Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 282     Entry time: 29 Nov 2021, 11:50
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 29.11.2021 
General Announcement:
- Today and tomorrow are the two last days of operation with ramp down of tunnels components. On Wednesday many activities are planned for the start of the maintenance period. 
- Sandra Plett comments there are 1000 packages o Self-tests at EuXFEL with 5 tests each. Sandra P. also mentions that FFP2 masks can be taken from reception (few amounts) or warehouse (larger amounts).

CTRL:
- Karabo deployment will start accordingly to the maintenance planning.

DA:
- Nothing to report.

EEE:
- Preparing for maintenance tasks.

VAC:
- Nothing to report.

XPD:
- Naresh K. mentions the issue with emergency light test carried by TS. HED planned to make measurements with a dark room (all lights OFF).

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Not present.

SPB:
- Nothing to report.

FXE:
- Cooling issue in cw49 (opening rack doors): A. Galler says that for the experiments does not need to open racks. On 02.12 XO will inform if the cooling backup system for 20C water works.

MID:
- Training to operate air compression in the Hall was done. Normal state for MID compressor will be OFF and only switched ON when this is needed.
- Jan-Torben D. also asks for the training. This has to be scheduled with TS and XO can assist with it.

HED:
- Emergency light problem occurring on Friday: A. Galler says that this test is being done remotely every week on Mondays; The referred test was a maintenance task and TS was not aware of the presence of 
users.

SCS:
- Nothing to report.

SQS:
- Re-arrangement of the beamline starting today.
- SQS is also interested in the training for compressors also.