SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
|
|
Message ID: 42
Entry time: 13 May 2019, 11:24
|
Author: |
Adriano Violante |
Location: |
General |
Severity: |
Information |
Subject: |
Report after dispatch meeting 09.30 |
|
|
SPB/SFX
- The gear ratio of the CSS is unclear but this was already known and discussed with SPB/SFX ==> AL is working on it toghter with AE.
FXE
- Karabo for Jungfrau detector has been udpated and works fine. For the LPD some issues were reported but SH commented that the problems arise from the fact that the signal FXE was trying to detect is very low, potentially close to the HW limit od the detector
SQS
- MPODS power supplies are behaving strangely (1 channel trips, but the power supply does not send any error message). TB and CY to have a look.
- The pnCCD is supposed to be used next week. Meeting after the dispatch meeting with AE, CAS, ITDM(!) to coordinate the efforts.
SCS
MID
- Mono needs cooling. Issue will be attacked today/tomorrow.
- 2 crates for the remote contro of vacuum compoennts are required to run in the intrument. CY wants to be present. There are difficulties finding a suitable time slot both for MS and CY. To be addressed offline.
HED
- Smaract stages behave strangely. AE support required.
OPT Lasers
- Crates will be switched on today. Meeting JE/OPT lasers today at 11 to coordinate the efforts.
XRO
XPD
VAC
DET
- Updated pipeline in SPB has been installed today.
- SCS DSSC took the first images (without beam)
AE
ITDM
EET
CAS
SRP
TS
AoB |