Entry   Notes XO Integration Meeting 21.07.2021, posted by Frederik Wolff-Fabris on 21 Jul 2021, 10:05 
General Announcement:
- XO would like to remind instruments that in case it is planned to use beam after 23:00, please put this information in the delivery table for that all
involved parts are aware of it.
Entry   Notes XO Integration Meeting 19.07.2021, posted by Frederik Wolff-Fabris on 19 Jul 2021, 11:37 
General Announcement:
-  A. Galler asks the instruments to also take a look at the operators table as they have a shift-by-shift information for X-ray delivery, not only into
the delivery tables.
Entry   Notes XO Integration Meeting 14.07.2021, posted by Andreas Galler on 14 Jul 2021, 09:28 


General Announcement:


 


CTRL:
Entry   Notes XO Integration Meeting 12.07.2021, posted by Andreas Galler on 12 Jul 2021, 09:29 


General Announcement:


 


CTRL:
Entry   Notes XO Integration Meeting 07.07.2021, posted by Andreas Galler on 07 Jul 2021, 09:14 


General Announcement:


 


CTRL:
Entry   Notes XO Integration Meeting 05.07.2021, posted by Andreas Galler on 07 Jul 2021, 09:07 
General Announcement:

- User Operations Meeting will resume on Friday

CTRL:
Entry   Notes XO Integration Meeting 30.06.2021, posted by Frederik Wolff-Fabris on 30 Jun 2021, 10:55 
General Announcement:
- D3 starts the radiation interlock / TUV tests at XHEXP1 today. Initially by SA1, followed by SA3 area. 
Torsten Schoen will be available to bridge SA2 power supply only when tests are to be done in these instruments. One can work in SA2 until RPOs arrive
Entry   Notes XO Integration Meeting 28.06.2021, posted by Frederik Wolff-Fabris on 28 Jun 2021, 10:28 
General Announcement:
- A. Galler reminds that Interlock tests are coming this week to the hutches. D3 did not make a schedule with respect to each hutch and when. 
As soon as the interlock tests are done in one instruments this will be informed to XO which in turn will communicate to the respective instrument.
Entry   Notes XO Integration Meeting 23.06.2021, posted by Frederik Wolff-Fabris on 23 Jun 2021, 10:41 
General Announcement:
- In case groups had issues with power glitch on last Sunday, please let XO know for that this will be discussed with Desy.
- Interlock tests are happening and will reach the hutches on next week. In the past there is little to no implications to the instruments. 
Entry   Notes XO Integration Meeting 21.06.2021, posted by Frederik Wolff-Fabris on 21 Jun 2021, 10:56 
General Announcement:
- Interlock tests starting this week. An e-mail was sent to xo-info@xfel.eu and if clarifications are needed please get in touch with XO.
- Zunaira A. asks if XO knows if emergency OFF will be tested and power would be bridged. 
Entry   Notes XO Integration Meeting 16.06.2021, posted by Arvid Gebhardt on 16 Jun 2021, 08:37 
General Announcement:

- Interlock test next 2 weeks starting on monday - from next wednesday the photon tunnels will be closed; Tests are the XHEXP1 take place on
30.06, 01.07 and 02.07 with the last date as reserve; An email is going to be send by FWF to the xo-info@xfel.eu list.
Entry   Notes XO Integration Meeting 14.06.2021, posted by Frederik Wolff-Fabris on 14 Jun 2021, 10:15 
General Announcement:
-
Entry   Notes XO Integration Meeting 09.06.2021, posted by Frederik Wolff-Fabris on 09 Jun 2021, 10:14 
General Announcement:
- Zunaira A. says that on HED on Saturday there was the 2 hour break on the search mal-function. It was solved by manual restart done by Eric B. (origin
was the DACHS 
Entry   Notes XO Integration Meeting 07.06.2021, posted by Frederik Wolff-Fabris on 07 Jun 2021, 10:29 
General Announcement:
- Accelerator has been shutdown this morning and the Summer/21 maintenance period has started.
- A. Galler asks the instruments to check the beamlines are in safe state for that tuning and setup starts after the maintenance without potentially damaging
Entry   Notes XO Integration Meeting 02.06.2021, posted by Frederik Wolff-Fabris on 02 Jun 2021, 10:24 
General Announcement:
- XO reminds staff to check the safety trainings and the DACHS access rights/permissions for the tunnels when planning tunnel accesses during the maintenance
period. 
Entry   Notes XO Integration Meeting 31.05.2021, posted by Frederik Wolff-Fabris on 31 May 2021, 10:18 
General Announcement:
- Next Friday is the last User & Operation meeting for this run. We will have presentations of 3 user groups.
- Today 31.05 is a normal delivery beam day.
Entry   Notes XO Integration Meeting 26.05.2021, posted by Frederik Wolff-Fabris on 26 May 2021, 10:23 
General Announcement:
- XO reminds the procedure for ZZ access is organized through the PRC. 
If a ZZ is needed, please get in touch with the PRC for advice and fill it up the Redmine access request (link located at the TTfinfo e-log). 
Entry   Notes XO Integration Meeting 19.05.2021, posted by Frederik Wolff-Fabris on 19 May 2021, 10:13 
General Announcement:
- A. Galler says the Interlock Tests schedule is placed at the EUXFEL Infrastructure Calendar. 
Concerning the TUV tests at Schenefeld side, this happens between June 30th and July 2nd (the 2nd is a reserve date). When a detailed schedule is made,
Entry   Notes XO Integration Meeting 17.05.2021, posted by Frederik Wolff-Fabris on 17 May 2021, 10:25 
General Announcement:
- Adrian Mancuso tells on the workaround for the crosstalk between SA1/SA3 documented by Harald Sinn. The idea was to switch off the feedback prior the
bunch changes. 
Entry   Notes XO Integration Meeting 12.05.2021, posted by Arvid Gebhardt on 12 May 2021, 09:21 
General Announcement:

- User Operations Meeting takes place on next Friday 09:00.

CTRL: