Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther, Page 25 of 29  Not logged in ELOG logo
ID Date Author Location Severity Subject Text Attachments
  88   28 Nov 2019, 15:42 Andreas GallerGeneralProblemaffected ITDM Systems after power cut tonight


XHQ.E1.092

SW-HH-AL-271
was available
  
  87   27 Nov 2019, 09:25 Andreas GallerGeneralInformationdispatch meeting Mon Nov 25 2019FXE: no issues

SPB: no issues

MID: Split & Delay line arriving
  
  86   20 Nov 2019, 10:12 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 20.11.19 ​FXE


Wille was asked by D3
to pull new cables for the Pandora in FXE
  
  85   13 Nov 2019, 10:12 Adriano ViolanteGeneralInformationStatus report after tech. Int. Meeting 9.30​FXE


Radiation tests ongoing.
EEE
informs that the PLC drawings will be exchanged
  
  84   12 Nov 2019, 09:49 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.00​FXE



FXE
– radiation tests and LPD tests planned
  
  83   28 Aug 2019, 10:33 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 28.08.2019XO

FXE


Leak in the LPD cooling
  
  82   26 Aug 2019, 09:52 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.30XO


Today a test of the fire
alarm system will take place. Mail has been
  
  81   21 Aug 2019, 11:15 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 21.08.19 XO


A review of the procedures
in case of power failure is in progress.
  
  80   19 Aug 2019, 11:11 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.30General


Still recovering from the
power loss occured on Saturday (The primary
  
  79   14 Aug 2019, 10:01 Gerd WellenreutherGeneralInformationMinutes of the Technical integration meeting 14.08.2019XO


On Monday at around 12:20
there was a power glitch at least in Hamburg,
  
  78   12 Aug 2019, 09:50 Gerd WellenreutherGeneralInformationStatus report after dispatch meeting 12.8.XO

FXE


XTD1 CRLs: There is an
  
  77   07 Aug 2019, 11:55 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 07.08.2019XO

The accelerator is now working
at 2.25 MHz. Kicker can be used. DET informs
 Technical_Integration_Meeting_07.08.2019_-_Copy_(4).pptx 
  76   05 Aug 2019, 10:19 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30XO

FXE


Photon3 detector has been
  
  75   02 Aug 2019, 09:10 Adriano ViolanteGeneralInformationInfo on dispatch meeting 09.00The meeting did not take place since only
EEE was attending.
  
  74   31 Jul 2019, 10:46 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 31.07.19 XO

FXE

SPB/SFX
  
  73   29 Jul 2019, 10:16 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30XO

FXE

SPB/SFX
  
  72   26 Jul 2019, 14:07 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.00XO

FXE

SPB/SFX
  
  71   24 Jul 2019, 10:54 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 24.07.19 XO

FXE


DAQ issue reported (data
  
  70   22 Jul 2019, 12:42 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30XO

FXE


DAQ issue reported (data
  
  69   19 Jul 2019, 10:48 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.00XO

FXE

SPB/SFX
  
ELOG V3.1.4-7c3fd00