Entry   Report after dispatch meeting 09.30, posted by Adriano Violante on 28 Jan 2019, 14:33 
SPB/SFX


The vacuum section of the burthrough monitor was vented for some intervention  and is now being pumped again.
CSS component
has issues with limit switches implementation. Will be discussed with AE and EET.
Jungfrau loop can be brough up once AE gets the fuse boxes
Entry   Report after dispatch meeting 09.00, posted by Adriano Violante on 25 Jan 2019, 10:07 
SPB/SFX


Trigger for Jungfrau detector is needed. 
Commissioning of the instrument should start next week
Loop priorities
for the donwstream components have been set with AE.


FXE
Entry   Report after dispatch meeting 09.30, posted by Adriano Violante on 23 Jan 2019, 10:47 
SPB/SFX

FXE


Fixing session of the sample stage. No controls modification involved. Done by today.
Shutter controls from the hutch. Some
Entry   Report after dispatch meeting 09.30, posted by Adriano Violante on 21 Jan 2019, 10:43 
SPB/SFX

FXE

​SQS
Entry   Report after dispatch meeting 09.00, posted by Adriano Violante on 18 Jan 2019, 11:05 
SPB/SFX


The interlock definitions in the tunnel were updated. They have to be tested.


FXE

​SQS
Entry   Report after dispatch meeting 09.30, posted by Adriano Violante on 16 Jan 2019, 10:20 
SPB/SFX

FXE

​SQS
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 14 Jan 2019, 12:58 
SPB/SFX


D.23 Cabling ongoing. Minor problems concerning Chicane filling. 10 cables need to be routed through another chicane.  Being
sorted out with EET.
Silicon oil pipe has been fixed and is undergoing pressure tests. So far successful.
Issue concerning tripping
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 09 Jan 2019, 10:04 
SPB/SFX


New Karabo release has been installed.


​FXE

​SQS
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 07 Jan 2019, 09:55 
SPB/SFX


CRLs will be brought in the SPB lab in XHQ. The vacuum group is installing the replacement pipe.
SFX cabling starting today.


​FXE

​SQS
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 19 Dec 2018, 13:17 
SPB/SFX


SFX part1 cabling preparation ongoing (WCBs mounting and labeling). Good progress.
CRLs will be brought out of XTD9 tomorrow.
Scaffolding
below D.23 has been removed. An official communication that now the area is completely accessible is still lacking.


​FXE
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 17 Dec 2018, 10:36 
SPB/SFX


SFX part1 cabling preparation ongoing (WCBs mounting and labeling)
waiting for the power to come back


FXE

​SQS
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 12 Dec 2018, 10:17 
SPB/SFX


Radiation damage tests were successful. 
Instrument is set for the power cut.


FXE


According to the information available to AE the instrument should be set up. 


SQS
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 10 Dec 2018, 09:50 
SPB

FXE


Timing tool has been tested during the week end. 
PP laser inch modes have been tested with the Gotthard detector.
Intra/inter
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 05 Dec 2018, 11:41 
SPB


pulse arrival time measurements to be done this week.
second Gotthard detector small issues being fixed (online data viewer
fixes - ongoing)


​FXE
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 03 Dec 2018, 11:45 
SPB


pulse arrival time measurements to be done next week.
second Gotthard detector small issues being fixed


​FXE

SQS
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 28 Nov 2018, 10:18 
SPB


 commissioning ongoing
Radiation test was not successful since the beam diameter was smaller than expected. 


​FXE

SQS
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 26 Nov 2018, 10:35 
SPB


KB system commissioning ongoing
Agipd commissioning stopped
Radiation tests preparation ongoing.


​FXE

SQS
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 21 Nov 2018, 10:13 
SPB


KB system and AGIPD commissioning ongoing


​FXE

SQS
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 19 Nov 2018, 10:39 
SPB


Gotthard needs to be tested.
Pulse picker will be used and commissioning still has to be done.
Sample chamber encoder
drift issue. Has to be investigated further. 


​FXE
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 14 Nov 2018, 10:23 
SPB


Lopp 5 update - will be agreed between SPB and AE
Smaract limit switches issues - AE will have a look. In the meanwhile also
the company of the controlles has  been asked by SPB
KB motor steps have different size with respect to encoders. This issue is known and