| Technical integration and coordination | 
| 
| Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther | Not logged in |  |  | 
|
| 
| Message ID: 417
    Entry time: 10 May 2023, 09:47 |  | | Author: | Frederik Wolff-Fabris |  | Location: | General |  | Severity: | Information |  | Subject: | Notes XO Integration Meeting 10.05.2023 | 
 |  | 
| General Announcement:
-	 
CTRL:
- Nothing to report.
DA:
- Time to commission the LPD detector was made and was useful.
EEE:
- Nothing to report.
VAC:
- Nothing to report.
XPD:
- No issues with diagnostics.
DET:
- Feedback on the MID AGIPD data: problem was around the PC layer from MID which needed a reboot. It seems to run well after that.
ITDM: 
- Problems with crashing DAQ in MID because of slowness of GPFS: memory had to be clean but after that it run fine.
XRO:
- Monday an access in XTD10 to repair the top slit of the SQS exit slit was done and successful: the bottom blade was also checked and is fine. The top one was exchanged; 
1. Yesterday morning exit slit was recommissioned and recalibrated. 
2. A software issue not correlated to the mechanical problem appeared (when setting the motor to a position it goes closer but not exactly to the desired position). 
3. A ticket was written but SQS can use it.
LAS:
- PP-laser in SA2 has issues with stage and an intervention is ongoing;
- At SA1 PP-laser a defect diode caused the leak and it being dried up currently. Laser will not be working at the end of this week. But there is a chance it will work at the start of next week.
UNSYS:
- All fine with Undulators.
SPB:
- Nothing to report.
FXE:
- Problem with LPD pipeline calibration last night is being addressed; DOC will be contacted today.
- Regarding He supply: situation did not change as related to last year and for next two weeks He supply is guaranteed.
MID:
- Mechanical issues with LDM being addressed.
- PP-Laser will not be used this week.
HED:
- Busy with beamtime.
SCS:
- Not present.
SQS:
- Nothing to report.
SXP:
- Busy with KB installation. |