ID Date Authordown Location Severity Subject Text Attachments
  71   24 Jul 2019, 10:54 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 24.07.19 XO

FXE


DAQ issue reported (data
  
  72   26 Jul 2019, 14:07 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.00XO

FXE

SPB/SFX
  
  73   29 Jul 2019, 10:16 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30XO

FXE

SPB/SFX
  
  74   31 Jul 2019, 10:46 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 31.07.19 XO

FXE

SPB/SFX
  
  75   02 Aug 2019, 09:10 Adriano ViolanteGeneralInformationInfo on dispatch meeting 09.00The meeting did not take place since only
EEE was attending.
  
  76   05 Aug 2019, 10:19 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30XO

FXE


Photon3 detector has been
  
  77   07 Aug 2019, 11:55 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 07.08.2019XO

The accelerator is now working
at 2.25 MHz. Kicker can be used. DET informs
 Technical_Integration_Meeting_07.08.2019_-_Copy_(4).pptx 
  80   19 Aug 2019, 11:11 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.30General


Still recovering from the
power loss occured on Saturday (The primary
  
  81   21 Aug 2019, 11:15 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 21.08.19 XO


A review of the procedures
in case of power failure is in progress.
  
  82   26 Aug 2019, 09:52 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.30XO


Today a test of the fire
alarm system will take place. Mail has been
  
  83   28 Aug 2019, 10:33 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 28.08.2019XO

FXE


Leak in the LPD cooling
  
  84   12 Nov 2019, 09:49 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.00​FXE



FXE
– radiation tests and LPD tests planned
  
  85   13 Nov 2019, 10:12 Adriano ViolanteGeneralInformationStatus report after tech. Int. Meeting 9.30​FXE


Radiation tests ongoing.
EEE
informs that the PLC drawings will be exchanged
  
  86   20 Nov 2019, 10:12 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 20.11.19 ​FXE


Wille was asked by D3
to pull new cables for the Pandora in FXE
  
  89   04 Dec 2019, 14:18 Adriano ViolanteGeneralInformationSummary of the technical integration meetingFXE


No major issues - PLCs
update has been started by EEE (BB)


SCS
  
  90   09 Dec 2019, 09:22 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.00FXE:


No major issues.
Karabo
will be updated to the version 2.7.0. on
  
  91   11 Dec 2019, 09:54 Adriano ViolanteGeneralInformationReport after Tech. Int. meeting 09.30 FXE:


New optical table will
be installed today. Access to the hutch could
  
  92   16 Dec 2019, 09:28 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.00FXE:


uTCA update has been completed
by EEE on Friday evening. Information
  
  93   18 Dec 2019, 10:06 Adriano ViolanteGeneralInformationReport after tech. Int. meeting 09.30MID:


SDL tests ongoing. Important
motors have been tested. Alignment of the
  
  94   08 Jan 2020, 12:36 Adriano ViolanteGeneralInformationReport of the Technical integration meeting SPB:


Coordinatd motion for MC2
motors is going to be rolled out by EEE soon.


FXE:
  