Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 348     Entry time: 10 Aug 2022, 09:56
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 10.08.2022 
General Announcement:
- Machine has restarted after the cryo failure: SA3 is receiving photons and tuning in SA1 and SA2 tunings are still ongoing.
- The SA3 beam pointing position (by the crosshair) was fixed on Monday. 

CTRL:
- Request on background effects on XTD2/SA1 Imager is ready to be deployed. SPB/SFX agreed to install now as there is no beam. A. Parenti will get in touch with SPB/SFX.

DA:
- Calibration constant (low) performance issue on the GPFS cache is solved. If issues still appear please contact Philipp S.

EEE:
- Nothing to report.

VAC:
- GATT SA3 is set with Ar operation. VAC needs to make tests (30 mins) regarding the injection issue that appears eventually and it will get in touch with SQS for defining a suitable time.

XPD:
- Nothing to report.

DET:
- Nothing major to report.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Nothing to report.
- Lasermet was contacted and no news by now.

UNSYS:
- Issue with cell33/SA2 not moving yesterday night was fixed by now.

SPB:
- Reports a misunderstanding with BKR on the requested 6keV photon energy.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Nothing to report. SQS will contact Martin D. for the tests on the GATT.