SASE1 Status and SASE3 Readiness Technical integration and coordination
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther, Page 22 of 33  Not logged in ELOG logo
ID Date Author Location Severity Subjectdown
  476   11 Dec 2023, 09:51 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 11.12.2023
General Announcement:
-	 

CTRL:
- Last week updates on Karabo were done. Please check systems for functionality.
- Another update of data loggers will be done in coming days.

DA:
- Following the Karabo updates DA is checking their devices.

EEE:
- Suffering from illnesses in the group: colleagues that are not sick try to get all work done but some delay in some activities is expected in some areas;
- Also Wille company is suffering with sickness and they try to find substituted colleagues.
- Vacuum updates were fixed; plan to update of SA2 VAC was postponed from Friday to today.

VAC:
- Nothing to report.

XPD:
- Request to EEE when updates for XGM are to start, please inform Florian Dietrich and Jan Gruenert for that they prepare beforehand. After update is done one needs to restart vacuum and XGM.

DET:
- AGIPD at SPB/SFX intervention: replaced all modules; three attempts were needed and the situation is that detector is fully operational and all modules are working. 
Also tests after Karabo deployment worked nicely. Next is a test with DAQ and everything looks very promising.
- At MID AGIPD: Bias issue is also fixed; tested at real conditions went successful. Cause was a wire.

ITDM: 
- Most of the activities are done.
- Problem with exchange of switch in SA2 for DAQ collection: power supply had a problem but not only it, so new chassis will be delivered and needs to be replaced. DAQ connections for SA2 is not working.

XRO:
- Planned works are continuing and everything is going fine.

LAS:
- Nothing to report.

UNSYS:
- More two last Apple-X are being installed; from today Beckhoff technicians will connect the cabling.
- Issues with encoders are solved (radiation damage). Replacement was done and calibration was successful.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
  564   11 Nov 2024, 09:46 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 11.11.2024
General Announcement:
- Last day of the FD taking place and switching back to 16.3GeV today.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- FD studies went fine during the weekend; Attoseconds went fine; XFELO progressed.
- PES can be used for the remaining delivery weeks for 2CPP but not for polarization.

DET:
- Nothing major to report.

ITDM: 
- Nothing special to report.

XRO:
- XFELO: Alignment problems as expected; first time using 4 undulators from inside the cavity; pointing/trajectory inside had changed and to be re-done on Sunday.
- In general, all studies brought some results even if not majors.

LAS:
- Not present.

UNSYS:
- Nothing to report.
- Polarized attoseconds need more time in FD weeks.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Setting up for two programs this week; all fine so far.

SCS:
- Nothing to report.

SQS:
- Take beam this week for IHR; finishing preparation.

SXP:
- Not present.
  177   11 Nov 2020, 10:49 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 11.11.2020
General Announcement:
- XO is in contact with some groups regarding the winter shutdown, in order to get additional information or solve potential conflicts. 
If there are any question, please contact us in this meeting or via e-mail.
- Steffen adds on the idea of using FXE for initial deployment of updated Karabo version. It will take place after 23/Nov.
- Jan asks how XO needs to be informed for tasks that groups deal with each other. A. Galler says XPD is on the list for setting a date to discuss this. 
Groups are encouraged to communicate with other support groups beforehand.

CTRL:
- Misbehaving timing server at MID yesterday was initially solved by EEE. EEE replaced the hardware of the timing system itself but problem continued. 
System seems now to be healthy but from time to time there are small timing interruptions. Investigation is ongoing and will be discussed in the digitizer meeting of Data 
department.
- One CTRL ticket on Doocs device at SCS: it was a problem with custom installation. CTRL asks to be informed in case groups have custom installations. This may pose a 
risk when deploying new updates.

DA:
- AGIPD train-ID issue: a small workaround until shutdown is in place. One has to set the individual channel and seems to be now working. Next intervention to take place 
during Winter maintenance time.

EEE:
- Nothing else to report aside of the MID timing system.

VAC:
- Nothing to report.

XPD:
- SA3 XGM was switched to Ne as requested by instruments.

DET:
- Preparation for activities on AGIPD at SPB/SFX during the winter time is ongoing.

ITDM: 
- Pre-announcement: at the start of the maintenance, ITDM has activity on the computer cluster. A separate announcement will be sent.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- No issues to report.
- Intervention date of AGIPD: SPB requires due to highest priority work that between 16/11-18/12 no interruptions of electrical power or the need of EQP may happen. 

FXE:
- Crosstalk SA1/SA3 was not seen yesterday as SQS used only 1 bunch.

MID:
- Nothing to add besides what CTRL and EEE have mentioned.

HED:
- Next week HED does not use X-ray beam: commissioning of the high power laser and test of pulse on demand are planned. A. Galler says it pulse on demand was fixed by 
CTRLs and can be used. 
- Question on use of ADCs: Bruno says some trains will not be recorder or be repeated. This may be related to the timing issue like in MID. 
But data can be acquired. It is under investigation accordingly to Bruno, with CTRL, DA, ITDM.

SCS:
- Not present.

SQS:
- Nothing to report.
  459   11 Oct 2023, 10:15 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 11.10.2023
General Announcement:
- Reminder that next week, on 20.10, is the deadline to submit the Winter maintenance task lists to XO. In case of help, please contact Martin Doering at xo-planning@xfel.eu.

CTRL:
- Nothing to report.

DA:
- Nothing to report; all quiet at the DOC also.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- A Silicon oil leak at DET cleaning room happened: leak comes from Jungfrau cooling loop (built by external company); status is area was cleaned and leak point is being searched;
- AGIPD setup at SPB got a failure of Julabo chiller; it does not work properly and it does not cool as expected. Detector is interlocked and there was no problems for itself; to be further investigated.

ITDM: 
- Gitlab was down for about 30 mins and now is available again.

XRO:
- Nothing to report.

LAS:
- Status of SA3 PP-laser: still investigating and in contact with AMPHOS. Still to be seen.
- Smaract in SA2 is fixed.

UNSYS:
- All good.

SPB:
- Issue with AGIPD chiller. Installed yesterday mid-day and was cooling slowly but not reaching base temperature.

FXE:
- Handover laser to SQS.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- In contact with EEE (Bernard) regarding the commissioning of our additional local box for the THz experiment.

SQS:
- Not present.

SXP:
- Nothing to report; backlash of M6 seems to be fine.
  267   11 Oct 2021, 09:27 Andreas GallerGeneralInformationNotes XO Integration Meeting 11.10.2021

General Announcement:

  •  

CTRL:

  • nothing report

DA:

  • nothing to report

EEE:

  • several motors in SPB/SFX had trouble, all originating from the same crate

VAC:

  • VAC problems at HED last Wed
    • monochromator section in the tunnel, two unidentified vacuum bursts

XPD:

  • nothing to be reported

DET:

  • nothing to report

ITDM:

  • nothing to report

XRO:

  • FXE (PZ) reported a large jump in the bender setting, sebsequently Ry and pitch drifted for days and stabilized later
    • M1 M2 alignment changed as well
    • currently stable and being investigated

LAS:

  • nothing to report

UNSYS: 

  • nothing to report

SPB/SFX:

  • unstable pulse energy jittering ~ 35% over days.

FXE:

  • Experiment went well, apart from minor issue with calibration pipeline with JF

MID:

  • all fine

HED:

  • nothing to report

SCS:

  • not present

SQS:

  • not present

AOB:

  •  

  547   11 Sep 2024, 09:50 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 11.09.2024
General Announcement:
-  Todays the machine setup is ongoing and from tomorrow it starts the beam delivery, as planned.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- P. Gessler informs there is no DOC today as there is no beam delivery; DRC is normally reachable.

VAC:
- Yesterday ZZ to exchange preventively a pump controller was carried out successfully.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.
- M. Vannoni says the SA1 drift (by M1) is being monitored and shall not be disruptive as feedback corrects it. XRO will keep an eye and assist in case of need.

LAS:
- SA3-PPL is being delivered.
- SA1-PPL being changed to THz experiment; to be ready today.
- SA2-PPL being changed to 1.1MHz, but no amplification was found; Rolled back to 188kHz to delivery to MID.
- Delay of trigger reported days ago: Desy looked into it and did not find anything specifically; Patrick G. will discuss with LAS.

UNSYS:
- Masking of undulator errors at BKR was addressed with MXL. 

SPB:
- Nothing to report.
- New Radiation constraints were issued and operation has to be with photon energies higher than 8keV.

FXE:
- This week’s nights will have operation higher than 8keV.

MID:
- Nothing to report. No limitations for photon energies on SA2 side.

HED:
- Nothing to report.

SCS:
- Detector calibration last Monday had issue with girder movement; EEE is aware and has to be working next beamtime.

SQS:
- Nothing to report.

SXP:
- Not present.
  450   11 Sep 2023, 09:47 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 11.09.2023
General Announcement:
- A Cryo issue taking place in the night Fri-SAT lead to beam not being delivered since them. The failure was at a magnetic bearing with a misreading of motor position. 
In parallel motors 3 and 4 were exchanged as preventive measure during this downtime. Cryo OK came back on Sunday afternoon and efforts are focusing in bringing machine up for cw37.

CTRL:
- Pulse on demand for FXE (main scene) will be updated today.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Not present.

DET:
- Nothing to report.

ITDM: 
- Not present.

XRO:
- Change middle layer for the bunch patter at SA1 for fixing today.

LAS:
- Not present.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Between Synchronization issue and cryo failure only a total of 6-7hs of data were collected.

SCS:
- Beamtime affected by cryo failure.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
  636   11 Aug 2025, 09:39 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 11.08.2025
General Announcement:
- A. Galler informs that regarding the LIMP-25 scheduling there is nothing new as compared to what was announced last Wednesday.

CTRL:
- Karabo 3 has been released. In case of any for assistance please do not hesitate in contacting CTRL groups.

DA:
- Nothing to report.

EEE:
- No issues; Loop updates in tunnels are ongoing.

VAC:
- Everything fine.

XPD:
- Nothing to report.

DET:
- AGIPD chiller has been recovered.

ITDM: 
- Tomorrow in the morning there will be maintenance of Maxwell log in nodes, as announced per e-mail. Jobs that are running will not be affected.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Not present.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
  250   11 Aug 2021, 10:45 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 11.08.2021
General Announcement:
- There was another power glitch last night. It seems that accelerator was not affected. If XFEL groups find affected devices, please contact XO.
- From healthy task force the Covid-19 measures stay in place as they are.

CTRL:
- Nothing major to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Running at SA3 at the edge of the energy range (3keV is at limit of the undulator tables (K near 4)). Sara C. says that with higher electron beam energy this won't be a problem. 
In addition, the problem was with only few cells and Suren A. is in contact with BKR. Jan G. says that will get in touch with Suren A.
- HED reported problems with beam pointing being instable. XPD and XRO will take a look on it and include XO for the analysis.

DET:
- Small hiccups but nothing major. Follow-up on the pipeline for DSSC and firmware for other detectors.
- Jolanta S.-D. is not aware of LPD/FXE update and will check with EEE/CTRL/FXE.

ITDM: 
- Announcement: ITDM would like to upgrade GitLab on next Wednesday 18.08 from early afternoon 13:00 and may take until the evening. Users of GitLab are contacted and no access to GitLab during that 
action.

XRO:
- Nothing to report. Maurizio V. will follow the HED beam instability.

LAS:
- Affected by power glitch: all PP-lasers / AMPHOS went down and warmed. LAS would need a solution for power glitches, considering power backups, UPS or batteries, as the controllers for this type of the 
pump goes down. 
- Jan G. says that XPD has a bunch of unused UPS and could offer to LAS.

UNSYS:
- Problem with cell6#SA3 quad mover is solved. Coupler was exchanged and it works. UNSYS has more spare parts and is in touch with Beckhoff.
- Sara C. says P. Gessler informed Karen had problem when changing undulator energies. Suren A. could not find any issue with Doocs / Unsys side. 
Patrick G. talked to Olaf H. and firstly BKR must try to change energies and if it works, then instruments shall try. Karen A. says BKR could moved energy and had no issues - the issue was in HED side. 
P. Gessler proposes that Unsys check with Olaf H. Further discussion will follow offline.

SPB:
- Couple of issues: 1. SBP Pop-in reached limit switch and had to be changed; 2. Affected by the PP-laser downtime overnight.
- A. Koch says there was about 0.5mm steps lost. He is looking into it if it is mechanical, motor, or control issue.

FXE:
- Wajid E. says work on the clock and control is ongoing for the LPD.

MID:
- Al fine and use of PP-laser is not needed currently.

HED:
- Nothing else to report besides of what was discussed during Unsys report.

SCS:
- Not present.

SQS:
- Not present.
  340   11 Jul 2022, 09:52 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 11.07.2022
General Announcement:
-  User Operation Meeting will re-start on cw30 (Friday 29.07).

CTRL:
- Nothing major to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Tunnels were searched and closed last Thursday and photon tunnels XTD6 and XTD9 can be opened again when Interlock tests are done.

XPD:
- Nothing to report.

DET:
- Problem with in-vacuum cooling pipes at DSSC detector: reason is not yet known and is under investigation.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Issues with timing system; issues with Doocs also. LAS needs to discuss with EEE and Desy groups. Patrick G. points that there is ticket with Tim Wilksen ongoing. Investigation will take place today.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.
- It requests to get an information when TUEV tests are done on THU or FRI, if available.

HED:
- HED thanks EEE for solving last week's issues.

SCS:
- Nothing to report.

SQS:
- Not present.
  619   11 Jun 2025, 09:48 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 11.06.2025
General Announcement:
-	 

CTRL:
- Update concerning broker issues at MID: CTRL would like to update it with the new SPB version for tests in the coming two weeks.

DA:
- Nothing to report.

EEE:
- Nothing directly from EEE;
- P. Gessler update on the 50Hz tests on 17.06: starts at 8AM and the master timing will stop sync with 50Hz. 
This produces a short jump of trains but shall automatically return back. When switching sync back again it will also jump once more. 
Idea is to test the noise reduction from the 50Kz Mains line and test if one can run without this sync with the 50Hz in future. If things run fine during the test one would run for two days without this 
Synchronization. 
Directed affected groups are already participating in meetings.
- A. Galler informs there is no plans for FEL beam delivery or tuning/energy change possibility during the 50Hz tests on 17.06. 

VAC:
- Everything is going well.
- VAC-OCD got a call from SCS this morning for a change of GATT gas. Please let VAC group knows 1-2 weeks in advance for such changes.

XPD:
- Nothing to report.

DET:
- Incident of DSSC at SCS was investigated and communicated to related people.

ITDM: 
- Not present.

XRO:
- Not present.

LAS:
- Not present.

UNSYS:
- Nothing to be reported.

SPB:
- Nothing to report.

FXE:
- Nothing to report.
- D3 tests taking place at FXE from Tuesday late shift.

MID:
- Nothing to report;
- Started with LIMP preparations.

HED:
- Everything fine and using beam for the last IHR.

SCS:
- Last beamtime occurring this week.

SQS:
- Preparing for next week D3 tests with 100W tests (100 pulses at 10mJ)

SXP:
- Not present.
  324   11 May 2022, 10:02 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 11.05.2022
General Announcement:
- The accelerator is currently down. An electrical power issue lead to a cryo failure at 08:45AM and both cold and warm compressors went down. 
The expected cryo OK shall come in the afternoon and by 15:30 we will have further information.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Incident in MID branch/SA2 last evening with the V0 valve being closed: VAC received automatic message with spike around the CRL2 was detected, then closing the V0 valve. Solved in 5 mins. 
Please report to VAC group (08:42PM) when such incidents happen. Reason behind this even is still unclear.

XPD:
- Nothing to add.

DET:
- Nothing to report.

ITDM: 
- A Change in configuration of run controllers for the DAQ may profit today as machine is down. ITDM will discuss with groups and inform accordingly. 
To be done in tunnels, laser, 5 instruments apart of SPB/SFX. One has to reload projects afterwards.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Apple-X: massive losses of encoders were found and the FD program is cancelled. A ZZ will be done today.
- Heidenheim linear encoders need to be replaced, quote is placed but not sure if it happens in summer maintenance.

SPB:
- Reconfiguring the instrument for the weekend.

FXE:
- Problem with XGMd: under work by Theo and Finni.

MID:
- It has now the PicoAmpmeter; in touch with EEE and CTRL.

HED:
- Monday long pulse train test: seems to be fine; also beam pointing stability went fine for HED.
- XRO was working with mirrors: Mikako M. says that Maurizio M. will address with HED the tests of vertical positions.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
  119   11 May 2020, 14:53 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 11.05.2020
General Announcement:
- The proposed works on the Control network are fully organized for this week;
- Safety: The EuXFEL task force for the Covid-19 discussed this morning the safety issues here presented last Friday. 
On Mondays and Wednesdays there will be a SRP representative in this meeting to address related questions and on Fridays Tobias Haas will be attending. 
- General: there was a short notice from MKK2 regarding cooling maintenance in tunnels to be performed today. This short notice is a communication error. 
The task was a summer shutdown work anticipated to today and was not properly communicated. No EuXFEL group raised concerns to this activity taking place today. 
- General: 30% staff presence restrictions - so far it seems that this number is fine. Groups are encouraged to think if there is a need to increase this number,
especially in the instrument side. Please inform XO. 

CTRL:
- The tickets with requests to be carried out this week are all planned.
- Group is moving to more usual tasks with instruments and support groups.

DA:
- Planned activities are in progress.

EEE:
- There was no observed master time reset from the Desy side after the Covid-19 accelerator shutdown. 

VAC:
- Nothing to report.

XPD:
- Last week's planned activities went fine.
- It is agreed with VAC that on Wednesday one section of XTD9 will be vented, in preparation for an activity.

DET:
- Nothing special to report; DSSC pump/cooling issue is being taken care.

ITDM: 
- Nothing to report.

XRO:
- A test of a motor in a magnetic switch of a XTD6 mirror will be made this week - proper ticket will be send to CTRL.

LAS:
- SA1 PP-laser is OK; others are progressing. Work goes smooth.

SPB:
- Starting the instrument. All fine until now and this week there is a plan to test Detectors.

FXE:
- The works are going as planned.

MID:
- Continue with technical commissioning: activities under control.

HED:
- Nothing special - group placed tasks with Controls and also need help from EEE, all under control.

SCS:
- Minor issues while switching on the beamline: CTRL is informed and is taking care.

SQS:
- Ramping up the vacuum: so far all going well.
  497   11 Mar 2024, 10:04 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 11.03.2024
General Announcement:
- A cryo failure happened today at 09:15AM. Machine is down and shifts for today are cancelled. Experts are investigating the issue to define when to expect ramp-up for the delivery week. Naresh K., as 
PRC, adds that the expected downtime is 12 hs.
- As PRC, Naresh K. informs the blue week activities were successful so far. On Sunday the AC for SPB/SFX was making strange noises - TS is aware and will look into details.

CTRL:
- Nothing to report.
- Dennis Goeries informs on DAQ report: Last week run configurations were replaced; this week the new DAQ will run completely ON at SPB/SFX – if everything runs fine then MID will be updated next week 
and others in cw15.

DA:
- Nothing to report.

EEE:
- Agreed to update tomorrow the SPB EPS.

VAC:
- Nothing to report.

XPD:
- Many studies were conducted; minor issues with calibration on XGM, but fixed;
- Diamond detector beamtime was successful.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- All fine.

LAS:
- Nothing to report.

UNSYS:
- SA1 cell 25 need replace terminal on undulator control rack - needs ZZ.
- Communication between undulator server to DOOCS is problematic for last cells (from 31) in SA1.

SPB:
- Issue with AGIPD 1-M Julabo chiller which does not work; needs TS.

FXE:
- A ticket for the Data groups for DAQ is sent.

MID:
- All fine.

HED:
- Preparing for next experiment. New DAQ with half upgrades are installed and will be running the whole week.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present. 
  385   11 Jan 2023, 11:16 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 11.01.2023
General Announcement:
- If you have a forwarded invitation for the XO Int. meeting in your calendar, it will not be automatically deleted. The new invitation was sent at the end of December. 
Please contact XO if you have not received. Another option is to subscribe to the xo-info mailing list.
- The Operations-2023 e-log is made available. Thanks to ITDM for the support on it.
- The 5Hz tests will take place on the 17-18.01. A timeline schedule is to made available today from Desy and will be shared via the xo-info list. 
The 5Hz operation will be done on the 17th and a hybrid mode test is on the 18th.
- Tunnels XTD6 and XTD9 will remain open for a max of 1 week. 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Power OFF in SA3: electronics in SQS, SCS and PP-lasers were affected. Systems had to be restarted. 
- Discussion is going on to avoid such mishaps not happening again in future.

VAC:
- XTD6 and XTD9 are open; Please FXE and HED shall check cameras and Monochromators before the tunnels are permanently closed.

XPD:
- XGM in SCS hutch was affected by the power failure. It was recovered and is back into the normal state. Other systems are also being brought back during this week.

DET:
- Nothing to report.

ITDM: 
- Upgrade of Ubuntu 18.04 LTS control PCs is going to take place until April. An e-mail was sent to xo-info list. Instruments shall contact ITDM accordingly by using the ticket systems.

XRO:
- Not present.

LAS:
- Switch OFF in SA3: no harm seems to remain. 

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- FXE is interested in XTD9 access for the next days. 

MID:
- Nothing to report.

HED:
- HED is interested in XTD6 access for the next days.

SCS:
- Suffered from the power OFF: bringing back vacuum for XGM and other systems. All shall be fine.

SQS:
- Not present.
  189   11 Jan 2021, 10:54 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 11.01.2021
General Announcement:
- The Interlock test light in the hutches take place on January 13th. From tomorrow is starts in the tunnels. 
We understand no support from instruments are needed and we thank HED and FXE for making their hutches available for these tests.
- A Functional interlock test was planned for the end of January. This will be shifted to later point in time.
- XO states that planned maintenance tasks that are critical for operation can of course be performed onsite at the XFEL campus. 

CTRL:
- Updated the microTCA crates was done.
- CTRL is testing many other systems.

DA:
- Nothing general to report.

EEE:
- Critical task to do related to the AIBS CPU: one power bridge is missing. EEE has to check and may need to switch one PLC off to replace the power bridge.

VAC:
- Continuing with tunnel installation works: urgent tasks.

XPD:
- No incidents to report. Tunnel works are ongoing together with VAC.
- Jan G. informed that not all channels are working in fast-ADC devices. XPD has informed CTRL and Steffen H. says that CTRL and EEE will take a look together.

DET:
- LPD calibration pipeline work is ongoing.

ITDM: 
- Nothing to report.

XRO:
- Ion pumps in SA1/3 photon beam transport are running. Pressure is in the order of 10^-8mbar.
- SA3 mc2 library update: continuing with checks some small items will need to be commissioned with beam.

LAS:
- Nothing to report.

UNSYS:
- Finishing small tasks at SA3 tunnel.

SPB:
- Start planning the revised schedule.
- XO informs that the emergency power OFF test takes place today in SA1 instruments. 

FXE:
- Nothing to add.
- XO informs that the emergency power OFF test takes place today in SA1 instruments.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Nothing to report.
  276   10 Nov 2021, 10:16 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 10.11.2021
General Announcement:
-	 

CTRL:
- Issue with mc2 motor (pop-up issue for step-up command): it has been identified and fixed. New version will be deployed in the shutdown. Workaround until then is to stop and restart device.

DA:
- On the slow migration/calibration at MID: it is understood as overload of cluster nodes responsible for migration; mitigated by adding two more nodes. Calibration services shall run better from now. 

EEE:
- Drifts with SQS digitizers: yesterday Bruno F. was working on it and it shall be fixed now.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing else to add apart of DA report - still more investigation is ongoing.

XRO:
- Nothing to report.

LAS:
- All fine with lasers.

UNSYS:
- In SA3: two encoders that were exchanged (cell#17 and cell#20) on Monday's ZZ. 
- Another PS (SA3/cell21) stopped working. Motor has to be replaced in a next ZZ (request placed). 
Suren K. also says that the whole intersection is not working (not able to recover after restart the system - Quad stays in position for operation). 
- SA1/cell14 a coupler of the undulator terminal was replaced.

SPB:
- AGIPD issue also observed last week and is under investigation. DET is aware and under investigation.

FXE:
- Nothing to report.

MID:
- Issue with calibration: MID would like to test it in order to close the review.

HED:
- Running user experiment this week.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
  364   10 Oct 2022, 10:09 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 10.10.2022
General Announcement:
- Wajid E. reminds DOC is not working this week but the DRC will take the calls over the week and redirect to respective OCD inside DATA department.
- Olivier M. mentions to use drc-xfel@xfel.eu for contacting the DRCs. However, the fastest way to communicate for urgent matters is using the regular DOC/DRC phone number.
- Martin D. updates the status of winter maintenance period: 
1. MTLs are in general with lower quality as compared to previous maintenance time (e.g. starting and ending dates); 
2. Groups will be contacted back by XO and meetings with groups will be scheduled in the coming days. 
- A. Galler shows the TTFinfo/schedule to inform on the schedule for this Blue/FD week starting today.

CTRL:
- X-ray feedback device reported by MID: device did not provide feedback for beam position. A bug fix was applied and it worked. 
CTRL proposes to apply to all other location today. No objections from the instruments appear during this meeting - so it will take place today.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- XTD6 was opened today for work on the high resolution Mono. It will stay open at least today and tomorrow.
- On Saturday VAC OCD approved to borrow a He bottle to MID. MID will return back to VAC today for He leak tests in tunnels.

XPD:
- Nothing to report.

DET:
- Nothing major to report.

ITDM: 
- Nothing to report.

XRO:
- Mikako M. enquires on the Blue week schedule: A. Galler says that requesters that got beamtime granted must be informed already.

LAS:
- SA1 PP-laser will test the trigger delay;
- LAS is performing SA3 PPL tuning for handling laser to SQS instruments.
- A. Galler says that optical sync was lost during the weekend in all instruments. The RF sync was on 30fs RMS performance which could be used.
UNSYS:
- Request for access in SA3 was done (fixing PS motors in cell 20 and 21): mostly to be done tomorrow or Wednesday.

SPB:
- Nothing to report.

FXE:
- PP-laser sync problems (6x last week) with loosing timing. It put the PPODL device into Error state; it could be recovered automatically but the laser timing wasn't conserved. 
So in about half the events the laser timing changed by 2-5 ns. Ticket was placed.

MID:
- Thanks to VAC for borrowing He bottle.
- Problems with optical sync; otherwise all fine.

HED:
- Nothing major to report.

SCS:
- Issues with Optical sync: drop happening on the Desy side (which do not have OCD on the weekend). After loosing Sync it took long to recover synchronization. At total about 15hs of beamtime was lost.
- There is no good alarm system indicating the sync was lost. This can be addressed at EuXFEL side. Steffen H. adds that a ticket is ongoing now and a good way for displaying will be worked out.

SQS:
- Nothing to report.
  645   10 Sep 2025, 10:31 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 10.09.2025
General Announcement:
- M. Doering announces on the LIMP-25: 
1. XTD10 Scaffolding is installed for cabling work in October; 
2. PLC updates: remaining work in tunnels to be done next week (discussed with VAC and XPD) as well as at SQS; 
3. Update task list: M. Doering will send to the groups the Task list for that it is updated accordingly to the latest status (e.g. completed, cancelled, delayed...); 
4. Recurring tasks for the Winter Maintenance will be planned for the end of the year. A list will be sent to the groups and please inform XO if you have new activities to be done before 2026. 

CTRL:
- Karabo upgrade: start with MID next week to spot possible issues. MID topic will be accessible from the hutch only. 

DA:
- Nothing to report.

EEE:
- PLC updates: see above.

VAC:
- Everything progressing well in XTD6 also with PLCs. 

XPD:
- Nothing to report.

DET:
- Nothing to report; starting AGIPD at MID before Karabo is down in October.

ITDM: 
- Nothing to report.
- Fast-X gateway upgrade last week is done.

XRO:
- Busy with SA1 activities.

LAS:
- Not present.

UNSYS:
- Delays with water and cable from Desy groups; but all ongoing.

SPB:
- Not present.

FXE:
- Nothing to report.

MID:
- MID control room is very warm: needs to check temperatures in control room; Gerd W. says technical infrastructure needs to be modified.

HED:
- Nothing to report.

SCS:
- Issue with installation of beam stop and AIBS position.

SQS:
- Not present.
SXP:
•	Not present.
  348   10 Aug 2022, 09:56 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 10.08.2022
General Announcement:
- Machine has restarted after the cryo failure: SA3 is receiving photons and tuning in SA1 and SA2 tunings are still ongoing.
- The SA3 beam pointing position (by the crosshair) was fixed on Monday. 

CTRL:
- Request on background effects on XTD2/SA1 Imager is ready to be deployed. SPB/SFX agreed to install now as there is no beam. A. Parenti will get in touch with SPB/SFX.

DA:
- Calibration constant (low) performance issue on the GPFS cache is solved. If issues still appear please contact Philipp S.

EEE:
- Nothing to report.

VAC:
- GATT SA3 is set with Ar operation. VAC needs to make tests (30 mins) regarding the injection issue that appears eventually and it will get in touch with SQS for defining a suitable time.

XPD:
- Nothing to report.

DET:
- Nothing major to report.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Nothing to report.
- Lasermet was contacted and no news by now.

UNSYS:
- Issue with cell33/SA2 not moving yesterday night was fixed by now.

SPB:
- Reports a misunderstanding with BKR on the requested 6keV photon energy.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Nothing to report. SQS will contact Martin D. for the tests on the GATT.