SASE1 Status and SASE3 Readiness
|
Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther |
Not logged in |
|
|
Message ID: 472
Entry time: 14 Feb 2018, 14:21
|
Author: |
Adriano Violante |
Location: |
General |
Severity: |
Information |
Subject: |
Status report after dispatch meeting 09.30 |
|
|
SPB
- MIddle layer karabo devices are responsible for the det. Karabo problems. Issue being addressed.
- 2 mirrors in D.02 installed.
- Test of the mirrors movements is done.
- Mirrors cooling bars being installed
Vacuum
XPD
- Pop-in monitor filters in XTD10 being changed
- Exit slit imager after Mono XTD10 has ot be commissioned and scintillator has to be put out of the beam way.
AE
- It can happena that some parameters cannot be set using Karabo due to lack of writing rights. A fix has been found but we would need to update all the loops. Since the problem is just occurring from time to time, AE asks to report specific cases for whoch a solution will be found. Same things happens with the re initialization of some devices. In this case the PLC crashes.
- Timing device in XTD 2 stopped working. Will be fixed today either by remote re start or by local intervention.
ITDM
- Broken server replaced
- Tomorrow there will be an update of the cluster between 9:00 and 10:00. DAQ will be down.
- Reboot of the online cluster needed. To be agreed with Detector group. 1 hour downtime also in this case.
CAS
- In SASE3, deployment of new (2.2.1) Karabo happened yesterday and seems stable, but brittle. Analysis of the reason ongoing.
- Today GAT final fixes plus testing will be performed
|