FXE
SPB/SFX
- XTD2 attenuator appears to be damaged.
- Beam at lower energies look disturbed, SPB/SFX will contact XRO.
- Digitizers have been requested. HW needs to be installed and set up and the timeline has to be clarified betweek BF and SPB. ==> next week
SQS
- pnCCD: testing the 5 axis of motion. 3 are working, but there are problems, the wiring of the cables is now being checked.
SCS
- Some issues are noticed regarding the triggering of the detector, but BF is on it
MID
- Due to the failed chiller, the user experiment had to be cancelled.
- As a consequence, time is available to commision other hardware. ==> to be clarified with AE which activities can be supported.
- Integration of the LDM: Safety document is needed.
HED
- Loop 6 being commissioned.
- Loop 1 was updated, parameters got lost. :-(
- Detector issues regarding Epix 100: First some HW + assistance from MID was provided to get the detector running. By now, the HED-owned HW for the Epix 10K is being used.
XRO
XPD
VAC
DET
AE
- Loop priorities for HED and MID are needed.
- AE reminds everybody to contact TSchoen if power is required during the middle of June, e.g. in order to keep the vacuum running.
ITDM
EET
CAS
SRP
- A safety walkthrough for SASE2 was done. Several installations are in conflict with the safety regulations regarding e.g. electrical installations. Detailed minutes will be provided. SRP will also involve TS / Süleyman Arslan.
TS
AoB
|