topic; downtime is expected and colleagues using cloning devices in this host (DOOCS requester to clone DOOCS) 
have to be refreshed and restarted.

DA:
- Nothing to report.

EEE:
- Incident that SCS motor not correctly moving during the weekend. PLC-OCD could not be reach due to phone issues; issue with motor was solved

VAC:
- ZZ on Thursday in XTD2 to exchange turbo pump was successful.

XPD:
- SA1 studies with 1nC was done in SA3 and not in SA1;
- 30keV went well on Wednesday but with Nepal-X no lasing was found on Friday.

DET:
- Nothing to report.

ITDM: 
- Nothing to add apart of CTRL report. An e-mail will be sent when it is done.

XRO:
- A. Trapp says the issue with SA2 motors moving slowly was fixed now after a patch was deployed.

LAS:
- Nothing to report.

UNSYS:
- ZZ last week for SA1 cell20 PS motor being replaced (damaged encoder). Many spare encoders are in house.

SPB:
- Nothing to report.

FXE:
- Preparing for in-house experiment.

MID:
- All fine at MID.

HED:
- 2 experiments this week at 18 and 24keV.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Preparing experiments at 4.5MHz.