ID Date Author Locationdown Severity Subject Text Attachments
  37   03 Feb 2017, 08:48 Jan GrünertXTD2InformationUpdate WP74 cabling status (w5)Information posted on behalf of Torben
Falk (WP74 cabling)
W
  
  60   06 Mar 2017, 18:14 Andreas KochXTD2InformationPop-In II-45 Karabo test






Normal
0
  
  62   07 Mar 2017, 11:09 Andreas KochXTD2InformationKarabo testing on WednesdayAs discussed with Wajid, I am availalbe
tomorrow Wednesday the whole day to continue
testing Karabo, motion loop. Wajid checked
  
  64   08 Mar 2017, 16:08 Andreas KochXTD2ProblemKarabo testingEnd switch testing: the in-position end
switch stopped devices working, also stopped
gateway connection. Stroke of motor is not
  
  65   08 Mar 2017, 16:18 Andreas KochXTD2InformationKarabo testingHere the link to the detailed list of issues:
https://docs.xfel.eu/share/page/site/xfelwp74/document-details?nodeRef=workspace://SpacesStore/1733b825-e62e-47af-abba-fdef1ff9485d
  
  71   10 Mar 2017, 14:56 Lewis BatchelorXTD2InformationCRLThe XTD2 CRL is now aligned and cabled.
Motor cabling is complete and ready
for local testing. Encoder and PT100 cabling
  
  75   15 Mar 2017, 08:13 Andreas KochXTD2InformationXTD2 ImagersXTD2, IMAG.2694.T9, Pop-In II-45: Acceptance
test of motor control under Karabo, done.
Camera device needs further explanations
  
  85   22 Mar 2017, 16:39 Andreas KochXTD2InformationPop-In II-45 Karabo testTrigger signal now available at imager. First
Karabo tests of camera device with trigger
successful. Detailed
  
  108   06 Apr 2017, 09:16 Andreas KochXTD2InformationImager




  
  110   06 Apr 2017, 13:36 Andreas KochXTD2Information motion loop not working !?Has anyone an idea why the motion loop
is not working? Thanks Andreas
  
  111   06 Apr 2017, 14:32 Andreas KochXTD2Information motion loop not working !?

    

       
            
  
  112   06 Apr 2017, 14:45 Andreas KochXTD2Information motion loop not working !?

    

       
            
  
  120   07 Apr 2017, 19:13 wajid ehsanXTD2InformationAcceptance test IMAGERS (FRIDAY 07-04-2017) 
SA1_XTD2_IMGPII45:
 
1)
MOTOR/SCREEN(DONE)
2)
  
  133   11 Apr 2017, 15:24 Jan GrünertXTD2ProblemBig issue with XGM vacuum in both XTD2 and XTD9 !
Both XGMs were and are on manual control
(but the remote cables into the turbo pump
controllers remained plugged in as usual)
  
  135   11 Apr 2017, 17:44 Raúl Villanueva-GuerreroXTD2FeedbackXTD2 Complete Gas Section (DPS-XGM-DPS) Isolation Interlock tested - SUCCESSFUL The interlock definition for complete
isolation of the whole section based on high
pressure signal has been successfully tested. 
  
  136   11 Apr 2017, 18:29 Raúl Villanueva-GuerreroXTD2FeedbackFast Valve Test - SUCCESFUL The Fast Valve test has been positively
tested. 
It has been consider that the signal
  
  137   11 Apr 2017, 18:38 Raúl Villanueva-GuerreroXTD2FeedbackBeam Stopper and V0 valve test - SUCCESSFUL The Interlock conditions for these
two components has been positively tested
but not exhaustively done:
  
  138   11 Apr 2017, 22:36 Jan GrünertXTD2InformationXGMs in loopBoth SASE1 XGMs (in XTD2 and XTD9) are
now again in the Vacuum Control Loop, their
vacuum being controlled by Beckhoff/karabo.
  
  162   21 Apr 2017, 15:26 Jan GrünertXTD2InformationCycling of PLC loop (shutdown and restart) - effects on XGM XTD2 and XTD9
Together with Nerea and Wajid and Alessandro

10:00
closed vatterflies at XTD9 and XTD2 from
KaraboFlorian is at XTD9 next to
  
  172   26 Apr 2017, 10:51 Jan GrünertXTD2ProblemkaraboGUI issues - during cycling of PLC loop (shutdown and restart) - effects on XGM XTD2 and XTD9
Problems described in detail below
(this entire procedure takes way too much
of our time, effectively still nearly 2 hours!):

Nerea/AE
 45.png49.png10.png 