running jdd panels in control rooms, posted by ITDM Admin on 01 Apr 2019, 10:29
|
On all PCs in the control rooms including BKR and also on the exflgateway there is a new version of jddd installed
which is working with openjdk-11.
It is worth to mention that the old javaws from old oracle java 8 is deprecated and it is not recommended running jddd panels using old way, like |
Re: running jdd panels in control rooms, posted by ITDM Admin on 19 Jun 2019, 16:33
|
Regarding the recent announcements from doocs/jddd people about running jddd application I post here a short summary:
- running jddd with oracle java 8 via java webstart will be no longer possible as of 10.07.19
- on all control PCs in the instruments control rooms, BKR and exflgateway the new jddd was already in use since March, as described in the previous |
Minutes of the Technical integration meeting 24.04.19 , posted by Gerd Wellenreuther on 24 Apr 2019, 10:05
|
SPB/SFX
SPB/SFX is preparing for the upcoming beamtime.
CRL motors being tested. --> Still ongoing.
CSS interlock tests
being planned for tomorrow. --> Still ongoing.
AE needs to know when Loop 9 and 10 are expected to run. SPB to check.
FXE |
Status report after dispatch meeting Monday 20.5. 09.30, posted by Gerd Wellenreuther on 20 May 2019, 10:02
|
SPB/SFX
are working on achieving a good focus @ 6 keV, which currently is not as good as expected.
Digitizers are ready, have been
tested by CAS ==> to be be installed / integrated probably next week
Different GUIs were reporting varying values for STATUS on different |
Minutes of the Technical integration meeting 22.05.19, posted by Gerd Wellenreuther on 22 May 2019, 09:58
|
FXE
SPB/SFX
XTD2 attenuator appears to be damaged.
Beam at lower energies look disturbed, SPB/SFX will contact |
Status report after dispatch meeting Friday 24.5. 09.00, posted by Gerd Wellenreuther on 24 May 2019, 11:01
|
SPB/SFX
are working on achieving a good focus @ 6 keV, which currently is not as good as expected. ==> This is understood now, those
were higher harmonics, too many absorbers in the beam. Absorber still shows some structure, though
Digitizers are ready, have been |
Status report after dispatch meeting Monday 27.5. 09.30 , posted by Gerd Wellenreuther on 27 May 2019, 10:35
|
SPB/SFX
Digitizers are ready, have been tested by CAS ==> to be be installed / integrated probably next week ==> according to Adrian probably
Monday, to be confirmed with AE (Bruno + Hamed) ==> is confirmed to be today
Different GUIs were reporting varying values |
Minutes of the Technical integration meeting 29.05.19 , posted by Gerd Wellenreuther on 29 May 2019, 10:30
|
FXE
SPB/SFX
XTD2 attenuator appears to be damaged. ==> Request to VAC: is it possible to exchange the attenuators in the summer shutdown? |
Minutes of the Technical integration meeting 05.06.2019, posted by Gerd Wellenreuther on 05 Jun 2019, 09:59
|
FXE
SPB/SFX
few days of beamtime remaining, no particular issues
preparing for emergency power off
preparing |
Status report after dispatch meeting 12.8., posted by Gerd Wellenreuther on 12 Aug 2019, 09:50
|
XO
FXE
XTD1 CRLs: There is an issue regarding a limit switch, to be repaired in the shutdown by MKnoll + EEE.
SPB/SFX |
Minutes of the Technical integration meeting 14.08.2019, posted by Gerd Wellenreuther on 14 Aug 2019, 10:01
|
XO
On Monday at around 12:20 there was a power glitch at least in Hamburg, affecting the machine.
In this cause, the startup
was delayed due to a missing signal from the Vacuum EPS-MPS-interface. The signal had to be manually enabled again.
Tuning is estimated to take |
Notes Dispatch meeting Feb 10th, 2020, posted by Frederik Wolff-Fabris on 10 Feb 2020, 10:12
|
SPB: Nothing to report;
FXE: Everything ongoing; nothing special to be reported;
|
notes Dipatch Meeting Feb. 17th, 2020, posted by Frederik Wolff-Fabris on 17 Feb 2020, 12:02
|
FXE:
Nothing to report: no issues;
|
notes Dipatch Meeting March 9th, 2020, posted by Frederik Wolff-Fabris on 10 Mar 2020, 12:44
|
* Users are scheduled to be here this week (4 beamlines in user runs). SPB, HED, MID report several users have cancelled the travel. Beamlines are making
mitigation plans
to run experiments.
|
Notes Dipatch Meeting March 16th, 2020 , posted by Frederik Wolff-Fabris on 16 Mar 2020, 09:36
|
FXE:
- Beamline is in safe state;
- Minor Jungfrau calibration issues over last week. In touch with DET and EEE;
|
notes Dipatch Meeting April 6th, 2020, posted by Frederik Wolff-Fabris on 06 Apr 2020, 09:50
|
CTRL:
- It was remotely observed that some cameras were consuming too much memory. By remotely re-starting these devices the issue was solved.
- No calls to the OCD during the weekend.
|
Notes Dispatch Meeting 20.04.2020, posted by Frederik Wolff-Fabris on 20 Apr 2020, 10:59
|
General:
- Desy informed a power glitch occurred on Thursday 16th at 04:55AM. TS has not seen any traces of it in the EuXFEL internal GLT.
- From next week the Dispatch meeting will start at 09:30AM.
|
Notes XO Integration Meeting 22.04.2020, posted by Frederik Wolff-Fabris on 23 Apr 2020, 10:04
|
General Announcement:
- An e-mail was sent yesterday about the relaxation of restrictions on the control network.
- From now on, the XO integration meeting series will happen on Monday and Wednesday at 09:30 and Friday at 11:30.
|
Notes XO Integration Meeting 24.04.2020, posted by Frederik Wolff-Fabris on 24 Apr 2020, 13:48
|
Relaxation control network:
- CTRL and XO remind the groups to submit the planned activities on e.g. scenes, projects, until Fridays.
- For next week case: please limit any hardware change. Reason is the current limitation on the physical presence of staff.
|
Notes XO Integration meeting 27.04.2020, posted by Frederik Wolff-Fabris on 28 Apr 2020, 16:19
|
General Announcement:
- The CTRL group has received 3 Control Network tasks that can be carried out this week;
- Requests from the groups to Tunnel activities from May 4th are being treated and an answer will come in the next couple of days.
|