Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther, Page 19 of 29  Not logged in ELOG logo
Entry   Notes XO Integration Meeting 12.04.2021, posted by Frederik Wolff-Fabris on 12 Apr 2021, 14:40 
General Announcement:
-  
Entry   Notes XO Integration Meeting 07.04.2021, posted by Andreas Galler on 07 Apr 2021, 08:52 


General Announcement:


.


CTRL:
Entry   Notes XO Integration Meeting 31.03.2021, posted by Frederik Wolff-Fabris on 31 Mar 2021, 11:01 
General Announcement:
- There is no UOM on next Friday April 02.
- The next XO Int. Meeting takes place on Wednesday 07.04.
Entry   Notes XO Integration Meeting 29.03.2021, posted by Frederik Wolff-Fabris on 29 Mar 2021, 10:45 
General Announcement:
- The UOM does not take place on next Friday 02.April.
- Pouneh S. informs the SCS panic button is not properly working (the search hutch does not perform as expected). This does not prevent operation and will
Entry   Notes XO Integration Meeting 24.03.2021, posted by Frederik Wolff-Fabris on 24 Mar 2021, 10:06 
General Announcement:
-  
Entry   Notes XO Integration Meeting 22.03.2021, posted by Frederik Wolff-Fabris on 22 Mar 2021, 10:14 
General Announcement:
- The Covid-19 health task force is looking into testing schemes to be employed on-site. In the future there will be an opportunity to do the self-tests
on-site for 
Entry   Notes XO Integration Meeting 17.03.2021, posted by Arvid Gebhardt on 17 Mar 2021, 09:15 
General Announcement:

- nothing.

CTRL:
Entry   Notes XO Integration Meeting 15.03.2021, posted by Frederik Wolff-Fabris on 15 Mar 2021, 11:26 
General Announcement:
- Following Desy e-mail to all EUXFEL staff, the emergency call system of the elevators will be offline on Thursday March 18th during the morning. Please
avoid using the 
Entry   Notes XO Integration Meeting 10.03.2021, posted by Arvid Gebhardt on 10 Mar 2021, 09:20 
General Announcement:

- nothing for now

CTRL:
Entry   Notes XO Integration Meeting 08.03.2021, posted by Frederik Wolff-Fabris on 08 Mar 2021, 10:49 
General Announcement:
- SPB/SFX will continue receiving beam this week for commissioning.
- Issues with access to the Operations/21 e-log: SPB run coordinator wrote to wrote to the admin but no answer so far. Entries by Adrian M. while using
Entry   Notes XO Integration Meeting 03.03.2021, posted by Arvid Gebhardt on 03 Mar 2021, 09:23 
General Announcement:

- Hick-ups in the beam operation are happening since last night. There is no obvious indications on the origin of the problem and MXL is investigating
to restore a normal beam delivery condition.
Entry   Notes XO Integration Meeting 01.03.2021, posted by Frederik Wolff-Fabris on 01 Mar 2021, 10:49 
General Announcement:
- An e-mail from Steve Aplin informs on how to contact the DATA operation center during beam delivery times. It changes contact phone numbers for OCDs.
Entry   Notes XO Integration Meeting 24.02.2021, posted by Arvid Gebhardt on 24 Feb 2021, 09:03 
General Announcement:

- Due to a failure alarm in the smoke extraction system in XTD6+8+9, Desy colleagues will need to reboot a crate and exchange one module. This
will bring down the air conditioning for the tunnels during about two hours. The activity is scheduled for March 1st starting at 11:30AM and
Entry   Notes XO Integration Meeting 22.02.2021, posted by Frederik Wolff-Fabris on 22 Feb 2021, 10:14 
General Announcement:
- In case someone has any remaining question on the use of masks in the hutches please feel free to ask in this meeting series or write XO an e-mail.
- Racks for the SXP will be delivered and moved around XHEXP1 in March. The calendar for such activities will appear in the EXFEL infrastructure calendar.
Entry   Notes XO Integration Meeting 17.02.2021, posted by Arvid Gebhardt on 17 Feb 2021, 09:27 
General Announcement:



CTRL:
Entry   Notes XO Integration Meeting 15.02.2021, posted by Frederik Wolff-Fabris on 17 Feb 2021, 08:52 
General Announcement:
- It had been a cooling water issue with SA1 and SA3 PPLs on Saturday. Other groups are encouraged to check their components for eventual damage. Cooling
water is back 
Entry   Notes XO Integration Meeting 10.02.2021, posted by Arvid Gebhardt on 10 Feb 2021, 09:20 
General Announcement:

- Tunnel closure: it has been decided both XTD6 and XTD9 will be searched and closed on Monday 15.02.

- Temporary tunnel access requests: for ZZ access please be aware of the new Redmine ticket for access requests. The link to it appears
Entry   Notes XO Integration Meeting 08.02.2021, posted by Arvid Gebhardt on 08 Feb 2021, 08:30 
General Announcement:

- XTD10 tunnel was closed last Friday; XTD9 to be closed by end of this week; XTD6 is undefined – mostly likely by Monday. Any schedule
deviation will be communicated.
Entry   Notes XO Integration Meeting 03.02.2021, posted by Arvid Gebhardt on 03 Feb 2021, 09:26 
General Announcement:

- Automatic Power Switch Testing was done yesterday. The switches are working as expected and a protocol has been produced. Torsten Schoen
informs this test is done every 4 years; from now on equipment can be connected again to the orange and green power outlets.
Entry   Notes XO Integration Meeting 01.02.2021, posted by Arvid Gebhardt on 01 Feb 2021, 09:06 
General Announcement:

- The test of the emergency automatic switch of power bridge is scheduled for Tuesday, 2nd of February 2021, 09:00. This will
affect orange outlets in XHQ and green and orange outlets in XHEXP1. A short interruption in the power supply lines will happen. We expect all groups have
ELOG V3.1.4-7c3fd00