Group Selection Page
HELP
DOC
Controls Group
Data Analysis Group
ITDM
WP76
DET
Vacuum
XRO
EEE
WP78
WP74
FXE
SCS
SPB
MID
HED
SQS
SXP
Sample Environment
Photon Commissioning Team
Operation
PSPO
XO
TS
|
Technical integration and coordination
SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
|
|
Message ID: 282
Entry time: 29 Nov 2021, 11:50
|
Author: |
Frederik Wolff-Fabris |
Location: |
General |
Severity: |
Information |
Subject: |
Notes XO Integration Meeting 29.11.2021 |
|
|
General Announcement:
- Today and tomorrow are the two last days of operation with ramp down of tunnels components. On Wednesday many activities are planned for the start of the maintenance period.
- Sandra Plett comments there are 1000 packages o Self-tests at EuXFEL with 5 tests each. Sandra P. also mentions that FFP2 masks can be taken from reception (few amounts) or warehouse (larger amounts).
CTRL:
- Karabo deployment will start accordingly to the maintenance planning.
DA:
- Nothing to report.
EEE:
- Preparing for maintenance tasks.
VAC:
- Nothing to report.
XPD:
- Naresh K. mentions the issue with emergency light test carried by TS. HED planned to make measurements with a dark room (all lights OFF).
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- Nothing to report.
UNSYS:
- Not present.
SPB:
- Nothing to report.
FXE:
- Cooling issue in cw49 (opening rack doors): A. Galler says that for the experiments does not need to open racks. On 02.12 XO will inform if the cooling backup system for 20C water works.
MID:
- Training to operate air compression in the Hall was done. Normal state for MID compressor will be OFF and only switched ON when this is needed.
- Jan-Torben D. also asks for the training. This has to be scheduled with TS and XO can assist with it.
HED:
- Emergency light problem occurring on Friday: A. Galler says that this test is being done remotely every week on Mondays; The referred test was a maintenance task and TS was not aware of the presence of
users.
SCS:
- Nothing to report.
SQS:
- Re-arrangement of the beamline starting today.