Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther |
Not logged in |
 |
|
|
Message ID: 477
Entry time: 21 Feb 2018, 10:55
Reply to this: 478
|
Author: |
Adriano Violante |
Location: |
General |
Severity: |
Information |
Subject: |
Status report after dispatch meeting 09.30 |
|
|
SPB
- KB chamber being pumped down
- Smaract commissioning ongoing
- Coordinate motion for VAC ready to be tested (probably tomorrow). It has to be agreed with Richard Bean
- Clean-up slits Karabo middle layer deployed and working. - The same hase to be done for the power slits.
FXE
- DAQ test ongoing - fixing of bugs
- After FXE has been moved into the new topic is not possible to read tunnel vacuum pressure anymore. Still the case.
- XGM in SASE3 fixed (A turbo broke - replaced)
- One exit slit Imager in XTD 10 commissioned
AE
- PBLM moto problem was found to be due to a wrong Karabo-PLC linking. ==> FIXED
- Soft mono commissioning started and AE support was required. DONE
ITDM
- Main problems with Train ID solved. Some problems still remain for some beckhoff loops in the tunnels==> AE on that.
- Some way to document the change of data format for devices has and will be found by IDTM
- Data source running for FXE. Changes have to be clearly communicated.
CAS
SASE3 - CY
- GATT works
- Inficon device to be improved (loop restart needed)
- CAS will deliver a method to deal with the configuration changes asked by the experiments, redirecting the changes to the proper platform (Firmware (AE), Karabo...)
|