Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 586     Entry time: 12 Dec 2018, 10:17
Author: Adriano Violante 
Location: General 
Severity: Information 
Subject: Status report after dispatch meeting 09.30 

SPB/SFX

  • Radiation damage tests were successful. 
  • Instrument is set for the power cut.

FXE

  • According to the information available to AE the instrument should be set up. 

SQS

  • Successful users run in the last 2 weeks
  • Some interlocks need to be activated. Discussion with AE ongoing
  • Loops updates to be discussed/executed plus CR status will be checked
  • Triggers requests are being sicussed with BF

SCS

MID

  • Cabling ongoing

HED

  • Loop 1 will be operative probably today. CAS support for creation of scenes has been asked.
  • Cabling ongoing.
  • Additional Racks in A27 have been installed

OPT Lasers

  • As soon as the system is ready for the power cut in SASE1 a mail will be sent  to PSPO.

XRO

XPD

VAC

AE

  • XTD6 crate 219 has to be rebooted.

EET

ITDM

  • Maintenance and updates (e.g. online clusters ) has started  as indicated in the shutdown activities planning. Should go on until the end of the week.

DET

CAS

  • 2.3.1. will be deployed in SASE3 tunnels today
  • Schedule for 2019 has been circulated by HS to the readiness mailing list

AoB

 