SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
|
|
Message ID: 11
Entry time: 22 Feb 2019, 12:36
|
Author: |
Adriano Violante |
Location: |
General |
Severity: |
Information |
Subject: |
MInutes of the dispatch meeting 09.00 |
|
|
SPB/SFX
- Pulse picker commissiong - Issues concerning motors position and triggers ==> To be worked out with AE, but beam is needed. Has to be done.
- DET group is helping setting up the Jungfrau detector (w/o PLC).
- DAQ performance test performed yesterday.
- Trigger for ns laser is needed next week. Everything should be already prepared but BF checks.
FXE
SQS
SCS
MID
HED
- Commissioning of components ongoing. There is a learinig curve concerning Karabo.
- Cabling issues and CR are being followed up with high priority by EET
- A camera is needed in the tunnel to align the spectrometer. Either a webcam or the camera dedicated to the second spectroemeter has to be moved (only temporary - no definitive changes needed). This can be done with a ZZ access on monday. KA is organizing the hardware, CAS and AE will take care of software and evetaually trigger.
OPT Lasers
XRO
XPD
VAC
- On monday the HW for the B4C in SA3 will be mounted. and tested. No loop updates concerning the interlock. This will happen in march.
- GATT loop update for SASE3 planned for Monday
AE
- A PLC in HED has to be replaced because of some beckhoff license that expired ==> Problem solved replacing the PLC. Whys did this happen is still not clear.
ITDM
DET
- SCS took data with the fast CCD. Data has to be analyzed but seems ok. ==> Ongoing
- SPB agipd OK==> Calibration is now running.
- FXE LPD had issues being followed up
EET
CAS
- Kickoff meeting with ITDM to start to evaluate InfluxDB, Grafana and Elastic Search as an alternative to the current Karabo DataLogger implementation (LA and VAC represents use cases to be addressed/solved). However, "nothing" will impact operation in the next months.
- SPB Loop 14 needs to be deployed (Karabo)
AoB
|