SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
|
|
Message ID: 9
Entry time: 18 Feb 2019, 10:09
|
Author: |
Adriano Violante |
Location: |
General |
Severity: |
Information |
Subject: |
Minutes of the dispatch meeting 09.30 |
|
|
SPB/SFX
- Data aggregators were often crashing during the WE and needed to be re initialized.
- Puls picker commissiong - Scan tool was used and worked. Issues concerning motors position and triggers ==> To be worked out with AE.
- DET group is helping setting up the Jungfrau detector.
FXE
- Mono commisisong ongoing. Beam was passing through both monos at the end of last shift.
- New beamstop mounted and being used.
SQS
SCS
- Parallel operation with SA1 did not generate major issues
- Karabo did not store the bunch pattern info
- Leds on the beamline are needed. Loop4 is the most important and will be updated today.
MID
- Water connections for the mono chiller will probably be reworked with the vac group.
- MIddle layer tests will be performed by CAS (CY)
- Aligment of the optics in XTD6.
- Tomorrow: exapod commissiong. PC with windows needed. ITDM+CAS
- Issues with scenes being stuck, probabl;y due to a HW error to be fixed with manual on-off operation ot the component switch. Being checked with CAS.
HED
OPT Lasers
XRO
XPD
- New trigger system needed for a gated camera in SASE3 - BF on it.
VAC
AE
- Timing server has been updated
- A PLC in HED has to be replaced because of some beckhoff license that expired (?)
ITDM
DET
- SCS took data with the fast CCD. Data has to be analyzed but seems ok.
- SPB agipd OK
- FXE LPD had issues being followed up
EET
CAS
AoB
A questionnaire to gather the activity of the next shutdown was sento to the XFEL and DESY group and operation leaders. The planning is going to be done together with DESY using the same templates and planning tools. |