  490   19 Mar 2018, 10:24 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30No new issues to be discussed where reported
by any groups.

The status and issues reported
  
  491   21 Mar 2018, 10:02 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB

On monday there was an issue with
a detector related PLC due to misconnection
  
  493   26 Mar 2018, 13:10 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30General

Due to the triggering of the emergency
power off in FXE caused by electrical works
  
  494   27 Mar 2018, 14:18 Jan GruenertGeneralInformationXTD1 openInfo from BKR:  the southern tunnels
were opened, thus XTD1 can be accessed now.
  
  495   28 Mar 2018, 15:22 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB


Sample delivery installed.
Tonight will be commissioned. Experiment
  
  496   29 Mar 2018, 09:48 Hugo Silva SantosGeneralInformationRe: Status report after dispatch meeting 09.30Update regarding Digitizer:

----- Forwarded Message -----
From: "hamed sotoudi namin"
  
  497   04 Apr 2018, 13:43 Gerd WellenreutherGeneralInformationStatus reports after dispatch meeting 13:00 4.4.SPB/SFX:


Mirror installation next
week


FXE:
  
  498   04 Apr 2018, 17:35 Janusz SzubaGeneralInformationControl network maintenanceTomorrow, 5.04, between 9:30 and 12:00
there will be urgent maintenance of one of
the two redundant main switches for the control
  
  499   04 Apr 2018, 17:46 Janusz SzubaGeneralInformationmaintenance of the online storage systemOn Friday, 6.04, there will be a maintenance
of the online storage system. This will tackle
the issues we had just before the last user
  
  501   09 Apr 2018, 14:25 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 13:00General

Emergency off test in SPB is shifted.
Date to be agreed on Friday. FXE test stays
  
  502   09 Apr 2018, 14:37 Adriano ViolanteGeneralInformationKarabo deployment datesFYI

Below
the E-Mail from Hugo Santos with the Karabo
  
  503   11 Apr 2018, 13:48 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 13:00SPB


Detector z motion would
be needed. AE checks the status of the crate.
  
  504   12 Apr 2018, 15:34 Adriano ViolanteGeneralInformationWater cooling mointenance by MKK doneDie Arbeiten an der Kühlwassersteuerung
konnten innerhalb des genannten

Zeitraums abgeschlossen werden,
  
  505   13 Apr 2018, 07:50 Adriano ViolanteGeneralInformationKarabo 2.2.3 installationHi all, for your information below a message
from Chris Youngman concerning Karabo 2.2.3
installations in SASE3.
  
  509   13 Apr 2018, 13:50 NEREA JARDONGeneralInformationShutdown MicroTCA4 SPB and FXEThis entry is on behalve of Frank Babies,
if you have any doubt about it, contact him:

On 16.Apr.2018
  
  511   16 Apr 2018, 14:20 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 13:00Summary of Karabo 2.2.3 deployment
dates:


Karabo 2.2.3 deployed in
  
  513   18 Apr 2018, 13:43 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 13:00SPB


Karabo has been deployed 
without major  problems! 
Now
  
  514   18 Apr 2018, 15:06 Gerd WellenreutherGeneralInformationTunnel closing after shutdownDear all,

below please find the hottest and
most up-to-date times for the closing of
  
  515   23 Apr 2018, 15:35 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 13:00SPB


Timing tool for optical
laser installed
Sample chamber's
  
  517   25 Apr 2018, 13:28 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 13:00SPB


Loops update: 1-4+8 this
week. 5-7 Wed. next week. 11-13 end next
  