SASE1 Status and SASE3 Readiness
|
Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther |
Not logged in |
|
|
Message ID: 592
Entry time: 16 Jan 2019, 10:20
|
Author: |
Adriano Violante |
Location: |
General |
Severity: |
Information |
Subject: |
Report after dispatch meeting 09.30 |
|
|
SPB/SFX
FXE
SQS
- Power cut of the primary power line in the rackroom will occur to allow fixing of the emergency power off system (as agreed between TS ans MM last week). Happening today. After completion CAS and AE support is needed to switch the systems back on.
- AQS chamber is being removed
- New interlock definitions have to be tested and implemented asap. AE will discuss a date to SQS, although Friday might me a good time.
- SQS is eager to get the new trigger system from desy and AE and help testing it. It was noted that the trigger is linked to a specific SASE.
SCS
MID
HED
OPT Lasers
XRO
XPD
VAC
- M2 mirror has been installed, the chamber closed. MCP is being mounted back.
AE
- VAC loops updates in the tunnels are ongoing and being coordinated with affected groups
- Motion 2 in SASE2 loop needs to be updated. Being coordinated with AKoch.
- SASE3+2 implementation of changes and commissioning ongoing.
EET
ITDM
DET
- During some AGIPD test with cold detector Karabo lost connection with the PLCs. This was due to the installation of new CPUs for the SFX components. For 10 minutes was not clear whether the vacuum was OK and for safety purposes the detector has been warmed up. These works have to be properly communicated next time.
CAS
AoB
- 22/23 January Fa. LIEN will fix the sliding doors in the SASE3 hutches.
|