Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther, Page 3 of 29  Not logged in ELOG logo
ID Date Author Location Severity Subjectdown Text Attachments
  58   21 Jun 2019, 10:13 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.00FXE

​SPB/SFX


An AC device in the control
  
  61   28 Jun 2019, 11:25 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.00XO

FXE

SPB/SFX
  
  64   05 Jul 2019, 09:54 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.00XO

FXE


Loops update has to be
  
  69   19 Jul 2019, 10:48 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.00XO

FXE

SPB/SFX
  
  72   26 Jul 2019, 14:07 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.00XO

FXE

SPB/SFX
  
  84   12 Nov 2019, 09:49 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.00​FXE



FXE
– radiation tests and LPD tests planned
  
  94   08 Jan 2020, 12:36 Adriano ViolanteGeneralInformationReport of the Technical integration meeting SPB:


Coordinatd motion for MC2
motors is going to be rolled out by EEE soon.


FXE:
  
  93   18 Dec 2019, 10:06 Adriano ViolanteGeneralInformationReport after tech. Int. meeting 09.30MID:


SDL tests ongoing. Important
motors have been tested. Alignment of the
  
  38   03 May 2019, 14:07 Adriano ViolanteGeneralInformationReport after dispatch meeting 9:00SPB/SFX


IRDa commissioning
ongoing. First images have been taken with
  
  3   04 Feb 2019, 10:17 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.30SPB/SFX


Waiting for the loop 12
to be running to start the commissioning
  
  25   29 Mar 2019, 11:02 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.30SPB/SFX

FXE

​SQS
  
  26   01 Apr 2019, 10:21 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.30SPB/SFX


The quadrant motion system
test for the AGIPD presented some issues
  
  30   08 Apr 2019, 10:48 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.30SPB/SFX


5Hz mode tests started
(SPB/SQS) and partially successful. A detailed
  
  42   13 May 2019, 11:24 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.30SPB/SFX


The gear ratio of the CSS
is unclear but this was already known and
  
  55   17 Jun 2019, 10:43 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.30FXE


Floor is being re-worked.
Experiment hutch is not accessible until
  
  80   19 Aug 2019, 11:11 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.30General


Still recovering from the
power loss occured on Saturday (The primary
  
  82   26 Aug 2019, 09:52 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.30XO


Today a test of the fire
alarm system will take place. Mail has been
  
  2   01 Feb 2019, 12:49 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.00SPB/SFX


Open AGIPD wing. Next 3
days are needed for fixing purposes.


FXE
  
  5   08 Feb 2019, 10:42 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.00SPB/SFX


IT cables in D.23 were
re-measured yesterday. Waiting for the measurements.
  
  8   15 Feb 2019, 12:14 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.00SPB/SFX


SPB requires the new trigger
solution to be implemented for AGIPD. This
  