Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther, Page 27 of 29  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry   Updated Components List, posted by Tobias Haas on 10 Feb 2017, 16:34 Components-XTD2-9.xlsx
 
Entry   Meeting Minutes 10 Feb 2017, posted by Frederike Wittmaack on 10 Feb 2017, 15:15 
Follow the link below to view the minutes and relating material on Alfresco.
http://tinyurl.com/zc3nvn9 
Entry   Updated Components List, posted by Tobias Haas on 10 Feb 2017, 15:07 Componets-XTD2-9-new.xlsx
 Added Diagnostic Screen for SPB and changed PRIO for DPS - XGM - DPS in XTD9 to high as discussed during the S1R meeting
Entry   Progress Beam Transport, posted by Tobias Haas on 10 Feb 2017, 08:31 
Post on behalf of Harald Sinn
Fortschritte, die ich letzte Woche beobachten konnte, sind: 
Entry   Status of Differential Pumping, posted by Tobias Haas on 09 Feb 2017, 17:16 
Post on behalf of R. Villanueva
please find attached the updated status of the Differential Pumping
Entry   Update of installation list for tomorrow's S1R Meeting, posted by Tobias Haas on 09 Feb 2017, 13:57 Componets-XTD2-9.xlsx
 Please check if correct. I mark all newly done things in yellow!
Entry   Meeting Minutes 03 Feb 2017, posted by Frederike Wittmaack on 03 Feb 2017, 14:22 
http://tinyurl.com/hwu4esq
Entry   Update WP74 cabling status (w5), posted by Jan Grünert on 03 Feb 2017, 08:48 
Information posted on behalf of Torben Falk (WP74 cabling)
Wir haben
nun alle Kabel für den XGM in XTD2 am Beckhoff angeschlossen.
Alle Leitungen sind bereit zum einstecken in die jeweiligen Komponenten.
Entry   WP74 components in XTD2 - electrical connections, posted by Bernard Baranasic on 02 Feb 2017, 18:29 
Status
of WP74 components testing and wiring this week:
 
On Monday we tested SR Imager and
K-Mono:
- issue with motor connect pinouts was discovered and I wanted to correct pinout today, but K-Mono and SR imager
Entry   XGM resistors - progress w5, posted by Jan Grünert on 02 Feb 2017, 17:54 XGM-resistors.pptx
Presentation for SASE1readiness-Meeting
on XGM resistor issue progress (w5) and plan (w6)
Entry   Status of component list as of 17:45, posted by Tobias Haas on 02 Feb 2017, 17:46 Componets-XTD2-9.xlsx
 
Entry   Installation List Update, posted by Tobias Haas on 02 Feb 2017, 16:56 Components-XTD2-9.xlsx
 Updates as of 2 Feb 16:30
Entry   SPB/SFX updates to component table, posted by Richard Bean on 02 Feb 2017, 14:29 Components-XTD2-9.xlsx
Table updated with status of SPB/SFX devices at end of XTD9 in preparation for SASE1 readiness meeting on 03.02.17
Entry   XGM resistor issue - analysis progress, posted by Jan Grünert on 01 Feb 2017, 17:42 
This is the current (w5) progress at DESY concerning the analysis of the serious XGM resistor issue (summary; a detailed report by DESY is available):

    The new “pulser test”  was verified at an operational XGMD at FLASH. The test method is (unfortuately) OK. This means that
the test results with issues from last week on all our XGMs are REAL.
    25% of all resistors in XBPMs affected, 0% of resistors in HAMPs affected,
Entry   Status of several XTD2 wiring tasks - on behalf of Bernard Baranasic, posted by Jan Grünert on 01 Feb 2017, 17:26 
Dear all,
 
today
I connected XGM Gas Supply to Beckhoff terminals in WP73 Vacuum crate in Rack 1.3.
Entry   Component table update, posted by Thomas Tschentscher on 27 Jan 2017, 10:22 Components-XTD2-9.xlsx
 
Entry   Software Report, posted by Tobias Haas on 27 Jan 2017, 09:25 
Post on behalf of S. Brockhauser
 Since I am in Grenoble and visiting ESRF, I will not be able to give you the report in person.
Entry   XGM at XTD2 / issue with in-vacuum-resistor, posted by Tobias Haas on 26 Jan 2017, 17:02 
Post on behalf of Jan Grünert:

 
Entry   Modification of the vacuum PLC loop, posted by Tobias Freyermuth on 26 Jan 2017, 13:10 







Normal
0




false
false
false
Entry   More items in the master equipment list, posted by Alessandro Silenzi on 24 Jan 2017, 18:36 
Master Component list is being updated.
https://docs.xfel.eu/share/proxy/alfresco/api/node/content/workspace/SpacesStore/1c6c10cd-d741-410d-bd05-bb00944514dc/MasterEquipmentList.xlsx?a=true
Best regards
ELOG V3.1.4-7c3fd00