Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther, Page 25 of 30  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Locationdown Severity Subject Text Attachments
  469   07 Feb 2018, 09:47 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB/SFX

- An AGIPD crate providing power
broke down and has been fixed already by
  
  470   12 Feb 2018, 08:46 Adriano ViolanteGeneralInformationStatus and plans after SASE1 Status/SASE3 Readiness Meeting 09.02.General


"In the beginning of this
meeting SM congratulated the whole staff
  
  471   12 Feb 2018, 10:03 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB


During operation Karabo
crashed. As soon as detector is being operated
  
  472   14 Feb 2018, 14:21 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB


MIddle layer karabo devices
are responsible for the det. Karabo problems.
  
  Draft   16 Feb 2018, 15:44 Adriano ViolanteGeneralInformationStatus and plans after SASE1 Status/SASE3 Readiness Meeting 16.02.Photon
Run Coordinator Report to Readiness Meeting

The
  
  474   18 Feb 2018, 17:20 Jan GrünertGeneralInformationCAS OCDHere is a information from Sandor on CAS
OCD Numbers
(this info is copied from the SASE1
  
  475   19 Feb 2018, 09:56 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB




KB chamber being
pumped down


interaction
  
  476   20 Feb 2018, 12:29 Eric BoydGeneralInformationFXE Beam Shutter KeyThe FXE beamshutter key has been installed
into the interlock system after satisfactory
completion of the FXE Chicane and Radiation
  
  477   21 Feb 2018, 10:55 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB


KB chamber being pumped
down
Smaract commissioning ongoing
Coordinate
  
  478   21 Feb 2018, 13:49 Alessandro SilenziGeneralInformationRe: Status report after dispatch meeting 09.30Small correction:

The coordinated motion is the KB-mirror's,
not the Vacuum.
  
  479   23 Feb 2018, 15:54 Gerd WellenreutherGeneralInformationStatus and plans after Readiness Meeting 23.02. Photon Run Coordinator (L. Samoylova):


SASE1 tuning is ongoing
(350 microJ)
SASE3 3000microJ
SASE1
  
  480   26 Feb 2018, 12:09 Monica ArestéGeneralInformationStatus report after dispatch meeting 26.02SPB:


Ion pumps running in the
Mirror chamber.
Starting test
  
  481   28 Feb 2018, 10:55 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB:


Ion pumps running in the
Mirror chamber. Vacuum level OK to run.
D.02
  
  482   02 Mar 2018, 14:36 Adriano ViolanteGeneralInformationStatus and plans after SASE1 Status/SASE3 Readiness Meeting 02.03.Photon
Run Coordinator (N. G. Kujala):


SASE1


  
  484   05 Mar 2018, 16:37 Adriano ViolanteGeneralInformationDetails on SPB issues reported in the dispatch meetingsBelow some clarifications from R. Bean
on the issues reported in today's dispatch
meeting:
  
  485   07 Mar 2018, 11:14 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB:


Monday morning Karabo failed.
It was not possible to operate anything.
  
  486   12 Mar 2018, 08:18 Adriano ViolanteGeneralInformationStatus and plans after SASE1 Status/SASE3 Readiness Meeting 09.03Photon Run Coordinator (L. Samoylova):


Commissioning during
  
  487   12 Mar 2018, 13:18 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB (Weinhausen):


During the night there
was an interlock issue. The fast shutter
  
  488   14 Mar 2018, 10:06 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB (Weinhausen/Round/Mancuso):


Again on the fast valve was
triggering the MPS interlock system. For
  
  489   19 Mar 2018, 08:42 Adriano ViolanteGeneralInformationStatus and plans after SASE1 Status/SASE3 Readiness Meeting 16.03..Photon Run Coordinator (H. Sinn):

1.) SASE1: User experiment SPB
could be finished sucussfully after several
  
ELOG V3.1.4-7c3fd00