Message ID: 590     Entry time: 09 Jan 2019, 10:04
Author: Adriano Violante 
Location: General 
Severity: Information 
Subject: Status report after dispatch meeting 09.30 

SPB/SFX

  • New Karabo release has been installed.

FXE

SQS

SCS

  • EET and AE should get in touch to discuss how to speed up the crates fixing. Some details need to be sorted out.

MID

HED

  • Mono in XTD6 need some work. Meeting today to discuss details with AE
  • HI res mono needs to be opened. Work being organized for next week.

OPT Lasers

  • The power glitches l2 nights ago caused a power loss between 1am and 7 am. The seeder in SASE 1 went off. It is being switched on again but this reduces considerably its lifetime. No problems in SASE3. Tha's probably because different protection voltage drops are used (20V/40V) for the fuses. TS will look into that to understand why and whether the situation can be improved.

XRO

  • M2 in SASE3 goes back this week and will be pumped during the week end.
  • Vac group busy ventin sections to replace imagers,

​​XPD

​​VAC

AE

EET

ITDM

DET

CAS

AoB

  • Power cut in the SQS/SCS rackroom needed to fix the emergency power off system. 1 hour needed for each rackroom. The redundant power line will not be affected. The following dates have been agreed:
    • SCS - MTeichmann will bring the PLCs ina safe state and give confirmation to TSchoen within 1 hour today
    • SQS - Power will be cut next Wednesday morning during the chamber switch. Exact time will be agreed next week.
    • Optical lasers are not involved in the power cut.