Subject: Notes XO Integration Meeting 11.05.2022 
General Announcement:
- The accelerator is currently down. An electrical power issue lead to a cryo failure at 08:45AM and both cold and warm compressors went down. 
The expected cryo OK shall come in the afternoon and by 15:30 we will have further information.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Incident in MID branch/SA2 last evening with the V0 valve being closed: VAC received automatic message with spike around the CRL2 was detected, then closing the V0 valve. Solved in 5 mins. 
Please report to VAC group (08:42PM) when such incidents happen. Reason behind this even is still unclear.

XPD:
- Nothing to add.

DET:
- Nothing to report.

ITDM: 
- A Change in configuration of run controllers for the DAQ may profit today as machine is down. ITDM will discuss with groups and inform accordingly. 
To be done in tunnels, laser, 5 instruments apart of SPB/SFX. One has to reload projects afterwards.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Apple-X: massive losses of encoders were found and the FD program is cancelled. A ZZ will be done today.
- Heidenheim linear encoders need to be replaced, quote is placed but not sure if it happens in summer maintenance.

SPB:
- Reconfiguring the instrument for the weekend.

FXE:
- Problem with XGMd: under work by Theo and Finni.

MID:
- It has now the PicoAmpmeter; in touch with EEE and CTRL.

HED:
- Monday long pulse train test: seems to be fine; also beam pointing stability went fine for HED.
- XRO was working with mirrors: Mikako M. says that Maurizio M. will address with HED the tests of vertical positions.

SCS:
- Nothing to report.

SQS:
- Nothing to report.