SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
|
|
Message ID: 58
Entry time: 21 Jun 2019, 10:13
|
Author: |
Adriano Violante |
Location: |
General |
Severity: |
Information |
Subject: |
Status report after dispatch meeting 09.00 |
|
|
FXE
SPB/SFX
- An AC device in the control room leaks. TBartsch has been informed.
- Some issues with pumps going off during the power glitch yesterday have occured.
- Power has come back after the interlock tests.
- Loops updates are being coordinated with EEE. No major issues.
- Detectors has been moved in the new position. MOV tests will follow and pumping down the system is foreseen for middle of next week.
SCS
SQS
- Power back. Testing of equipment ongoing.
- Loop9. PLCs are reachable but not the temrinals. EEE will check.
- Interlock communication issue. EEE will reboot the master loop.
- Some Harting connectors have to be plugged in the modules. NRennhack will discuss the details with EEE.
MID
HED
Optical lasers
VAC
XRO
XPD
DET
EEE
- Due to the power glitch yesterday some uTCA crates in the rackrooms had problems (despite the redundant power lines). This was caused by the firmware not being able to deal with these type of instabilities of the mail power line. The crates are now working again and a new version of the fw will be updated to avoid these issues in the future. In addition, the uTCA crates in the hutches do not get redundant power lines, this means that they went off and should be checked to make sure they are working properly.
CAS
- Tests of Karabo 2.5.0. are ongoing (integration PLC/DAQ). HS will give a report on Monday about the tests and the preliminary deployment schedule.
ITDM
- Some servers require fw updates. JS will send a mail to readiness@xfel.eu with the details.
AoB |