Technical integration and coordination
SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
|
|
Message ID: 293
Entry time: 19 Jan 2022, 11:00
|
Author: |
Frederik Wolff-Fabris |
Location: |
General |
Severity: |
Information |
Subject: |
Notes XO Integration Meeting 19.01.2022 |
|
|
General Announcement:
- Machine status: SA2 is currently lasing @ 9keV and 2.5mJ. North Branch was closed yesterday and after a quick ZZ in XTD10 this morning the BBA and tuning will resume today and tomorrow.
- X-ray delivery tables for cw05 have been sent to the instruments and we thank to all that have already sent us a feedback.
- DOC will start next Monday. From MON-FRI from 9Am to 5PM. For the next weekend the photon staff in shift work shall send a ticket or only in case of urgent/critical matters call the DRC phone. The PLCs
are providing OCDs.
CTRL:
- Bassler cameras were migrated to Aravis library.
DA:
- Nothing to report.
EEE:
- ZZ is ongoing to check a faulty switch signal in XTD10.
VAC:
- Benoit R. is currently in the tunnel on the ZZ;
- VAC systems are all fine and ready to take beam.
XPD:
- Aravis library installed and tested; all went fine.
- XTD6 ongoing tasks are under progress and may be finished already at the end of the day. If progress is made accordingly to the plan, XTD6 can be closed tomorrow.
The new M-port crate was connected yesterday (upgrade of MCP). Almost all is finished; Wolfgang F. finishes small things.
DET:
- Nothing to report.
ITDM:
- Offline storage system update scheduled for today (Dcache affected). E-mail will be send when finished by end of the day.
XRO:
- Nothing to report; all maintenance activities completed.
LAS:
- As aftermath of cooling water and air conditioning issues during maintenance: problems with misalignment of all lasers; LAS has troubles to align them.
- For SA2, LAS is confident will be fine with alignment. The SA3 is a bit behind of SA2;
- SA1 presents the biggest misalignment after T and H shock - long pump pulse. The 280kHz test is now in secondary priority. LAS will report day-by-day and is not so confident will be ready for instruments
in February.
UNSYS:
- Finished to install air coils in Apple-X.
- SA2 phase shifter solved.
SPB:
- Nothing to report.
FXE:
- Interlock issues were fixed.
MID:
- All fine at MID.
HED:
- All fine at HED.
SCS:
- Nothing to report.
SQS:
- All good at SQS. |