SPB/SFX
- Digitizers are ready, have been tested by CAS ==> to be be installed / integrated probably next week ==> according to Adrian probably Monday, to be confirmed with AE (Bruno + Hamed) ==> is confirmed to be today
- Different GUIs were reporting varying values for STATUS on different clients / machines ==> ARound will make sure a proper description of the issue (which machines, which clients, when, ...) will be brought to the attention of the proper people @ CAS. ==> CAS is aware. ==> CAS has a suspect.
- There appears to be an issue with recorded / stored values vs. values shown in the client of motors moving. CAS shall receive a proper + detailed description of the issue.
FXE
- Tool to save motor positions is not working reliably. ==> CAS + AE have different tools on different levels. There is not automatic / global restoring of for example motor positions from the CAS-side available. BUT in the shutdown motor position should not be lost, unless there is a true power outage also affecting the CPUs.
- Problems with the PP-laser have been reported.
SQS
SCS
MID
- Request to have the same kind of feedback as implemented at FXE ==> will require HW changes, to be done during the summer shutdown, and work by CAS in order to adapt the procedure from FXE.
HED
- According to KS the Smaract-stages are to be checked with AE
- Interlock definitions would be needed by Wednesday ==> MS is on it.
- Last weeks issues regarding the epix were probably caused by the DAQ.
OPT Lasers
XRO
XPD
VAC
DET
- The DSSC underwent successful readout test, more DAQ-test to come.
- The pnCCD saw first visible light, working now on the delay / timing.
AE
ITDM
EET
CAS
- A Hotfix 2.4.2 is provided by CAS, which should fix some issues related to the XGM.
SRP
TS
AoB |